SOLICITATION NO. W912EE19B0015

DATE: 07 August 2019

SPECIFICATIONS

FOR

WASHINGTON, BOLIVAR AND SUNFLOWER COUNTIES,

MS, BIG SUNFLOWER RIVER - SEDIMENT REDUCTION

STRUCTURES, PHASE IX, FC/MR&T, BIG SUNFLOWER

RIVER BASIN

THIS PROCUREMENT IS 100% WOMAN OWNED SMALL

BUSINESS SET-ASIDE

♦ Building Strong ♦ Serving the Army ♦ Serving the Nation

VICKSBURG DISTRICT

4155 CLAY STREET

VICKSBURG, MS 39183-3435

INQUIRIES

REGARDING THIS SOLICITATION SHOULD

BE MADE TO THE FOLLOWING:

http://www.projnet.org/projnet

PLANS AND SPECIFICATIONS AVAILABLE ON THE FEDERAL

BUSINESS OPPORTUNITIES (FBO) WEB PAGE AT

http://www.fedbizopps.gov/.

http://www.fedbizopps.gov/

W912EE-19-B-0015

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SOLICITATION, OFFER, AND AWARD (SF1442)

00100 BIDDING SCHEDULE/INSTRUCTONS TO BIDDERS

00600 REPRESENTATIONS AND CERTIFICATIONS

00700 CONTRACT CLAUSES

00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS

01 22 00.00 09 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 09 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.00 09 CONTRACTOR QUALITY CONTROL

01 57 20.00 09 ENVIRONMENTAL PROTECTION

01 57 23.00 09 STORM WATER POLLUTION PREVENTION PLAN

DIVISION 05 - METALS

05 60 00.00 09 WELDING

DIVISION 13 - SPECIAL CONSTRUCTION

13 60 00.00 09 MISCELLANEOUS ITEMS

DIVISION 31 - EARTHWORK

31 06 00.00 09 ENGINEERING FABRIC

31 11 00.00 09 CLEARING AND GRUBBING

31 23 03.00 09 EXCAVATION, BACKFILL, FILL, AND CONTROL OF WATER

31 32 13.19 09 LIME TREATMENT

31 37 00.00 09 STONE PROTECTION FOR STRUCTURES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 02.00 09 EROSION CONTROL

DIVISION 33 - UTILITIES

33 42 29.00 09 CORRUGATED METAL PIPE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

601-631-5793

WASHINGTON, BOLIVAR AND SUNFLOWER COUNTIES, MS

BIG SUNFLOWER RIVER - SEDIMENT REDUCTION STRUCTURES PHASE IX

FC/MR&T, BIG SUNFLOWER RIVER BASIN

DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment, constructing eight (8) riser pipe grade control structures in Washington, Bolivar & Sunflower Counties, Mississippi. Principal features of the work include clearing and grubbing, excavation, fill, backfill, embankment, miscellaneous items, control of water, engineering fabric, stone protection, corrugated metal pipe, erosion control, lime treatment, welding, concrete work, storm water pollution prevention and environmental protection.

THE ESTIMATED VALUE OF PROPOSED WORK IS BETWEEN $1,000,000.00 AND $5,000,000.00.

W912EE

Jason M. Carlock

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

(Title, identifying no., date):10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NEGOTIATED 07 August 2019(RFP)

(IFB) W912EE19B0015

SOLICITATION, OFFER,

CALL:

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG, MS 39183-3435

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(If Other Than Item 7)

5. REQUISITION/PURCHASE REQUEST NO.

W807PM91710923

AND AWARD

1. SOLICITATION NO. 2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED PAGE

4. CONTRACT NO. 6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO CODE

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within __10__ calendar days and complete it within

210 CALENDAR DAYS after receiving award, X notice to proceed. This performance period is X mandatory, negotiable.

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed Offers in original copy to perform work required are due at the place specified in Item 8 by 1400 (hour) local time ______________ 12 September 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than ___60__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

X

TAX ID: See Item 14 document and return _______ copies to issuing office.)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Must be fully completed by offeror)

15. TELEPHONE NO.

16. REMITTANCE ADDRESS

20B. SIGNATURE

Contractor agrees

31A. NAME OF CONTRACTING OFFICER

30C. DATE 31B. UNITED STATES OF AMERICA

BY

(REV. 4-85) STANDARD FORM 1442 BACK

(Type or print)

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN

30B. SIGNATURE

NSN 7540-01-155-3212

to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

28. NEGOTIATED AGREEMENT (Contractor is required to sign this

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

OFFER

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CAGE CODE DUNS NUMBER:

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

96X3112

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Include area code)

(Include only if different than Item 14)

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE

29. AWARD (Contractor is not required to sign this document.)

Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

(Type or print)

31C. AWARD DATE

27. PAYMENT WILL BE MADE BY

US ARMY CORPS OF ENGRS FINANCE CENTER

5722 INTEGRITY DRIVE

MILLINGTON, TN 39054-5005

26. ADMINISTERED BY

VICKSBURG CONTRACTING OFFICE

4155 CLAY STREET

VICKSBURG, MS 39183-3435

Email:

Section 00100 - Bidding Schedule/Instructions to Bidders

BIDDING SCHEDULE

WASHINGTON, BOLIVAR AND SUNFLOWER COUNTIES, MS

BIG SUNFLOWER RIVER - SEDIMENT REDUCTION STRUCTURES PHASE IX

FC/MR&T, BIG SUNFLOWER RIVER BASIN

ITEM DESCRIPTION EST UNIT UNIT AMOUNT

NO. QTY PRICE

0001 BS-21 1 JB FOR $_______________

0002 BS-22B 1 JB FOR $_______________

0003 BS-03 1 JB FOR $_______________

0004 BS-05 1 JB FOR $_______________

0005 HP-33E 1 JB FOR $_______________

0006 BPC-62 1 JB FOR $_______________

0007 BPC-63 1 JB FOR $_______________

0008 BP-06B 1 JB FOR $_______________

0009 BS-14A 1 JB FOR $_______________

TOTAL $____________________

W912EE19B0015

NOTES:

(a) THIS PROCUREMENT IS A 100%, WOMAN OWNED SMALL BUSINESS SET-ASIDE.

(b) Lack of registration in the SAM database will make a bidder ineligible for award. SEE CONTRACT CLAUSE 52.204-7 ENTITLED "System for Award Management”.

(c) Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE

EXTENDED ESTIMATED AMOUNT FOR ANY ITEM, HIS BID WILL BE DECLARED

NONRESPONSIVE.

(d) All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "job" (JB) or "each". For Federal Acquisition Regulations (FAR) and FAR supplement reference purposes, ‘job’ can be used in the place of ‘lump sum’.

(e) If a bid or modification to a bid based on unit price is submitted which provides for a “job” adjustment to the total estimated cost, the application of the “job” adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the “job” adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.

(f) All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

(g) Award will be made as a whole to the lowest responsive, responsible bidder as may be in the best interest of the Government.

(h) THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF1442.

The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) calendar days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

(i) VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS.

In addition to complying with the requirements outlined in FAR Part 22.13, FAR

Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract.

While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

- U.S. Department of Labor Veterans’ Employment and Training Service (VETS):

https://www.dol.gov/vets/

- Federal Veteran Employment Information: https://www.fedshirevets.gov/

- Veterans Opportunity to Work (VOW) Program: https://www.benefits.va.gov/vow/

- U.S. Army Warrior Transition Command Employment Index:

https://wct.army.mil/modules/employers/index.html

- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes

1. INVITATION FOR BIDS (IFB) NO. W912EE19B0014

FOR: WASHINGTON, BOLIVAR AND SUNFLOWER COUNTIES, MS, BIG

SUNFLOWER RIVER – SEDIMENT REDUCTION STRUCTURES PHASE IX,

FC/MR&T, BIG SUNFLOWER RIVER BASIN.

TO OPEN: 12 SEPTEMBER 2019, 1400 HOURS, LOCAL TIME AT PLACE OF BID

OPENING.

SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE RECEIVED UNTIL

DATE AND TIME OF BID OPENING. THE GOVERNMENT RESERVES THE RIGHT,

AS THE INTERESTS OF THE GOVERNMENT MAY REQUIRE, TO POSTPONE OR

DELAY THE DATE AND/OR TIME SET FOR OPENING BIDS. REVISIONS OR

AMENDMENTS TO THE BID OPENING DATE AND/OR TIME, IF ANY, WILL BE

ANNOUNCED BY AMENDMENT OR AMENDMENTS TO THIS INVITATION FOR

BIDS.

BID OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE AT

http://www.mvk.usace.army.mil/BusinessWithUs/Contracting.aspx.

BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION

AS REQUIRED BY THIS SOLICIATION AND ITS ATTACHMENTS. THE PENALTY

FOR MAKING FALSE STATEMENTS IN BIDS IS PRESCRIBED IN 18 U.S.C. 1001.

(FAR 52.214-4 APR 1984)

2. YOUR ATTENTION IS DIRECTED TO CLAUSE 52.214-5 ENTITLED

“SUBMISSION OF BIDS”. IT IS THE BIDDER’S RESPONSIBILITY TO ENSURE

THAT BIDS SENT BY COMMERCIAL CARRIER ARE CLEARLY IDENTIFIED AS

CONTAINING A SEALED BID ON THE OUTERMOST ENVELOPE. THIS

INCLUDES, BUT IS NOT LIMITED TO, BIDS SENT VIA: FEDERAL EXPRESS,

AIRBORNE EXPRESS, EXPRESS COURIER SERVICES, INC., EXPRESS MAIL - U.S.

POSTAL SERVICE, UNITED PARCEL SERVICE AND PUROLATOR.

3. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL

OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING

FROM THIS SOLICITATION.

4. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT

CLAUSE ENTITLED, “AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS

FOR CONSTRUCTION”, WHICH WILL APPLY TO THE CONTRACT RESULTING

FROM THIS SOLICITATION.

http://www.mvk.usace.army.mil/BusinessWithUs/Contracting.aspx

5. SEE SECTION 00 80 00.00 09, SPECIAL CONTRACT REQUIREMENTS, CLAUSE

ENTITLED “COMMENCEMENT, PROSECUTION, AND COMPLETION OF THE

WORK (APR 1984)”.

6. SEE SECTION 01 00 00.00 09, GENERAL CONTRACT REQUIREMENTS CLAUSE,

ENTITLED, “PAYMENT INVOICES” WHICH WILL APPLY TO THE CONTRACT

RESULTING FROM THIS SOLICITATION. THE FEDERAL ACQUISITION

REGULATION REQUIRES THAT THE “REMIT TO” ADDRESS OF THE INVOICE

MATCH THE “REMIT TO” ADDRESS ON THE CONTRACT OR A PROPER NOTICE

OF ASSIGNMENT.

7. MAIL BIDS TO THE VICKSBURG DISTRICT HEADQUARTERS BUILDING, 4155

CLAY STREET, VICKSBURG, MISSISSIPPI 39183-3435. BIDS SENT BY

COMMERCIAL CARRIER SHALL BE CLEARLY MARKED ON THE OUTER

ENVELOPE AS CONTAINING A “SEALED BID”. BIDS MUST BE RECEIVED PRIOR

TO THE EXACT TIME SET FOR BID OPENING.

8. HAND CARRIED BIDS MUST BE DELIVERED TO THE VICKSBURG DISTRICT

HEADQUARTERS BUILDING, 4155 CLAY STREET, VICKSBURG, MISSISSIPPI

39183-3435. ALL BIDS MUST BE RECEIVED PRIOR TO THE EXACT TIME SET

FOR BID OPENING. NOTE: BIDS DELIVERED LATER THAN 15 MINUTES PRIOR

TO THE TIME SET FOR THE BID OPENING SHALL BE DELIVERED DIRECTLY

TO ROOM 103, BID OPENING ROOM.

9. BIDS WILL NOT BE ACCEPTED NOR SHALL BIDS BE WITHDRAWN

TELEGRAPHICALLY OR BY ELECTRONIC COMMERCE.

10. IN ACCORDANCE WITH THE PROVISIONS OF SUBPART 36.201

(EVALUATION OF CONTRACTOR PERFORMANCE) OF THE FEDERAL

ACQUISITION REGULATION (FAR), CONSTRUCTION CONTRACTOR’S

PERFORMANCE SHALL BE EVALUATED THROUGHOUT THE PERFORMANCE

OF THE CONTRACT. THE UNITED STATES ARMY CORPS OF ENGINEERS

(USACE) FOLLOWS THE PROCEDURES OUTLINED IN ENGINEERING

REGULATION 415-1-17 TO FULFILL THIS FAR REQUIREMENT. FOR

CONSTRUCTION CONTRACTS AWARDED AT OR ABOVE $100,000.00, THE USACE

WILL EVALUATE CONTRACTOR’S PERFORMANCE AND PREPARE A

PERFORMANCE REPORT USING THE CONSTRUCTION CONTRACTOR

APPRAISAL SUPPORT SYSTEM (CCASS), WHICH IS NOW A WEB-BASED

SYSTEM. AFTER AN EVALUATION (INTERIM OR FINAL) IS WRITTEN UP BY

THE USACE, THE CONTRACTOR WILL HAVE THE ABILITY TO ACCESS,

REVIEW AND COMMENT ON THE EVALUATION FOR A PERIOD OF 30 DAYS.

ACCESSING AND USING CCASS REQUIRES SPECIFIC SOFTWARE, CALLED PKI

CERTIFICATION, WHICH IS INSTALLED ON THE USER’S COMPUTER. THE

CERTIFICATION IS A DEPARTMENT OF DEFENSE REQUIREMENT AND WAS

IMPLEMENTED TO PROVIDE SECURITY IN ELECTRONIC TRANSACTIONS.

THE CERTIFICATION SOFTWARE COULD COST APPROXIMATELY $110 - $125

PER CERTIFICATE PER YEAR AND IS PURCHASED FROM AN EXTERNAL

CERTIFICATE AUTHORITIES (ECA) VENDOR. CURRENT INFORMATION

ABOUT THE PKI CERTIFICATION PROCESS AND FOR CONTACTING VENDORS

CAN BE FOUND ON THE WEB SITE: https://www.cpars.gov/. IF THE CONTRACTOR

WISHES TO PARTICIPATE IN THE PERFORMANCE EVALUATION PROCESS,

ACCESS TO CCASS AND PKI CERTIFICATION IS THE SOLE RESPONSIBILITY OF

THE CONTRACTOR.

11. ELECTRONIC FUNDS TRANSFER (EFT)

PURSUANT TO FAR 52.232-5 AND 52.232-33, ALL PAYMENTS UNDER THIS CONTRACT WILL BE MADE BY

ELECTRONIC FUNDS TRANSFER (EFT). CONTRACTORS ARE REQUIRED TO COMPLETE FORM:

UFC-DISB-4.

THE FORM AND COMPLETION INSTRUCTIONS MAY BE PROVIDED FROM THE U. S. ARMY CORPS

OF ENGINEERS AT:

https://www.tam.usace.army.mil/Portals/77/docs/Deployment%202013/Admin/Direct_deposit14.pdf

THE “INSTALLATION EROC” FOR THE VICKSBURG CONSOLIDATED CONTRACTING OFFICE IS “B4."

12. BID PACKAGE ATTACHMENTS

SECTION 00600, REPRESENTATIONS AND CERTIFICATIONS ARE TO BE

COMPLETED AND INCLUDED IN THE BID PACKAGE SUBMITTED BY THE

OFFEROR.

13. TECHNICAL INQUIRIES AND QUESTIONS

ALL Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet (https://www.projnet.org) no later than 5 days prior to bid opening date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet.

Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are all finalized.

THE SOLICITATION NUMBER IS: W912EE-19-B-0015

THE BIDDER INQUIRY KEY IS: NCD4SK-7635S7

https://www.cpars.gov/

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret

Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

THE CALL CENTER OPERATES WEEKDAYS FROM 8AM TO 5PM U.S. CENTRAL

TIME ZONE (CHICAGO). THE TELEPHONE NUMBER FOR THE CALL CENTER IS

800-428-HELP.

14. PRIOR TO BID OPENING, IN ACCORDANCE WITH FEDERAL

ACQUISITION REGULATION PART 14.303 (b) MODIFICATION OR

WITHDRAWAL OF BIDS, “A BID MAY BE WITHDRAWN IN PERSON BY A BIDDER

OR ITS AUTHORIZED REPRESENTATIVE IF, BEFORE THE EXACT TIME SET

FOR OPENING OF BIDS, THE IDENTITY OF THE PERSONS REQUESTING

WITHDRAWAL IS ESTABLISHED AND THAT PERSON SIGNS A RECEIPT FOR

THE BID."

THE FOLLOWING STEPS WILL BE REQUIRED BY THE VICKSBURG

CONTRACTING OFFICE:

1) CONTRACTOR MUST PRESENT A LETTER VERIFYING THEY ARE A

REPRESENTATIVE OF THE COMPANY.

2) CONTRACTOR MUST SHOW VALID, GOVERNMENT ISSUED PICTURE ID.

3) VICKSBURG DISTRICT CONTRACTING OFFICE WILL HAVE THE

REPRESENTATIVE SIGN A RECEIPT FOR BID.

GENERAL NOTICES

1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA

AUTHORITY:

Flood Control Act of 1944, 1950, 1962 and 1965

APPROPRIATION: P.L. 115-244 Energy And Water, Legislative Branch, And Military Construction And Veterans Affairs Appropriations Act, 2019

FUNDING CITATION: 96X3112

2. NEGOTIATIONS AFTER SEALED BIDDING.

The Government has the option to reject all bids received in response to the sealed bid advertisement and initiate negotiation. Negotiations will include soliciting offers from each responsible bidder that submits a bid in response to the Invitation for Bids. If, after bid opening, the Contracting Officer determines that negotiations are in the best interest of the Government, the following steps will be followed:

(a) An amendment to the sealed bid advertisement will be issued to each responsible bidder changing the Invitation for Bids Number to Request for Proposals Number.

The amendment will also make any necessary changes to the scope of the work.

(b) A cover letter signed by the negotiator will accompany the amendment explaining the procedures to be followed during negotiations.

3. BID GUARANTEE, PERFORMANCE AND PAYMENT BONDS.

A bid guarantee is required with bid package and is to be executed on Standard Form SF24.

Performance and payment bonds will be required after award. See Section 00700, Contract Clauses 52.228-1, BID GUARANTEE and 52.228-15, PERFORMANCE AND PAYMENT

BONDS -- CONSTRUCTION

4. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS.

The right is reserved, as the interest of the Government may require, to revise or amend the specifications and/or drawings prior to the date set for opening bids. Such revisions or amendments, if any, will be announced by amendment or amendments to this Invitation for Bids.

Copies of such amendments as may be issued will be furnished to all prospective bidders. If the revision or amendments are of a nature which require material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the District Engineer will enable bidders to revise their bids. In such case, the amendments will include an announcement of the new date for opening bids.

5. CONDITIONS AFFECTING THE WORK.

Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications, or related documents.

6. BIDDER'S QUALIFICATIONS/Pre Award Survey.

A determination of contractor responsibility will be made. A determination of non-responsibility may be cause for the rejection of a prospective contractor's bid. In accordance with FAR 9.104-1

- General Standards, before a bid is considered for award, the bidder shall be requested by the Government to submit a statement regarding their previous experience in performing comparable work, their business and technical organization, financial resources, the plant available to be used in performing the work and/or other information necessary to make the determination of contractor responsibility." .

7. SITE OF THE WORK.

Bidders are advised that for purpose of applicability of the Davis-Bacon Act and other contract labor standard provisions, "the site of the work" under the contract to be awarded pursuant to this Invitation may not be limited to the physical place(s) where the construction called for in the contract will remain when work on it has been completed. The "site of the work" may include other adjacent or nearby property used by the Contractor or Subcontractors during such construction. For example, fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., will be considered part of the site of the work provided they are dedicated exclusively or nearly so to performance on the contract and are so located in proximity to the actual construction location that it would be reasonable to include them.

8. INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE, AND

BONDS.

a. Specifications, Invitation No. W912EE19B0003, Bidding Schedule, Construction Contract Clauses, and Wage Determination Decision No. MS20190001 01/04/2019 of the Secretary of Labor, are parts of this Invitation.

b. (1) An offeror (bidder) electing to use individual sureties for either bid guarantees or performance and payment bonds must submit, concurrently with the bonds and required affidavits, a statement of both the business and personal names of the persons and/or brokerages firms through whom the bonds or the guarantees were obtained, together with the address and telephone number of the persons and/or brokerage firms.

(2) Offerors or bidders should note that some individual sureties and brokers of individual sureties have been debarred or suspended from offering themselves or others as sureties to the Government. Offerors or bidders are responsible for ascertaining the current status of their sureties and brokers.

(3) Failure to provide the required information or the submission of bid guarantees obtained from debarred or suspended sureties or brokers may cause rejection of the offer (bid).

9. DEFINITIONS

(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.

(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

(c) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of l978 is the Armed Services Board of Contract Appeals, addressed as follows: Recorder, Armed Services Board of Contract Appeals, Skyline 6, 7th Floor, 5109 Leesburg Pike, Falls Church, Virginia 22041-3208.

(d) "Small business concern" means a concern including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in 13 CFR 121.

(1) Size Standards for Construction and Special Trades.

(a) Construction. A concern is small if its average annual receipts for its preceding 3 fiscal years did not exceed $36.5 million.

(b) Dredging. A concern is small if (1) its average annual receipts for its preceding 3 fiscal years did not exceed $27.5 million, and (2) at least 40 percent of the yardage in the contract's plans and specifications is dredged with equipment owned by the concern or obtained from another small business dredging concern.

CLAUSES INCORPORATED BY REFERENCE

52.214-3 Amendments To Invitations For Bids DEC 2016

52.214-4 False Statements In Bids APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.222-38 Compliance With Veterans' Employment Reporting

Requirements

FEB 2016

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

CLAUSES INCORPORATED BY FULL TEXT

52.214-5 SUBMISSION OF BIDS (DEC 2016)

(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.

(c) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.

(d) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a FIRM FIXED PRICE TYPE contract resulting from this solicitation.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Economic Area Goals for Minority Goals for Female

Participation for Each Trade

Participation for Each Trade

Memphis, Tennessee Non-SMSA (Non-Standard Metropolitan Statistical Area) Counties

26.5%

6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Memphis, Tennessee, Non-SMSA Counties, which includes Washington, Bolivar and Sunflower Counties, Mississippi.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3, 000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

VICKSBURG DISTRICT CONTRACTING OFFICE

ATTN: CONTRACTING OFFICER

4155 CLAY STREET

VICKSBURG, MS 39180

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

The clauses at 52.236-2, DIFFERING SITE CONDITIONS, and 52.236-3, SITE INVESTIGATIONS AND CONDITIONS AFFECTING THE WORK, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. Site visits may be arranged during normal duty hours (8:00 a.m.

to 4:45 p.m., Monday through Friday) by contacting: U.S. Army Corps of Engineers, Mr. Jason Overstreet, Project Engineer, Greenwood Area Office, 100 Moore Street, Greenwood, MS 38930-4512, telephone (662) 453-5531, e-mail:

GAO@usace.army.mil.

mailto:GAO@usace.army.mil

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)

Paragraph (a) has been altered per DFARS 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

((a) Definitions. As used in this provision—

“System for Award Management (SAM) database” means the primary Government repository for contractor information required for the conduct of business with the Government.

“Commercial and Government Entity (CAGE) code” means—

(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or

(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an “NCAGE code.”

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR 32.11) for the same parent concern.

http://farsite.hill.af.mil/

“Registered in the System for Award Management (SAM) database” means that—

(1) The contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and Contractor and Government Entity (CAGE) code into the SAM database; and

(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as part of the SAM registration process; and

(4) The Government has marked the record “Active.”

“Unique entity identifier” means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)

(1) By submission of an Offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the unique entity identifier that identifies the Offeror’s name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company Headquarters name and address (reporting relationship within your entity).

http://www.sam.gov/ http://www.sam.gov/

(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) Offerors may obtain information on registration at https://www.acquisition.gov.

(End of clause) https://www.acquisition.gov/

Section 00600 - Representations & Certifications

52.204-3 Taxpayer Identification OCT 1998 52.209-7 Information Regarding Responsibility Matters OCT 2018 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

252.209-7002 Disclosure Of Ownership Or Control By A Foreign Government

JUN 2010

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.

(2) The small business size standard is $36,500,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xx) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.

(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.

(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225- 5.

(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxiv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.