This document contains an amendment to a solicitation and a description of a federal contract opportunity. The solicitation, number W912EE19R0002, is for indefinite delivery indefinite quantity multiple award task order contracts for the lease of cutterhead hydraulic pipeline dredges no less than 24 inches in diameter. The dredges must be fully operated with attendant plant and personnel and have a draft no greater than 9 feet. The scope of work involves construction and maintenance dredging within the Vicksburg District of the Corps of Engineers and other districts. The amendment establishes a new proposal due date of 11 January 2019 at 2:00 pm and replaces and adds attachments regarding past performance questionnaires and contractor experience. The opportunity is for the Vicksburg District to award up to four firm fixed price IDIQ MATOC contracts with a total value not to exceed $45 million for a period of three years.

Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912EE19R0002 for FY 19 Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Aw ard Task Order Contracts

(Matoc) For The Lease of Multiple Cutterhead, Hydraulic Pipeline Dredges (Not Less Than 24-Inch Diameter), Fully Operated w ith Attendant

Plant And Personnel, With A Draft Not to Exceed 9 Feet, for Construction And Maintenance Dredging Within the vicksburg District, Other

Districts Within the Mississippi Valley Division, or Districts Adjacent to the Vicksburg District. Please see contionation pages for changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Dec-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE19R0002

X 9B. DATED (SEE ITEM 11)

07-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Dec-2018

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE19R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

A new Proposal due date and time of Friday, 11 January 2019 at 02:00 p.m. is hereby established.

Attachment 1 of Section 00130 was revised and replaced.

Attachment 2 of Section 00130 was hereby added by this Amendment.

Pages revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page.

Pages added by this amendment have the notation “Added by Amendment 0001” at the bottom of the page.

OFFEROR ATTACHMENT #2

PRIME CONTRACTOR EXPERIENCE FORM

Technical:

Sub-Factor _________________________ Sub-Factor Title ___________________________________

Project Number: _____________________________

Name of Offeror: ______________________________________________________________________

Name of Customer / Client: _____________________________________________________________

Telephone Number of Customer / Client: __________________________________________________

Email Address of Customer / Client: _______________________________________________________

Project Title: ________________________________________________________________________

Contract Number: __________________________ Location of Project: __________________________

Contract Value at Award: $__________________Value at Completion: __________________________

Contract Required Completion Date: _____________________________________________________

Actual Completion Date: _______________________________________________________________

Description of the Project’s Scope:

"ADDED BY AMENDMENT 0001"

Indicate the technical experience gained from this project:

Details of your firm’s role and activities during construction of the project: Describe your firm’s role in the project, include whether your firm participated as a prime or as a subcontractor.

Describe any unique challenges or innovations involved in the project and your firm’s role in them:

Notes:

ATTACHMENT 1 PAST PERFORMANCE QUESTIONNAIRE

W912EE19R0002

"REVISED BY AMENDMENT 0001"

DEPARTMENT OF THE ARMY

VICKSBURG DISTRICT, CORPS OF ENGINEERS

4155 CLAY STREET

VICKSBURG, MS 39183-3435

15 November 2018

REPLY TO ATTENTION OF:

Vicksburg District Contracting Office

Dear Sir or Madam:

The Vicksburg District, Corps of Engineers is conducting a performance confidence assessment in anticipation of a possible contract award under the advertised request for proposal number:

W912EE19R0002, Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order(MATOC) Contracts For The Lease Of Multiple Cutterhead, Hydraulic Pipeline Dredges (Not Less Than 24-Inch Diameter), Fully Operated With Attendant Plant And Personnel, With A Draft Not To Exceed 9 Feet, For Construction And Maintenance Dredging Within The Vicksburg District, Other Districts Within The Mississippi Valley Division, Or Districts Adjacent To The Vicksburg District. An Offeror interested in proposing on this work has identified you as a Point of Contact (POC) on a past or present contract which the Offeror deems relevant to this effort. We are, therefore, requesting your assistance in completing the attached Past Performance Assessment Questionnaire so that we may evaluate the Offeror under the Factor of past performance. The Questionnaire has been developed for ease of electronic completion.

Description of the work required by the RFP is as follows: Features of the work may include furnishing all plant, labor, materials, and equipment necessary for performing construction dredging. The material to be dredged will consist of sand, gravel, loose rock, silt, mud and clay; and in certain localities stumps, roots, logs, riprap, driftwood, sunken objects, and miscellaneous debris may be encountered. The dredge must be equipped with suitable pump impellers and cutters to efficiently handle these varying materials.

Please provide your comments regarding the overall assessment of the Offeror’s performance on the contract identified and any additional information that your organization deems relevant to our evaluation team. It is important that your information be as factual, accurate and complete as possible to preclude the need for follow-up by the evaluators.

Please complete and submit the Questionnaire within 3 days of receipt via e-mail to Dustin G. Cannada, Contract Specialist, at Dustin.G.Cannada@usace.army.mil. If you have any questions relative to the enclosed Questionnaire, please contact Dustin Cannada. We encourage you to provide the requestor a copy of your comments for his proposal package.

Thank you in advance for your assistance.

Robert E. Screws Contracting Officer

W912EE19R0002

"REVISED BY AMENDMENT 0001"

SCREWS.ROBERT.13846145

2018.12.17 14:16:00 -06'00'

ATTACHMENT 1: PAST PERFORMANCE QUESTIONNAIRE

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as:

Percent of project work performed:

If subcontractor, who was the prime

Prime Contractor Sub Contractor Joint Venture Other (Explain)

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable): Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

RESPONDENT IDENTIFICATION Respondent to complete Blocks 5-8)

5. Respondent Information Organization:

Name:

Title:

Date:

Telephone Number Address:

E-mail Address:

6. Describe the respondent’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

W912EE19R0002

8. Respondent’s Signature:

NOTE: USACE REQUESTS THAT THE RESPONDENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE

TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE

SUBMISSION ON USACE SOLICITATIONS. AS A COURTESY, QUESTIONNAIRES SHALL ALSO BE

SUBMITTED DIRECTLY TO THE GOVERNMENT’S POINT OF CONTACT VIA EMAIL AT

@USACE.ARMY.MIL PRIOR TO PROPOSAL CLOSING DATE THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

W912EE19R0002

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or subelement being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY RESPONDENT

W912EE19R0002

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client E VG S M U N

W912EE19R0002

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate backup documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes:

following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional relevant past efforts by this company. If yes, please provide the name and telephone number of a point of contact:

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary). Thank you for your assistance