AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912EE-17-B-0004, for Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 22-Inch Diameter), Fully Operated w ith Attendant Plant and Personnel, w ith a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging w ithin the Vicksburg District, Other Districts w ithin the Mississippi Valley Division, or Districts Adjacent to the Vicksburg District, is amended as follow s:
SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE-17-B-0004
X 9B. DATED (SEE ITEM 11)
31-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jun-2017
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE-17-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A BID OPENING DATE AND TIME OF THURSDAY, 13 JULY 2017 AT 2:30 P.M. HAS BEEN
SCHEDULED.
The following Federal Acquisition Regulation and USACE Acquisition Instruction clauses have been added by this amenmdment:
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
UAI 5152.211-9000 EVALUATION OF SUBDIVIDED ITEMS. (MAR 1995)
UAI 5152.211-9001 VARIATIONS IN ESTIMATED QUANTITIES – SUBDIVIDED ITEMS (MAR
1995)
UAI 5152.236-9009 PARTNERING (FEB 2000)
UAI 5152.249-9000 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 2009)
BID SCHEDULE and NOTES are revised and replaced in their entirety.
SPECIFICATION Section 00 80 00.00 09, Section 01 00 00.00 09, and Section 35 20 23.00 09 are revised and replaced in their entirety.
Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
UAI 5152.211-9000 EVALUATION OF SUBDIVIDED ITEMS. (MAR 1995)
Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subitems.
(End of clause)
UAI 5152.211-9001 VARIATIONS IN ESTIMATED QUANTITIES – SUBDIVIDED ITEMS (MAR 1995)
This variation in estimated quantities clause is applicable only to item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022 is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause Federal Acquisition Regulation (FAR) 52.211-18, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022 exceeds 115% oris less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
"Revised by Amendment 0001"
UAI 5152.236-9009 PARTNERING (FEB 2000)
In order to most effectively accomplish this contract, the Government proposes to form a partnership with the Contractor to develop a cohesive building team. It is anticipated that this partnership would involve the <NAME THE USING ORGANIZATIONS AND OTHER CRITICAL PARTIES HERE>, the Contractor, primary subcontractors and designers, and the Corps of Engineers. This partnership would strive to develop a cooperative management team drawing on the strengths of each team member in an effort to achieve a quality project within budget and on schedule. This partnership would be bilateral in membership and participation will be completely voluntary. Any cost associated with effectuating this partnership, excluding travel and lodging cost of Government personnel, will be borne by <<SELECT AN OPTION TO SPECIFY: the Contractor/each party/the Government. The partnering meetings shall be held in [Fill in with Date, Time, Place, etc.].
UAI 5152.249-9000 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 2009)
Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under Federal Acquisition Regulation (FAR) 49.206-2(b). In evaluating a termination settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
(c) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.
(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).
(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.
(End of Summary of Changes)
REVISED BID SCHEDULE
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER) FULLY OPERATED WITH
ATTENDANT PLANT AND PERSONNEL WITH A DRAFT NOT TO EXCEED 9 FEET FOR CONSTRUCTION AND MAINTENANCE DREDGING WITHIN THE VICKSBURG DISTRICT, OTHER DISTRICTS WITHIN THE MISSISSIPPI VALLEY DIVISION, OR DISTRICTS
ADJACENT TO THE VICKSBURG DISTRICT
The work to be performed by this contract will be in the Mississippi River Harbors within the Vicksburg District, but in accordance with paragraph 1.3.2 “Other Locations” in Section 35 20 23.00 09 DREDGING, of the contract, there is also the possibility of being required to be moved to other locations in the Vicksburg District, other Districts adjacent to the Vicksburg District, or other Districts within the Mississippi Valley Division.
The work to be performed by OPTIONAL LINE ITEMS 0015 through 0022 will be in the Vicksburg Harbor.
ITEM
NO. SUPPLIES/SERVICES QTY UNIT
UNIT
PRICE AMOUNT
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 22-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET
0001AA FIRST 958 HOURS 958 HR $ $
0001AB OVER 958 HOURS 958 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 22-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE
0002AA FIRST 909 HOURS 909 HR $ $
0002AB OVER 909 HOURS 909 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 22-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9FEET, AND WITH TRAVELING
SPUD CARRIAGE, PLUS UNDERWATER
PUMP OVER 700 HORSEPOWER
0003AA FIRST 856 HOURS 856 HR $ $
0003AB OVER 856 HOURS 856 HR $ $
ITEM
NO. SUPPLIES/SERVICES QTY UNIT
UNIT
PRICE AMOUNT
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 24-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET
0004AA FIRST 887 HOURS 887 HR $ $
0004AB OVER 887 HOURS 887 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 24-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE
0005AA FIRST 803 HOURS 803 HR $ $
0005AB OVER 803 HOURS 803 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 24-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE, PLUS UNDERWATER
PUMP OVER 750 HORSEPOWER
0006AA FIRST 757 HOURS 757 HR $ $
0006AB OVER 757 HOURS 757 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 27-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET
0007AA FIRST 751 HOURS 751 HR $ $
0007AB OVER 751 HOURS 751 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 27-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE
0008AA FIRST 658 HOURS 658 HR $
0008AB OVER 658 HOURS 658 HR $
UNIT
PRICE AMOUNT
0009 MOBILIZATION 1 JOB FOR $
0010 DEMOBILIZATION 1 JOB FOR $
0011 REMOBILIZATION 1 EA $ $
0012 TOWING SERVICE UPSTREAM 300 MI $ $
0013 TOWING SERVICE DOWNSTREAM 300 MI $ $
0014 SHORELINE 3,000 LF $ $
TOTAL BASE $
BIDDING SCHEDULE- OPTION 1 - VICKSBURG HARBOR
NO. SUPPLIES/SERVICES QTY UNIT
UNIT
PRICE AMOUNT
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 22-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET
0015AA FIRST 501 HOURS 501 HR $ $
0015AB OVER 501 HOURS 501 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 22-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE
0016AA FIRST 452 HOURS 452 HR $ $
0016AB OVER 452 HOURS 452 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 22-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9FEET, AND WITH TRAVELING
SPUD CARRIAGE, PLUS UNDERWATER
PUMP OVER 700 HORSEPOWER
0017AA FIRST 399 HOURS 399 HR $ $
0017AB OVER 399 HOURS 399 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 24-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET
0018AA FIRST 430 HOURS 430 HR $ $
0018AB OVER 430 HOURS 430 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 24-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE
0019AA FIRST 346 HOURS 346 HR $ $
0019AB OVER 346 HOURS 346 HR $ $
UNIT
PRICE AMOUNT
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 24-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE, PLUS UNDERWATER
PUMP OVER 750 HORSEPOWER
0020AA FIRST 300 HOURS 300 HR $ $
0020AB OVER 300 HOURS 300 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 27-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET
0021AA FIRST 294 HOURS 294 HR $ $
0021AB OVER 294 HOURS 294 HR $ $
LEASE OF ONE CUTTERHEAD, HYDRAULIC
PIPELINE DREDGE (NOT LESS THAN 27-
INCH DIAMETER, WITH ATTENDANT
PLANT, AND WITH A DRAFT NOT TO
EXCEED 9 FEET, AND WITH TRAVELING
SPUD CARRIAGE
0022AA FIRST 228 HOURS 228 HR $ $
0022AB OVER 228 HOURS 228 HR $ $
TOTAL OPTION 1 $
TOTAL BASE PLUS OPTION 1 $
NOTES
(a) THIS PROCUREMENT IS UNRESTRICTED.
(b) All technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. See Section 00100 Entitled
“TECHNICAL INQUIRIES AND QUESTIONS”.
(c) Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE
BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED
AMOUNT FOR ANY ITEM, HIS BID WILL BE DECLARED NONRESPONSIVE.
(d) All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "lump sum", "job" or "each".
(e) If a bid or modification to a bid based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.
(f) Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021,and 0022, are subdivided bid items. Each of these items has been subdivided into two sub-items. The Contractor shall bid on only one of these eight subdivided bid items for the base contract period and shall bid on only one of the eight subdivided bid items for each bid option. A bid for the work shall include a bid for each of the sub-items for either Item 0001, 0002, 0003, 0004, 0005, 0006, 0007, OR 0008, and 0015, 0016, 0017, 0018, 0019, 0020, 0021, OR 0022. Bidders should refer to Section 00 08 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph entitled "VARIATIONS IN ESTIMATED QUANTITIES--SUBDIVIDED ITEMS" before preparing their bid for these items.
http://www.projnet.org/projnet
(g) All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
(h) Award will be made as a whole to the lowest responsive, responsible bidder as may be in the best interest of the Government.
(i) Lack of registration in the SAM database will make an offeror ineligible for award. SEE CONTRACT CLAUSE 52.204-7
ENTITLED, "SYSTEM FOR AWARD MANAGEMENT".
(j)The SF1442, Bidding Schedule, Plant Characteristic Sheets, and Section 00600 (Representations and Certifications) must be accurately completed and returned with your bid or it may be rejected as nonresponsive.
(k) The contract will be 365 days from the date of award, unless it becomes necessary to terminate the contract earlier.
(l)DEMOBILIZATION: Only ONE demobilization will be paid.
(m) Line items 0015-0022 are optional line items that may be exercised if funding becomes available but will not extend the period of performance of this contract.
(n) Except for the subdivided bid items as noted in paragraph above, Bidders shall include a bid price for all items in the base period and all items in the option period. Failure to provide bid prices for all payment items will render the bid non-responsive.
(o) If a contractor submits a bid on this solicitation to use a dredge that is currently under another contract then the contractor may not be eligible for award unless they submit a detailed plan demonstrating how they plan to successfully complete multiple contracts using one dredge. Any plan submitted must be accepted and approved by USACE prior to award.
W9112EE-17-B-0004
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 DELIVERY, PROSECUTION, TERMINATION, AND SUBSTITUTION OF PLANT
1.1.1 Delivery
1.1.2 Prosecution
1.1.3 Termination
1.1.4 Substitution of Plant
1.2 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
1.3 PERFORMANCE OF WORK BY THE CONTRACTOR
1.4 PHYSICAL DATA (APR 1984)
1.5 MISPLACED MATERIALS
1.6 FUEL TRANSFER
1.7 ENVIRONMENTAL PROTECTION
1.7.1 Scope
1.7.2 Quality Control
1.7.3 Submittals
1.7.4 Notification
1.7.5 Protection of the Environmental Resources
1.7.6 Maintenance of Pollution Control Facilities
1.7.7 Training of Contractor Personnel in Pollution Control
1.7.8 Payment
1.8 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.9 ENVIRONMENTAL LITIGATION
1.10 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)
1.11 SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS
1.12 I-WATCH
1.13 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
1.14 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
DOCUMENT 00 80 00.00 09 Page 1 Revised By Amendment 0001
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 DELIVERY, PROSECUTION, TERMINATION, AND SUBSTITUTION OF PLANT
1.1.1 Delivery
a. The Contractor shall deliver the dredge and attendant plant ready for operation to the first work location as described in Section 35 20 23.00 09 DREDGING, paragraph, FIRST WORK LOCATION, or to any alternate work site nearer to the point of origin as may be directed, within 30 calendar days after date of receipt by the Contractor of notice to proceed. The plant will undergo a government inspection within 7-10 days after the bid opening, and the contractor notified of acceptance or rejection.
b. A prework conference will be held prior to commencement of work.
The time and place of the conference will be determined by mutual agreement between the Contracting Officer or his designated representative and the Contractor.
1.1.2 Prosecution
The Contractor shall prosecute the work assigned him to meet the schedule of dredging operations as determined by the Contracting Officer. The work schedule will normally be 24 hours per day, 7 days per week .
1.1.3 Termination
Upon termination or completion of the contract, the dredge and attendant plant will be released to the Contractor at the site of the final work location.
1.1.4 Substitution of Plant
Substitution of dredge or dredges will be allowed in rare cases provided the Contractor furnishes written justification and the following conditions are met:
a. The substitute dredge meets all requirements of the contract specifications, and the Contractor submits clear evidence that the proposed substitute dredge can, and has performed at the rate set forth in Section 35 20 23.00 09 DREDGING, paragraph DREDGING EQUIPMENT.
b. The substitute dredge will be made available for inspection by Government personnel prior to beginning work and prior to the release of the working dredge.
c. The Government is reimbursed all costs in connection with inspection of the substitute dredge.
d. The substitute dredge is delivered to the worksite before the original dredge is shutdown and moved off the jobsite. This
DOCUMENT 00 80 00.00 09 Page 2 requirement does not apply to substitutions made during suspension and release periods as per Section 01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS, paragraph DURATION OF CONTRACT, subparagraph "c".
e. The submitted rate for the substitute dredge has been determined by the Contracting Officer to be in the best interest of the Government.
f. Substitution of plant will not be allowed prior to award of contract.
g. If the substitute dredge does not meet the specifications for the bid item of the original dredge, the hourly rate of the substitute dredge shall be computed by the following formula:
Substitute Dredge Hourly Rate = ((Original Hourly Rate)X(Estimated Hours in Original Bid Item))/(Estimated Hours in Bid Item Applicable to Substitute Dredge)
1.2 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
Within 10 days after award, the successful Bidder/Contractor must furnish the Contracting Officer a description of the items of work which will be performed with its own forces and the estimated cost of those items. (See paragraph PERFORMANCE OF WORK BY THE CONTRACTOR.)
1.3 PERFORMANCE OF WORK BY THE CONTRACTOR
The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifty (50) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government. (FAR 52.236-1)
1.4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) Weather Conditions. Data on weather conditions may be obtained from the National Weather Service.
(b) Transportation Facilities. Floating plant may reach the sites of work via the Mississippi, Red, and Ouachita/Black Rivers. Obtaining access through private lands to landings near the sites of work for land transportation is the responsibility of the Contractor.
c. Channel Traffic. Traffic on the rivers consists of commercial towboats and tows, passenger vessels, and small boats. Traffic in the river and harbors may interfere to some extent with dredging operations.
d. The material to be dredged will consist of sand, gravel, loose rock, silt, mud and clay; and in certain localities stumps, roots, logs, riprap, driftwood, sunken objects, and miscellaneous debris may be encountered. The dredge must be equipped with suitable pump impellers and cutters to efficiently handle these varying materials on pipeline lengths up to 6,500 feet.
DOCUMENT 00 80 00.00 09 Page 3
e. The work required consists of making or enlarging dredge cuts, construction of fills, and dredging in various channels and harbors.
The currents may vary from 0 to 7 feet per second. The bank to be cut may extend as much as 45 feet above the water surface.
f. The dredging operations contemplated are not all in or near cities. Camps or floating plant may be necessary for the housing or boarding of the labor employed by the Contractor.
g. Obstruction of Channel. The Government will not keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army in accordance with provisions of Section 7 of the River and Harbor Act, approved 8 August 1917. The Contractor is required to conduct the work in such a manner as to obstruct navigation as little as possible, and if the Contractor's plant obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a safe passage. Upon completion of the work, the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other markers placed by him under the contract in navigable water or on shore.
h. During the contract period, there is a possibility that the Contractor will receive requests from private interests and local governments to dredge outside the channel limits alongside privately owned wharfs or docks. Provided the work can be accomplished without detriment to the work assigned by the Government, and subject to the prior approval of the Contracting Officer in each instance, the Contractor may utilize during the contract period, equipment being furnished to the Government under this contract for accomplishing work requested by said private interests and local governments. It is understood and agreed that in temporarily releasing the Contractor's equipment for performing work outside of channel limits for private interests and local governments, the Government does not assume any responsibility whatsoever for the said work, or for the collection from said private interests and local governments of any amounts earned for work performed.
i. Condition of Channel. Data on current channel conditions may be obtained from the U.S. Coast Guard.
1.5 MISPLACED MATERIALS
Should the Contractor during the progress of the work lose, dump, throw overboard, sink, or misplace any material, plant, machinery, or appliance, which in the opinion of the Contracting Officer may be dangerous to or obstruct navigation, the Contractor shall immediately recover and remove the object. The Contractor shall give immediate notice, with description and location of such obstructions, to the Contracting Officer or inspector, and when required, mark or buoy such obstructions until removed. Should the Contractor refuse, neglect, or delay compliance with the above requirements, the obstruction may be removed by the Contracting Officer, and the cost of such removal may be deducted from any money due or to become due the Contractor, or may be recovered under his bond. The liability of the Contractor of the removal of a vessel wrecked or sunk without fault or negligence shall be limited to that provided in Sections 15, 19, and 20 of the River and Harbor Act of 3 March 1899 (33 U.S.C. 410, DOCUMENT 00 80 00.00 09 Page 4 et seq.)
1.6 FUEL TRANSFER
When marine plant and equipment are in use under this contract, a safe means of fuel transfer will be used. This fuel transfer will meet the Coast Guard Regulations 33 CFR 156.120 regarding fuel/oil transfer operations and 33 CFR 155.320 fuel/oil discharge containment. The marine plant will be checked for compliance before the plant is allowed to be used on the contract.
1.7 ENVIRONMENTAL PROTECTION
1.7.1 Scope
This section covers prevention of environmental pollution and damage as the result of construction operations under this contract and for those measures set forth in this specification, environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare;
unfavorably alter ecological balances of importance to human life; affect other species of importance to man; or degrade the utility of the environment for aesthetic, cultural and/or historical purposes. The control of environmental pollution and damage requires consideration of air, water, and land, and includes management of visual aesthetics, noises, solid waste, radiant energy, and radioactive materials, as well as other pollutants.
1.7.2 Quality Control
The Contractor shall establish and maintain quality control for environmental protection of all items set forth herein. The Contractor shall record on daily reports any problems complying with laws, regulations and ordinances and corrective action taken.
1.7.3 Submittals
a. General. Within 15 days after Award of the contract, an Environmental Protection Plan shall be submitted to the Contracting Officer for review and acceptance. The Contractor shall submit an environmental protection plan in accordance with provisions as herein specified. The plan shall include but not be limited to the following:
(1) A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, and abatement that are applicable to the Contractor's proposed operations, and the requirements imposed by those laws, regulations, and permits.
(2) Methods for protection of features to be preserved within authorized work areas. The Contractor shall prepare a listing of the methods to protect resources needing protection, including but not limited to trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, archaeological, and cultural resources.
(3) Procedures to be implemented to provide the required environmental protection and to comply with the applicable laws and regulations. The Contractor shall set out the procedures to
DOCUMENT 00 80 00.00 09 Page 5 be followed to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures set out in accordance with the Environmental Protection Plan.
(4) Permit or license and the location of the solid waste disposal area.
(5) Environmental monitoring plans for the job site, including land, water, air, and noise monitoring.
b. Implementation. Prior to commencement of the work, the Contractor shall submit in writing the above Environmental Protection Plan.
Approval of the Contractor's plan will not relieve the Contractor of his responsibility for adequate and continuing control of pollutants and other environmental protection measures. The Contractor shall not commence physical work at the site until the plan has been accepted by the Contracting Officer, or his authorized representative.
1.7.4 Notification
The Contracting Officer will notify the Contractor in writing of any observed noncompliance with the aforementioned Federal, State, or local laws or regulations, permits, and other elements of the Contractor's environmental protection plan. The Contractor shall, after receipt of such notice, inform the Contracting Officer of proposed corrective action and take such action as may be approved. If the Contractor fails to comply, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extension shall be granted, or costs or damages allowed to the Contractor for any such suspension.
1.7.5 Protection of the Environmental Resources
a. General. The environmental resources within the project boundaries and those affected outside the limits of permanent work under this contract shall be protected during the entire period of this contract.
The Contractor shall confine his activities to areas defined by the drawings and specifications. Environmental protection shall be as stated in the following paragraphs.
b. Protection of Land Resources
(1) Disposal of Solid Wastes, General. Solid wastes (excluding material resulting from clearing and grubbing) shall be placed in containers which are emptied on a regular schedule. All handling and disposal shall be conducted to prevent contamination.
(2) Disposal of Solid Waste by Removal From Site. The Contractor shall transport all solid waste off of the work site and dispose of it in compliance with federal, state, and local requirements for solid waste disposal.
(3) Disposal of Chemical Waste. Chemical waste shall be stored in corrosion resistant containers, removed from the work area, and disposed of in accordance with federal, state, and local regulations.
(4) Disposal of Discarded Materials. Discarded materials other than those which can be included in the solid waste category will
DOCUMENT 00 80 00.00 09 Page 6 be disposed of as directed by the Contracting Officer.
c. Preservation and Recovery of Historical Archaeological and Cultural Resources. Known historical, archaeological, and cultural resources within the Contractor's work area will be designated by the Contracting Officer, and the Contractor shall take precautions to preserve all such resources as they existed at the time they were pointed out to the Contractor. The Contractor shall install all protection for these resources and shall be responsible for their preservation during this contract. All items having any historical or archaeological interest which are discovered in the course of any construction activities shall be carefully preserved. The Contractor shall leave the archaeological find undisturbed and shall immediately report the find to the Contracting Officer so that the proper authorities may be notified.
d. Protection of Air Resources
(1) General. The Contractor shall keep construction activities under surveillance, management, and control to minimize pollution of air resources. All activities, equipment, processes, and work operated or performed by the Contractor in accomplishing the specified construction activities shall be in strict accordance with the applicable state air pollution regulations and all Federal emission and performance laws and standards. Ambient Air Quality Standards set by the Environmental Protection Agency shall be maintained for those construction operations and activities specified in this section. Special management techniques as set out below shall be implemented to control air pollution by the construction activities which are included in the contract.
(2) Hydrocarbons and Carbon Monoxide. Hydrocarbons and carbon monoxide emissions from equipment shall be controlled to Federal and State allowed limits at all times.
(3) Odors. Odors shall be controlled at all times for all construction activities, processing, and preparation of materials.
(4) Monitoring of Air Quality. Monitoring of air quality shall be the responsibility of the Contractor. All air areas affected by the construction activities shall be monitored by the Contractor.
1.7.6 Maintenance of Pollution Control Facilities
The Contractor shall maintain all constructed facilities and portable pollution control devices for the duration of the contract, or for that length of time construction activities create the particular pollutant.
1.7.7 Training of Contractor Personnel in Pollution Control
The Contractor shall train his personnel in all phases of environmental protection. The training shall include methods of detecting and avoiding pollution, familiarization with pollution standards, both statutory and contractual, and installation and care of facilities (vegetative covers, and instruments required for monitoring purposes) to ensure: adequate and continuous environmental pollution control.
DOCUMENT 00 80 00.00 09 Page 7
1.7.8 Payment
No separate payment or direct payment will be made for the cost of the work covered under this section, and such work will be considered as a subsidiary obligation of the Contractor.
1.8 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, Basis for Settlement of Proposals and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
(UAI 31.105-101)
NOTE: EP-1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule" is available on the Internet at http://www.usace.army.mil/inet/usace-docs/eng-pamphlets/ep.htm or may be purchased from the Government Printing Office on CD-ROM by calling (202) 512-1800.
1.9 ENVIRONMENTAL LITIGATION
a. If the performance of all or any part of the work is suspended, delayed, or interrupted due to an order of a court of competent jurisdiction as a result of environmental litigation, as defined below, the Contracting Officer, at the request of the Contractor, shall
DOCUMENT 00 80 00.00 09 Page 8 determine whether the order is due in any part to the acts or omissions of the Contractor, or a Subcontractor at any tier, not required by the terms of the contract. If it is determined that the order is not due in any part to acts or omissions of the Contractor, or a Subcontractor at any tier, other than as required by the terms of this contract, such suspension, delay, or interruption shall be considered as if ordered by the Contracting Officer in the administration of this contract under the terms of the Contract Clause SUSPENSION OF WORK in this contract.
The period of such suspension, delay, or interruption shall be considered unreasonable, and an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) as provided in that clause, subject to all the provisions thereof.
b. The term "Environmental Litigation", as used herein, means a lawsuit alleging that the work will have an adverse effect on the environment, or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment.
1.10 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)
This variation in estimated quantities clause is applicable only to Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, and 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, and 0022.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, and 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, and 0022 is less than 85 percent of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(c) If the actual quantity of work performed under Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, and 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, and 0022 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item, and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Item Nos. 0001, 0002, 0003, 0004, 0005, 0006, 0007, and 0008, 0015, 0016, 0017, 0018, 0019, 0020, 0021, and 0022 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity. (UAI 52.211-5001)
1.11 SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS
All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in
DOCUMENT 00 80 00.00 09 Page 9 accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. The Contractor shall have each applicable employee complete a SF-85P and submit to the Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435 within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS.
Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435. For those Contractors that do not have a CAGE Code or Facility Security Clearance, Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435 Security Office will process the investigation in coordination with the Contractor and contract employees.
1.12 I-WATCH
The Contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.13 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. The contractor will coordinate with the COR and/or the facility security office for access when required. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.14 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An
DOCUMENT 00 80 00.00 09 Page 10 initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
DOCUMENT 00 80 00.00 09 Page 11
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SCOPE OF WORK
1.3 PAYMENTS
1.3.1 General
1.3.2 Pay Time
1.4 PAYMENT INVOICES
1.5 SUBMITTAL OF SUBCONTRACTING PLAN
1.6 DESIGNATED BILLING OFFICE
1.7 PLANT
1.8 DURATION OF CONTRACT
1.9 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS
OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)
1.10 SERVICES TO BE FURNISHED TO THE GOVERNMENT
1.11 ACCIDENT PREVENTION PLAN
1.12 LOUISIANA SEVERANCE TAXES
1.13 ACCIDENT INVESTIGATIONS AND REPORTING
1.14 SSHO STAFFING FOR USACE DREDGING CONTRACTS
1.15 SSHO REQUIREMENTS FOR DREDGING
1.16 DESIGNATED REPRESENTATIVE (DR) REQUIREMENTS FOR DREDGING
1.17 SAFETY PERSONNEL TRAINING REQUIREMENTS FOR DREDGING
1.18 DREDGING AND DREDGE RELATED MARINE WORK
1.19 DAILY INSPECTIONS
1.20 MACHINERY AND MECHANIZED EQUIPMENT
1.21 MANDATORY CONDITIONS FOR WORK INVOLVING MARINE PLANT
1.22 HARBOR MAINTENANCE FEE
1.23 OFFICE ACCOMMODATIONS FOR INSPECTORS
1.24 MEANS OF ESCAPE FOR PERSONNEL QUARTERED OR WORKING ON FLOATING
PLANT
1.25 EMERGENCY ALARMS AND SIGNALS
1.26 SIGNAL LIGHTS
1.27 HURRICANE PLAN
1.28 COAST GUARD MOTORBOAT OPERATOR'S LICENSE
1.29 WORKING IN THE VICINITY OF STRUCTURES OR UTILITY CROSSINGS
1.30 OUTBOARD BOATS
1.31 WARRANTY
1.32 CONTRACTOR'S RESPONSIBILITY
1.33 FUEL CONSUMPTION REPORTING REQUIREMENTS
1.34 MINIMUM REQUIRED INSURANCE
1.35 MARINE EQUIPMENT OWNERSHIP AND OPERATING SCHEDULE
1.36 MEALS SUPPLIED TO GOVERNMENT EMPLOYEES
PART 2 PRODUCTS (Not Applicable)
SECTION 01 00 00.00 09 Page 1
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 00 00.00 09 Page 2
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
19 CFR 24.24 Harbor Maintenance Fee
33 CFR 156 Oil and Hazardous Material Transfer Operations
1.2 SCOPE OF WORK
The work to be performed under the contract consists of furnishing all plant, materials, equipment, supplies, labor and transportation, including fuel, power, water (except any materials, equipment, transportation, utility, or service specified to be furnished by the Government), and performing all work in strict accordance with the specifications and schedules. The Government intends to use the dredge at any of the locations as described in Section 35 20 23.00 09 DREDGING, paragraph WORK
LOCATIONS.
1.3 PAYMENTS
1.3.1 General
Payments will be made monthly. The unit price or job price or prices stated in the contract will be used in determining the amounts to be paid for work performed by the Contractor. Payment for work under contract will be made by the USACE Finance Center, CEFC-AO-P, 5722 Integrity Drive, Millington, Tennessee 38054-5005.
1.3.2 Pay Time
Pay time shall begin on the date and…