SPECIFICATION FOR INSTALLING
SECURITY FENCE AT
ERDC FIRING RANGE IN FLOWERS MS.
1.0 SCOPE. The Contractor shall provide all plant, labor, equipment, materials, and supplies to furnish and install approximately 4200’ of seven feet high chain link fence topped with 3 strand barbed wire. IAW AUFC 4-022-03. There will be one 20’ sliding gate on the southwest entry point the facility. There will be a twelve foot swinging gate on the northwest corner of the facility. Fence shall be up to the standards of https://www.wbdg.org/FFC/DOD/UFC/ufc_4_022_03_2013.pdf fencing regulations.
2.0 Security Requirements
a. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
b. Suspicious Activity Reporting Training (e.g. iWATCH CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
c. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
https://www.wbdg.org/FFC/DOD/UFC/ufc_4_022_03_2013.pdf
d. E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
3.0 LOCATION OF WORK: Take Flowers exit on Henry lake road to the first intersection, take right on Ceres Boulevard to the North Frontage road. Take right on North Frontage road all the way past the National Guard building. 32°21'29.94"N and 90°38'23.14"W.
12 ft access swing gate
7ft high Chain link Fence topped with 3 strand Barbed wire. IAW AUFC 4-022-03
20 ft access gate On rails/non-swing