A22_Amendment_0003_W912EE-17-B-0009.pdf
PDF 744 KB Posted
- Solicitation number
- W912EE-17-B-0009
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_OfficialAbstract_17B09.pdf | ||
| A22_Amendment_0002_W912EE-17-B-0009-0002.pdf | ||
| A22_Amendment_0001_W912EE17B00090001.pdf | ||
| 17b0009.pdf | ||
| specs.pdf | ||
| 385-1-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No. W912EE17B0009, for Flood Control, Mississippi River and Tributaries, West Bank Mississippi River Levees, Bayou Vidal - Elkridge, Louisiana, Levee Enlargement and Berms, Item 416-R, is amended as follow s:
SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE17B0009
X 9B. DATED (SEE ITEM 11)
05-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2017
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE17B0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
Special Notices and Notes section are revised and replaced in their entirety.
SPECIFICATIONS: SF1442 and Section 00 80 00.00 09 are revised and replaced.
Specifications revised by this amendment have the notation "Revised by Amendment 0003" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
DEPARTMENT OF THE ARMY
VICKSBURG DISTRICT, CORPS OF ENGINEERS
4155 CLAY STREET
VICKSBURG, MISSISSIPPI 39183-3435
REPLY TO ATTENTION OF:
SOLICITATION NO. W912EE-17-B-0009
FOR: FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES WEST BANK
MISSISSIPPI RIVER LEVEES BAYOU VIDAL - ELKRIDGE, LOUISIANA LEVEE
ENLARGEMENT AND BERMS ITEM 416-R
TO OPEN:
1. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL
OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS
SOLICITATION.
2. THIS PROCUREMENT IS TOTAL SMALL BUSINESS E SET-ASIDE.
3. Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity.
IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED
AMOUNT FOR ANY ITEM, HIS BID WILL BE DECLARED NONRESPONSIVE.
4. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) D-U-N-S number. If you do not already have a D&B D-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.
5. BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS
REQUIRED BY THIS SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR
MAKING FALSE STATEMENTS IN BIDS IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4
APR 1984)
6. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "job" or "each".
7. If a bid or modification to a bid based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.
8. All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
9. Award will be made as a whole to the lowest responsive, responsible bidder as may be in the best
"Revised by Amendment 0003" https://www.sam.gov/ http://fedgov.dnb.com/webform interest of the Government.
10. THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442.
The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted. The Notice to Proceed will be issued on or about November 01, 2017.
11. Lack of registration in the SAM database will make an offeror ineligible for award. SEE
CONTRACT CLAUSE 52.204-7 ENTITLED, "SYSTEM FOR AWARD MANAGEMENT".
12. The SF1442, Bidding Schedule, and Section 00600 (Representations and Certifications) must be accurately completed and returned with your bid or it may be rejected as nonresponsive.
13. VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract.
While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
14. The Contractor should be aware of the additional surveying requirements for this contract. See Section 01 00 00.00 09 for more information.
DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment, and constructing Item 416-R, Levee Enlargement and Berms, in Tensas Parish, Louisiana. Principal features of the work include mobilization and demobilization, clearing and grubbing, semicompacted levee embankment, ramps, semicompacted berm embankment, uncompacted berm embankment, removing and replacing existing gravel surfacing, crushed stone surfacing, mowing, turfing, erosion control matting, cattle guards, storm water pollution prevention and environmental protection.
"Revised by Amendment 0003"
B4CTCDGC
Cross-Out
B4CTCDGC
Cross-Out
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN
ACCORDANCE WITH THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY
AND HEALTH REQUIREMENTS MANUAL", DATED NOVEMBER 2014.
ATTENTION:
Contractors must complete, and submit with their offer, the provisions located in section 00600. An offeror may also submit, in lieu of the completed section 00600, a complete hard copy of their Online Representations and Certifications Applications (ORCA) registration. See FAR Clauses 52.204-7 and 52.204-8 for requirement information. The website for ORCA is www.sam.gov.
"Revised by Amendment 0003" http://www.sam.gov/
W807PM71677255
FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES WEST BANK MISSISSIPPI RIVER LEVEES BAYOU VIDAL -
ELKRIDGE, LOUISIANA LEVEE ENLARGEMENT AND BERMS ITEM 416-R
DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment, and constructing Item 416-R, Levee Enlargement and Berms, in Tensas Parish, Louisiana. Principal features of the work include mobilization and demobilization, clearing and grubbing, semicompacted levee embankment, ramps, semicompacted berm embankment, uncompacted berm embankment, removing and replacing existing gravel surfacing, crushed stone surfacing, mowing, turfing, erosion control matting, cattle guards, storm water pollution prevention and environmental protection.
The estimated value of the proposed work is between $5,000,000 and $10,000,000.
DUSTIN G. CANNADA (601)631-7546
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
05 JULY 2017
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SEE SPECIAL NOTICES TO BIDDERS
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by
GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within 10 calendar days and complete it within (310 calendar days after receiving
230 calendar days after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 00 80 00.00 09
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 by (08 August 2017 at 02:00 p.m.)
IIf this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
VICKSBURG CONTRACTING OFC
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE
PAGE
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(601)631-7261FAX: TEL: TEL: FAX:
W912EE17B0009
X
Revised By Amendment 0003
B4EDGDML
Cross-Out
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY: 964145
US ARMY CORPS OF ENGRS FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
26. ADMINISTERED BY
VICKSBURG CONTRACTING OFFICE
4155 CLAY STREET
VICKSBURG, MS 39183-3435
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
Section 00100 - Bidding Schedule/Instructions to Bidders
SPECIAL NOTICES
FOR: FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES WEST BANK
MISSISSIPPI RIVER LEVEES BAYOU VIDAL - ELKRIDGE, LOUISIANA LEVEE
ENLARGEMENT AND BERMS ITEM 416-R
RIGHT OF WAY IS CURRENTLY NOT AVAILABLE. BID OPENING WILL NOT BE HELD UNTIL
RIGHT OF WAY IS AVAILABLE.
BID OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE
AT http://155.76.244.230/bids/bids.htm
1. SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE
RECEIVED UNTIL DATE AND TIME OF BID OPENING.
2. THIS PROCUREMENT IS A TOTAL SMALL BUSINESS SET-ASIDE.
3. YOUR ATTENTION IS DIRECTED TO SECTION 00100-BID
SCHEDULE/INSTRUCTIONS TO BIDDERS CLAUSE ENTITLED “SUBMISSION
OF BIDS”. IT IS THE BIDDER’S RESPONSIBILITY TO ENSURE THAT
BIDS SENT BY COMMERCIAL CARRIER ARE CLEARLY IDENTIFIED AS
CONTAINING A SEALED BID ON THE OUTERMOST ENVELOPE. THIS
INCLUDES, BUT IS NOT LIMITED TO, BIDS SENT VIA: FEDERAL
EXPRESS, AIRBORNE EXPRESS, EXPRESS COURIER SERVICES, INC.,
EXPRESS MAIL - U.S. POSTAL SERVICE, UNITED PARCEL SERVICE AND
PUROLATOR.
4. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL
OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
5. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT
CLAUSE ENTITLED, “AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS
FOR CONSTRUCTION”, WHICH WILL APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
6. SEE SECTION 00 80 00.00 09, SPECIAL CONTRACT
REQUIREMENTS, CLAUSE ENTITLED “COMMENCEMENT, PROSECUTION,
AND COMPLETION OF WORK”.
7. SEE SECTION 01 00 00.00 09, GENERAL CONTRACT REQUIREMENTS
CLAUSE, ENTITLED, “PAYMENT INVOICES” WHICH WILL APPLY TO THE
CONTRACT RESULTING FROM THIS SOLICITATION. THE FEDERAL
ACQUISITION REGULATION REQUIRES THAT THE “REMIT TO” ADDRESS OF
http://155.76.244.230/bids/bids.htm
THE INVOICE MATCH THE “REMIT TO” ADDRESS ON THE CONTRACT OR A
PROPER NOTICE OF ASSIGNMENT.
8. MAIL BIDS TO THE VICKSBURG DISTRICT HEADQUARTERS
BUILDING, ROOM 120, 4155 CLAY STREET, VICKSBURG, MISSISSIPPI
39183-3435. BIDS SENT BY COMMERCIAL CARRIER SHALL BE CLEARLY
MARKED ON THE OUTER ENVELOPE AS CONTAINING A “SEALED BID”.
BIDS MUST BE RECEIVED PRIOR TO THE EXACT TIME SET FOR BID
OPENING.
9. HAND CARRIED BIDS MUST BE DELIVERED TO THE CONTRACTING
OFFICE, ROOM 120, IN THE VICKSBURG DISTRICT HEADQUARTERS
BUILDING, 4155 CLAY STREET, VICKSBURG, MISSISSIPPI 39183-3435.
ALL BIDS MUST BE RECEIVED PRIOR TO THE EXACT TIME SET FOR BID
OPENING. NOTE: BIDS DELIVERED LATER THAN 15 MINUTES PRIOR TO
THE TIME SET FOR THE BID OPENING SHALL BE DELIVERED DIRECTLY
TO ROOM 103, BID OPENING ROOM, RATHER THAN ROOM 120, THE PLANS
AND SPECIFICATIONS ROOM.
10. BIDS WILL NOT BE ACCEPTED NOR SHALL BIDS BE WITHDRAWN
TELEGRAPHICALLY OR BY ELECTRONIC COMMERCE.
11. VENDORS CAN BE FOUND ON THE WEB SITE: http://www.cpars.navy.mil/.
IF THE CONTRACTOR WISHES TO PARTICIPATE IN THE PERFORMANCE
EVALUATION PROCESS, ACCESS TO CCASS AND PKI CERTIFICATION IS THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
12. ELECTRONIC FUNDS TRANSFER (EFT)
PURSUANT TO FAR 52.232-5 AND 52.232-33, ALL PAYMENTS UNDER
THIS CONTRACT WILL BE MADE BY ELECTRONIC FUNDS TRANSFER (EFT).
CONTRACTORS ARE REQUIRED TO COMPLETE FORM:
UFC-DISB-4.
THE FORM AND COMPLETION INSTRUCTIONS MAY BE DOWNLOADED FROM
THE U. S. ARMY CORPS OF ENGINEERS FINANCE CENTER AT:
HTTP://WWW.FC.USACE.ARMY.MIL (CLICK ON "DIRECTORATES" AT THE
TOP OF THE PAGE, THEN CLICK ON "DIRECTORATE OF ACCOUNTING
OPERATIONS" AND THEN “EFT DIRECT DEPOSIT FORM”)
THE “INSTALLATION EROC” FOR THE VICKSBURG CONSOLIDATED
CONTRACTING OFFICE IS “B4."
"Revised by Amendment 0003" http://www.cpars.navy.mil/ http://www.fc.usace.army.mil/
13. PRIOR TO BID OPENING, IN ACCORDANCE WITH FEDERAL
ACQUISITION REGULATION PART 14.303 (b) MODIFICATION OR
WITHDRAWAL OF BIDS, “A BID MAY BE WITHDRAWN IN PERSON BY A
BIDDER OR ITS AUTHORIZED REPRESENTATIVE IF, BEFORE THE EXACT
TIME SET FOR OPENING OF BIDS, THE IDENTITY OF THE PERSONS
REQUESTING WITHDRAWAL IS ESTABLISHED AND THAT PERSON SIGNS A
RECEIPT FOR THE BID."
THE FOLLOWING STEPS WILL BE REQUIRED BY THE VICKSBURG
CONTRACTING OFFICE:
1) CONTRACTOR MUST PRESENT A LETTER VERIFYING THEY ARE A
REPRESENTATIVE OF THE COMPANY.
2) CONTRACTOR MUST SHOW VALID PICTURE ID.
3) VICKSBURG DISTRICT CONTRACTING OFFICE WILL HAVE THE
REPRESENTATIVE SIGN A RECEIPT FOR BID.
W912EE-17-B-0009
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.2 LIQUIDATED DAMAGES-CONSTRUCTION
1.3 EXCEPTION TO LIQUIDATED DAMAGES
1.4 CONTRACT DRAWINGS AND SPECIFICATIONS
1.5 CORRESPONDENCE AND ELECTRONIC COMMUNICATION
1.6 (S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
1.7 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
1.8 PHYSICAL DATA
1.9 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
1.10 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.11 I-WATCH
1.12 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
1.13 SECURITY CLEARANCE/ACCESS PRIVILEGES
1.14 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
1.15 FOREIGN NATIONALS WORKING ON GOVERNMENT CONTRACTS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
DOCUMENT 00 80 00.00 09 Page 1
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 310370 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises. (FAR 52.211-10)
The notice to proceed with construction will be issued after receipt and Government verification of the required performance and payment bonds. The contract also requires submission of various pre-work plans and Government approval of those plans as well as various preconstruction meetings prior to commencement of physical work at the site. Notice to proceed will not be delayed to await receipt of these plans. The contract performance time includes adequate time for submission and Government review of the required pre-work plans and all required preconstruction meetings to be conducted after notice to proceed. The Notice to Proceed will be issued on or about November 01, 2017.
1.2 LIQUIDATED DAMAGES-CONSTRUCTION
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $842 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed.
These liquidated damages are in addition to excess costs of repurchase under the Termination clause. (FAR 52.211-12)
1.3 EXCEPTION TO LIQUIDATED DAMAGES
Since the Contractor's obligations specified in Section 32 92 00.00 09 EXISTING TURF MAINTENANCE AND NEW TURF ESTABLISHMENT may extend beyond the completion time specified in paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, these periods and the additional work, if required, will be exempt from liquidated damages provided all other work has been completed.
1.4 CONTRACT DRAWINGS AND SPECIFICATIONS
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall --
DOCUMENT 00 80 00.00 09 Page 2
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general --
(1) Large-scale drawings shall govern small scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the INDEX TO DRAWINGS shown on Drawing No. G-002 entitled PROJECT LOCATION MAPS AND INDEX TO DRAWINGS, File No.
M-15-980.
(DFARS 252.236-7001)
1.5 CORRESPONDENCE AND ELECTRONIC COMMUNICATION
For ease and speed of communications, both the Government and Contractor shall exchange correspondence and all other documents duplicate in both hard paper copy and electronic format. Inclusion of an electronic copy is in addition to any other parts of the contract that may specify a minimum number of hard copies to be submitted, such as for shop drawing transmittals. Electronic submission can be accomplished by one of the following methods: email, file upload to the following website https://safe.amrdec.army.mil/SAFE, or through the Quality Control System (QCS) software interface with the Resident Management System (RMS). Format for electronic submissions will be in portable document format (.pdf).
Documents include all general correspondence, administrative plans, all material submittals including shop drawings, progress schedules, submittal registers, requests for information (RFIs), Quality Control (QC) test results, pay requests, etc. Paper documents will govern, in the event of discrepancy with the electronic version. Generally, paper documents will also govern where effective receipt dates are required, such as contractor claims submitted under the Disputes clause of the contract and progress payment requests. However in the case of administrative plans, shop drawings and other submittals transmitted for government review, both the electronic and hard copies are required to begin the review process, so the effective date of receipt will be the date when both the electronic and hard copies are received by the government.
DOCUMENT 00 80 00.00 09 Page 3
1.6 (S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rmssupport.helpserve.com/) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data;
ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.
FAR 52.222-8 and FAR 52.222-13
DOCUMENT 00 80 00.00 09 Page 4
1.8 PERFORMANCE OF WORK BY THE CONTRACTOR
The Contractor shall perform on the site and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government. (FAR 52.236-1)
1.8 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
Within 10 days after award, the successful Bidder/Contractor must furnish the Contracting Officer a description of the items of work which will be performed with its own forces and the estimated cost of those items. (See paragraph PERFORMANCE OF WORK BY THE CONTRACTOR.)
1.7 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
Within 10 days after award, the successful Bidder/Contractor must furnish the Contracting Officer a description of the items of work which will be performed with its own forces and the estimated cost of those items. (See Contract Clause NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE.)
1.8 PHYSICAL DATA
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and borings.
(b) Weather Conditions. Information with respect to temperatures and precipitation may be obtained from the National Weather Service.
(c) Transportation Facilities.
(1) Roads. Interstate 20, U.S. Highway No. 65, and local roads serve the general area.
(2) Railroads. The Contractor is responsible for determining the availability of railroad service.
(d) Floods.
(1) High water stages or events are not to be considered a "flood," and damages resulting therefrom are not compensable under Section 01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS, paragraph DAMAGE TO WORK unless river or stream stages exceed channel capacity and overtop the natural or artificial banks. High water stages and/or high water events at stages below ordinary top bank of a river or stream are not floods, even if such water reaches the project. For example, water flowing through or over low points in the river or stream bank, such as drains, are not floods.
(e) Additional Data. Additional data consisting of additional cross sections, records of borings, and boring samples are available for inspection at:
DOCUMENT 00 80 00.00 09 Page 5
U.S. Army Engineer District, Vicksburg 4155 Clay Street
Vicksburg, Mississippi 39183-3435
(FAR 52.236-4)
1.9 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
(a) The Government will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item.
(1) Sixty percent of the lump sum price upon completion of the Contractor's mobilization at the work site.
(2) The remaining forty percent upon completion of demobilization.
(b) The Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid if the Contracting Officer believes that the percentages in subparagraphs (a)(1) and (2) of this clause do not bear a reasonable relation to the cost of the work in this contract.
(1) Failure to justify such price to the satisfaction of the Contracting Officer will result in payment, as determined by the Contracting Officer, of--
(i) Actual mobilization costs at completion of mobilization;
(ii) Actual demobilization costs at completion of demobilization;
and
(iii) The remainder of this item in the final payment under this contract.
(2) The Contracting Officer's determination of the actual costs in paragraph (b)(1) of this clause is not subject to appeal.
(DFARS 252.236-7004)
1.10 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, Basis for Settlement of Proposals and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For
DOCUMENT 00 80 00.00 09 Page 6 equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
(UAI 31.105-101)
NOTE: EP-1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule" is available on the Internet at http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx, then search for EP 1110-1-8, then click on the link and then choose EP_1110-1-8_Vol-03.pdf or may be purchased from the Government Printing Office on CD-ROM by calling (202) 512-1800.
1.11 I-WATCH
The Contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.12 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
DOCUMENT 00 80 00.00 09 Page 7
1.13 SECURITY CLEARANCE/ACCESS PRIVILEGES
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.14 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.15 FOREIGN NATIONALS WORKING ON GOVERNMENT CONTRACTS
In order for a foreign national to be permitted to work on a Government contract, the Contractor must submit a letter requesting such to the Foreign Disclosure Officer (FDO). The FDO will conduct a disclosure review and provide a recommendation to the Contracting Officer. If the request is approved, the foreign national must be escorted at all times while on a Government property or work site. Letters should be mailed to Foreign Disclosure Officer (Carol Bridges), ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
DOCUMENT 00 80 00.00 09 Page 8
| AM_0003.pdf |
| Revised FRONT PAGES.pdf |
| DEPARTMENT OF THE ARMY |
| FOR: FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES WEST BANK MISSISSIPPI RIVER LEVEES BAYOU VIDAL - ELKRIDGE, LOUISIANA LEVEE ENLARGEMENT AND BERMS ITEM 416-R |
File details come from the government source that posted it. Updated .