AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference W912EE-17-B-0008, Indefinite Delivery/Indefinite Quantity (IDIQ) Contract, Flood Control, Mississippi River & Tributaries, Mississippi River, Mile 616 - 326 A.H.P., Stone Repairs to Revetments and Dikes. This solicitation is amended as follow s:
See continuation page for changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE17B0008
X 9B. DATED (SEE ITEM 11)
14-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Aug-2017
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE17B0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SPECIFICATIONS: Section 01 00 00.00 09 is revised and replaced.
Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
All other terms and conditions remain unchanged.
(End of Summary of Changes)
Page 7 of the solicitation is replaced in it's entirety.
1. INVITATION FOR BIDS (IFB) NO. W912EE-17-B-0008
FOR: INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT,
FLOOD CONTROL, MISSISSIPPI RIVER & TRIBUTARIES, MISSISSIPPI
RIVER, MILE 616-326 A.H.P, STONE REPAIRS TO REVETMENTS AND DIKES
TO OPEN: 15 AUGUST 2017, 1430 HOURS, LOCAL TIME AT PLACE OF
BID OPENING
BID OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE AT
http://www.mvk.usace.army.mil/BusinessWithUs/Contracting.aspx.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS
REQUIRED BY THIS SOLICIATION AND ITS ATTACHMENTS. THE PENALTY
FOR MAKING FALSE STATEMENTS IN BIDS IS PRESCRIBED IN 18 U.S.C.
1001. (FAR 52.214-4 APR 1984)
SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE RECEIVED UNTIL
DATE AND TIME OF BID OPENING.
2. THIS PROCUREMENT IS UNRESTRICTED.
3. TECHNICAL ISSUES WILL BE MANAGED VIA PROJNET (SEE PARAGRAPH
15 BELOW).
4. YOUR ATTENTION IS DIRECTED TO SECTION 00100-BID
SCHEDULE/INSTRUCTIONS TO BIDDERS CLAUSE ENTITLED “SUBMISSION OF
BIDS”. IT IS THE BIDDER’S RESPONSIBILITY TO ENSURE THAT BIDS
SENT BY COMMERCIAL CARRIER ARE CLEARLY IDENTIFIED AS CONTAINING
A SEALED BID ON THE OUTERMOST ENVELOPE. THIS INCLUDES, BUT IS
NOT LIMITED TO, BIDS SENT VIA: FEDERAL EXPRESS, AIRBORNE
EXPRESS, EXPRESS COURIER SERVICES, INC., EXPRESS MAIL - U.S.
POSTAL SERVICE, UNITED PARCEL SERVICE AND PUROLATOR.
5. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL
OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
6. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT
CLAUSE ENTITLED, “AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION”, WHICH WILL APPLY TO THE CONTRACT RESULTING FROM
THIS SOLICITATION.
7. SEE SECTION 00 80 00.00 09, SPECIAL CONTRACT REQUIREMENTS,
CLAUSE ENTITLED “COMMENCEMENT, PROSECUTION, AND COMPLETION OF
THE WORK (APR 1984)”.
W912EE-17-B-0008
Revised by Amendment 0001 http://www.mvk.usace.army.mil/BusinessWithUs/Contracting.aspx
W912EE-17-B-0008
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PURPOSE AND SCOPE
1.4 PERIOD OF SERVICE
1.5 ORDERING PROCEDURES FOR TASK ORDERS
1.6 PROPOSAL SUBMISSION REQUIREMENTS
1.7 AWARD DECISION
1.8 LIQUIDATED DAMAGES
1.9 TIME EXTENSIONS
1.10 ESTIMATED QUANTITIES
1.11 PARTNERING
1.12 ORDER OF WORK
1.13 RIGHTS-OF-WAY
1.14 PRECONSTRUCTION CONFERENCE
1.15 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
1.16 PROGRESS CHART
1.17 DESIGNATED BILLING OFFICE
1.18 PAYMENT INVOICES
1.19 TEMPORARY EXCAVATION AND EMBANKMENTS
1.20 TEMPORARY PROJECT FENCING
1.21 AS-BUILT DRAWINGS
1.22 PROJECT SIGN
1.23 MINIMUM REQUIRED INSURANCE
1.24 WORK IN QUARANTINED AREA
1.25 CERTIFICATES OF COMPLIANCE
1.26 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS
OF ENGINEERS SAFETY AND HEALTH MANUAL (EM 385-1-1)
1.27 SAFETY SIGN
1.28 ACCIDENT PREVENTION PLAN
1.29 DAILY INSPECTIONS
1.30 ACCIDENT INVESTIGATIONS AND REPORTING
1.31 ACCOMMODATIONS FOR GOVERNMENT REPRESENTATIVES
1.32 JANITOR SERVICES
1.33 MACHINERY AND MECHANIZED EQUIPMENT
1.34 VEHICLE WEIGHT LIMITATIONS
1.35 UTILITIES AND IMPROVEMENTS
1.36 DAMAGE TO WORK
1.37 CONTROL OF ACCESS TO CONSTRUCTION AREAS
1.38 HARBOR MAINTENANCE FEE
1.39 MEANS OF ESCAPE FOR PERSONNEL QUARTERED OR WORKING ON FLOATING
PLANT
1.40 EMERGENCY ALARMS AND SIGNALS
1.41 SIGNAL LIGHTS
1.42 PLAN OF OPERATION
SECTION 01 00 00.00 09 Page 1 Revised By amendment 0001
1.43 MILEAGE
1.44 INSPECTION
1.45 ACCEPTANCE OF WORK UNDER THIS CONTRACT
1.46 PROTECTION OF EXISTING STABILIZATION WORK
1.47 INITIAL REPAIR SURVEYS - DIKE REPAIR SITES
1.48 CONTRACTOR'S CERTIFICATE
1.49 LAYOUT OF WORK
1.50 SUBCONTRACTS (SUPPLEMENT TO THE CONTRACT CLAUSE, "SUBCONTRACTS
(FIXED PRICE CONTRACT")
1.51 CONTAMINATION OF WATER
1.52 MOORING LINES
1.53 SUNDAYS, HOLIDAYS, AND NIGHTS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 00 00.00 09 Page 2
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
19 CFR 24.24 Harbor Maintenance Fee
33 CFR 156 Oil and Hazardous Material Transfer Operations
1.2 SUBMITTALS
Government approval is required for all submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
AS-BUILT DRAWINGS; G, DR
Electronic survey file requirements are required for initial and final surveys of work as in .xyz, .dtm, and alignment file formats.
SD-11 Closeout Submittals
INITIAL REPAIR SURVEYS - DIKE REPAIR SITES; G, DR
Electronic survey file requirements are required for initial and final surveys of work as in .xyz, .dtm, and alignment file formats.
1.3 PURPOSE AND SCOPE
The purpose and scope of this indefinite-delivery, indefinite-quantity (IDIQ) contract consists of furnishing all plant, labor, materials and equipment, and performing all work for performing stone repairs to revetments and dikes at various locations on the Mississippi River between Miles 616 and 326 A.H.P.
SECTION 01 00 00.00 09 Page 3
1.4 PERIOD OF SERVICE
This contract will be in effect from the date of contract award (date signed by the Contracting Officer) and shall remain in effect for a period of 365 days or until exhaustion of the "not to exceed" amount of $3,500,000 $4,000,000, whichever comes first. Modifications to individual Task Orders may be issued during the performance period of the Task Order which may extend beyond the expiration date of the contract. The expiration or termination of the ordering period shall not affect any Task Order issued during the effective period of this contract.
Note: The rates proposed by the Contractor on the bid schedule shall be used until the 365 day period expires, regardless of the dollar amount spent up to the "not to exceed" amount of $3,500,000$4,000,000.
The maximum overall cumulative value of work awarded under the contract resulting from this solicitation will not exceed $3,500,000$4,000,000 over the life of the entire contract.
The minimum guaranteed amount for the contract period is $2,000,000. Only the Contracting Officer has the authority to modify the terms and conditions of this contract.
1.5 ORDERING PROCEDURES FOR TASK ORDERS
When the Government requires work under this contract, a request for proposal (RFP) will be issued. The request will include information concerning the statement of work, specifications, drawings (if applicable), attachments, information pertaining to a site visit, and any other requirements for submission (e.g., proposal requirements, bid schedule, etc). The Government shall provide the work requirements in the statement of work issued with each individual Task Order. All work, at a minimum, shall meet all codes and standards associated with the required work.
Notification to Contractor: As the need exists for performance under the terms of this contract, the Contracting Officer or his authorized representative will notify the Contractor of an existing requirement in writing.
1.6 PROPOSAL SUBMISSION REQUIREMENTS
Preparation of Proposal. The Contractor shall prepare his proposal for accomplishment of the task. The proposal shall be submitted to the Contracting Officer within 7 calendar days after the date of receipt of the RFP unless a different time period is specified by the individual RFP.
Review of Proposal. Upon receipt of the Contractor's proposal, the Government will review the proposal for completeness, compliance with the contract, accuracy, and adequacy for filling the Government's requirements.
The Government will negotiate with the Contractor all quantities and performance times.
Proposals will either be accepted as is or negotiated to the mutual agreement of both the Government and the Contractor. Upon conclusion of satisfactory discussions or negotiations (if required), a Task Order will be issued by the Contracting Officer reflecting the negotiated order price and payment terms as outlined in the statement of work or specifications.
If discussions are held, at the conclusion, the Contractor will be requested to provide a final proposal revision. In any instance where
SECTION 01 00 00.00 09 Page 4 there is failure to reach agreement on price, the Government reserves the right to withdraw the project and have it completed by other means or to issue the order unilaterally based on the rates bid by the Contractor on the Bid Schedule to the solicitation/contract.
1.7 AWARD DECISION
Whenever possible, award will be made without discussions. The awarded Task Order will be firm-fixed price with a specified completion date based upon the required rate of stone placement.
Task Orders will be issued on DD Form 1155. The Task Order becomes binding when the Contracting Officer signs the Order. Notice to Proceed (NTP) will be issued separately after receipt of acceptable Performance and Payment Bonds, if required (i.e., Task Orders over $30,000).
Note: For Task Orders greater than $30,000 but less than $150,000, only a payment bond or irrevocable letter of credit (ILC) is required. However, for Task Orders greater than $150,000 both a payment bond and performance bond are required. Reference Clauses numbered 52.228-13, 52.228-14, and 52.228-15 of Section 00700, CONTRACT CLAUSES.
Individual Task Orders. Each Task Order will include the following information:
a. Date of the Task Order.
b. Contract number and Task Order number.
c. Item number, description, quantity, unit prices and total price.
d. Task Order price, delivery or performance data.
e. Accounting and appropriation data.
f. Any other pertinent data.
Contract Prices - Bidding Schedule. The Government's payment for the Lump Sum Amount of individual Task Orders shall constitute full compensation to the Contractor for: (1) furnishing all plant, labor, equipment, materials and supplies; and (2) performing all operations required to complete the work in conformity with the drawings and specifications. The Contractor shall include in their proposal the cost of all work required by the drawings and specifications.
1.8 LIQUIDATED DAMAGES
This clause supplements Section 00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12).
Liquidated Damages will be specified in individual Task Orders and if the Contractor fails to complete the work within the time specified in a Task Order, or any extension, the Government may assess liquidated damages for each day of delay in accordance with FAR Clause 52.211-12.
Liquidated damages shall be concurrent and cumulative and applied as stated in each individual Task Order.
Exception to Liquidated Damages. In case the Contracting Officer
SECTION 01 00 00.00 09 Page 5 determines completion of work is not feasible during the completion period(s) stated in the Task Order, such work will be exempted from liquidated damages.
1.9 TIME EXTENSIONS
Notwithstanding any other provisions of this contract, it is mutually understood that the time extensions for changes in the work will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the Task Order completion date will be extended only for those specific elements so delayed and that the remaining Task Order completion dates for all other portions of the work will not be altered and may further provide for an equitable readjustment of liquidated damages under the new completion schedule. (FAR 52.211-13)
1.10 ESTIMATED QUANTITIES
In general, the estimated quantities shown on the Bidding Schedule are estimated from the anticipated amount of work. Actual quantities required will vary based upon the actual work required as determined in the field.
1.11 PARTNERING
The Government encourages formation of informal project partnerships on all projects. A project partnership strives to utilize a cooperative working relationship to jointly establish and effectively reach mutual project execution goals. The partnering process will in no way relax nor stiffen the requirements of the contract, but will enhance the likelihood of success through improved working relationships. The possibility of an informal partnership may be discussed at the Pre-construction Conference for this project.
1.12 ORDER OF WORK
a. Normally, revetment and dike repair operations proceed from upstream to downstream, but this order of work is not guaranteed. The Contractor shall prosecute the work at the various revetments and dikes in such order of precedence as may be prescribed by the Contracting Officer. Work shall begin at the upper end of the lower half at the District, in Task Order No. 2. Work may begin at the upper end of the upper half Task Order No. 1 when completed.
b. Generally, work ordered at any revetment or dike will consist of all stone repair to be performed on the revetment or dike; however, the Government reserves the right to order that only portions of the work on any revetment or dike be placed under a Task Order, the remainder of the work to be accomplished by other means. The Government further reserves the right after a task order has been issued for work on a revetment or dike to delete from the task order all or any part of said work when river stages or other conditions are such that minor repair work at that locality is not feasible.
1.13 RIGHTS-OF-WAY
a. The required rights-of-way for the work to be constructed under this contract, within the limits indicated on all drawings, will be provided by the Government. If these rights-of-way are used by the Contractor, he shall, at his own expense, do all work necessary to make
SECTION 01 00 00.00 09 Page 6 such rights-of-way suitable for traveling to and from the worksite.
Upon completion of the Contractor's work, any such rights-of-way furnished by the Government shall be left in a condition satisfactory to the Contracting Officer.
b. When so directed by the Contracting Officer, the Contractor shall, without expense to the Government and at any time during the progress of the work when it is not being actively used for contract operations, promptly vacate and clean up any part of the Government grounds or rights-of-way that have been allotted to or have been in use by the Contractor.
c. The Contractor shall not obstruct any existing roads on lands controlled by the United States except with written permission of the Contracting Officer and shall maintain such roads in as good condition as exists at the time of commencement of work under this contract.
d. The Contractor shall procure, without expense to the Government, all additional lands, access roads, or rights-of-way necessary for his use in the performance of the work or as required by his method of operation. The Contractor shall submit written evidence to the Contracting Officer that he has obtained the rights-of-way from the property owners. The written evidence shall consist of an authenticated copy of the conveyance under which the Contractor acquired such rights-of-way, prepared and executed in accordance with the laws of the State in which the land is located. The Contractor shall also obtain from the owners a release for the Government for any damages which may result from his use of such rights-of-way. The written conveyance and release shall be provided to the Government prior to use of Contractor obtained additional lands, access roads, or rights-of-way. If temporary rights-of-way are obtained by the Contractor the period of time for those rights shall coincide with Section 00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, plus a reasonable time for any extension granted for the completion of the work. Any agreements or permits with levee boards, counties, parishes, municipalities, or other political subdivisions for moving material and equipment will be the responsibility of the Contractor and will be obtained at no expense to the Government. Any delays to the Contractor resulting from delays in procuring such additional lands, access roads, rights-of-way, or permits for moving material and equipment for his work under this contract will not be a basis for any claim for increase in the cost of this contract. The Contractor shall make his own investigations to determine the conditions, restrictions and difficulties which may be encountered in acquiring such. In addition, the Contractor shall be solely liable for any and all damages and claims of any nature whatsoever arising from or growing out of the acquisition and use of rights-of-way, etc., other than those furnished by the Government. The Contractor shall also obtain from the owners a release for both the Government and the local sponsor for any changes that may result to lands procured by the Contractor for his convenience.
e. Notwithstanding any language or drawings to the contrary in this contract, the United States will not provide access or rights-of-way over any public lands and will not be responsible for acquiring such.
f. The Contractor shall repair at no expense to the Government, any and all damage to any existing roads when such damage is a result of his operations under this contract. (CEMVK-OC, 1989)
SECTION 01 00 00.00 09 Page 7
1.14 PRECONSTRUCTION CONFERENCE
a. A preconstruction conference will be arranged by the Area Engineer as soon after contract award as possible, and the conference will be conducted before work is allowed to commence. The Area Engineer will notify the Contractor of the time, date, and location for the meeting.
At this conference, the Contractor will be oriented with respect to contract administration procedures, lines of authority, and construction matters. All known subcontractors performing at least 20 percent of the contract are required to attend this conference.
Additional conferences may be established by the Area Engineer for any major subcontractors unknown at the time of the initial conference.
b. Submission by the Contractor of the items listed below will determine the date of the conference. The following items shall be submitted (electronic and hard copy) to the Area Engineer for review at least seven (7) calendar days prior to the preconstruction conference:
(1) Accident Prevention Plan
(2) Quality Control Plan
(3) Environmental Protection Plan
c. The Contractor shall bring to this conference, in completed form the following:
(1) Letter of superintendent appointment and authority
(2) Letter of personnel designation(s)
(3) List of subcontractors
(4) Certificate of insurance with 30-day written cancellation notice to Contracting Officer.
d. The Contractor should bring to this conference, or at least be prepared to discuss, the following:
(1) Submittal register
(2) Progress chart or Network Analysis System (as applicable)
e. Minutes of this conference will be taken and prepared by the Area Engineer and sent to the Contractor for his concurrence and signature.
1.15 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
At least 7 days before beginning work on each Task Order, the Contractor shall notify Mr. Robin Blake, Area Engineer, Vidalia Area Office, 100 Advocate Row, Vidalia, Louisiana 71373-3032, telephone (318) 336-5226.
1.16 PROGRESS CHART
The progress chart required by provisions of paragraph (a) of the Contract Clause SCHEDULES FOR CONSTRUCTION CONTRACTS shall be prepared on ENG FORM 2454, copies of which will be furnished to the Contractor by the Government. Three (3) copies of the schedule will be required. The
SECTION 01 00 00.00 09 Page 8
Progress Chart shall be periodically updated.
1.17 DESIGNATED BILLING OFFICE
The designated billing office for this contract shall be Vidalia Area Office, 100 Advocate Row, Vidalia, Louisiana 71373-3032.
1.18 PAYMENT INVOICES
a. The Federal Acquisition Regulation requires that the "REMIT TO" address on the invoice match the "REMIT TO" address on the contract or a proper notice of assignment. The Payment Office will verify a match of the "REMIT TO" address in the contract and contractor’s invoice prior to payment. If the addresses do not match, the invoice will be determined improper and returned to the contractor for correction and resubmission. If an invoice is improperly returned, the original invoice receipt date shall be used as the basis for determining interest to be paid in accordance with the PROMPT PAYMENT ACT.
b. Among other things, the Contract Clause PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS requires that a proper invoice for payment include substantiation of the amounts requested. As required in Office of Management and Budget, Circular A-125 (Rev.), PROMPT PAYMENT, dated December 12, 1989, substantiation of the amount requested for progress payments under construction contracts includes the following:
(1) An itemization of the amounts requested related to the various elements of work required by the contract covered by the payment request;
(2) A listing of the amount included for work performed by each subcontractor under the contract;
(3) A listing of the total amount of each subcontract under the contract;
(4) A listing of the amounts previously paid to each such subcontractor under the contract; and,
(5) Additional supporting data in a form and detail required by the Contracting Officer.
c. Failure to include the above information in a contractor’s invoice will result in the invoice being considered defective under the provisions of the PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS clause of the contract, and it will be returned to the contractor for correction and resubmission. (CEMVK-OC, 1997)
1.19 TEMPORARY EXCAVATION AND EMBANKMENTS
If the Contractor proposes to construct temporary roads or embankments and excavations for plant and/or work areas, he shall obtain approval of the Contracting Officer prior to start of such temporary work. No unauthorized road construction, excavation or embankment construction (including disposal areas) will be permitted. The Contractor shall use existing ramps when available.
SECTION 01 00 00.00 09 Page 9
1.20 TEMPORARY PROJECT FENCING
Temporary project fencing as required by Section 4, "Temporary Facilities", paragraph 04.A.04 of EM 385-1-1, "Safety and Health Requirements Manual", is not required on this project.
1.21 AS-BUILT DRAWINGS
This paragraph supplements the Contract Clause SPECIFICATIONS AND DRAWINGS
FOR CONSTRUCTION.
a. Generally, plans are not provided for each site of work, however, in the event that plans are provided to the Contractor for a specific site of work, such plans shall be marked in red identifying the limits of stone placement.
b. As-Built drawings for dike repair (including any longitudinal stone toe dikes) shall be provided in accordance with the same requirements as shown in this section in paragraph INITIAL REPAIR SURVEYS - DIKE REPAIR SITES. The Contractor shall deliver to the Contracting Officer the two (2) original full-size completed sets of as-built marked blueline prints at the time of the final inspection of the project. In addition, the Contractor shall provide two CD-ROM's, each containing a full-size, 400 dpi PDF (portable document format) set of as-built drawings, to the Contracting Officer at the time of final inspection.
The as-built drawings shall be identified by entering the words "AS-BUILT DRAWINGS" in letters at least 3/16-inch high, placed in the lower right corner of each drawing.
c. The Contractor shall also provide GPS Coordinates representative of the inner and outer limits of stone placed. No separate measurement or payment will be made for providing as-built drawings or for any of the work required by this clause, and all costs therefore shall be included in the applicable contract prices contained in the Bidding Schedule.
1.22 PROJECT SIGN
The Contractor shall fabricate, erect and maintain one sign for project identification. The sign shall be displayed and positioned for reading by passing viewers. The exact location is subject to Contracting Officer's approval. Information for the right side of the project sign shall be as follows:
Title: INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ)
CONTRACT
FLOOD CONTROL, MISSISSIPPI RIVER & TRIBUTARIES
Project: MISSISSIPPI RIVER
MILE 616-326 AHP
STONE REPAIRS TO REVETMENTS AND DIKES
Contract No: W912EE-17-C-0XXX
Contractor: (Contractor's name and city)
The project identification sign shall meet the requirements specified in the U.S. Army Corps of Engineers Sign (USACES) Standards Manual, EP 310-1-6a and EP 310-1-6b. A copy of the sign standards manual is available for review at the office of the Vicksburg District Sign Program Manager and
SECTION 01 00 00.00 09 Page 10 questions concerning manufacture and installation of the project identification sign may be addressed to:
Vicksburg District Sign Program Manager (Lawran Richter)
ATTN: CEMVK-OD-MN
4155 Clay Street Vicksburg, MS 39183-3435 Telephone: (601) 631-5287
1.23 MINIMUM REQUIRED INSURANCE
The following paragraph is applicable if the services involved are performed on a Government Installation. Government Installation is defined as property where the Government holds by fee simple title, by construction rights-of-way, or perpetual easement, etc., an interest in real property.
See the Contract Clause INSURANCE-WORK ON A GOVERNMENT INSTALLATION.
a. Workmen's Compensation and Employer's Liability Insurance. The Contractor shall comply with all applicable workmen's compensation Statutes of the applicable state of the location of work and shall furnish evidence of Employer's Liability Insurance in an amount of not less than $100,000.
b. General Liability Insurance. Bodily injury liability insurance in the minimum limits of $500,000 per occurrence on the comprehensive form of policy.
c. Automobile Liability Insurance. Minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. This insurance shall be on the comprehensive form of policy and shall cover the operation of all automobiles used in performance of the contract.
d. Marine Insurance. Hull policy must be endorsed for towers liability (tow and cargo) and the amount of the policy must be supplemented by excess towers' liability in the minimum amount of $1,000,000, and also by excess protection and indemnity insurance in an amount not less than $1,000,000. All policies must be endorsed for navigation limits applicable to this contract. The United States Corps of Engineers, Vicksburg District, must be named as an additional insured on all policies, and the policies shall contain an endorsement waiving subrogation against the United States. In the event of material changes in coverage or of cancellation of any policy, written notice shall be given to the Contracting Officer at least 30 days prior to the effective date of such change or cancellation.
1.24 WORK IN QUARANTINED AREA
The work called for by this contract involves activities in parishes and counties quarantined by the Department of Agriculture to prevent the spread of certain plant pests which may be present in the soil. The Contractor agrees that all construction equipment and tools to be moved from such parishes and counties shall be thoroughly cleaned of all soil residues at the construction site with water under pressure and that hand tools shall be thoroughly cleaned by brushing or other means to remove all soil. In addition, if this contract involves the identification, shipping, storage, testing, or disposal of soils from such quarantined area, the Contractor agrees to comply with the provisions of ER 1110-1-5, "Plant Pest Quarantined Areas and Foreign Soil Samples" attachments, a copy of which
SECTION 01 00 00.00 09 Page 11 will be made available by the Contracting Officer upon request. The Contractor agrees to ensure compliance with this obligation by all subcontractors.
1.25 CERTIFICATES OF COMPLIANCE
Any certificates required for demonstrating proof of compliance of material with specification requirement shall be executed in four (4) copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.26 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS OF
ENGINEERS SAFETY AND HEALTH MANUAL (EM 385-1-1)
Contractors are required to comply with the latest version, and all posted changes, of the U.S. Army Corps of Engineers Safety and Health Requirements Manual in effect on the issue date of this solicitation. EM 385-1-1 and changes are available on the Internet at http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx, Search for EM_385-1-1, then click on EM_385-1-1 2014 english version.
Prior to making an offer, offerors should check the referenced website for the latest changes. No separate payment will be made for compliance with the requirements of this paragraph, or for compliance with other safety requirements of the contract.
1.27 SAFETY SIGN
The Contractor shall fabricate, erect and maintain a safety sign at the site, as located by the Contracting Officer. The sign shall be erected as soon as practicable, but not later than 15 calendar days after the date established for commencement of work. The data required shall be current.
The safety sign shall meet the requirements specified in the U.S. Army Corps of Engineers Sign (USACES) Standards Manual, EP 310-1-6a and EP 310-1-6b. A copy of the sign standards manual is available for review at the office of the Vicksburg District Sign Program Manager and questions concerning manufacture and installation of the safety sign may be addressed to:
Vicksburg District Sign Program Manager (Lawran Richter)
ATTN: CEMVK-OD-MN
4155 Clay Street Vicksburg, MS 39183-3435 Telephone: (601) 631-5287
1.28 ACCIDENT PREVENTION PLAN
Refer to the Contract Clause ACCIDENT PREVENTION (Alternate I). Within 15 days after receipt of award of the contract, an Accident Prevention Plan shall be submitted to the Contracting Officer for review and acceptance.
The plan shall be prepared as specified in Appendix A, "Minimum Basic Outline for Accident Prevention Plan" of EM 385-1-1. In addition to the
SECTION 01 00 00.00 09 Page 12 requirements listed, the Contractor shall also submit the required information on the forms outlined below, which can be found on the Vicksburg District Construction Division home page, http://www.mvk.usace.army.mil/Missions/EngineeringandConstructionDivision, click on Construction Services Branch, then click on Forms.
a. An executed LMV Form 358-R, "Administrative Plan".
b. An executed LMK Form 359-R, "Hazard Analysis" for each definable feature of work.
c. When marine plant and equipment are in use under a contract, the method of fuel oil transfer shall be submitted on LMV Form 414R, "Fuel Oil Transfer-Floating Plant". (Refer to 33 CFR 156.)
d. The Contractor shall not commence physical work at the site until the plan has been accepted by the Contracting Officer, or his authorized representative. At the Contracting Officer's discretion, the Contractor may submit his Hazard Analysis only for the first phase of construction provided that it is accompanied by an outline of the remaining phases of construction. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase.
Also, refer to Section 1, "Program Management", paragraph 01.B, "Indoctrination and Training" of EM 385-1-1.
1.29 DAILY INSPECTIONS
Refer to the Contract Clause INSPECTION OF CONSTRUCTION. The Contractor shall perform daily safety inspections and record them on the forms approved by the Contracting Officer. Reports of daily inspections shall be maintained at the job site. The reports shall be records of the daily inspections and resulting actions. As a minimum each report shall include the following:
a. Phase(s) of construction underway during the inspection
b. Locations or areas inspections were made.
c. Results of inspection, including nature of deficiencies observed and corrective actions taken, or to be taken, date, and signature of the person responsible for its contents.
1.30 ACCIDENT INVESTIGATIONS AND REPORTING
Refer to EM 385-1-1, Section 1, "Program Management", paragraph 01.D, "Accident Reporting and Recordkeeping". Accidents shall be investigated and reports completed by the immediate supervisor of the employee(s) involved and reported in writing to the Contracting Officer or his representative within one working day after the accident occurs.
1.31 ACCOMMODATIONS FOR GOVERNMENT REPRESENTATIVES
a. Accommodations. The Contractor shall furnish and maintain a temporary building for the exclusive use of the Government Representatives and shall move the building from the vicinity of one part of the work to another as the work progresses. The building shall be of light, but weatherproof construction, approximately 120 square feet in size with not less than 7 feet of headroom. It shall have a minimum of three windows arranged to open and to be securely fastened
SECTION 01 00 00.00 09 Page 13 from the inside. The door shall be of wood panel or solid core construction and be equipped with a padlock and heavy duty hasp bolted to the door. Insect screens shall be provided for windows. Glass panels in windows shall be equipped with bars or heavy mesh screens which will prevent easy access to the building through these panels.
The room shall be equipped with a desk that can be locked, four chairs, a four drawer filing cabinet and sufficient shelf space for the inspector's maps and charts and a drafting table providing a working surface of 3 feet by six feet consisting of 3/4 inch plywood, hinged to a wall of the building, with hinged legs. The Contractor shall heat the building by means of heaters and shall cool the building by means of an air conditioning unit, to the satisfaction of the Contracting Officer. A minimum of two wall outlets and two ceiling drops shall be provided in the building. Toilet facilities shall be provided in the building/trailer or adjacent thereto. The office shall not be located on a machine barge with a "working" dragline or trackhoe. The building shall remain the property of the Contractor and upon completion of all work under the contract shall be removed as provided in the Contract Clause OPERATIONS AND STORAGE AREAS. An office trailer meeting the above requirements will be acceptable.
b. Electrical and Radio. Electric current shall also be provided for operation of lights, appliances, calculators,and computers. Electric current may be provided by use of a portable generator. Adequate wall outlets and adequate ceiling mounted lights shall be provided in the building. In addition, a two-way radio with the contractors working frequency shall be provided for continuous communications between the inspector and the contract superintendent. Electrical surge protection is required at all wall outlets in the inspector's office.
c. The Contractor shall provide cellular phone service for use by Government inspectors in addition to the radio equipment specified in subparagraph "b" above. The phone system must be capable of providing communication capabilities anywhere in the limits of the work. One cellular phone shall be provided on each work unit employed by the Contractor and/or his subcontractors.
d. The Contractor shall provide an aluminum skiff or boat, with an enclosed cabin that will provide occupants and equipment protection from the elements, with a minimum length of 18 feet and a minimum bottom width of 72 inches. The boat shall be equipped with outboard motor(s) of appropriate horsepower for the craft selected, travel distances involved, and the waters in which the work is located, but not more than the maximum rated horsepower. An operator shall be provided for operation of the vessel during daylight hours for sounding and general inspection duties. The Contractor shall maintain the vessel in a safe and reliable operating condition in accordance with EM 385-1-1 and the U. S. Coast Guard requirements. The vessel may be used by the Contractor when not needed by the inspector, but it must be made available for the inspector's use at any time.
e. The requirements of this clause shall be provided by the Contractor at no additional expense to the Government. Should the Contractor refuse, neglect, or delay compliance with the above requirements, the specific facilities may be furnished and maintained by the Contracting Officer, and the cost thereof will be deducted from any amount due or to become due the Contractor.
SECTION 01 00 00.00 09 Page 14
1.32 JANITOR SERVICES
The Contractor shall furnish daily janitorial services for the offices, shop, and other buildings or floating plant on the project site and perform any required maintenance of facilities and grounds during the entire life of the contract. Toilet facilities shall be kept clean and sanitary at all times. Services shall be performed at such a time and in such a manner to least interfere with the operations but will be accomplished only when the offices are in use. The Contractor shall also provide daily trash collection and cleanup to the buildings and adjacent outside areas, snow removal as required, and shall dispose of all discarded debris in a manner approved by the Contracting Officer.
1.33 MACHINERY AND MECHANIZED EQUIPMENT
Machinery and mechanized equipment used under this contract shall comply with the following:
a. When mechanized equipment is operated on floating plant, the Contractor shall provide positive and acceptable means of preventing this equipment from moving or falling into the water. The type of equipment addressed by this clause includes front-end loaders, bulldozers, trucks (both on- and off-road), backhoes, track hoes, and similar equipment. If the Contractor plans to use such equipment on floating plant, an activity hazard analysis must be developed for this feature of work. The plan must include a detailed explanation of the type or types of physical barriers, curbs, structures, etc., which will be incorporated to protect the operator and prevent the equipment from entering the water. Nonstructural warning devices may be considered for situations where the use of structural barriers is determined to be impracticable. The activity hazard analysis must thoroughly address the procedure and be submitted to the Corps for review and acceptance prior to start of this feature of work.
b. The stability of crawler, truck, and wheel-mounted cranes shall be assured.
(1) The manufacturer's load-rating chart may be used to determine the maximum allowable working load for each particular crane's boom angle provided a test load, with a boom angle of 20 degrees, confirms the manufacturer's load-rating table.
(2) Stability tests are required if:
(i) there is no manufacturer's load-rating chart securely fixed to the operator's cab;
(ii) there has been a change in boom or other structural member;
or
(iii) there has been a change in the counterweight.
The test shall consist of lifting a load with the boom in the least stable undercarriage position and at an angle of 20 degrees above the horizontal. The test shall be conducted under close supervision on a firm, level surface. The load that tilts the machine shall be identified as the test load. The test load moment (in ft-lbs) shall then be calculated by multiplying the horizontal distance (in ft) from the center of rotation of the
SECTION 01 00 00.00 09 Page 15 machine to the test load, times the test load (in lbs).
Three-fourths of this test-load moment shall then be used to compute the maximum allowable operating loads for the boom at 20, 40 ,60, and 80 degrees above horizontal. From these maximum allowable operating loads, curve shall be plotted and posted in the cab of the machine in sight of the operator. These values shall not be exceeded except in the performance test described below. The test load shall never exceed 100 percent of the manufacturer's maximum rated capacity.
(3) In lieu of the test and computations above, the crane may be load tested for stability at each of the four boom positions listed above.
c. Performance tests shall be performed in accordance with Section 16, "Machinery and Mechanized Equipment" of EM 385-1-1, "Safety and Health Requirements Manual", except as specified below. Performance tests shall be conducted after each stability test, when the crane is placed in service on a project, and at least every 12 months.
(1) When conducting a performance load test which is required of a new crane or a crane in which load sustaining parts have been altered, replaced, or repaired (excluding replacement of the rope), the test load shall be as specified in ASME/ANSI B30 series. That is, for overhead, gantry, portal, pillar, tower, monorail, and underhung cranes, the test load shall not exceed 125 percent of the manufacturer's load rating capacity chart at the configuration of the test; for hammerhead tower, mobile, and floating cranes and boom trucks, the test load shall not exceed 110 percent of the manufacturer's load rating capacity chart at the configuration of the test.
(2) When conducting a performance load test which is required because a crane is reconfigured, or reassembled after disassembly, or because the crane requires an annual load test, the test loads shall not exceed 100 percent of the manufacturer's load rating capacity chart at the configuration of the test.
(3) All load tests are required to be conducted in accordance with the manufacturer's recommendations.
d. Inspections shall be made which will ensure a safe and economical operation of both cranes and draglines with inspection documented.
Copies of the inspections and tests shall be available at the job site for review. All stability and performance tests on cranes and all complete dragline inspections shall be witnessed by the Contracting Officer or his authorized representative.
e. A complete dragline inspection shall be made:
(1) at least annually;
(2) prior to the dragline being placed in operation; and
(3) after the dragline has been out of service for more than 6 months.
f. All heavy equipment moved onto the worksite shall be inspected for compliance with this contract. The CEMVK-SO Inspection forms attached
SECTION 01 00 00.00 09 Page 16 at the end of this section shall be completed by the Contractor. All completed forms, including abatement schedule of any violations, shall be maintained at the job site for continued review and update as needed.
1.34 VEHICLE WEIGHT LIMITATIONS
Vehicle weight limitations for operation on rural roads and bridges may affect the prosecution of work in this contract. The Contractor will be responsible for obtaining all necessary licenses and permits in accordance with the Contract Clause PERMITS AND RESPONSIBILITIES. Current information regarding road and bridge weight limits may be obtained by contacting the applicable Department of Transportation and the president of the county Board of Supervisors for the counties or the police jury for the parishes through which equipment and materials will be transported as a result of this contract.
1.35 UTILITIES AND IMPROVEMENTS
a. All known utilities within the limits of the work, such as pipes, communication lines, powerlines, etc., that would interfere with construction work will be removed, modified, or relocated by local interests or utility companies at no cost to the Contractor unless otherwise noted in the plans/specifications. The Contractor, however, shall cooperate with the authorities or company representatives and shall conduct his operations in such manner as to result in a minimum of inconvenience to the owners of said utilities.
b. Any unidentified pipes or structures which may be found within the limits of the work during the course of construction shall not be disturbed nor shall construction or excavation be performed at these locations unless and until approved by the Contracting Officer.
Payment for ordered excavation, if any, will be made in accordance with the Contract Clause CHANGES of the contract.
1.36 DAMAGE TO WORK
a. The responsibility for damage to any part of the permanent work shall be as set forth in the Contract Clause PERMITS AND RESPONSIBILITIES. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood (see Section 00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS paragraph PHYSICAL DATA, subparagraph FLOODS) or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make repairs as ordered by the Contracting Officer and full compensation for such repairs to permanent work will be made at the applicable contract unit or lump sum prices as fixed and established in the contract.
This is the start of the file's text. The full file is on GovTribe.