About this file

Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912EE-17-R-0003 for Ouachita River Basin, Little Missouri River, Narrow s Dam, Arkansas, The Narrow s Dam and Pow er Plant 8,888/11/111 KVA, Narrow s GSU Installation and Sw itchyard Upgrade, is amended as follow s:

Please see continuation pages for changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE-17-R-0003

X 9B. DATED (SEE ITEM 11)

02-Mar-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Mar-2017

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE-17-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SPECIAL NOTICES Pages 5 & 6 are revised and replaced in their entirety.

DRAWINGS: Drawings 13957-1000, 13957-6501, and Topo and Boring sheets have been added.

Drawings added by this amendment have the notation “Added by Amendment 0001” in the lower right hand corner.

Items revised by this amendment have an asterisks (*) in the margins before and after the changes to the previous issue as well as the notation “Revised by Amendment 0001” at the bottom of the page.

Section 00100 - Bidding Schedule/Instructions to Bidders

SPECIAL NOTICES

1) THIS REQUEST FOR PROPOSAL IS BEING ADVERTISED AS A

UNRSTRICTED PROCUREMENT.

FOR: OUACHITA RIVER BASIN, LITTLE MISSOURI RIVER, NARROWS

DAM, ARKANSAS, THE NARROWS DAM AND POWER PLANT 8,888/11/111

KVA, NARROWS GSU INSTALLATION AND SWITCHYARD UPGRADE

PROPOSAL DUE: 04 April 2017 @ 1200 HOURS

A PRE-BID SITE VISIT WILL BE CONDUCTED FOR 15 MARCH 2017 AT

1000 HRS. ATTENDANCE IS HIGHLY RECOMMENDED. PARTICIPANTS

WILL MEET AT NARROWS POWER PLANT, 2859 HWY 19 NORTH,

MURFREESBORO, ARKANSAS 71958, POINT OF CONTACT IS DEWEY

EVANS, 501-767-2401, EXT 73025.

2) NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE “EQUAL

OPPORTUNITY CLAUSE” AND THE “AFFIRMATIVE ACTION COMPLIANCE

REQUIREMENTS FOR CONSTRUCTION” WHICH MAY APPLY TO THE CONTRACT

RESULTING FROM THIS SOLICITATION.

3) MAIL PROPOSALS TO THE VICKSBURG DISTRICT HEADQUARTERS

BUILDING, CONTRACTING OFFICE, 4155 CLAY STREET,

VICKSBURG, MISSISSIPPI 39183-3435. ATTN: DUSTIN CANNADA

OR EMAIL TO DUSTIN.G.CANNADA@USACE.ARMY.MIL.

4) HAND CARRIED PROPOSALS MUST BE DELIVERED TO THE

VICKSBURG DISTRICT HEADQUARTERS BUILDING, 4155 CLAY

STREET, VICKSBURG, MISSISSIPPI 39183-3435. ATTN: DUSTIN

CANNADA.

5) PROPOSALS WILL NOT BE ACCEPTED NOR SHALL PROPOSALS BE

WITHDRAWN TELEGRAPHICALLY.

6) IN ACCORDANCE WITH THE PROVISIONS OF SUBPART 36.201

(EVALUATION OF CONTRACTOR PERFORMANCE) OF THE FEDERAL

ACQUISITION REGULATION (FAR), CONSTRUCTION CONTRACTOR’S

PERFORMANCE SHALL BE EVALUATED THROUGHOUT THE PERFORMANCE

OF THE CONTRACT. THE UNITED STATES ARMY CORPS OF ENGINEERS

(USACE) FOLLOWS THE PROCEDURES OUTLINED IN ENGINEERING

REGULATION 415-1-17 TO FULFILL THIS FAR REQUIREMENT. FOR

CONSTRUCTION CONTRACTS AWARDED AT OR ABOVE $100,000.00, THE

USACE WILL EVALUATE CONTRACTOR’S PERFORMANCE AND PREPARE A

PERFORMANCE REPORT USING THE CONSTRUCTION CONTRACTOR

APPRAISAL SUPPORT SYSTEM (CCASS), WHICH IS NOW A WEB-BASED

"Revised By Amendment 0001" mailto:%20Dustin.G.Cannada@usace.army.mil

SYSTEM. AFTER EVALUATION (INTERIM OR FINAL), THE CONTRACTOR

WILL HAVE THE ABILITY TO ACCESS, REVIEW AND COMMENT ON THE

EVALUATION FOR A PERIOD OF 30 DAYS. ACCESSING AND USING

CCASS REQUIRES SPECIFIC SOFTWARE, CALLED PKI CERTIFICATION,

WHICH IS INSTALLED ON THE USER’S COMPUTER. THE

CERTIFICATION IS A DEPARTMENT OF DEFENSE REQUIREMENT AND

WAS IMPLEMENTED TO PROVIDE SECURITY IN ELECTRONIC

TRANSACTIONS. THE CERTIFICATION SOFTWARE COULD COST

APPROXIMATELY $110 - $125 PER CERTIFICATE PER YEAR AND IS

PURCHASED FROM AN EXTERNAL CERTIFICATE AUTHORITIES (ECA)

VENDOR. CURRENT INFORMATION ABOUT THE PKI CERTIFICATION

PROCESS AND FOR CONTACTING VENDORS CAN BE FOUND ON THE WEB

SITE: HTTP://WWW.CPARS.NAVY.MIL/. IF THE CONTRACTOR WISHES

TO PARTICIPATE IN THE PERFORMANCE EVALUATION PROCESS,

ACCESS TO CCASS AND PKI CERTIFICATION IS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR.

7) ELECTRONIC FUNDS TRANSFER (EFT)

PURSUANT TO FAR 52.232-5 AND 52.232-33, ALL PAYMENTS UNDER

THIS CONTRACT WILL BE MADE BY ELECTRONIC FUNDS TRANSFER

(EFT). CONTRACTORS ARE REQUIRED TO COMPLETE FORM: UFC-DISB-

4.

THE FORM AND COMPLETION INSTRUCTIONS MAY BE DOWNLOADED FROM

THE U. S. ARMY CORPS OF ENGINEERS FINANCE CENTER AT:

HTTP://WWW.FC.USACE.ARMY.MIL (CLICK ON "DIRECTORATES" AT

THE TOP OF THE PAGE, THEN CLICK ON "DIRECTORATE OF

ACCOUNTING OPERATIONS" AND THEN “EFT DIRECT DEPOSIT FORM”)

THE “INSTALLATION EROC” FOR THE VICKSBURG CONSOLIDATED

CONTRACTING OFFICE IS “B4."

8) IN ACCORDANCE WITH AFARS 5101.602-2, THE FOLLOWING IS

HEREBY INCORPORATED INTO THIS SOLICITATION.

FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION.

NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATE FUNDS

ARE MADE AVAILABLE.

"Revised By Amendment 0001" http://www.cpars.navy.mil/ http://www.fc.usace.army.mil/

H1 H0

X1 X2

1 5

H1

H0 X2

H1

H0 X1

H1

H0 X1X2

H1

X1 X2

H0

H1

H0X2

Added By Amendment 0001

Added by Amendment 0001

File details come from the government source that posted it. Updated .