Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_Official_Abstract_18B10.pdf | ||
| A22_AM01_W912EE18B0010.pdf | ||
| specs.pdf | ||
| 385-1-1.pdf | ||
| 18b0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Invitation for Bids (IFB) W912EE18B0010, Desoto and Marshall Counties, Mississippi, MDHP, BS-15-03, FC/MR&T, Yazoo River Basin, Coldw ater River Watershed, previously scheduled to open 14 August 2018, 1430 Hours. Referenced IFB is amended as follow s: A NEW BID OPENING DATE/TIME OF 23 AUG 2018, 1400 HOURS , IS HEREBY ESTABLISHED. Continued on Page 2
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE18B0010
X 9B. DATED (SEE ITEM 11)
13-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2018
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE18B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
BID OPENING DATE AND TIME: A new bid opening date/time of 23 Aug 2018, 1400 hours, is hereby established.
DRAWINGS: Drawings C-110, C-111, C-112, C-120, C-121, C-130, C-131, C-132, C-133, C-134, and C-135 are revised and replaced.
Drawings revised by this amendment have the notation “Revised by Amendment 0002” in the title block.
Attachments Drawings C-110, C-111, C-112, C-120, C-121, C-130, C-131, C-132, C-133, C-134, and C-135
(END OF SUMMARY OF CHANGES)
39039
400 400
EXISTING GROUND
C OF WEIR 1
C OF WEIR 2
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
LEGEND
R650 STONE RIPRAP
SURVEY BASELINE
STONE WEIR
MAY 14.
ANY TREE REMOVAL SHALL BE DONE BETWEEN SEPTEMBER 1 THROUGH 13.
ALL PROFILES ARE CUT ALONG THE THALWEG OF THE CREEK.12.
THESE POINTS IF NECESSARY TO CONSTRUCT THE PROJECT.
LOCATED IN THE FIELD. CONTRACTOR WILL BE REQUIRED TO ESTABLISH
SOME CONTROL POINTS SHOWN ON THE DRAWINGS ARE NOT PHYSICALLY 11.
OUTSIDE OF THE CONSTRUCTION RIGHT OF WAY.
RIGHT OF ENTRY IS AVAILABLE FOR ALL CONTROL POINTS LOCATED 10.
SYSTEM.
COORDINATE SYSTEM AND NOT PART OF THE STATE PLANE COORDINATE
ELEVATIONS SHOWN ON THE PLAN SET SHALL BE TREATED AS A LOCAL
FOR CONSTRUCTION LAYOUT PURPOSES THE COORDINATES AND 9.
SURVEY CONTROL ARE AVAILABLE UPON REQUEST.
GEODETIC CONTROL SHEETS, CONTAINING IN DEPTH DESCRIPTIONS OF 8.
LOCATION WHERE THE TRANSVERSE TIEBACK BEGINS.
SECTION AND THE AZIMUTH OF THE CROSS SECTION. THIS IS ALSO THE
EXACT SPOT WHERE THE LONGITUDINAL STONE DIKE CROSSES THE CROSS
THE LOCATIONS INDICATED IN THE STONE TIEBACK TABLE REFLECT THE 7.
SECTION.
AZIMUTH DIRECTIONS ARE BASED ON THE DIRECTION OF THE CUT CROSS 6.
VERTICAL REFERENCE SYSTEM; NAVD 88.5.
83.
HORIZONTAL COORDINATE SYSTEM: STATE PLANE, MISSISSIPPI EAST, NAD 4.
ZERO AZIMUTH IS FACING NORTH.3.
TIEBACKS.
NOT TO SCALE. SEE THE CROSS SECTIONS FOR DIMENSIONS OF INDIVIDUAL
THE TIEBACK SYMBOL INDICATES THE LOCATION OF THE TIEBACK AND IS 2.
SHEET C-502.
BANK PAVING, SEE SHEET C-501. FOR DETAILS ON THE STONE WEIRS, SEE
FOR DETAILS ON THE LONGITUDINAL PEAKED STONE TOE DIKE AND STONE 1.
GENERAL NOTES
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:11 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
A
N S I
D
S
IT
E P
L A
N
C-110
D
W A
L L
A C
E P .E
G
A N
D E
R S
O N
G
A N
D E
R S
O N
D
M O
O N
E Y
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
V
IC
K S
B U
R G D
IS
T R
IC
T
R
IV
E R S
T A
B
IL
IZ
A T
IO
N S
E C
T
IO
N
A1
SCALE: 1" = 60' 60' 120'0
D1
SCALE: 1" = 60' 60' 120'0
N
B A
N K S
T A
B
IL
IZ
A T
IO
N S
IT
E
BANK STABILIZATION SITE 2 - SITE PLAN
BANK STABILIZATION SITE 2 - PROFILE
M A T C
H L
IN
E
W E
E -1
-B -0
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
L
L
5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
STATION
L
FLOW
THALWEG OF CREEK
EL. 388.075
IR BS15-03-B
C WEIR 2
C WEIR 1
EL. 377.396
IR BS 1503-R1
EL. 381.971
IR BS 1503-R2
S T A . 7
+4 0.
°3 8' .3 5"
S T A . 7
.7
1° '1 5.
S T A . 7
.7
1° '1 5.
S T
A . 0
.5
°1
'2 .5
S T
A . -0
.4
°5
'4 .9
S T
A . -0
.5
°1
'2 .5
6.1
°25 '52 .59
.1
°5 '4 .7
E=743718.89
N=1903998.21
E=743727.34
N=1903994.71
E=743747.71
N=1904050.93
E=743756.68
N=1904046.51
E=744229.40
N=1904510.79
E=744230.21
N=1904520.76
E=744285.99
N=1904517.95
E=744285.69
N=1904507.83
C
C
C
C.P. #1
C.P. #2
C.P. #3
C.P. #4
C.P. #18
C.P. #19
C.P. #20
C.P. #21
C.P. #22
C.P. #23
360 36
380380
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
LEGEND
R650 STONE RIPRAP
SURVEY BASELINE
STONE WEIR
MAY 14.
ANY TREE REMOVAL SHALL BE DONE BETWEEN SEPTEMBER 1 THROUGH 13.
ALL PROFILES ARE CUT ALONG THE THALWEG OF THE CREEK.12.
THESE POINTS IF NECESSARY TO CONSTRUCT THE PROJECT.
LOCATED IN THE FIELD. CONTRACTOR WILL BE REQUIRED TO ESTABLISH
SOME CONTROL POINTS SHOWN ON THE DRAWINGS ARE NOT PHYSICALLY 11.
OUTSIDE OF THE CONSTRUCTION RIGHT OF WAY.
RIGHT OF ENTRY IS AVAILABLE FOR ALL CONTROL POINTS LOCATED 10.
SYSTEM.
COORDINATE SYSTEM AND NOT PART OF THE STATE PLANE COORDINATE
ELEVATIONS SHOWN ON THE PLAN SET SHALL BE TREATED AS A LOCAL
FOR CONSTRUCTION LAYOUT PURPOSES THE COORDINATES AND 9.
SURVEY CONTROL ARE AVAILABLE UPON REQUEST.
GEODETIC CONTROL SHEETS, CONTAINING IN DEPTH DESCRIPTIONS OF 8.
LOCATION WHERE THE TRANSVERSE TIEBACK BEGINS.
SECTION AND THE AZIMUTH OF THE CROSS SECTION. THIS IS ALSO THE
EXACT SPOT WHERE THE LONGITUDINAL STONE DIKE CROSSES THE CROSS
THE LOCATIONS INDICATED IN THE STONE TIEBACK TABLE REFLECT THE 7.
SECTION.
AZIMUTH DIRECTIONS ARE BASED ON THE DIRECTION OF THE CUT CROSS 6.
VERTICAL REFERENCE SYSTEM; NAVD 88.5.
83.
HORIZONTAL COORDINATE SYSTEM: STATE PLANE, MISSISSIPPI EAST, NAD 4.
ZERO AZIMUTH IS FACING NORTH.3.
TIEBACKS.
NOT TO SCALE. SEE THE CROSS SECTIONS FOR DIMENSIONS OF INDIVIDUAL
THE TIEBACK SYMBOL INDICATES THE LOCATION OF THE TIEBACK AND IS 2.
SHEET C-502.
BANK PAVING, SEE SHEET C-501. FOR DETAILS ON THE STONE WEIRS, SEE
FOR DETAILS ON THE LONGITUDINAL PEAKED STONE TOE DIKE AND STONE 1.
GENERAL NOTES
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
LC OF WEIR 3
EXISTING GROUND
17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
STATION
EL. 379.498
IR BS 1503-R3
EL. 377.016
IR BS 1503-R4
THALWEG OF CREEK
C WEIR 3
S T
A .5
'0
.2
S T
A .8
'0
.2
S T
A .1
'0
.2
.1
°3
'4 .8
551.92158°18'37.14"
130° 08'33
.23"
E=744628.52
N=1904157.63
E=744620.38
N=1904151.11
E=744662.66
N=1904113.23
E=744654.86
N=1904106.98
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:17 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
W A
L L
A C
E P .E
S
IT
E P
L A
N
C-111
G
A N
D E
R S
O N
G
A N
D E
R S
O N
D
M O
O N
E Y
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
R
IV
E R S
T A
B
IL
IZ
A T
IO
N S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
T
M A
T C
H L
IN
E
A1
SCALE: 1" = 60' 60' 120'0
M A
TC
H
LIN
E 9+25
D1
SCALE: 1" = 60' 60' 120'0
N
B A
N K S
T A
B
IL
IZ
A T
IO
N S
IT
E
BANK STABILIZATION SITE 2 - SITE PLAN
BANK STABILIZATION SITE 2 - PROFILE
W E
E -1
-B -0
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
C.P. #5
C.P. #6
C.P. #14
C.P. #15
C.P. #16
C.P. #17
360360
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
L
THALWEG OF CREEK
EL. 368.457
IR BS 1503-R7
C WEIR 4
EL. 374.893
IR BS 1503-R5
C WEIR 4
C WEIR 5
EL. 384.685
IR BS 1503-R6
EL. 367.283
IR BS 1503-R8
S T
A .7
°5
'3
.8
S T
A . 3
.9
'2
.4
S T
A . 2
.9
'2
.4
S T
A . 2
.8
'2
.4
S T
A .6
°2
'1
.2
S T
A .4
°2
'1
.2
130°08'33.18" 273.84
91°18'29.63" 258.32
95°04'02.65"
317.17
84°57'23.8 1"
E=745255.20
N=1903509.61
E=745252.54
N=1903499.97
E=745309.04
N=1903498.37
E=745307.99
N=1903488.42
E=745944.67
N=1903577.15
E=745944.78
N=1903572.15
E=746000.65
N=1903578.41
E=746000.88
N=1903568.41
LEGEND
R650 STONE RIPRAP
SURVEY BASELINE
STONE WEIR
MAY 14.
ANY TREE REMOVAL SHALL BE DONE BETWEEN SEPTEMBER 1 THROUGH 13.
ALL PROFILES ARE CUT ALONG THE THALWEG OF THE CREEK.12.
THESE POINTS IF NECESSARY TO CONSTRUCT THE PROJECT.
LOCATED IN THE FIELD. CONTRACTOR WILL BE REQUIRED TO ESTABLISH
SOME CONTROL POINTS SHOWN ON THE DRAWINGS ARE NOT PHYSICALLY 11.
OUTSIDE OF THE CONSTRUCTION RIGHT OF WAY.
RIGHT OF ENTRY IS AVAILABLE FOR ALL CONTROL POINTS LOCATED 10.
SYSTEM.
COORDINATE SYSTEM AND NOT PART OF THE STATE PLANE COORDINATE
ELEVATIONS SHOWN ON THE PLAN SET SHALL BE TREATED AS A LOCAL
FOR CONSTRUCTION LAYOUT PURPOSES THE COORDINATES AND 9.
SURVEY CONTROL ARE AVAILABLE UPON REQUEST.
GEODETIC CONTROL SHEETS, CONTAINING IN DEPTH DESCRIPTIONS OF 8.
LOCATION WHERE THE TRANSVERSE TIEBACK BEGINS.
SECTION AND THE AZIMUTH OF THE CROSS SECTION. THIS IS ALSO THE
EXACT SPOT WHERE THE LONGITUDINAL STONE DIKE CROSSES THE CROSS
THE LOCATIONS INDICATED IN THE STONE TIEBACK TABLE REFLECT THE 7.
SECTION.
AZIMUTH DIRECTIONS ARE BASED ON THE DIRECTION OF THE CUT CROSS 6.
VERTICAL REFERENCE SYSTEM; NAVD 88.5.
83.
HORIZONTAL COORDINATE SYSTEM: STATE PLANE, MISSISSIPPI EAST, NAD 4.
ZERO AZIMUTH IS FACING NORTH.3.
TIEBACKS.
NOT TO SCALE. SEE THE CROSS SECTIONS FOR DIMENSIONS OF INDIVIDUAL
THE TIEBACK SYMBOL INDICATES THE LOCATION OF THE TIEBACK AND IS 2.
SHEET C-502.
BANK PAVING, SEE SHEET C-501. FOR DETAILS ON THE STONE WEIRS, SEE
FOR DETAILS ON THE LONGITUDINAL PEAKED STONE TOE DIKE AND STONE 1.
GENERAL NOTES
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
L
L
C OF WEIR 4
C OF WEIR 5
EXISTING GROUND
28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
STATION
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:23 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
W A
L L
A C
E P .E
S
IT
E P
L A
N
C-112
G
A N
D E
R S
O N
G
A N
D E
R S
O N
D
M O
O N
E Y
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
R
IV
E R S
T A
B
IL
IZ
A T
IO
N S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
T
M A T C
H L
IN
E
A1
SCALE: 1" = 60' 60' 120'0
D1
SCALE: 1" = 60' 60' 120'0
N
B A
N K S
T A
B
IL
IZ
A T
IO
N S
IT
E
BANK STABILIZATION SITE 2 - SITE PLAN
BANK STABILIZATION SITE 2 - PROFILE
W E
E -1
-B -0
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
C.P. #7
C.P. #8
C.P. #9
C.P. #10
C.P. #11
C.P. #12
C.P. #13
435435
445 4
C WEIR 6
EL. 439.162
IR ROW KJ-2
EL. 448.641
IR ROW KJ-1
EL. 453.246
TBM ROW KJ-A
THALWEG OF CREEK
50 FT BEHIND BASELINE
RIGHT OF WAY
50 FT BEHIND TOP BANK
RIGHT OF WAY
E=774849.63
N=1892925.49
E=774850.82
N=1892915.56
E=774794.11
N=1892915.62
E=774794.56
N=1892925.61
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
LEGEND
R650 STONE RIPRAP
SURVEY BASELINE
STONE WEIR
MAY 14.
ANY TREE REMOVAL SHALL BE DONE BETWEEN SEPTEMBER 1 THROUGH 13.
ALL PROFILES ARE CUT ALONG THE THALWEG OF THE CREEK.12.
THESE POINTS IF NECESSARY TO CONSTRUCT THE PROJECT.
LOCATED IN THE FIELD. CONTRACTOR WILL BE REQUIRED TO ESTABLISH
SOME CONTROL POINTS SHOWN ON THE DRAWINGS ARE NOT PHYSICALLY 11.
OUTSIDE OF THE CONSTRUCTION RIGHT OF WAY.
RIGHT OF ENTRY IS AVAILABLE FOR ALL CONTROL POINTS LOCATED 10.
SYSTEM.
COORDINATE SYSTEM AND NOT PART OF THE STATE PLANE COORDINATE
ELEVATIONS SHOWN ON THE PLAN SET SHALL BE TREATED AS A LOCAL
FOR CONSTRUCTION LAYOUT PURPOSES THE COORDINATES AND 9.
SURVEY CONTROL ARE AVAILABLE UPON REQUEST.
GEODETIC CONTROL SHEETS, CONTAINING IN DEPTH DESCRIPTIONS OF 8.
LOCATION WHERE THE TRANSVERSE TIEBACK BEGINS.
SECTION AND THE AZIMUTH OF THE CROSS SECTION. THIS IS ALSO THE
EXACT SPOT WHERE THE LONGITUDINAL STONE DIKE CROSSES THE CROSS
THE LOCATIONS INDICATED IN THE STONE TIEBACK TABLE REFLECT THE 7.
SECTION.
AZIMUTH DIRECTIONS ARE BASED ON THE DIRECTION OF THE CUT CROSS 6.
VERTICAL REFERENCE SYSTEM; NAVD 88.5.
83.
HORIZONTAL COORDINATE SYSTEM: STATE PLANE, MISSISSIPPI EAST, NAD 4.
ZERO AZIMUTH IS FACING NORTH.3.
TIEBACKS.
NOT TO SCALE. SEE THE CROSS SECTIONS FOR DIMENSIONS OF INDIVIDUAL
THE TIEBACK SYMBOL INDICATES THE LOCATION OF THE TIEBACK AND IS 2.
SHEET C-502.
BANK PAVING, SEE SHEET C-501. FOR DETAILS ON THE STONE WEIRS, SEE
FOR DETAILS ON THE LONGITUDINAL PEAKED STONE TOE DIKE AND STONE 1.
GENERAL NOTES
L
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
OF ROAD
EXISTING EDGE
EXISTING GROUND
C OF WEIR 6
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
STATION
C.P. #1
C.P. #2
C.P. #9
C.P. #10
C.P. #11
C.P. #12
C.P. #13
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:28 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
N
S
W A
L L
A C
E P .E
S
IT
E P
L A
N
C-120
G
A N
D E
R S
O N
G
A N
D E
R S
O N
D
M O
O N
E Y
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
R
IV
E R S
T A
B
IL
IZ
A T
IO
N S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
T
D1
SCALE: 1" = 50' 50' 100'0
A1
SCALE: 1" = 60' 60' 120'0
B A
N K S
T A
B
IL
IZ
A T
IO
N S
IT
E
BANK STABILIZATION SITE 3 - SITE PLAN
BANK STABILIZATION SITE 3 - PROFILE
W E
E -1
-B -0
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
L
S T
A . 4
.2
°1
'4
.1
S T
A .1
'5
.6
S T
A .7
'5
.3
430430430
435 435
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C.P. #3
C.P. #4
C.P. #5
C.P. #6
C.P. #7
C.P. #8
LEGEND
R650 STONE RIPRAP
SURVEY BASELINE
STONE WEIR
MAY 14.
ANY TREE REMOVAL SHALL BE DONE BETWEEN SEPTEMBER 1 THROUGH 13.
ALL PROFILES ARE CUT ALONG THE THALWEG OF THE CREEK.12.
THESE POINTS IF NECESSARY TO CONSTRUCT THE PROJECT.
LOCATED IN THE FIELD. CONTRACTOR WILL BE REQUIRED TO ESTABLISH
SOME CONTROL POINTS SHOWN ON THE DRAWINGS ARE NOT PHYSICALLY 11.
OUTSIDE OF THE CONSTRUCTION RIGHT OF WAY.
RIGHT OF ENTRY IS AVAILABLE FOR ALL CONTROL POINTS LOCATED 10.
SYSTEM.
COORDINATE SYSTEM AND NOT PART OF THE STATE PLANE COORDINATE
ELEVATIONS SHOWN ON THE PLAN SET SHALL BE TREATED AS A LOCAL
FOR CONSTRUCTION LAYOUT PURPOSES THE COORDINATES AND 9.
SURVEY CONTROL ARE AVAILABLE UPON REQUEST.
GEODETIC CONTROL SHEETS, CONTAINING IN DEPTH DESCRIPTIONS OF 8.
LOCATION WHERE THE TRANSVERSE TIEBACK BEGINS.
SECTION AND THE AZIMUTH OF THE CROSS SECTION. THIS IS ALSO THE
EXACT SPOT WHERE THE LONGITUDINAL STONE DIKE CROSSES THE CROSS
THE LOCATIONS INDICATED IN THE STONE TIEBACK TABLE REFLECT THE 7.
SECTION.
AZIMUTH DIRECTIONS ARE BASED ON THE DIRECTION OF THE CUT CROSS 6.
VERTICAL REFERENCE SYSTEM; NAVD 88.5.
83.
HORIZONTAL COORDINATE SYSTEM: STATE PLANE, MISSISSIPPI EAST, NAD 4.
ZERO AZIMUTH IS FACING NORTH.3.
TIEBACKS.
NOT TO SCALE. SEE THE CROSS SECTIONS FOR DIMENSIONS OF INDIVIDUAL
THE TIEBACK SYMBOL INDICATES THE LOCATION OF THE TIEBACK AND IS 2.
SHEET C-502.
BANK PAVING, SEE SHEET C-501. FOR DETAILS ON THE STONE WEIRS, SEE
FOR DETAILS ON THE LONGITUDINAL PEAKED STONE TOE DIKE AND STONE 1.
GENERAL NOTES
L
L
L
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
E L E
V .0
S T
A .0
E L E
V .0
S T
A .0
E L E
V .0
EXISTING GROUND
C OF WEIR 7
C OF WEIR 8
C OF WEIR 9
11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
E L E
V A
T
IO
N I
N F
E E
T
N .A .V .D .8
STATION
S T
A .0
S T
A .0
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:33 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
W A
L L
A C
E P .E
S
IT
E P
L A
N
C-121
G
A N
D E
R S
O N
G
A N
D E
R S
O N
D
M O
O N
E Y
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
R
IV
E R S
T A
B
IL
IZ
A T
IO
N S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
T
D1
SCALE: 1" = 50' 50' 100'0
N
A1
SCALE: 1" = 60' 60' 120'0
B A
N K S
T A
B
IL
IZ
A T
IO
N S
IT
E
BANK STABILIZATION SITE 3 - SITE PLAN
BANK STABILIZATION SITE 3 - PROFILE
W E
E -1
-B -0
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
L
L
L
C WEIR 9
C WEIR 7
C WEIR 8
EL. 417.185
NAIL FLY PT 10601
EL. 433.834
IR ROW KJ-3
EL. 438.206
TBM ROW KJ-B
THALWEG OF CREEK
S T
A . 1
.8
°4
'1
.3
S T
A . 1
.8
°4
'1
.3
S T
A . 1
.8
°4
'1
.3
S T
A .6
°3
'0
.0
S T
A .6
°2
'2
.7
S T
A .1
°5
'0
.8
S T
A .4
°1
'5 .0
S T
A .6
°1
'5 .0
S T
A .9
°1
'5 .0
50 FT BEHIND BASELINE
RIGHT OF WAY
50 FT BEHIND TOP BANK
RIGHT OF WAY
E=774332.63
N=1892842.85
E=774334.28
N=1892852.80
E=774277.95
N=1892850.71
E=774280.53
N=1892860.37 E=774086.54
N=1892875.24
E=774087.28
N=1892865.27
E=774031.43
N=1892861.17
E=774030.70
N=1892871.14
E=773850.62
N=1892893.07
E=773852.86
N=1892902.76
E=773775.98
N=1892920.93
E=773779.73
N=1892930.55
E=770508.81
N=1884851.11
ROW
E=770515.22
N=1884880.78
ROW
E=770558.67
N=1885081.87
ROW
E=770911.70
N=1885005.60
ROW
E=770841.18
N=1884679.23
ROW
E=770488.15
N=1884755.51
ROW
TOP EL.=505.00'
E=770664.19
N=1884840.75
48" RISER
CENTER OF
INV. EL.=492.00'
E=770687.00
N=1884946.31
36" CONDUIT
END OF
LIMITS OF R200 RIPRAP
EL.=510.00
E=770757.10
N=1884831.39
SPILLWAY
EL.=510.00
E=770768.72
N=1884838.04
SPILLWAY
EL.=510.00
E=770775.17
N=1884867.92
SPILLWAYEL.=510.00
E=770757.62
N=1884887.14
SPILLWAY
EL.=513.00
E=770750.36
N=1884854.87
EMBANKMENT
EL.=513.00
E=770603.74
N=1884886.54
EMBANKMENT
150' EMBANKMENT @ EL. 513.00
BLANKET @ EL. 501.00
IMPERVIOUS UPSTREAM
1V:3H
1V:2.5H
1V:3H 1V:2H
1V:3H
C/L CREEK
C/L CREEK
C/L SPILLWAY
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:37 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
V
ID
L
W A
L L
A C
E P .E
C-130
N W
M
N A
T H
A N M
O R
R O
W
R H
M
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
A C
M E S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
T
E C
R W -R
P -1
-0
0 60'30'
SCALE: 1"=30'
S
IT
E P
L A
N
SITE PLAN - SITE CRW-RP-15-01
30' ROW
.8
.9
A Z
°1
'3
361.18'
.7
A Z
°1
'3
361.18'
ROW LIMITS
ROW LIMITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS
ROW LIMITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
25'
WOODS
WOODS
WOODS
TOP
TOP
T O
P
T O
P B
A N
K
B A
N K
BANK
BANK
F L
O W
FLOW
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
W E
E -1
-B -0
SEE SHEET X-501.
5. FOR STORM WATER POLLUTION PREVENTION PLAN TYPICAL DETAILS,
4. FOR MISCELLANEOUS CONSTRUCTION DETAILS, SEE SHEET C-506.
3. FOR MISCELLANEOUS PIPE AND RISER DETAILS, SEE SHEET C-505.
2. FOR PIPE AND RISER DETAILS, SEE SHEET C-504.
1. FOR GENERAL SITE PLAN AND DETAILS, SEE SHEET C-503.
REFERENCES:
* 8. ANY TREE REMOVAL MUST BE DONE BETWEEN SEPTEMBER 1 - MAY 14.
7. GENERAL SITE AREA SHALL BE SLOPED TO DRAIN TO RISER.
OF ALL STOCKPILES.
6. SILT FENCES SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE
SHEETS FOR DETAILS.
MATTING ARE NOT SHOWN ON THE SITE PLAN. SEE REFERENCE
5. ANTI-VORTEX BAFFLE, RISER FENCE, AND EROSION CONTROL
4. FOR CENTERLINE PROFILE ALONG CONDUIT, SEE SHEET C-230.
3. AZIMUTHS ARE TURNED CLOCKWISE FROM NORTH.
ELEVATIONS IN FEET, NAVD88.
2. COORDINATE SYSTEM NAD83 MISSISSIPPI EAST ZONE.
1. EXISTING GROUND SURVEY DATA WAS COLLECTED IN 2017.
NOTES:
/2
/2
R E
V
IS
E D B
Y A
M E
N D
M E
N T
AMENDED AFTER ADVERTISEMENT
E=727502.87
N=1913898.21
ROW
E=727502.87
N=1913928.51
ROW
E=727779.45
N=1913898.21
ROW E=727779.45
N=1914011.27
ROW
E=728070.02
N=1914365.16
ROW
E=728038.24
N=1914376.04
ROW
E=727711.36
N=1914487.89
ROW
E=727502.87
N=1914487.89
ROW
EL. 314.00
FILL TO TOP BANK
TOP EL.=312.00
E=727655.23
N=1914296.43
72" RISER
CENTER OF
INV. EL.=301.00
E=727562.22 N=1914330.33
54" CONDUIT
END OF
193.42' EMBANKMENT @ EL. 320.00
BLANKET @ EL. 308.00
IMPERVIOUS UPSTREAM
EL.=320.00
E=727603.83
N=1914245.94
EMBANKMENT
EL.=320.00
E=727648.35
N=1914368.08
EMBANKMENT
EL.=320.00
E=727648.35
N=1914431.49
EMBANKMENT
LIMITS OF R200 RIPRAP
1V:3H
1V:2.5H
1V:3H
1V:2H
1V:2H
350' DIVERSION EMBANKMENT
C/L PIGEON ROOST CREEK
C/L CREEK
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:42 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
V
ID
L
W A
L L
A C
E P .E
C-131
N W
M
N A
T H
A N M
O R
R O
W
R H
M
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
A C
M E S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
E C
R W -R
P -1
-0
0 60'30'
SCALE: 1"=30'
S
IT
E P
L A
N
SITE PLAN - SITE CRW-RP-15-02
30' ROW ROW LIMITS
R O
W L
IM
IT
S
ROW LIMITS
R O
W
LIM
ITS
R O
W
LIM
ITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS
R
O W
WOODS
WOODS
WOODS
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
TOP
TOP
TO
P
TOP
TOP
T O
P
TOP
T O
P
BANK
B A N
K
B A
N K
B A
N K
B A
N K
B A
N K
B A
N K
B A
N K
B A
N K
TOP
FLOW
F L
O W
F L
O W
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
559.37'
AZ 180°0'0"
.5
A Z
'0
113.06'
AZ 180°0'0"
457.90'
A Z 39°23'20"
.4
A Z
°5
'2
.5
A Z
'0
W E
E -1
-B -0
SEE SHEET X-501.
5. FOR STORM WATER POLLUTION PREVENTION PLAN TYPICAL DETAILS,
4. FOR MISCELLANEOUS CONSTRUCTION DETAILS, SEE SHEET C-506.
3. FOR MISCELLANEOUS PIPE AND RISER DETAILS, SEE SHEET C-505.
2. FOR PIPE AND RISER DETAILS, SEE SHEET C-504.
1. FOR GENERAL SITE PLAN AND DETAILS, SEE SHEET C-503.
REFERENCES:
* 8. ANY TREE REMOVAL MUST BE DONE BETWEEN SEPTEMBER 1 - MAY 14.
7. GENERAL SITE AREA SHALL BE SLOPED TO DRAIN TO RISER.
OF ALL STOCKPILES.
6. SILT FENCES SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE
SHEETS FOR DETAILS.
MATTING ARE NOT SHOWN ON THE SITE PLAN. SEE REFERENCE
5. ANTI-VORTEX BAFFLE, RISER FENCE, AND EROSION CONTROL
4. FOR CENTERLINE PROFILE ALONG CONDUIT, SEE SHEET C-230.
3. AZIMUTHS ARE TURNED CLOCKWISE FROM NORTH.
ELEVATIONS IN FEET, NAVD88.
2. COORDINATE SYSTEM NAD83 MISSISSIPPI EAST ZONE.
1. EXISTING GROUND SURVEY DATA WAS COLLECTED IN 2017.
NOTES:
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
R E
V
IS
E D B
Y A
M E
N D
M E
N T
E=728199.64
N=1914418.12
ROW
E=728199.64
N=1914449.81
ROW
E=728549.25
N=1914418.12
ROW
E=728610.98
N=1914226.67
ROW
E=729041.32
N=1914226.67
ROW
E=728893.66
N=1914736.86
ROW
E=728199.64
N=1914686.25
ROW
TOP EL.=313.00
E=728590.44
N=1914499.98
48" RISER
CENTER OF
INV. EL.=301.00
E=728586.56
N=1914619.42
36" CONDUIT
END OF
EL.=322.00
E=728336.28
N=1914529.25
EMBANKMENT
EL.=322.00
E=728756.06
N=1914542.88
EMBANKMENT
420' EMBANKMENT @ EL. 322.00
FILL TO EL. 309.00
BLANKET @ EL. 309.00
IMPERVIOUS UPSTREAM
1V:3H
1V:2.5H
1V:2H
1V:3H
90' DIVERSION EMBANKMENT
100' DIVERSION EMBANKMENT
C/L PIGEON ROOST CREEK
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:46 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
V
ID
L
W A
L L
A C
E P .E
C-132
N W
M
N A
T H
A N M
O R
R O
W
R H
M
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
A C
M E S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
E C
R W -R
P -1
-0
0 60'30'
SCALE: 1"=30'
S
IT
E P
L A
N
SITE PLAN - SITE CRW-RP-15-03
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
R
O W
.4
349.61'
AZ 90°0'0"
.1
A Z
°7 '4
430.34'
AZ 90°0'0"
.1
A Z
°5
'2
695.86'
ROW LIMITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS ROW LIMITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS ROW LIMITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS
TOP
TOP
TOP
TOP
TO
P
T O P
BANK
BANK
BANK
BANK
BANK
BANK
WOODS
WOODS
CULTIVATED FIELD
FLOW
FLOW
W E
E -1
-B -0
SEE SHEET X-501.
5. FOR STORM WATER POLLUTION PREVENTION PLAN TYPICAL DETAILS,
4. FOR MISCELLANEOUS CONSTRUCTION DETAILS, SEE SHEET C-506.
3. FOR MISCELLANEOUS PIPE AND RISER DETAILS, SEE SHEET C-505.
2. FOR PIPE AND RISER DETAILS, SEE SHEET C-504.
1. FOR GENERAL SITE PLAN AND DETAILS, SEE SHEET C-503.
REFERENCES:
* 8. ANY TREE REMOVAL MUST BE DONE BETWEEN SEPTEMBER 1 - MAY 14.
7. GENERAL SITE AREA SHALL BE SLOPED TO DRAIN TO RISER.
OF ALL STOCKPILES.
6. SILT FENCES SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE
SHEETS FOR DETAILS.
MATTING ARE NOT SHOWN ON THE SITE PLAN. SEE REFERENCE
5. ANTI-VORTEX BAFFLE, RISER FENCE, AND EROSION CONTROL
4. FOR CENTERLINE PROFILE ALONG CONDUIT, SEE SHEET C-231.
3. AZIMUTHS ARE TURNED CLOCKWISE FROM NORTH.
ELEVATIONS IN FEET, NAVD88.
2. COORDINATE SYSTEM NAD83 MISSISSIPPI EAST ZONE.
1. EXISTING GROUND SURVEY DATA WAS COLLECTED IN 2017.
NOTES:
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
E=745801.28
N=1902767.32
ROW
E=745823.06
N=1902723.56
ROW
E=745836.48
N=1902696.58
ROW
E=745957.57
N=1902453.19
ROW
E=745984.37
N=1902170.27
ROW
E=746183.48
N=1902189.13
ROW
E=746117.51
N=1902885.59
ROW
TOP EL.=365.00
E=745989.28
N=1902689.74
60" RISER
CENTER OF
INV. EL.=347.00
E=746091.35
N=1902740.52
42" CONDUIT
END OF
EL.=372.00
E=745976.06
N=1902779.18
EMBANKMENT
EL.=372.00
E=746051.79
N=1902626.98
EMBANKMENT
170' EMBANKMENT @ EL. 372.00
EL. 265.00
FILL TO TOP BANK
LIMITS OF R200 RIPRAP
1V:3H
1V:2.5H
SLOPE TO DRAIN TO RISER
1V:2H
55' DIVERSION EMBANKMENT
395' DIVERSION EMBANKMENT
C/L CUFFAWA CREEK
C/L CREEK
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
360 360
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:51 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
V
ID
L
W A
L L
A C
E P .E
C-133
N W
M
N A
T H
A N M
O R
R O
W
R H
M
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
A C
M E S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
E C
R W -R
P -1
-0
0 60'30'
SCALE: 1"=30'
S
IT
E P
L A
N
SITE PLAN - SITE CRW-RP-15-04
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
.6
.88
AZ 3
°3 2'5
5"
1.8
4'
AZ 3
°3 2'5
5"
284.18'
AZ 174°35'
21"
.0
A Z
°3
'2
699.58'
AZ 174°35'
21"
FL
OW
FLOW
F L O
W
CULTIVATED FIELD
T O
P
T O
P
TOP
BANK
B A
N K
B A
N K
T O P
BANK
' R
OW
W E
E -1
-B -0
SEE SHEET X-501.
5. FOR STORM WATER POLLUTION PREVENTION PLAN TYPICAL DETAILS,
4. FOR MISCELLANEOUS CONSTRUCTION DETAILS, SEE SHEET C-506.
3. FOR MISCELLANEOUS PIPE AND RISER DETAILS, SEE SHEET C-505.
2. FOR PIPE AND RISER DETAILS, SEE SHEET C-504.
1. FOR GENERAL SITE PLAN AND DETAILS, SEE SHEET C-503.
REFERENCES:
* 8. ANY TREE REMOVAL MUST BE DONE BETWEEN SEPTEMBER 1 - MAY 14.
7. GENERAL SITE AREA SHALL BE SLOPED TO DRAIN TO RISER.
OF ALL STOCKPILES.
6. SILT FENCES SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE
SHEETS FOR DETAILS.
MATTING ARE NOT SHOWN ON THE SITE PLAN. SEE REFERENCE
5. ANTI-VORTEX BAFFLE, RISER FENCE, AND EROSION CONTROL
4. FOR CENTERLINE PROFILE ALONG CONDUIT, SEE SHEET C-231.
3. AZIMUTHS ARE TURNED CLOCKWISE FROM NORTH.
ELEVATIONS IN FEET, NAVD88.
2. COORDINATE SYSTEM NAD83 MISSISSIPPI EAST ZONE.
1. EXISTING GROUND SURVEY DATA WAS COLLECTED IN 2017.
NOTES:
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
R E
V
IS
E D B
Y A
M E
N D
M E
N T
E=746294.50
N=1897775.28
ROW
E=746394.50
N=1897775.28
ROW
E=746559.62
N=1898095.24
ROW
E=746573.91
N=1898122.94
ROW
E=746573.91
N=1898242.94
ROW
E=746252.33
N=1898225.17
ROW
TOP EL.=374.00
E=746420.94
N=1898125.67
66" RISER
CENTER OF
TOP EL.=374.00
E=746421.67
N=1898114.69
66" RISER
CENTER OF
INV. EL.=355.00
E=746313.93
N=1898118.56
48" CONDUIT
END OF
INV. EL.=355.00
E=746314.66
N=1898107.59
48" CONDUIT
END OF
EL.=381.00
E=746396.67
N=1898034.54
EMBANKMENT
EL.=381.00
E=746384.75
N=1898214.15
EMBANKMENT
EL.=370.00
E=746442.01
N=1898121.56
DITCH
EL.=370.00
E=746499.38
N=1898157.16
DITCH
C/L DITCH
180' EMBANKMENT @ EL. 381.00
240' DIVERSION EMBANKMENT
LIMITS OF R200 RIPRAP
LIMITS OF R200 RIPRAP
EL. 380.00
FILL TO TOP BANK
EL. 378.00
FILL TO TOP BANK 1V:2H
1V:2H
1V:2.5H
GRADE TO DRAIN TO RISER
1V:2H
C/L CUFFAWA CREEK
(DO NOT DISTURB)
EXISTING 30" RISER PIPE
(DO NOT DISTURB)
EXISTING 30" CONDUIT
(DO NOT DISTURB)
EXISTING BRIDGE
MARIANNA ROAD
(DO NOT DISTURB)
EXISTING POWERPOLE
(DO NOT DISTURB)
EXISTING POWERPOLE
(DO NOT DISTURB)
EXISTING POWERPOLE
(DO NOT DISTURB)
EXISTING POWERLINE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
370375
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:55 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
V
ID
L
W A
L L
A C
E P .E
C-134
N W
M
N A
T H
A N M
O R
R O
W
R H
M
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
A C
M E S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
E C
R W -R
P -1
-0
0 60'30'
SCALE: 1"=30'
S
IT
E P
L A
N
SITE PLAN - SITE CRW-RP-15-05
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
30' ROW
30' ROW
ROW LIMITS
ROW LIMITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS
R O
W L
IM
IT
S
322.08'
AZ 266°50'12"
A Z '0
.0
A Z
°1
'4
100'
AZ 90°0'0"
.8
A Z
°3
'4
F L
O W
T O
P
TOP
TOP
TOP
BANK
BANK
B A N
K
B A
N K
CULTIVATED FIELD
CULTIVATED FIELD
CULTIVATED FIELD
W E
E -1
-B -0
SEE SHEET X-501.
5. FOR STORM WATER POLLUTION PREVENTION PLAN TYPICAL DETAILS,
4. FOR MISCELLANEOUS CONSTRUCTION DETAILS, SEE SHEET C-506.
3. FOR MISCELLANEOUS PIPE AND RISER DETAILS, SEE SHEET C-505.
2. FOR PIPE AND RISER DETAILS, SEE SHEET C-504.
1. FOR GENERAL SITE PLAN AND DETAILS, SEE SHEET C-503.
REFERENCES:
* 8. ANY TREE REMOVAL MUST BE DONE BETWEEN SEPTEMBER 1 - MAY 14.
7. GENERAL SITE AREA SHALL BE SLOPED TO DRAIN TO RISER.
OF ALL STOCKPILES.
6. SILT FENCES SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE
SHEETS FOR DETAILS.
MATTING ARE NOT SHOWN ON THE SITE PLAN. SEE REFERENCE
5. ANTI-VORTEX BAFFLE, RISER FENCE, AND EROSION CONTROL
4. FOR CENTERLINE PROFILE ALONG CONDUIT, SEE SHEET C-232.
3. AZIMUTHS ARE TURNED CLOCKWISE FROM NORTH.
ELEVATIONS IN FEET, NAVD88.
2. COORDINATE SYSTEM NAD83 MISSISSIPPI EAST ZONE.
1. EXISTING GROUND SURVEY DATA WAS COLLECTED IN 2017.
NOTES:
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
E=761408.44
N=1936364.58
ROW
E=761397.31
N=1936336.21
ROW
E=761352.30
N=1936221.51
ROW
E=760772.92
N=1936448.86
ROW
E=760913.35
N=1936806.73
ROW
E=761250.60
N=1936674.39
ROW
E=761216.95
N=1936588.63
ROW
E=761459.08
N=1936493.62
ROW
TOP EL.=451.00
E=760989.43
N=1936526.75
54" RISER
CENTER OF
INV. EL.=433.00
E=761035.00
N=1936642.88
36" CONDUIT
END OF
LIMITS OF R200 RIPRAP
EL.=460.00
E=760889.82
N=1936601.02
EMBANKMENT
EL.=460.00
E=761073.486
N=1936528.95
EMBANKMENT
197.30' EMBANKMENT @ EL. 460.00
EL.=455.00
E=761071.34
N=1936484.79
SPILLWAY
EL.=455.00
E=761094.34
N=1936507.34
SPILLWAY
EL.=455.00
E=761103.47
N=1936530.61
SPILLWAY
EL.=455.00
E=761099.08
N=1936563.06
SPILLWAY
C/L SPILLWAY
BLANKET @ EL. 437.00
IMPERVIOUS UPSTREAM
1V:3H
1V:3H
1V:2.5H
1V:3H
C/L DITCH
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:58 AM 8/9/2018 pw://COE-MVKPWP01VIC.mvk.ds.usace.army.mil:CEMVK01/Documents/Civil Works/08 - Yazoo River Basin/11 - Mississippi Delta Headwaters Projects (MDHP)/MDHP, BS-15-03/30000 - Planning & Engineering & Design/30AA0 - Engineering & Design/CAD_BIM/_Sheets/BS-15-03_
S
V
ID
L
W A
L L
A C
E P .E
C-135
N W
M
N A
T H
A N M
O R
R O
W
R H
M
V
IC
K S
B U
R G
M
IS
S
IS
S
IP
P I
A C
M E S
E C
T
IO
N
V
IC
K S
B U
R G D
IS
T R
IC
E C
R W -R
P -1
-0
0 60'30'
SCALE: 1"=30'
S
IT
E P
L A
N
SITE PLAN - SITE CRW-RP-15-06
D E
S O
T O A
N D M
A R
S H
A L L C
O U
N T
IE
S
M S
F C /M
R
T
Y A
Z O
O R
IV
E R B
A S
IN
M D
H P
B S -1
-0
C O
L D
W A
T E
R R
IV
E R W
A T
E R
S H
E D
R
O W
622.40'
.2
A Z
°2
'3
.6
A Z
°2
'3
260.11'
AZ 111°25'31"
.1
362.29'
.4
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS
ROW LIMITS
ROW LIMITS
ROW LIMITS
R O
W L
IM
IT
S
R O
W L
IM
IT
S
ROW LIMITS
ROW LIMITS
25'
F L
O W
F L
O W
WOODS
WOODS
WOODS
WOODS
FIELD
TOP
T O
P
T O
P
T O
P B
A N
KB
A
N K
B A N
K
B A
N K
W E
E -1
-B -0
SEE SHEET X-501.
5. FOR STORM WATER POLLUTION PREVENTION PLAN TYPICAL DETAILS,
4. FOR MISCELLANEOUS CONSTRUCTION DETAILS, SEE SHEET C-506.
3. FOR MISCELLANEOUS PIPE AND RISER DETAILS, SEE SHEET C-505.
2. FOR PIPE AND RISER DETAILS, SEE SHEET C-504.
1. FOR GENERAL SITE PLAN AND DETAILS, SEE SHEET C-503.
REFERENCES:
* 8. ANY TREE REMOVAL MUST BE DONE BETWEEN SEPTEMBER 1 - MAY 14.
7. GENERAL SITE AREA SHALL BE SLOPED TO DRAIN TO RISER.
OF ALL STOCKPILES.
6. SILT FENCES SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE
SHEETS FOR DETAILS.
MATTING ARE NOT SHOWN ON THE SITE PLAN. SEE REFERENCE
5. ANTI-VORTEX BAFFLE, RISER FENCE, AND EROSION CONTROL
4. FOR CENTERLINE PROFILE ALONG CONDUIT, SEE SHEET C-232.
3. AZIMUTHS ARE TURNED CLOCKWISE FROM NORTH.
ELEVATIONS IN FEET, NAVD88.
2. COORDINATE SYSTEM NAD83 MISSISSIPPI EAST ZONE.
1. EXISTING GROUND SURVEY DATA WAS COLLECTED IN 2017.
NOTES:
/2
/2
AMENDED AFTER ADVERTISEMENT
R E
V
IS
E D B
Y A
M E
N D
M E
N T
| A22_Drawings_Am0002.pdf |
| BS-15-03_C-110 |
| BS-15-03_C-111 |
| BS-15-03_C-112 |
| BS-15-03_C-120 |
| BS-15-03_C-121 |
| BS-15-03_C-130 |
| BS-15-03_C-131 |
| BS-15-03_C-132 |
| BS-15-03_C-133 |
| BS-15-03_C-134 |
| BS-15-03_C-135 |
File details come from the government source that posted it.