AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912EE18B0002, for Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 22-Inch Diameter), Fully

Operated w ith Attendant Plant and Personnel, w ith a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging w ithin the

Vicksburg District, Other Districts w ithin the Mississippi Valley Division, or Districts Adjacent to the Vicksburg District, is amended as follow s:

SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE18B0002

X 9B. DATED (SEE ITEM 11)

27-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Mar-2018

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE18B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

A BID OPENING DATE AND TIME OF TUESDAY, 03 APRIL 2018 AT 2:00 P.M. HAS BEEN

ESTABLISHED.

SF1442, BID SCHEDULE and NOTES are revised and replaced in their entirety.

SPECIFICATIONS: Section 00 80 00.00 09, Section 01 00 00.00 09, and Section 35 20

23.00 09 are revised and replaced in their entirety.

Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.

ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0001AA FIRST HOURS 993 HR $ $

0001AB HOURS OVER ITEM 0001AA 993 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE

0002AA FIRST HOURS 944 HR $ $

0002AB HOURS OVER ITEM 0002AA 944 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9FEET, AND

WITH TRAVELING SPUD CARRIAGE, PLUS

UNDERWATER PUMP OVER 700 HORSEPOWER

0003AA FIRST HOURS 891 HR $ $

0003AB HOURS OVER ITEM 0003AA 891 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0004AA FIRST HOURS 922 HR $ $

0004AB HOURS OVER ITEM 0004AA 922 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE

"Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet for Construction and Maintenance Dredging within the Vicksburg District, other Districts within the Mississippi Valley Division, or Districts adjacent to the Vicksburg District"

The work to be performed by this contract will be in the Ouachita and Black and Red River Waterways, but in accordance with paragraph 1.3.2 “Other Locations” in Section 02482 of the contract, there is also the possibility of being required to be moved to other locations in the Vicksburg District, other Districts adjacent to the Vicksburg District, or other Districts within the Mississippi Valley Division.

"Revised By Amendment 0001"

0005AA FIRST HOURS 838 HR $ $

0005AB HOURS OVER ITEM 0005AA 838 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE, PLUS

UNDERWATER PUMP OVER 750 HORSEPOWER

0006AA FIRST HOURS 792 HR $ $

0006AB HOURS OVER ITEM 0006AA 792 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 27-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0007AA FIRST HOURS 786 HR $ $

0007AB HOURS OVER ITEM 0007AA 786 HR $ $

0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 27-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING

SPUD CARRIAGE

0008AA FIRST HOURS 720 HR $

0008AB HOURS OVER ITEM 0008AA 720 HR $

0009 MOBILIZATION 1 JOB FOR $

0010 DEMOBILIZATION 1 JOB FOR $

REMOBILIZATION 1 EA $ $

0012 TOWING SERVICE UPSTREAM 300 MI $ $

0013 TOWING SERVICE DOWNSTREAM 300 MI $ $

SHORELINE 3,000 LF $ $

$TOTAL BASE

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0015AA

FIRST HOURS 501 HR $ $

0015AB

HOURS OVER ITEM 0015AA 501 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE

0016AA

FIRST HOURS 452 HR $ $

0016AB

HOURS OVER ITEM 0016AA 452 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9FEET, AND

WITH TRAVELING SPUD CARRIAGE, PLUS

UNDERWATER PUMP OVER 700 HORSEPOWER

0017AA

FIRST HOURS 399 HR $ $

0017AB

HOURS OVER ITEM 0017AA 399 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0018AA

FIRST HOURS 430 HR $ $

0018AB

HOURS OVER ITEM 0018AA 430 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE

0019AA

FIRST HOURS 346 HR $ $

0019AB

HOURS OVER ITEM 0019AA 346 HR $ $

The work to be performed by OPTIONAL LINE ITEMS 0015 through 0022 will be in the Red River.

BIDDING SCHEDULE- OPTION 1 - RED RIVER

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE, PLUS

UNDERWATER PUMP OVER 750 HORSEPOWER

0020AA

FIRST HOURS 300 HR $ $

0020AB

HOURS OVER ITEM 0020AA 300 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 27-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0021AA

FIRST HOURS 294 HR $ $

0021AB

HOURS OVER ITEM 0021AA 294 HR $ $

0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 27-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING

SPUD CARRIAGE

0022AA

FIRST HOURS 228 HR $ $

0022AB

HOURS OVER ITEM 0022AA 228 HR $ $

TOTAL OPTION 1

TOTAL BASE PLUS OPTION 1

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0023AA

FIRST HOURS 501 HR $ $

0023AB

HOURS OVER ITEM 0015AA 501 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE

0024AA

FIRST HOURS 452 HR $ $

0024AB

HOURS OVER ITEM 0016AA 452 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 22-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9FEET, AND

WITH TRAVELING SPUD CARRIAGE, PLUS

UNDERWATER PUMP OVER 700 HORSEPOWER

0025AA

FIRST HOURS 399 HR $ $

0025AB

HOURS OVER ITEM 0017AA 399 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0026AA

FIRST HOURS 430 HR $ $

0026AB

HOURS OVER ITEM 0018AA 430 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE

0027AA

FIRST HOURS 346 HR $ $

0027AB

HOURS OVER ITEM 0019AA 346 HR $ $

The work to be performed by OPTIONAL LINE ITEMS 0023 through 0030 will be in the Ouachita/Black Rivers.

BIDDING SCHEDULE- OPTION 2 - OUACHITA/BLACK RIVERS

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 24-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING SPUD CARRIAGE, PLUS

UNDERWATER PUMP OVER 750 HORSEPOWER

0028AA

FIRST HOURS 300 HR $ $

0028AB

HOURS OVER ITEM 0020AA 300 HR $ $

LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 27-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET

0029AA

FIRST HOURS 294 HR $ $

0029AB

HOURS OVER ITEM 0021AA 294 HR $ $

0030 LEASE OF ONE CUTTERHEAD, HYDRAULIC

PIPELINE DREDGE (NOT LESS THAN 27-INCH

DIAMETER, WITH ATTENDANT PLANT, AND

WITH A DRAFT NOT TO EXCEED 9 FEET, AND

WITH TRAVELING

SPUD CARRIAGE

0030AA

FIRST HOURS 228 HR $ $

0030AB

HOURS OVER ITEM 0022AA 228 HR $ $

$TOTAL BASE PLUS ALL OPTIONS

TOTAL BASE PLUS OPTION 2

TOTAL OPTION 2

NOTES

(a) THIS PROCUREMENT IS UNRESTRICTED.

(b) All technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. See Section 00100 Entitled “TECHNICAL INQUIRIES AND

QUESTIONS”.

(c) Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT

PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR ANY ITEM, HIS BID WILL BE DECLARED

NONRESPONSIVE.

(d) All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "lump sum", "job" or "each".

(e) If a bid or modification to a bid based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.

(f) Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008,0015, 0016, 0017, 0018, 0019, 0020, 0021, 022, 0023, 0024, 0025, 0026, 0027, 0028, 0029 and 0030 have been subdivided into sub-items. A bid for the work shall include a bid for each of these sub-items. Bidders should refer to Section 00 08 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph entitled “VARIATIONS IN ESTIMATED QUANTITIES—SUBDIVIDED ITEMS” before preparing their bids for these items.

(g) All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

(h) Award will be made as a whole to the lowest responsive, responsible bidder as may be in the best interest of the Government.

(i) Lack of registration in the SAM database will make an offeror ineligible for award. SEE CONTRACT CLAUSE

52.204-7 ENTITLED, "SYSTEM FOR AWARD MANAGEMENT".

(j)The SF1442, Bidding Schedule, Plant Characteristic Sheets, and Section 00600 (Representations and Certifications) must be accurately completed and returned with your bid or it may be rejected as nonresponsive.

(k) The contract will be 365 days from the date of award, unless it becomes necessary to terminate the contract earlier.

(l) If a Contractor submits a bid on this solicitation to use a dredge that is currently under another contract then the Contractor may not be eligible for award, unless they submit a detailed plan demonstrating how they plan to successfully complete multiple contracts using one dredge. Any plan submitted must be accepted and approved by USACE prior to award.

http://www.projnet.org/projnet

X

W807PM80572813

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER) FULLY OPERATED WITH ATTENDANT PLANT AND PERSONNEL WITH A DRAFT NOT TO EXCEED 9 FEET

FOR CONSTRUCTION AND MAINTENANCE DREDGING WITHIN THE VICKSBURG DISTRICT, OTHER

DISTRICTS WITHIN THE MISSISSIPPI VALLEY DIVISION, OR DISTRICTS ADJACENT TO THE VICKSBURG

DISTRICT

DESCRIPTION OF WORK: The work consists of furnishing, delivering and operating one (1) cutterhead, hydraulic pipeline dredge (not less than 22-inch diameter), fully operated with attendant plant and personnel with a draft not to exceed 9 feet for construction and maintenance dredging within the Vicksburg District, other districts within the Mississippi Valley Division, or Districts adjacent to the Vicksburg District.

The estimated value of the proposed work is between $1,000,000 and $5,000,000.

DUSTIN G. CANNADA (601)631-7546

NOTE: In this request for proposal, "bid" and "bidder" mean "offer" and "offeror".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

27 FEBRUARY 2018

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

SEE SPECIAL NOTICES TO BIDDERS

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by

GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within 14 calendar days and complete it within (365 calendar days after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 00 80 00.00 09

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original to perform the work required are due at the place specified in Item 8 BY 03 April 2018 @ 02:00 p.m.

If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

VICKSBURG CONTRACTING OFC

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE

PAGE

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(601)631-7261 FAX: TEL: TEL: FAX:

W912EE18B0002

20B. SIGNATURE

(REV. 4-85) STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE 27. PAYMENT WILL BE MADE BY: 964145

US ARMY CORPS OF ENGRS FINANCE CENTER

5722 INTEGRITY DRIVE

MILLINGTON TN 38054-5005

26. ADMINISTERED BY

VICKSBURG CONTRACTING OFFICE

4155 CLAY STREET

VICKSBURG, MS 39183-3435

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(Must be fully completed by offeror) OFFER

W912EE-18-B-0002

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23.00 09 DREDGING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 Revised By Amendment 0001

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 80 00.00 09

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 DELIVERY, PROSECUTION, TERMINATION, AND SUBSTITUTION OF PLANT

1.1.1 Delivery

1.1.2 Prosecution

1.1.3 Termination

1.1.4 Substitution of Plant

1.2 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION

1.3 PERFORMANCE OF WORK BY THE CONTRACTOR

1.4 PHYSICAL DATA

1.5 MISPLACED MATERIALS

1.6 FUEL TRANSFER

1.7 ENVIRONMENTAL PROTECTION

1.7.1 Scope

1.7.2 Quality Control

1.7.3 Submittals

1.7.4 Notification

1.7.5 Protection of the Environmental Resources

1.7.6 Maintenance of Pollution Control Facilities

1.7.7 Training of Contractor Personnel in Pollution Control

1.7.8 Payment

1.8 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.9 ENVIRONMENTAL LITIGATION

1.10 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS

1.11 SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS

1.12 I-WATCH

1.13 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

1.14 SECURITY CLEARANCE/ACCESS PRIVILEGES

1.15 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

DOCUMENT 00 80 00.00 09 Page 1

SECTION 00 80 00.00 09

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 DELIVERY, PROSECUTION, TERMINATION, AND SUBSTITUTION OF PLANT

1.1.1 Delivery

a. The Contractor shall deliver the dredge and attendant plant ready for operation to the first work location as described in Section 35 20 23.00 09 DREDGING, paragraph, FIRST WORK LOCATION, or to any alternate work site nearer to the point of origin as may be directed, within 3014 calendar days after date of receipt by the Contractor of notice to proceed. The plant will undergo a government inspection within 7-10 days after the bid opening, and the contractor notified of acceptance or rejection.

b. A prework conference will be held prior to commencement of work.

The time and place of the conference will be determined by mutual agreement between the Contracting Officer or his designated representative and the Contractor.

1.1.2 Prosecution

The Contractor shall prosecute the work assigned him to meet the schedule of dredging operations as determined by the Contracting Officer. The work schedule will normally be 24 hours per day, 7 days per week .

1.1.3 Termination

Upon termination or completion of the contract, the dredge and attendant plant will be released to the Contractor at the site of the final work location.

1.1.4 Substitution of Plant

Substitution of dredge or dredges will be allowed in rare cases provided the Contractor furnishes written justification and the following conditions are met:

a. The substitute dredge meets all requirements of the contract specifications, and the Contractor submits clear evidence that the proposed substitute dredge can, and has performed at the rate set forth in Section 35 20 23.00 09 DREDGING, paragraph DREDGING EQUIPMENT.

b. The substitute dredge will be made available for inspection by Government personnel prior to beginning work and prior to the release of the working dredge.

c. The Government is reimbursed all costs in connection with inspection of the substitute dredge.

d. The substitute dredge is delivered to the worksite before the original dredge is shutdown and moved off the jobsite. This

DOCUMENT 00 80 00.00 09 Page 2 requirement does not apply to substitutions made during suspension and release periods as per Section 01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS, paragraph DURATION OF CONTRACT, subparagraph "c".

e. The submitted rate for the substitute dredge has been determined by the Contracting Officer to be in the best interest of the Government.

f. Substitution of plant will not be allowed prior to award of contract.

g. If the substitute dredge does not meet the specifications for the bid item of the original dredge, the hourly rate of the substitute dredge shall be computed by the following formula:

Substitute Dredge Hourly Rate = ((Original Hourly Rate)X(Estimated Hours in Original Bid Item))/(Estimated Hours in Bid Item Applicable to Substitute Dredge)

1.2 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION

Within 10 days after award, the successful Bidder/Contractor must furnish the Contracting Officer a description of the items of work which will be performed with its own forces and the estimated cost of those items. (See paragraph PERFORMANCE OF WORK BY THE CONTRACTOR.)

1.3 PERFORMANCE OF WORK BY THE CONTRACTOR

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifty (50) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government. (FAR 52.236-1)

1.4 PHYSICAL DATA

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) Weather Conditions. Data on weather conditions may be obtained from the National Weather Service.

(b) Transportation Facilities. Floating plant may reach the sites of work via the Mississippi, Red, and Ouachita/Black Rivers. Obtaining access through private lands to landings near the sites of work for land transportation is the responsibility of the Contractor.

c. Channel Traffic. Traffic on the rivers consists of commercial towboats and tows, passenger vessels, and small boats. Traffic in the river and harbors may interfere to some extent with dredging operations.

d. The material to be dredged will consist of sand, gravel, loose rock, silt, mud and clay; and in certain localities stumps, roots, logs, riprap, driftwood, sunken objects, and miscellaneous debris may be encountered. The dredge must be equipped with suitable pump impellers and cutters to efficiently handle these varying materials on pipeline lengths up to 7,500 feet.

DOCUMENT 00 80 00.00 09 Page 3

e. The work required consists of making or enlarging dredge cuts, construction of fills, and dredging in various channels and harbors.

The currents may vary from 0 to 7 feet per second. The bank to be cut may extend as much as 45 feet above the water surface.

f. The dredging operations contemplated are not all in or near cities. Camps or floating plant may be necessary for the housing or boarding of the labor employed by the Contractor.

g. Obstruction of Channel. The Government will not keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army in accordance with provisions of Section 7 of the River and Harbor Act, approved 8 August 1917. The Contractor is required to conduct the work in such a manner as to obstruct navigation as little as possible, and if the Contractor's plant obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a safe passage. Upon completion of the work, the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other markers placed by him under the contract in navigable water or on shore.

h. During the contract period, there is a possibility that the Contractor will receive requests from private interests and local governments to dredge outside the channel limits alongside privately owned wharfs or docks. Provided the work can be accomplished without detriment to the work assigned by the Government, and subject to the prior approval of the Contracting Officer in each instance, the Contractor may utilize during the contract period, equipment being furnished to the Government under this contract for accomplishing work requested by said private interests and local governments. It is understood and agreed that in temporarily releasing the Contractor's equipment for performing work outside of channel limits for private interests and local governments, the Government does not assume any responsibility whatsoever for the said work, or for the collection from said private interests and local governments of any amounts earned for work performed.

i. Condition of Channel. Data on current channel conditions may be obtained from the U.S. Coast Guard.

1.5 MISPLACED MATERIALS

Should the Contractor during the progress of the work lose, dump, throw overboard, sink, or misplace any material, plant, machinery, or appliance, which in the opinion of the Contracting Officer may be dangerous to or obstruct navigation, the Contractor shall immediately recover and remove the object. The Contractor shall give immediate notice, with description and location of such obstructions, to the Contracting Officer or inspector, and when required, mark or buoy such obstructions until removed. Should the Contractor refuse, neglect, or delay compliance with the above requirements, the obstruction may be removed by the Contracting Officer, and the cost of such removal may be deducted from any money due or to become due the Contractor, or may be recovered under his bond. The liability of the Contractor of the removal of a vessel wrecked or sunk without fault or negligence shall be limited to that provided in Sections 15, 19, and 20 of the River and Harbor Act of 3 March 1899 (33 U.S.C. 410, DOCUMENT 00 80 00.00 09 Page 4 et seq.)

1.6 FUEL TRANSFER

When marine plant and equipment are in use under this contract, a safe means of fuel transfer will be used. This fuel transfer will meet the Coast Guard Regulations 33 CFR 156.120 regarding fuel/oil transfer operations and 33 CFR 155.320 fuel/oil discharge containment. The marine plant will be checked for compliance before the plant is allowed to be used on the contract.

1.7 ENVIRONMENTAL PROTECTION

1.7.1 Scope

This section covers prevention of environmental pollution and damage as the result of construction operations under this contract and for those measures set forth in this specification, environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare;

unfavorably alter ecological balances of importance to human life; affect other species of importance to man; or degrade the utility of the environment for aesthetic, cultural and/or historical purposes. The control of environmental pollution and damage requires consideration of air, water, and land, and includes management of visual aesthetics, noises, solid waste, radiant energy, and radioactive materials, as well as other pollutants.

1.7.2 Quality Control

The Contractor shall establish and maintain quality control for environmental protection of all items set forth herein. The Contractor shall record on daily reports any problems complying with laws, regulations and ordinances and corrective action taken.

1.7.3 Submittals

a. General. Within 15 days after Award of the contract, an Environmental Protection Plan shall be submitted to the Contracting Officer for review and acceptance. The Contractor shall submit an environmental protection plan in accordance with provisions as herein specified. The plan shall include but not be limited to the following:

(1) A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, and abatement that are applicable to the Contractor's proposed operations, and the requirements imposed by those laws, regulations, and permits.

(2) Methods for protection of features to be preserved within authorized work areas. The Contractor shall prepare a listing of the methods to protect resources needing protection, including but not limited to trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, archaeological, and cultural resources.

(3) Procedures to be implemented to provide the required environmental protection and to comply with the applicable laws and regulations. The Contractor shall set out the procedures to

DOCUMENT 00 80 00.00 09 Page 5 be followed to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures set out in accordance with the Environmental Protection Plan.

(4) Permit or license and the location of the solid waste disposal area.

(5) Environmental monitoring plans for the job site, including land, water, air, and noise monitoring.

b. Implementation. Prior to commencement of the work, the Contractor shall submit in writing the above Environmental Protection Plan.

Approval of the Contractor's plan will not relieve the Contractor of his responsibility for adequate and continuing control of pollutants and other environmental protection measures. The Contractor shall not commence physical work at the site until the plan has been accepted by the Contracting Officer, or his authorized representative.

1.7.4 Notification

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with the aforementioned Federal, State, or local laws or regulations, permits, and other elements of the Contractor's environmental protection plan. The Contractor shall, after receipt of such notice, inform the Contracting Officer of proposed corrective action and take such action as may be approved. If the Contractor fails to comply, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extension shall be granted, or costs or damages allowed to the Contractor for any such suspension.

1.7.5 Protection of the Environmental Resources

a. General. The environmental resources within the project boundaries and those affected outside the limits of permanent work under this contract shall be protected during the entire period of this contract.

The Contractor shall confine his activities to areas defined by the drawings and specifications. Environmental protection shall be as stated in the following paragraphs.

b. Protection of Land Resources

(1) Disposal of Solid Wastes, General. Solid wastes (excluding material resulting from clearing and grubbing) shall be placed in containers which are emptied on a regular schedule. All handling and disposal shall be conducted to prevent contamination.

(2) Disposal of Solid Waste by Removal from Site. The Contractor shall transport all solid waste off of the work site and dispose of it in compliance with federal, state, and local requirements for solid waste disposal.

(3) Disposal of Chemical Waste. Chemical waste shall be stored in corrosion resistant containers, removed from the work area, and disposed of in accordance with federal, state, and local regulations.

(4) Disposal of Discarded Materials. Discarded materials other than those which can be included in the solid waste category will

DOCUMENT 00 80 00.00 09 Page 6 be disposed of as directed by the Contracting Officer.

c. Preservation and Recovery of Historical Archaeological and Cultural Resources. Known historical, archaeological, and cultural resources within the Contractor's work area will be designated by the Contracting Officer, and the Contractor shall take precautions to preserve all such resources as they existed at the time they were pointed out to the Contractor. The Contractor shall install all protection for these resources and shall be responsible for their preservation during this contract. All items having any historical or archaeological interest which are discovered in the course of any construction activities shall be carefully preserved. The Contractor shall leave the archaeological find undisturbed and shall immediately report the find to the Contracting Officer so that the proper authorities may be notified.

d. Protection of Air Resources

(1) General. The Contractor shall keep construction activities under surveillance, management, and control to minimize pollution of air resources. All activities, equipment, processes, and work operated or performed by the Contractor in accomplishing the specified construction activities shall be in strict accordance with the applicable state air pollution regulations and all Federal emission and performance laws and standards. Ambient Air Quality Standards set by the Environmental Protection Agency shall be maintained for those construction operations and activities specified in this section. Special management techniques as set out below shall be implemented to control air pollution by the construction activities which are included in the contract.

(2) Hydrocarbons and Carbon Monoxide. Hydrocarbons and carbon monoxide emissions from equipment shall be controlled to Federal and State allowed limits at all times.

(3) Odors. Odors shall be controlled at all times for all construction activities, processing, and preparation of materials.

(4) Monitoring of Air Quality. Monitoring of air quality shall be the responsibility of the Contractor. All air areas affected by the construction activities shall be monitored by the Contractor.

1.7.6 Maintenance of Pollution Control Facilities

The Contractor shall maintain all constructed facilities and portable pollution control devices for the duration of the contract, or for that length of time construction activities create the particular pollutant.

1.7.7 Training of Contractor Personnel in Pollution Control

The Contractor shall train his personnel in all phases of environmental protection. The training shall include methods of detecting and avoiding pollution, familiarization with pollution standards, both statutory and contractual, and installation and care of facilities (vegetative covers, and instruments required for monitoring purposes) to ensure: adequate and continuous environmental pollution control.

DOCUMENT 00 80 00.00 09 Page 7

1.7.8 Payment

No separate payment or direct payment will be made for the cost of the work covered under this section, and such work will be considered as a subsidiary obligation of the Contractor.

1.8 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

(a) This special contract requirement does not apply to terminations.

See 52.249-5000, Basis for Settlement of Proposals and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

(UAI 31.105-101)

NOTE: EP-1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule" is available on the Internet at http://www.usace.army.mil/inet/usace-docs/eng-pamphlets/ep.htm or may be purchased from the Government Printing Office on CD-ROM by calling (202) 512-1800.

1.9 ENVIRONMENTAL LITIGATION

a. If the performance of all or any part of the work is suspended, delayed, or interrupted due to an order of a court of competent jurisdiction as a result of environmental litigation, as defined below, the Contracting Officer, at the request of the Contractor, shall

DOCUMENT 00 80 00.00 09 Page 8 determine whether the order is due in any part to the acts or omissions of the Contractor, or a Subcontractor at any tier, not required by the terms of the contract. If it is determined that the order is not due in any part to acts or omissions of the Contractor, or a Subcontractor at any tier, other than as required by the terms of this contract, such suspension, delay, or interruption shall be considered as if ordered by the Contracting Officer in the administration of this contract under the terms of the Contract Clause SUSPENSION OF WORK in this contract.

The period of such suspension, delay, or interruption shall be considered unreasonable, and an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) as provided in that clause, subject to all the provisions thereof.

b. The term "Environmental Litigation", as used herein, means a lawsuit alleging that the work will have an adverse effect on the environment, or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment.

1.10 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS

This variation in estimated quantities clause is applicable only to Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, and 0030.

(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

(b) Where the actual quantity of work performed for Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, and 0030 is less than 85 percent of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.

(c) If the actual quantity of work performed under Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, and 0030 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item, and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, and 0030 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity. (UAI 52.211-5001)

1.11 SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS

All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract who require access to Automated Information Systems

DOCUMENT 00 80 00.00 09 Page 9

(AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. The Contractor shall have each applicable employee complete a SF-85P and submit to the Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435 within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS.

Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435. For those Contractors that do not have a CAGE Code or Facility Security Clearance, Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435 Security Office will process the investigation in coordination with the Contractor and contract employees.

1.12 I-WATCH

The Contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

1.13 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

1.14 SECURITY CLEARANCE/ACCESS PRIVILEGES

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

1.15 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has

DOCUMENT 00 80 00.00 09 Page 10 two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

DOCUMENT 00 80 00.00 09 Page 11

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00.00 09

GENERAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SCOPE OF WORK

1.3 PAYMENTS

1.3.1 General

1.3.2 Pay Time

1.4 PAYMENT INVOICES

1.5 SUBMITTAL OF SUBCONTRACTING PLAN

1.6 DESIGNATED BILLING OFFICE

1.7 PLANT

1.8 DURATION OF CONTRACT

1.9 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS

OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)

1.10 SERVICES TO BE FURNISHED TO THE GOVERNMENT

1.11 ACCIDENT PREVENTION PLAN

1.12 LOUISIANA SEVERANCE TAXES

1.13 ACCIDENT INVESTIGATIONS AND REPORTING

1.14 SSHO STAFFING FOR USACE DREDGING CONTRACTS

1.15 SSHO REQUIREMENTS FOR DREDGING

1.16 DESIGNATED REPRESENTATIVE (DR) REQUIREMENTS FOR DREDGING

1.17 SAFETY PERSONNEL TRAINING REQUIREMENTS FOR DREDGING

1.18 DREDGING AND DREDGE RELATED MARINE WORK

1.19 DAILY INSPECTIONS

1.20 MACHINERY AND MECHANIZED EQUIPMENT

1.21 MANDATORY CONDITIONS FOR WORK INVOLVING MARINE PLANT

1.22 HARBOR MAINTENANCE FEE

1.23 OFFICE ACCOMMODATIONS FOR INSPECTORS

1.24 MEANS OF ESCAPE FOR…