Text version
SEE ADDENDUM
(No Collect Calls)
W912EE18Q0023 21-Aug-2018
b. TELEPHONE NUMBER
601-631-5379
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 24 Aug 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912EE9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KELLY A HYNUM F
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
601-631-7261FAX:
TEL: 601-631- SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$36,500,000
NAICS:
237110
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF55
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
BID SCHEDULE
U.S. ARMY CORPS OF ENGINEERS
IDIQ FOR SUPPLY AND INSTALLATION OF HDPE PIPE LINERS FOR
VARIOUS LOCATIONS IN AR, LA, MS
WITHIN MVK FOR THE US ARMY CORPS OF ENGINEERS
PERIOD OF PERFORMANCE: 01 SEP 2018 THROUGH 31 AUG 2023
CLIN 0001 BASE YEAR: 01 SEP 2018 - 31 AUG 2019
ITEM
NO.
DESCRIPTION
EST
QTY
U/M
UNIT
PRICE
AMOUNT
0001 63" (LINER DIAMETER) 1 FOOT
54" (LINER DIAMETER)
FOOT
48" (LINER DIAMETER)
42" (LINER DIAMETER)
36" (LINER DIAMETER)
32" (LINER DIAMETER)
30" (LINER DIAMETER)
28" (LINER DIAMETER)
26" (LINER DIAMETER)
24"(LINER DIAMETER)
22" (LINER DIAMETER)
20" (LINER DIAMETER)
18" (LINER DIAMETER)
16" (LINER DIAMETER)
14" (LINER DIAMETER)
12" (LINER DIAMETER)
10" (LINER DIAMETER)
U.S. ARMY CORPS OF ENGINEERS
IDIQ FOR SUPPLY AND INSTALLATION OF HDPE PIPE LINERS
FOR VARIOUS LOCATIONS IN AR, LA, MS
Contract #
CLIN 0002 - 1st OPTION YEAR: 01 SEP 2019 - 31 AUG 2020
FOR VARIOUS LOCATIONS IN AR, LA, MS
CLIN 0003 - 2nd OPTION YEAR: 01 SEP 2020 - 31 AUG 2021
FOR VARIOUS LOCATIONS IN AR, LA, MS
CLIN 0004 - 3rd OPTION YEAR: 01 SEP 2021 - 31 AUG 2022
W912EE18Q0023
CLIN 0005 - 4th OPTION YEAR: 01 SEP 2022 - 31 AUG 2023
63" (LINER DIAMETER)
SCOPE OF WORK
DRAFT SCOPE OF WORK
HDPE PIPE LINERS
Supply & Installation at Various Locations in AR, LA, & MS Within MVK for the U.S.
ARMY Corps of Engineers
The USACE, Vicksburg District has a requirement to rehabilitate existing gravity drainage structures by slip lining the existing corrugated pipes with high density polyethylene (HDPE) pipe. Existing pipes to be lined range in diameter from 24-inches to 60-inches and range in length from 20 feet to 300 feet. Cast in Place Liners are not acceptable.
GENERAL DESCRIPTION OF LINERS.
0001 HDPE Pipe Liners. General.
The HDPE pipe-liner, grout, and materials supplied under this contract shall be new. The HDPE pipe shall meet the requirements of ASSHTO M326. The pipe and fittings shall be fabricated from polyethylene (PE) resin compounds conforming to cell class PE345464C with a designation of PE 3408 and a minimum dimension ratio (DR) of 32.5 as specified in ASTM D 3350. The criteria for the pipe to be lined are provided below.
All dimensions shall be field verified by the contractor. The pipe manufacturer shall have a representative onsite to ensure proper installation and grouting procedures. The pipe-liner shall be solid wall construction, have a smooth interior and exterior surface with no corrugations, have mechanical end connectors, have a minimum section length of 10 feet but not to exceed 50 feet and be self-supporting with the above conditions and designed for ‘fully deteriorated pipe’.
Overall, the hydraulic cross-section shall be maintained as large as possible. The liner shall have a minimum of the full flow capacity of the original pipe before rehabilitation. The pipe joints shall meet the requirements of ASTM D 3212 and shall be water-tight. The existing pipe shall be cleaned of dirt and debris and a mandrell pulled through the pipe prior to HDPE pipe installation.
The pipe- liner shall be installed in accordance with ASTM F 585. The space between the existing pipe and HDPE liner shall be grouted to seal the annular space. The grout shall be a cellular type grout with a density between 60 and 80 pounds per cubic foot with a minimum compressive strength of 300 psi at 28 days. Venting of the annular space will be necessary to assure uniform filling during the grouting operation. The pressure on the annular space during the grouting process shall be limited to prevent damage to the pipe- liner. The gauged grout pressure shall not exceed that of the pipe manufacturer’s recommendation or 5 psi, whichever is smaller. Regardless of the pressure, the contractor shall be responsible for any damage or distortion to the pipe-liner due to grouting. Upon completion of the structural rehabilitation, the pipe shall be inspected in accordance with the above ASTM standards. A camera specifically designed for such purposes shall be used during this inspection. A color video recording shall be made and provided to the COR for acceptance.
LOCATIONS OF STRUCTURES TO BE LINED.
The locations are within the Vicksburg District drainage basins located in the States of Louisiana, Arkansas, and Mississippi. The work in Louisiana lies in Catahoula and Concordia Parishes along levees within the Red River Backwater area which spans from Jonesville, LA, to Larto Lake on the west side of the Ouachita Black River, and, on the east side of the river from Wildsville, LA, to ACME, LA, and extending along the red river backwater levee to the intersection of the Red River levee and the Mississippi River Levee.
The locations within the red river backwater levees also include from Jonesville, LA, northward to Sicily Island, Clayton and Waterproof, LA.
The work in Arkansas is in the general area of Southeast Arkansas including Jefferson, Lincoln, and Arkansas Counties, AR, along the Arkansas River.
In Mississippi, the work will be bounded by the Mississippi River Levee to the Tennessee State Line extending through the MS Delta and areas including the four Corps Lakes.
Preparatory Work:
The bidder is responsible for performing all preparatory dewatering work. The preparatory work may include the placement of temporary earthen cofferdams to prevent storm water from running through or backing into the existing pipe structure. The work may also require the removal of water, mud, dirt, rock, and debris from within the existing pipe prior to HDPE liner installation to facilitate a complete annular grout seal between the host pipe and the liner.
Submittals:
The contractor shall submit information verifying that the product and installation technique meet the requirements of this solicitation.
The contractor shall be responsible for estimating grout quantities and measuring actual grout volumes pumped. These estimates and actual volumes shall be recorded and provided to the government representative.
The contractor shall demonstrate previous experience by submitting a description of work experience including the dates of past performance and experience in pipe lining type work.
If the following submittals are not received the bidder will be deemed non-responsive:
1. Submittal 1 - Experience:
Contractor is to provide experience in installing HDPE pipe through a levee or dam. Must provide:
a. Names and experience of personnel
b. Dates and locations of previous installations
c. Levee or Dam owner contact information from two previous jobs.
2. Submittal 2 - Certification letter:
Contractor installing the HDPE liners must provide a certification letter from the manufacturer verifying the contractor’s capability in properly installing the manufacturer’s HDPE product.
3. Submittal 3 - Materials:
Contractor must provide adequate documentation proving the materials to be supplied (HDPE and grout, etc) meet the minimum quality required by the technical specifications.
4. Submittal 4 - Pre-installation Plan:
Contractor must submit his installation plan/procedure and prove it meets the specification and manufacturer’s recommendation for installation. The installation plan must include:
a. A drawing for each pipe to be lined showing the plan view and the cross section of the grout tubes, existing pipe, bulkheads, and new pipe liner. This drawing shall indicate the existing pipe location by decimal degree coordinates and levee station name, the existing pipe diameter and length, liner diameter and length, diameter and length of each grout tube and vent tube, the grout mix design, the estimated volume of grout required to fill the annular space, and the means by which the contractor will measure the actual grout volume required to fill the annular space.
5. Submittal 5 - Pre-installation video:
Contractor must submit a video that clearly documents the condition of the existing pipe after all mud, dirt, gravel, rock, and other debris has been removed and prior to the installation of the HDPE liner. The USACE shall review the video and confirm the pipe is clean prior to the contractor installing the liner. The video shall be of sufficient quality and clarity with regards to lighting, steadiness, adequate camera speed, and focus, such that all joints and flaws can be clearly observed in the video.
6. Submittal 6 - Completed installation report:
Contractor must submit a report for each installed liner that contains the information from submittal 4 for each pipe location with the addition of the actual amount of grout pumped into the annular space between the existing pipe and the HDPE liner. This report must also document any difficulties encountered during the installation and grouting process.
7. Submittal 7 - Post-installation video:
Contractor shall submit a post-installation video showing the condition of the inside of the installed HDPE liner after installation. The video shall be of sufficient quality and clarity with regards to lighting, steadiness, adequate camera speed, and focus, such that all joints and flaws can be clearly observed in the video.
SUSTAINABILITY REQUIREMENTS: EPA Designated (CPG) Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.
SECURITY REQUIREMENTS. The following security measures may be required in the event the contractor must access an Army controlled installation, facility or area. For example, an Army controlled installation means the Vicksburg District Headquarters, the Harbor facility, or other areas controlled by security personnel or electronic security systems. Areas such as levees do not fall under this requirement.
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas." Levees are not security restricted areas.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
INSTRUCTIONS TO OFFERORS
(1) Solicitation W912EE18Q0023 is being issued as a Request for Quote (RFQ), under a 100% Small Business Set-Aside. The following NAICS codes is applicable to this solicitation, 237110 – Water and Sewer Line and Related Structures Construction, with a small business size standard of $36,500,000.00.
(2) This RFQ shall result in the award of a Single Award Task Order Contract (SATOC). The resulting SATOC will consist of a base period for twelve (12) months and four (4) twelve month options.
The Government intends to award one (1), Indefinite Delivery Indefinite Quantity (IDIQ), Firm, Fixed-Price, delivery order contract under the SATOC.
(3) The guaranteed minimum value for each contract awarded is $3,500.00, for the life of the contract, including the base, and any options (if exercised).
(4) The SATOC shall not exceed a cumulative capacity of $5,000,000.00, for all contracts awarded under this solicitation, including the base and all option years.
(5) DELIVERY ORDERS: All deliveries requested during a contract period will be specified in written firm, fixed-price delivery orders. A request for quote (RFQ), with a detailed scope of work including specific delivery locations, and a delivery schedule will be issued.
Delivery Orders will be awarded from the SATOC.
Individual Delivery Orders issued under this contract may be signed by any Contracting Officer of this agency, within the authority of their warrant. One contract will be awarded under this solicitation.
All delivery orders issued hereunder are subject to the terms and conditions of this contract. This contract shall control in the event of conflict with any task order. However, a task order may be modified at the contracting officer’s discretion.
EVALUATION FACTORS
SATOC AWARD BASIS AND EVALUATIONS: The government intends to make a Single award. Offers for less than the required items specified in the solicitation, and solicitation bidding schedule will not be accepted.
The Government intends to award without discussions, while reserving the right to hold discussions (if determined by the Contracting Officer to be in the Government’s best interest).
Offerors are encouraged to provide their best proposed pricing in their initial offer.
52.212-2 EVALUATION--COMMERCIAL ITEMS
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
FACTOR 1 Technical and Management Capability (Acceptable/Unacceptable) FACTOR 2 Past Performance (Acceptable/Unacceptable) FACTOR 3 Price
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Submittals; It is incumbent upon the offeror to submit sufficient information for the Government to make a determination of your technical and management capability, and satisfactory past performance. Failure to submit sufficient information for the government to determine your technical and management capability, satisfactory past performance, or price may be cause for rejection of your quote. The contractor shall provide sufficient documentation of technical and management capability, by including technical literature, brochures, equipment list, list of key personnel, resumes, documentation of experience making deliveries of similar volumes, and meeting equivalent delivery schedules for like materials on contracts of a similar type, size, scope & complexity, and any other information to enable the Government to determine the offeror’s capability.
(1) Technical & Management Capability - offerors shall be evaluated on an (acceptable/unacceptable) basis considering the following sub-factors;
a. Capability to complete deliveries in accordance with the project scope of work, to all locations within the Vicksburg District boundaries, located in the states of Arkansas, Louisiana and Mississippi.
b. Capability to provide all the material types requested, from USACE approved sources.
The offeror shall provide a listing of all sources from which they propose to furnish materials with their proposal.
c. Capability to complete delivery on schedule, and maintain minimum deliveries at the daily rates specified.
d. Experience of the company making deliveries of similar volumes, and meeting equivalent delivery schedules, for like materials, on contracts of a similar type, size, scope and complexity, within the last three (3) years.
e. Project Management and organization capability, including prior experience as a Contractor managing contracts of a similar nature, size, scope, and complexity, within the last three (3) years.
(2) Satisfactory Past Performance - Past Performance will be evaluated on an (acceptable/unacceptable) basis. To demonstrate satisfactory past performance the offeror shall provide documentation of satisfactory performance on past or current contracts of a similar type, size, scope and complexity, performed within the last 5 years, as well as, provide references, including names and contact information of references who can verify their past performance.
Past performance information of key personnel and crew may be provided if the company has limited or no past performance. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror will be evaluated as neutral on Past Performance, providing the offeror supplies a certified statement with their offer that no past performance information is available. The Government’s approach to evaluating past performance is to check the references provided by the contractor to verify satisfactory past performance as well as data obtained from other sources available i.e.
government database, past contract files, etc. The offeror is cautioned that while the Government will consider data from other sources, the burden of demonstrating satisfactory past performance rests with the offeror.
The Government’s assessment will focus on contracts that meet the following conditions:
Recency. Only contracts that were performed or awarded within the last five (5) years will be considered.
Relevancy. Only contracts which were/are relevant in scope will be considered.
(3) Price - Price quotes will be examined to determine the extent to which proposed prices are comparable with the Government estimates, and previous procurement history, and a determination will be made of price reasonableness. The Government may reject any proposal that is determined to be NOT fair and reasonable, unrealistically high or low in price when compared to Government estimates, or are unbalanced, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the requirements.
All proposals will be evaluated for price, from prices presented on the fully completed bidding schedule, based on the total of all line items. Pricing that is determined to be unrealistic may result in the rejection of your proposal.
The contractor shall provide a copy of the completed SF-1449 Bidding Schedule with their proposal. Individual line item prices in the bidding schedule shall reflect the maximum price to SUPPLY the material listed in that line item, to the location specified, and will be used for the purpose of price evaluation.
Offerors must provide pricing on the entire bid schedule. Failure to provide pricing on all CLINs within the bidding schedule will be grounds for rejection of your proposal. Offerors shall provide their pricing for the Base Year and All Option Years.
Unbalanced Pricing; Unbalanced pricing exists when one or more contract line item is significantly over or understated as indicated by the application of cost or price analysis techniques. Proposal CLINs shall be analyzed to determine if proposed CLIN prices are unbalanced. An offer may be rejected if the Contracting Officer determines that the lack of balanced pricing poses an unacceptable risk to the Government.
TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). Offerors are encouraged to submit questions at least 3 days prior to solicitation due date, in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet.
The Solicitation Number is: W912EE18Q0023
The Bidder/Offeror Inquiry Key is: P5XA66-XT88RX
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Bidders/Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 500 Job
BASE YEAR
FFP
The contractor shall supply and deliver high density polyethylene (HDPE) pipe liners in efforts to rehabilitate existing gravity drainage structures by slip lining the existing corrugated pipes. Delivery will be made to locations specified within the Vicksburg District (MVK) area of responsibility, in accordance with the scope of work and the terms and conditions of this contract and/or task orders issued under this contract. With a period of performance of 01-Sept-2018 through 31-August 2019.
FOB: Destination
NET AMT
0002 500 Job
OPTION OPTION YEAR 1
FFP
The contractor shall supply and deliver high density polyethylene (HDPE) pipe liners in efforts to rehabilitate existing gravity drainage structures by slip lining the existing corrugated pipes. Delivery will be made to locations specified within the Vicksburg District (MVK) area of responsibility, in accordance with the scope of work and the terms and conditions of this contract and/or task orders issued under this contract. With a period of performance of 01-Sept-2019 through 31-August 2020.
0003 500 Job
OPTION OPTION YEAR 2
FFP
The contractor shall supply and deliver high density polyethylene (HDPE) pipe liners in efforts to rehabilitate existing gravity drainage structures by slip lining the existing corrugated pipes. Delivery will be made to locations specified within the Vicksburg District (MVK) area of responsibility, in accordance with the scope of work and the terms and conditions of this contract and/or task orders issued under this contract. With a period of performance of 01-Sept-2020 through 31-August 2021.
0004 500 Job
OPTION OPTION YEAR 3
FFP
The contractor shall supply and deliver high density polyethylene (HDPE) pipe liners in efforts to rehabilitate existing gravity drainage structures by slip lining the existing corrugated pipes. Delivery will be made to locations specified within the Vicksburg District (MVK) area of responsibility, in accordance with the scope of work and the terms and conditions of this contract and/or task orders issued under this contract. With a period of performance of 01-Sept-2021 through 31-August 2022.
0005 500 Job
OPTION OPTION YEAR 4
FFP
The contractor shall supply and deliver high density polyethylene (HDPE) pipe liners in efforts to rehabilitate existing gravity drainage structures by slip lining the existing corrugated pipes. Delivery will be made to locations specified within the Vicksburg District (MVK) area of responsibility, in accordance with the scope of work and the terms and conditions of this contract and/or task orders issued under this contract. With a period of performance of 01-Sept-2022 through 31-August 2023.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
1.00 $3,500.00 25,000.00 $5,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
1.00 $3,500.00 500.00 $1,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-SEP-2018 TO
31-AUG-2019
N/A N/A
0002 POP 01-SEP-2019 TO
31-AUG-2020
0003 POP 01-SEP-2020 TO
31-AUG-2021
0004 POP 01-SEP-2021 TO
31-AUG-2022
0005 POP 01-SEP-2022 TO
31-AUG-2023
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984 52.204-7 System for Award Management OCT 2016 52.222-50 Combating Trafficking in Persons MAR 2015 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.206-7000 Domestic Source Restriction DEC 1991 252.213-7000 Notice to Prospective Suppliers on Use of Supplier
Performance Risk System in Past Performance Evaluations
MAR 2018
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)
(a) Definitions. As used in this clause--
Postconsumer fiber means—
(1) Paper, paperboard, and fibrous materials from retail stores, office buildings, homes, and so forth, after they have passed through their end-usage as a consumer item, including: used corrugated boxes; old newspapers; old magazines; mixed waste paper; tabulating cards; and used cordage; or
(2) All paper, paperboard, and fibrous materials that enter and are collected from municipal solid waste; but not
(3) Fiber derived from printers' over-runs, converters' scrap, and over-issue publications.
(b) The Contractor is required to submit paper documents, such as offers, letters, or reports that are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber, whenever practicable, when not using electronic commerce methods to submit information or data to the Government.
(End of clause)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
(a) Definitions. As used in this clause--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management (SAM) records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) database means that--
(1) The Contractor has entered all mandatory information, including the unique entity identifier and the EFT indicator (if applicable), the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database;
(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
System for Award Management (SAM) means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—
(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;
(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12;
and
(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(c)(1)(i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to—
(A) Change the name in the SAM database;
(B) Comply with the requirements of subpart 42.12 of the FAR; and
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (c)(1)(i) of this clause, or fails to perform the agreement at paragraph (c)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the EFT clause of this contract.
(3) The Contractor shall ensure that the unique entity identifier is maintained with the entity designated at www.sam.gov for establishment of the unique entity identifier throughout the life of the contract. The Contractor shall communicate any change to the unique entity identifier to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the unique entity identifier does not necessarily require a novation be accomplished.
(d) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.acquisition.gov.
52.211-16 VARIATION IN QUANTITY (APR 1984)
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.
(b) The permissible variation shall be limited to:
10% Percent increase 10% Percent decrease This increase or decrease shall apply to all delivery orders.
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quantity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefor, and the Contractor waives all right, title, or interests therein. Quantities in excess of $250 will, at the option of the Government, either be returned at the Contractor's expense or retained and paid for by the Government at the contract unit price.
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.
Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.
Additional copies will be issued for a fee.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (https://assist.dla.mil/online/start/).
(ii) Quick Search…