A0002_Amendment.pdf
PDF 344 KB Posted
- Attached to
- Supply and Delivery of Hydrated Lime
- Solicitation number
- W912EE-16-T-0044
About this file
Amendment 02- New bid schedule Projnet Question and Answer and added quantities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A0001_Amendment.pdf | ||
| A22_Lime_new_solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation W912EE-16-T-0044 The purpose of this modif ication is to add line item quantities, attach new bid schedule, and projnet questions and answ er to the solicititaion. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE-16-T-0044
X 9B. DATED (SEE ITEM 11)
16-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2016
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE-16-T-0044
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
NEW BID SCHEDULE
LIME BID SCHEDULE SOLICITATION: W912EE-16-T-0044
BASE YEAR
(YEAR 1)
ITEM NO.
DESCRIPTION
QTY
UNIT
OF
MEASU
RE
PRICE
AMOUNT
0001 Furnish and Deliver Type N Hydrated Lime
0001AA MISSISSIPPI RIVER LEVEE
SLIDE REPAIRS
(To include delivery or site application fees)
TONS
0001AB RED RIVER BACK WATER
LEVEE SLIDE REPAIRS
0001AC BAYOU BODCAU LEVEE
SLIDE REPAIRS
0001AD FREIGHT CHARGE PER
TRUCK LOAD TO BE
INCUREED ONLY WHEN
LIME IS DELIVERED BUT
CANNOT BE SPREAD CUE
TO WEATHER
CONDITIONS
Each
TOTAL FOR BASE YEAR $_____________________________
1ST OPTION
YEAR
(YEAR 2)
UNIT OF
MEASURE
0002 Furnish and Deliver Type N Hydrated Lime
0002AA MISSISSIPPI
RIVER LEVEE
SLIDE REPAIRS
(To include delivery or site application fees)
00002AB RED RIVER BACK
WATER LEVEE
SLIDE REPAIRS
0002AC BAYOU BODCAU
LEVEE SLIDE
REPAIRS
0002AD FREIGHT CHARGE
PER TRUCK LOAD
TO BE INCUREED
ONLY WHEN
LIME IS
DELIVERED BUT
CANNOT BE
SPREAD CUE TO
WEATHER
TOTAL FOR 1ST OPTION YEAR $_____________________________
2ND OPTION
(YEAR 3)
0003 Furnish and
0003AA MISSISSIPPI
SLIDE REPAIRS
0003AB RED RIVER BACK
WATER LEVEE
SLIDE REPAIRS
0003AC BAYOU BODCAU
LEVEE SLIDE
REPAIRS
0003AD FREIGHT CHARGE
PER TRUCK LOAD
TO BE INCUREED
ONLY WHEN
LIME IS
DELIVERED BUT
CANNOT BE
SPREAD CUE TO
TOTAL FOR 2ND OPTION YEAR $_____________________________
3RD OPTION
(YEAR 4)
0004 Furnish and
0004AA MISSISSIPPI
SLIDE REPAIRS
0004AB RED RIVER BACK
WATER LEVEE
SLIDE REPAIRS
0004AC BAYOU BODCAU
LEVEE SLIDE
REPAIRS
0004AD FREIGHT CHARGE
PER TRUCK LOAD
TO BE INCUREED
ONLY WHEN
LIME IS
DELIVERED BUT
CANNOT BE
SPREAD CUE TO
TOTAL FOR 3RD OPTION YEAR $_____________________________
4TH OPTION
(YEAR 5)
0005 Furnish and
0005AA MISSISSIPPI
SLIDE REPAIRS
0005AB RED RIVER BACK
WATER LEVEE
SLIDE REPAIRS
0005AC BAYOU BODCAU
LEVEE SLIDE
REPAIRS
0005AD FREIGHT CHARGE
PER TRUCK LOAD
TO BE INCUREED
ONLY WHEN
LIME IS
DELIVERED BUT
CANNOT BE
SPREAD CUE TO
TOTAL FOR 4TH OPTION YEAR $_____________________________
TOTAL BASE PLUS ALL FOUR OPTION YEARS $__________________________
PROJNET QUESTIONS AND ANSWERS
1 What is the maximum northern and southern distance of Levee Slide Repairs for MS River Levee?
200 miles from Vicksburg Ms.
2 What is the maximum northern and southern distance of Levee Slide Repairs for Red River Back Water Levee?
50 mile radius of Claton La.
3 What is the maximum northern and southern distance of Levee Slide Repairs for Bayou Bodcau Levee?
32°41'59.09"N - south point and 32°43'11.35"N - north point
4 Is any of the Levee Slide Repairs for Bayou Bodcau Levee in Arkansas? If so, what's the location?
No
5. All lime procured under this contract will be delivered in the boundaries of the Vicksburg District.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN type priced has been deleted.
The pricing detail quantity 4,890.00 has been deleted.
The unit of issue Net Ton (2,000 LB) has been deleted.
CLIN 0002
CLIN 0003
CLIN 0004
CLIN 0005
SUBCLIN 0001AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AA 2,750 Net Ton
(2,000 LB)
MISSISSIPPI RIVER LEVEE SLIDE REPAIRS
FFP
FOB: Destination
NET AMT
SUBCLIN 0001AB is added as follows:
0001AB 1,640 Net Ton
RED RIVER BACK WATER LEVEE SLIDE REPAIRS
SUBCLIN 0001AC is added as follows:
0001AC 500 Net Ton
BAYOU BODCAU LEVEE SLIDE REPAIRS
SUBCLIN 0001AD is added as follows:
0001AD 5 Each
FREIGHT CHARGE
FFP
FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN
LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER
SUBCLIN 0002AA is added as follows:
0002AA 2,750 Net Ton
OPTION MISSISSIPPI RIVER LEVEE SLIDE REPAIRS
SUBCLIN 0002AB is added as follows:
0002AB 1,640 Net Ton
OPTION RED RIVER BACK WATER LEVEE SLIDE REPAIRS
SUBCLIN 0002AC is added as follows:
0002AC 500 Net Ton
OPTION BAYOU BODCAU LEVEE SLIDE REPAIRS
SUBCLIN 0002AD is added as follows:
0002AD 5 Each
OPTION FREIGHT CHARGE
FFP
FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN
LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER
SUBCLIN 0003AA is added as follows:
0003AA 2,750 Net Ton
SUBCLIN 0003AB is added as follows:
0003AB 1,640 Net Ton
SUBCLIN 0003AC is added as follows:
0003AC 500 Net Ton
SUBCLIN 0003AD is added as follows:
0003AD 5 Each
OPTION FREIGHT CHARGE
FFP
FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN
LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER
SUBCLIN 0004AA is added as follows:
0004AA 2,750 Net Ton
SUBCLIN 0004AB is added as follows:
0004AB 1,640 Net Ton
SUBCLIN 0004AC is added as follows:
0004AC 500 Net Ton
SUBCLIN 0004AD is added as follows:
0004AD 5 Each
OPTION FREIGHT CHARGE
FFP
FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN
LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER
SUBCLIN 0005AA is added as follows:
0005AA 2,750 Net Ton
SUBCLIN 0005AB is added as follows:
0005AB 1,640 Net Ton
SUBCLIN 0005AC is added as follows:
0005AC 500 Net Ton
SUBCLIN 0005AD is added as follows:
0005AD 5 Each
OPTION FREIGHT CHARGE
FFP
FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN
LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AA:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AD:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AD:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AD:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AD:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AD:
(End of Summary of Changes)