About this file

This document contains a bid abstract for a federal contract solicitation to perform stone bank paving work along the Mississippi River between Miles 616 and 326. The United States Army Corps of Engineers, Vicksburg District is seeking bids for mobilization, grading, excavation, slope dressing, stone bank paving, upstream and downstream towing, and environmental protection work. Bids were due on July 8, 2021 with Riverside Construction Co., Inc. identified as the apparent low bidder at $3,346,855. Four other contractors submitted bids ranging from $4,493,945 to $5,269,000. The independent government estimate was $3,895,860. The awarded contract will be for an indefinite delivery/indefinite quantity with a guaranteed minimum of $1 million and a not-to-exceed maximum of $7 million. Task orders may be issued between date of award and March 31, 2023.

View the file

Other files

File Type Posted
AM0001_Solicitation_W912EE21B0005.pdf PDF
385-1-1.pdf PDF
Drawings_W912EE21B0005.pdf PDF
Solicitation_W912EE21B0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ABSTRACT

FOR SOLICITATION NO. W912EE21B0005

BID OPENING: 08-JULY-2021 AT 2:00 PM CENTRAL

MS RIVER, MILE 616-326 AHP

STONE BANK PAVING, FY-21

FC/MR&T, CHANNEL IMPROVEMENT PROGRAM

INDEFINITE DELIVERY / INDEFINITE QUANTITY (IDIQ)

UNSUCCESSFUL BIDDER #1

CONTRACTOR NAME:

ADDRESS:

CAGE CODE:

DUNS NUMBER:

KESSER INTERNATIONAL, INC.

P.O. BOX 723, LITTLE ROCK, ARKANSAS 72203

1CJ52

858726144

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB FOR $325,000.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 616-494)

33,300 TON $ 57.00 $1,898,100.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 494-326)

33,000 TON $ 57.00 $1,898,100.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 616-494)

5,000 TON $ 55.00 $275,000.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 494-326)

5,000 TON $ 55.00 $275,000.00

0006 UPSTREAM TOWING 100 MILE $475.00 $47,500.00

0007 DOWNSTREAM TOWING 100 MILE $ 300.00 $30,000.00

TOTAL $$4,748,700.00

UNSUCCESSFUL BIDDER #2

CONTRACTOR NAME:

ADDRESS:

CAGE CODE:

DUNS NUMBER:

BIS SERVICES, L.L.C.

1485 29TH STREET, KENNER, LOUISIANA 70062-5356

1MCZ8

081153376

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB FOR $248,656.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 616-494)

33,300 TON $ 52.12 $1,719,600.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 494-326)

33,000 TON $ 55.32 $1,825,560.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 616-494)

5,000 TON $ 66.00 $330,000.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 494-326)

5,000 TON $ 69.20 $346,000.00

0006 UPSTREAM TOWING 100 MILE $143.07 $14,307.00

0007 DOWNSTREAM TOWING 100 MILE $ 98.22 $9,822.00

TOTAL $$4,493,945.00

UNSUCCESSFUL BIDDER #3

ADDRESS:

CAGE CODE:

DUNS NUMBER:

SYTE CORPORATION

1642 N BOSWORTH AVE, SUITE 1C, CHICAGO, ILLINOIS 60642

339E0 170943083

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB FOR $437,666.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 616-494)

33,300 TON $ 53.78 $1,790,874.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 494-326)

33,000 TON $ 55.00 $1,831,500.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 616-494)

5,000 TON $ 56.23 $281,150.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 494-326)

5,000 TON $ 57.75 $288,750.00

0006 UPSTREAM TOWING 100 MILE $305.58 $30,558.00

0007 DOWNSTREAM TOWING 100 MILE $244.46 $24,446.00

TOTAL $$4,684,944.00

UNSUCCESSFUL BIDDER # 5

ADDRESS:

CAGE CODE:

DUNS NUMBER:

ANDERSON CONTRACTING L.L.C.

222 ANDERSON LANE, YAZOO CITY, MISSISSIPPI 39194

4YTX0

807842773

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB FOR $190,000.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 616-494)

33,300 TON $ 63.00 $2,097,900.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 494-326)

33,000 TON $ 67.00 $2,231,100.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 616-494)

5,000 TON $ 68.00 $340,000.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 494-326)

5,000 TON $ 72.00 $360,000.00

0006 UPSTREAM TOWING 100 MILE $300.00 $30,000.00

0007 DOWNSTREAM TOWING 100 MILE $200.00 $20,000.00

TOTAL $$5,269,000.00

LOWEST BIDDER #4

ADDRESS:

CAGE CODE:

DUNS NUMBER:

RIVERSIDE CONSTRUCTION CO., INC.

4111 WASHINGTON STREET, VICKSBURG, MISSISSIPPI 39180

06SL4

807781216

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB FOR $125000.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 616-494)

33,300 TON $ 40.31 $1,342,323.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 494-326)

33,000 TON $ 42.54 $1,416,582.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 616-494)

5,000 TON $ 42.78 $213,900.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 494-326)

5,000 TON $ 45.01 $225,050.00

0006 UPSTREAM TOWING 100 MILE $160.00 $16,000.00

0007 DOWNSTREAM TOWING 100 MILE $ 80.00 $8,000.00

TOTAL $$3,346,855.00

INDEPENDENT GOVERNMENT ESTIMATE

U.S. ARMY CORPS OF ENGINEERS, VICKSBURG DISTRICT

4155 CLAY STREET, VICKSBURG, MISSISSIPPI 39183-3435

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT

PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB FOR $321,500.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 616-494)

33,300 TON $ 45.60 $1,518,480.00

STONE BANK PAVING, STONE 125 LB

MAX, UPPER BANK (MILE 494-326)

33,000 TON $ 46.80 $1,558,440.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 616-494)

5,000 TON $ 45.60 $228,000.00

STONE BANK PAVING, “C” STONE MAX,

UPPER BANK (MILE 494-326)

5,000 TON $ 46.80 $234,000.00

0006 UPSTREAM TOWING 100 MILE $213.50 $21,350.00

0007 DOWNSTREAM TOWING 100 MILE $140.90 $14,090.00

TOTAL $$3,895,860.00

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT, ALL OFFERS

RECEIVED IN RESPONSE TO THIS SOLICITATION.

CONTRACT SPECIALIST CONTRACTING OFFICER