AM0001_Solicitation_W912EE20B0004.pdf
PDF 5 MB Posted
- Solicitation number
- W912EE20B0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_Official Abstract_W912EE20B0004.pdf | ||
| AM0003_Solicitation_W912EE20B0004.pdf | ||
| AM0002_Solicitation_W912EE20B0004.pdf | ||
| A22_SOLICITATION_W912EE20B0004.pdf | ||
| A02_DRAWINGS.pdf | ||
| 385-1-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912EE-20-B-0004, for J. Bennett Johnston Waterw ay, Red River, Indefinite Delivery/Indefinite Quantity Contract, Stone Repairs to Revetment and Dikes, FY19, Mile 235 to 0, is amended as follow s:
SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EE20B0004
X 9B. DATED (SEE ITEM 11)
03-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Feb-2020
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE20B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
BID OPENING DATE: The bid opening date has changed from 03 March 2020 at 2:00 PM CST to
17 March 2020 at 2:00 PM CST. See revised SF1442.
SPECIFICATIONS: Bid Schedule and the Specifications are revised and replaced in their entirety.
Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page.
SECTION 0700 – CONTRACT CLAUSES: FAR Clauses 52.216-19 – Order Limitations (OCT 1995), and 52.216-22 – Indefinite Quantity (OCT 1995) have been incorporated by full text.
Revised by Amendment 0001
W912EE20B0004
W807PM00223316
J. BENNETT JOHNSTON WATERWAY, RED RIVER INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT
STONE REPAIRS TO REVETMENTS AND DIKES MILE 235 TO 0.
Description of Work: This is an unrestricted procurement. The work consists of furnishing all plant, labor, materials and equipment, and performing stone repairs to revetments and dikes at various locations on the Red River (J. Bennett Johnston Waterway) between River Miles 235 and 0. Principal features of work include grading; earth or sand fill, and subgrade restoration; stone paving, stone fill and subaqueous stone placement; removing pavement; breaking out paving; rearranging disarranged concrete paving; degrading of stone along revetments; repair to dikes and revetments, including placement of stone fill in specified areas of minor damage and stone paving protection; and environmental protection. In addition, some stone dike and stone revetment locations will require extensive stone repairs. This work will be performed in the Red River and varying water depths and currents may be encountered. Currents usually encountered at the sites of the work during low water period may vary from about one mile per hour to six miles per hour.
The estimated value of the proposed work is between $1,000,000 and $5,000,000.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
31 January 2020
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT
CALLS)(601)631-5705
SEE SPECIAL NOTICES TO BIDDERS
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
OLLIE HARDAWAY III
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by
GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within 10 calendar days and complete it within (See Section 00 80
00.00 09, para. 1.1)calendar days after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 00 80 00.00 09
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 by 1200 (hour) local time 03 MAR 2020 AT 02:00 P.M.
CST IIf this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE
PAGE
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(601)631-7261 FAX: TEL: TEL: FAX:
W912EE20B0004
X
1400 17 MAR-2020 AT 02:00 P.M.
Revised by Amendment 0001
W912EE20B0004
b4oc9flj Cross-Out b4oc9flj Cross-Out
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 964145
US ARMY CORPS OF ENGRS FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
26. ADMINISTERED BY
VICKSBURG CONTRACTING OFFICE
4155 CLAY STREET
VICKSBURG, MS 39183-3435
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
27-FEB-2020
W912EE
Revised by Amendment 0001
W912EE20B0004
REVISED BID SCHEDULE
J. BENNETT JOHNSTON WATERWAY, RED RIVER INDEFINITE DELIVERY/INDEFINITE
QUANTITY (IDIQ) CONTRACT STONE REPAIRS TO REVETMENTS AND DIKES,
MILE 235 TO 0
ITEM DESCRIPTION
EST
QTY U/M UNIT PRICE AMOUNT
MOBILIZATION AND
DEMOBILIZATION 1 JOB $ $
STONE REPAIRS, STONE
BANK PAVING GRADED
STONE "C", BELOW POOL
NO.2, RIVER MILES
(74.4-0) 1,000 TN $ $
STONE REPAIRS TO DIKES
& REVETMENTS,GRADED
STONE "B", BELOW POOL
NO.2, RIVER MILES
(74.4-0)
0003A FIRST 2,500 TONS 2,500 TN $ $
0003B OVER 2,500 TONS 2,500 TN $ $
STONE REPAIRS, STONE
BANK PAVING GRADED
STONE "C", POOLS NO.2 &
No.3, RIVER MILES
(168.5-74.4) 1,000 TN $ $
STONE REPAIRS TO DIKES
& REVETMENTS, GRADED
STONE "B", POOLS NO.2 &
No.3, RIVER MILES (168.5-74.4)
0005A FIRST 20,000 TONS 20,000 TN $ $
0005B OVER 20,000 TONS 20,000 TN $ $
STONE REPAIRS, STONE
BANK PAVING GRADED
STONE "C", POOLS NO.4 &
No.4, RIVER MILES
(235.0-168.5) 1,000 TN $ $
Revised by Amendment 0001
W912EE20B0004
ITEM DESCRIPTION
EST
QTY U/M UNIT PRICE AMOUNT
STONE REPAIRS TO DIKES
& REVETMENTS, GRADED
STONE "B", POOLS NO.4 &
No.4, RIVER MILES (235.0-
168.5)
0007A FIRST 2,500 TONS 2,500 TN $ $
0007B OVER 2,500 TONS 2,500 TN $ $
0008 UPSTREAM TOWING 100 MI $ $
0009 DOWNSTREAM TOWING 100 MI $ $
TOTAL
***This Single Award Task Order Contract (SATOC) has a Not To Exceed (NTE) capacity of $4,500,000.00 and a Minimum Guarantee of $2,000,000.00. Contract duration will be 365 days from the date of award. Please refer to Specifications Section 00 80 00.00 09 for task order duration. The rates proposed by the Contractor on the bid schedule shall be used throughout the duration of the contract regardless of the dollar amount spent up to the "not to exceed" amount of $4,500,000.00. These rates shall also remain effective as applicable for the life of all task orders issued.***
Revised by Amendment 0001
W912EE20B0004
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 05-Mar-2020 02:00 PM to 17-Mar-2020 02:00 PM.
The following have been deleted:
BID SCHEDULE
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $3,000,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor -
(1) Any order for a single item in excess of $8,000,000.00;
(2) Any order for a combination of items in excess of $8,000,000.00; or
(3) A series of orders from the same ordering office within NO MINIMUM days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within NO MINIMUM days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
Revised by Amendment 0001
W912EE20B0004
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after TASK ORDER COMPLETION AND FINAL ACCEPTANCE OF WORK BY THE
GOVERNMENT.
(End of clause)
(End of Summary of Changes)
Revised by Amendment 0001
See revised Specifications below.
W912EE20B0004
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.1.1 Commencement
1.1.2 Prosecution
1.1.3 Completion
1.2 EXCLUSION PERIODS FOR COMPUTING COMPLETION SCHEDULE
1.3 LIQUIDATED DAMAGES-CONSTRUCTION
1.4 CONTRACT DRAWINGS AND SPECIFICATIONS
1.5 CORRESPONDENCE AND ELECTRONIC COMMUNICATION
1.6 (S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
1.7 PERFORMANCE OF WORK BY THE CONTRACTOR
1.8 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
1.9 PHYSICAL DATA
1.10 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.12 OBSTRUCTION OF NAVIGABLE WATERWAYS
1.13 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
1.14 CONTRACTOR FURNISHED COMMUNICATION
1.15 I-WATCH
1.16 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
1.17 SECURITY CLEARANCE/ACCESS PRIVILEGES
1.18 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
DOCUMENT 00 80 00.00 09 Page 1 Revised By Amendment 0001
W912EE20B0004
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.1.1 Commencement
The Contractor shall be required to commence work under each Task Order within 10 calendar days after the date of receipt of Notice to Proceed and to diligently prosecute said work.
The Government anticipates issuing Requests for Proposals for the following task orders on the contract. The estimated tonnages are based on the best information available at the time of this solicitation and may vary due to site conditions.
Proposed Task Orders:
T.O. 1 - Stone Repair (RM 235 - 0) - Estimated tonnage: 50,000 tons of "B" Stone.
Notice to Proceed with Task Order 1 will be issued within 30 days of inspection trip depending on river stages.
It is the intent of the Government to issue the Notice to Proceed for the task order shown. Only one mobilization and demobilization cost will be paid for the original task order. No additional mobilization and demobilization will be paid, unless additional task orders are not issued consecutively to another ongoing task order. If, for his convenience, the Contractor requests delays between issuance of task orders within the limitations described above, the Government will not be obligated to pay additional mobilization and demobilization costs. As indicated by the Bidding Schedule, sites requiring larger stone quantities are located through Pool 3 and Pool 4.
1.1.2 Prosecution
(1) The "revetment stone repair" rate of progress that will be required of the Contractor on this work will be based on the Contractor maintaining an average rate of stone placement of 1000 tons per calendar day for revetments and dike repairs.
Sudden rises in river stages are normal during low-water construction season and may at times limit repair work to the upper part of the bank paving or dikes. In such case where part of the work required on certain revetments or dikes is prevented due to high river stages, the Contracting Officer may direct the Contractor to return to these revetments or dikes to complete the work after moving his operations to other localities. In the event river stages at the time of the work are lower than at the time the detailed instructions as to work to be done are furnished the Contractor, or additional work is determined to be necessary during the progress of the work, the Contracting Officer
DOCUMENT 00 80 00.00 09 Page 2 Revised By Amendment 0001
W912EE20B0004
may direct such additional work as may be necessary. In any event, except as stated above, the Contractor will be required to diligently and continuously (without interruption) prosecute the work under this contract, maintain the specified rate of progress, and complete the work during the time as determined in paragraph COMPLETION.
(2) If the Contractor falls behind the progress called for, the Contractor shall take such steps as may be necessary to improve his progress and the Contracting Officer may require him to increase the number of shifts and/or overtime operations, and/or the amount of construction plant without additional cost to the Government.
(3) Failure of the Contractor to comply with the requirements of the Contracting Officer under these provisions of the specifications shall be grounds for determination by the Contracting Officer that the Contractor is not prosecuting the work with such diligence as will ensure completion within the time specified. Upon such determination, the Contracting Officer may terminate the Contractor's right to proceed with the work or any separable part thereof, in accordance with the Contract Clause DEFAULT (FIXED PRICE CONSTRUCTION).
1.1.3 Completion
The Contractor shall complete the entire work for the Task Order within the number of calendar days determined by dividing the total tons of repair stone by 1000, beginning 10 calendar days after the receipt of Notice to Proceed, plus 5 days for completion, including finish dressing.
The time for completion will be extended to the extent that the work is suspended due to river stages, lock outages or dredging operations. The number of days computed above shall be used when computing liquidated damages as specified in paragraph LIQUIDATED DAMAGES-CONSTRUCTION. If, through no fault or negligence of the Contractor, the work is not completed at such times as river stages at the worksite, or sites, reach a height which makes it inadvisable or impracticable to proceed with the work under the Task Order, and is of such indicated duration as to constitute the end of the working season, the Contracting Officer will give the Contractor 10 calendar days written notice of the termination of the Task Order pursuant to the terms of this paragraph, in which event the Contractor will be paid for work actually performed at the applicable contract unit price or prices.
1.2 EXCLUSION PERIODS FOR COMPUTING COMPLETION SCHEDULE
(This clause supplements paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, above.)
No work shall be performed during the period of 23 December 2020 through 28 December 2020, inclusive, and such period shall not have been considered in computing the time allowed for completion of a Task Order.
1.3 LIQUIDATED DAMAGES-CONSTRUCTION
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $914.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, damages will continue to accrue until the work is completed. These
DOCUMENT 00 80 00.00 09 Page 3 Revised By Amendment 0001
W912EE20B0004
liquidated damages are in addition to excess costs of repurchase under the Termination clause. (FAR 52.211-12)
1.4 CONTRACT DRAWINGS AND SPECIFICATIONS
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall --
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general --
(1) Large-scale drawings shall govern small scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
J. BENNETT JOHNSTON WATERWAY, RED RIVER
INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT
STONE REPAIRS TO REVETMENTS AND DIKES, FY19
MILE 235 TO 0.
DRAWING TITLE DRAWING NO.
COVER SHEET & INDEX G-001
LOCALITY MAP BELOW
LOCK AND DAM NO. 1 G-002
LOCALITY MAP POOL NO. 1 G-003
LOCALITY MAP POOL NO. 2 G-004
DOCUMENT 00 80 00.00 09 Page 4 Revised By Amendment 0001
W912EE20B0004
LOCALITY MAP POOL NO. 3 G-005
LOCALITY MAP POOL NO. 4 G-006
LOCALITY MAP POOL NO. 5 G-007
TYPICAL DETAILS C-501
(DFARS 252.236-7001)
1.5 CORRESPONDENCE AND ELECTRONIC COMMUNICATION
For ease and speed of communications, both the Government and Contractor shall exchange correspondence and all other documents duplicate in both hard paper copy and electronic format. Inclusion of an electronic copy is in addition to any other parts of the contract that may specify a minimum number of hard copies to be submitted, such as for shop drawing transmittals. Electronic submission can be accomplished by one of the following methods: email, file upload to the following website https://safe.armdec.army.mil/SAFE, or through the Quality Control System (QCS) software interface with the Resident Management System (RMS). Format for electronic submissions will be in portable document format (.pdf).
Documents include all general correspondence, administrative plans, all material submittals including shop drawings, progress schedules, submittal registers, requests for information (RFIs), Quality Control (QC) test results, pay requests, etc. Paper documents will govern, in the event of discrepancy with the electronic version. Generally, paper documents will also govern where effective receipt dates are required, such as Contractor claims submitted under the Disputes clause of the contract and progress payment requests. However in the case of administrative plans, shop drawings and other submittals transmitted for government review, both the electronic and hard copies are required to begin the review process, so the effective date of receipt will be the date when both the electronic and hard copies are received by the government.
1.6 (S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
The Contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the Contractor elects to use an electronic Davis-Bacon payroll processing system, then the Contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the Contractor to comply with Davis-Bacon and related Act regulations. When the Contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the Contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the Contractor chooses to
DOCUMENT 00 80 00.00 09 Page 5 Revised By Amendment 0001
W912EE20B0004
use an electronic Davis-Bacon payroll system, then the Contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the Contractor.
The Contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the Contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce Contractor-certified electronic versions of weekly payroll data;
ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
All Contractor-incurred costs related to the Contractor's provision and use of an electronic payroll processing service shall be included in the Contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.
FAR 52.222-8 and FAR 52.222-13
1.7 PERFORMANCE OF WORK BY THE CONTRACTOR
The Contractor shall perform on the site and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government. (FAR 52.236-1)
1.8 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
Within 10 days after award, the successful Bidder/Contractor must furnish the Contracting Officer a description of the items of work which will be performed with its own forces and the estimated cost of those items. (See paragraph PERFORMANCE OF WORK BY THE CONTRACTOR.)
1.9 PHYSICAL DATA
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
DOCUMENT 00 80 00.00 09 Page 6 Revised By Amendment 0001
W912EE20B0004
a. The indications of physical conditions on the drawings and in the specifications are the result of site investigations.
b. Local Conditions. Pertinent data of different local gages on the Red River are indicated in the following tabulations.
LOCATION RIVER MILE POOL ELEVATION GAGE ZERO FT
NGVD
BANKFULL
Lock and Dam #5
Upstream 200.0 145.0 0.0 146.5
Downstream 200.0 120.0 0.0 146.5
Lock and Dam #4
Upstream 168.5 120.0 0.0 120.0
Downstream 168.5 95.0 0.0 120.0
Lock and Dam #3
Upstream 116.5 95.0 0.0 100.0
Downstream 116.5 64.0 0.0 100.0
Lock and Dam #2
Upstream 74.4 64.0 0.0 68.0
Downstream 74.4 40.0 0.0 68.0
Lock and Dam #1
Upstream 43.9 40.0 0.0 53.0
Downstream 43.9 - 0.0 53.0
Old River Control
Structure Upstream 1.0 - 0.0 48.0
Extreme high water usually occurs during April and May after which the stage usually falls to approximately the minimum pool elevation and remains low for several months. The normal working season for the work to be done under this contract is seldom more than five months, and usually extends from about 15 July to about 15 December. Annual hydrographs of different Engineer gages within limits of the Vicksburg District are available for inspection at the office of the Contracting Officer. Currents usually encountered at the sites of the work during low water period may vary from about one mile per hour to about six miles per hour. Navigation through the locks on the Red River may be impeded at times by high river stages.
c. Weather Conditions. Information with respect to temperatures and precipitation may be obtained from the National Weather Service.
d. Conditions of Channel. Hydrographic surveys in the vicinity of the work are available for inspection at the office of the Contracting Officer.
e. Channel Traffic. The normal traffic on the river consisting of self-propelled craft with or without tows will pass the worksite, as well as possible channel maintenance dredging activities in the vicinity of the repair sites. See also Contract Clause 52.236-8, DOCUMENT 00 80 00.00 09 Page 7 Revised By Amendment 0001
W912EE20B0004
"Other Contracts (April 1984)."
f. Obstruction of Channel. The Government will not undertake to keep the channel free from vessels or any other obstructions except to the extent of such regulation, if any, as may be prescribed by the Secretary of the Army in accordance with provisions of Section 7 of the River and Harbor Act, approved 8 August 1917. The Contractor will be required to conduct the work in such a manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such extent as may be necessary to afford a practicable passage. Upon completion of the work at each locality the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under this contract. See also paragraph OBSTRUCTION OF
NAVIGABLE WATERWAYS (DEC 1991).
g. Mooring Restrictions. Mooring on the Red River may be required in some locations. Contact the U.S. Coast Guard regarding any restrictions prior to mooring.
h. Floods. High water stages or events are not to be considered a "flood," and damages resulting therefrom are not compensable under Section 01 00 00.00 09, paragraph DAMAGE TO WORK unless river or stream stages within the Government-furnished rights-of-way exceed channel capacity and overtop the natural or artificial banks.
(FAR 52.236-4)
1.10 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
(a) The Government will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item.
(1) Sixty percent of the lump sum price upon completion of the Contractor's mobilization at the work site.
(2) The remaining forty percent upon completion of demobilization.
(b) The Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid if the Contracting Officer believes that the percentages in subparagraphs (a)(1) and (2) of this clause do not bear a reasonable relation to the cost of the work in this contract.
(1) Failure to justify such price to the satisfaction of the Contracting Officer will result in payment, as determined by the Contracting Officer, of--
(i) Actual mobilization costs at completion of mobilization;
(ii) Actual demobilization costs at completion of demobilization;
and
(iii) The remainder of this item in the final payment under this contract.
(2) The Contracting Officer's determination of the actual costs
DOCUMENT 00 80 00.00 09 Page 8 Revised By Amendment 0001
W912EE20B0004
in paragraph (b)(1) of this clause is not subject to appeal.
(DFARS 252.236-7004)
1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
(UAI 31.105-101)
NOTE: EP-1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule" is available on the Internet at http://www.usace.army.mil/ inet/usace-docs/eng-pamphlets/ep.htm, or may be purchased from the Government Printing Office on CD-ROM by calling (202) 512-1800.
1.12 OBSTRUCTION OF NAVIGABLE WATERWAYS
(a) The Contractor shall-
(1) Promptly recover and remove any material, plant, machinery, or appliance which the Contractor loses, dumps, throws overboard, sinks, or misplaces, and which, in the opinion of the Contracting Officer, may be dangerous to or obstruct navigation;
DOCUMENT 00 80 00.00 09 Page 9 Revised By Amendment 0001
W912EE20B0004
(2) Give immediate notice, with description and locations of any such obstructions, to the Contracting Officer; and
(3) When required by the Contracting Officer, mark or buoy such obstructions until the same are removed.
(b) The Contracting Officer may--
(1) Remove the obstructions by contract or otherwise should the Contractor refuse, neglect, or delay compliance with paragraph (a) of this clause; and
(2) Deduct the cost of removal from any monies due or to become due to the Contractor; or
(3) Recover the cost of removal under the Contractor's bond.
(c) The Contractor's liability for the removal of a vessel wrecked or sunk without fault or negligence is limited to that provided in Sections 15, 19, and 20 of the River and Harbor Act of March 3, 1899 (33 U.S.C. 410 et. seq). (DFARS 252.236-7002)
1.13 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
The Variation in Estimated Quantities clause is applicable only to Item Nos. 0003, 0005, and 0007.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for Item Nos. 0003, 0005, and 0007 is less than 85 percent of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(c) If the actual quantity of work performed under Item Nos. 0003, 0005, and 0007 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item Nos. 0003, 0005, and 0007 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity. (UAI 52.211-5001)
1.14 CONTRACTOR FURNISHED COMMUNICATION
A two-way radio with the Contractor's working frequencies shall be provided for continuous communications between the inspector and the contractor superintendent. The Contractor shall also provide cellular phone service for use by Government inspectors in addition to the radio equipment specified above.
DOCUMENT 00 80 00.00 09 Page 10 Revised By Amendment 0001
W912EE20B0004
1.15 I-WATCH
The Contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.16 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
1.17 SECURITY CLEARANCE/ACCESS PRIVILEGES
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.18 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
DOCUMENT 00 80 00.00 09 Page 11 Revised By Amendment 0001
W912EE20B0004
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PURPOSE AND SCOPE
1.4 PERIOD OF SERVICE
1.5 ORDERING PROCEDURES FOR TASK ORDERS
1.6 PROPOSAL SUBMISSION REQUIREMENTS
1.7 AWARD DECISION
1.8 LIQUIDATED DAMAGES
1.9 TIME EXTENSIONS
1.10 ESTIMATED QUANTITIES
1.11 PARTNERING
1.12 ORDER OF WORK
1.13 RIGHTS-OF-WAY
1.14 PRECONSTRUCTION CONFERENCE
1.15 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
1.16 PROGRESS CHART
1.17 DESIGNATED BILLING OFFICE
1.18 PAYMENT INVOICES
1.19 TEMPORARY EXCAVATION AND EMBANKMENTS
1.20 TEMPORARY PROJECT FENCING
1.21 AS-BUILT DRAWINGS
1.22 PROJECT SIGN
1.23 MINIMUM REQUIRED INSURANCE
1.24 WORK IN QUARANTINED AREA
1.25 CERTIFICATES OF COMPLIANCE
1.26 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS
OF ENGINEERS SAFETY AND HEALTH MANUAL (EM 385-1-1)
1.27 SAFETY SIGN
1.28 ACCIDENT PREVENTION PLAN
1.29 DAILY INSPECTIONS
1.30 ACCIDENT INVESTIGATIONS AND REPORTING
1.31 ACCOMMODATIONS FOR GOVERNMENT REPRESENTATIVES
1.32 JANITOR SERVICES
1.33 MACHINERY AND MECHANIZED EQUIPMENT
1.34 VEHICLE WEIGHT LIMITATIONS
1.35 UTILITIES AND IMPROVEMENTS
1.36 DAMAGE TO WORK
1.37 CONTROL OF ACCESS TO CONSTRUCTION AREAS
1.38 HARBOR MAINTENANCE FEE
1.39 MEANS OF ESCAPE FOR PERSONNEL QUARTERED OR WORKING ON FLOATING
PLANT
1.40 EMERGENCY ALARMS AND SIGNALS
1.41 SIGNAL LIGHTS
1.42 PLAN OF OPERATION
SECTION 01 00 00.00 09 Page 1 Revised By Amendment 0001
W912EE20B0004
1.43 MILEAGE
1.44 INSPECTION
1.45 ACCEPTANCE OF WORK UNDER THIS CONTRACT
1.46 PROTECTION OF EXISTING STABILIZATION WORK
1.47 INITIAL REPAIR SURVEYS - DIKE REPAIR SITES
1.48 CONTRACTOR'S CERTIFICATE
1.49 LAYOUT OF WORK
1.50 SUBCONTRACTS (SUPPLEMENT TO THE CONTRACT CLAUSE, "SUBCONTRACTS
(FIXED PRICE CONTRACT")
1.51 CONTAMINATION OF WATER
1.52 MOORING LINES
1.53 SUNDAYS, HOLIDAYS, AND NIGHTS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 00 00.00 09 Page 2 Revised By Amendment 0001
W912EE20B0004
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
19 CFR 24.24 Harbor Maintenance Fee
33 CFR 156 Oil and Hazardous Material Transfer Operations
1.2 SUBMITTALS
Government approval is required for all submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
AS-BUILT DRAWINGS; G, DR
Electronic survey file requirements are required for initial and final surveys of work as in .xyz, .dtm, and alignment file formats.
SD-11 Closeout Submittals
INITIAL REPAIR SURVEYS - DIKE REPAIR SITES; G, DR
Electronic survey file requirements are required for initial and final surveys of work as in .xyz, .dtm, and alignment file formats.
1.3 PURPOSE AND SCOPE
The purpose and scope of this indefinite-delivery, indefinite-quantity (IDIQ) contract consists of furnishing all plant, labor, materials and equipment, and performing all work for performing stone repairs to revetments and dikes at various locations on the Red River between Miles 235 and 0.
SECTION 01 00 00.00 09 Page 3 Revised By Amendment 0001
W912EE20B0004
1.4 PERIOD OF SERVICE
This contract will be in effect from the date of contract award (date signed by the Contracting Officer) and shall remain in effect for a period of 365 days or until exhaustion of the "not to exceed" capacity of $4,500,000, whichever comes first. Modifications to individual Task Orders may be issued during the performance period of the Task Order which may extend beyond the expiration date of the contract. The expiration or termination of the ordering period shall not affect any Task Order issued during the effective period of this contract.
The minimum guaranteed amount for the contract period is $2,000,000. Only the Contracting Officer has the authority to modify the terms and conditions of this contract.
1.5 ORDERING PROCEDURES FOR TASK ORDERS
When the Government requires work under this contract, a request for proposal (RFP) will be issued. The request will include information concerning the statement of work, specifications, drawings (if applicable), attachments, information pertaining to a site visit, and any other requirements for submission (e.g., proposal requirements, bid schedule, etc). The Government shall provide the work requirements in the statement of work issued with each individual Task Order. All work, at a minimum, shall meet all codes and standards associated with the required work.
Notification to Contractor: As the need exists for performance under the terms of this contract, the Contracting Officer or his authorized representative will notify the Contractor of an existing requirement in writing.
1.6 PROPOSAL SUBMISSION REQUIREMENTS
Preparation of Proposal. The Contractor shall prepare his proposal for accomplishment of the task. The proposal shall be submitted to the Contracting Officer within 7 calendar days after the date of receipt of the RFP unless a different time period is specified by the individual RFP.
Review of Proposal. Upon receipt of the Contractor's proposal, the Government will review the proposal for completeness,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .