A0002_Amendment.pdf

PDF 344 KB Posted

Attached to
Supply and Delivery of Hydrated Lime
Solicitation number
W912EE-16-T-0044
Issued by

About this file

Amendment 02- New bid schedule Projnet Question and Answer and added quantities.

View the file

Other files

File Type Posted
A0001_Amendment.pdf PDF
A22_Lime_new_solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation W912EE-16-T-0044 The purpose of this modif ication is to add line item quantities, attach new bid schedule, and projnet questions and answ er to the solicititaion. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE-16-T-0044

X 9B. DATED (SEE ITEM 11)

16-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Aug-2016

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE-16-T-0044

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

NEW BID SCHEDULE

LIME BID SCHEDULE SOLICITATION: W912EE-16-T-0044

BASE YEAR

(YEAR 1)

ITEM NO.

DESCRIPTION

QTY

UNIT

OF

MEASU

RE

PRICE

AMOUNT

0001 Furnish and Deliver Type N Hydrated Lime

0001AA MISSISSIPPI RIVER LEVEE

SLIDE REPAIRS

(To include delivery or site application fees)

TONS

0001AB RED RIVER BACK WATER

LEVEE SLIDE REPAIRS

0001AC BAYOU BODCAU LEVEE

SLIDE REPAIRS

0001AD FREIGHT CHARGE PER

TRUCK LOAD TO BE

INCUREED ONLY WHEN

LIME IS DELIVERED BUT

CANNOT BE SPREAD CUE

TO WEATHER

CONDITIONS

Each

TOTAL FOR BASE YEAR $_____________________________

1ST OPTION

YEAR

(YEAR 2)

UNIT OF

MEASURE

0002 Furnish and Deliver Type N Hydrated Lime

0002AA MISSISSIPPI

RIVER LEVEE

SLIDE REPAIRS

(To include delivery or site application fees)

00002AB RED RIVER BACK

WATER LEVEE

SLIDE REPAIRS

0002AC BAYOU BODCAU

LEVEE SLIDE

REPAIRS

0002AD FREIGHT CHARGE

PER TRUCK LOAD

TO BE INCUREED

ONLY WHEN

LIME IS

DELIVERED BUT

CANNOT BE

SPREAD CUE TO

WEATHER

TOTAL FOR 1ST OPTION YEAR $_____________________________

2ND OPTION

(YEAR 3)

0003 Furnish and

0003AA MISSISSIPPI

SLIDE REPAIRS

0003AB RED RIVER BACK

WATER LEVEE

SLIDE REPAIRS

0003AC BAYOU BODCAU

LEVEE SLIDE

REPAIRS

0003AD FREIGHT CHARGE

PER TRUCK LOAD

TO BE INCUREED

ONLY WHEN

LIME IS

DELIVERED BUT

CANNOT BE

SPREAD CUE TO

TOTAL FOR 2ND OPTION YEAR $_____________________________

3RD OPTION

(YEAR 4)

0004 Furnish and

0004AA MISSISSIPPI

SLIDE REPAIRS

0004AB RED RIVER BACK

WATER LEVEE

SLIDE REPAIRS

0004AC BAYOU BODCAU

LEVEE SLIDE

REPAIRS

0004AD FREIGHT CHARGE

PER TRUCK LOAD

TO BE INCUREED

ONLY WHEN

LIME IS

DELIVERED BUT

CANNOT BE

SPREAD CUE TO

TOTAL FOR 3RD OPTION YEAR $_____________________________

4TH OPTION

(YEAR 5)

0005 Furnish and

0005AA MISSISSIPPI

SLIDE REPAIRS

0005AB RED RIVER BACK

WATER LEVEE

SLIDE REPAIRS

0005AC BAYOU BODCAU

LEVEE SLIDE

REPAIRS

0005AD FREIGHT CHARGE

PER TRUCK LOAD

TO BE INCUREED

ONLY WHEN

LIME IS

DELIVERED BUT

CANNOT BE

SPREAD CUE TO

TOTAL FOR 4TH OPTION YEAR $_____________________________

TOTAL BASE PLUS ALL FOUR OPTION YEARS $__________________________

PROJNET QUESTIONS AND ANSWERS

1 What is the maximum northern and southern distance of Levee Slide Repairs for MS River Levee?

200 miles from Vicksburg Ms.

2 What is the maximum northern and southern distance of Levee Slide Repairs for Red River Back Water Levee?

50 mile radius of Claton La.

3 What is the maximum northern and southern distance of Levee Slide Repairs for Bayou Bodcau Levee?

32°41'59.09"N - south point and 32°43'11.35"N - north point

4 Is any of the Levee Slide Repairs for Bayou Bodcau Levee in Arkansas? If so, what's the location?

No

5. All lime procured under this contract will be delivered in the boundaries of the Vicksburg District.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN type priced has been deleted.

The pricing detail quantity 4,890.00 has been deleted.

The unit of issue Net Ton (2,000 LB) has been deleted.

CLIN 0002

CLIN 0003

CLIN 0004

CLIN 0005

SUBCLIN 0001AA is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AA 2,750 Net Ton

(2,000 LB)

MISSISSIPPI RIVER LEVEE SLIDE REPAIRS

FFP

FOB: Destination

NET AMT

SUBCLIN 0001AB is added as follows:

0001AB 1,640 Net Ton

RED RIVER BACK WATER LEVEE SLIDE REPAIRS

SUBCLIN 0001AC is added as follows:

0001AC 500 Net Ton

BAYOU BODCAU LEVEE SLIDE REPAIRS

SUBCLIN 0001AD is added as follows:

0001AD 5 Each

FREIGHT CHARGE

FFP

FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN

LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER

SUBCLIN 0002AA is added as follows:

0002AA 2,750 Net Ton

OPTION MISSISSIPPI RIVER LEVEE SLIDE REPAIRS

SUBCLIN 0002AB is added as follows:

0002AB 1,640 Net Ton

OPTION RED RIVER BACK WATER LEVEE SLIDE REPAIRS

SUBCLIN 0002AC is added as follows:

0002AC 500 Net Ton

OPTION BAYOU BODCAU LEVEE SLIDE REPAIRS

SUBCLIN 0002AD is added as follows:

0002AD 5 Each

OPTION FREIGHT CHARGE

FFP

FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN

LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER

SUBCLIN 0003AA is added as follows:

0003AA 2,750 Net Ton

SUBCLIN 0003AB is added as follows:

0003AB 1,640 Net Ton

SUBCLIN 0003AC is added as follows:

0003AC 500 Net Ton

SUBCLIN 0003AD is added as follows:

0003AD 5 Each

OPTION FREIGHT CHARGE

FFP

FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN

LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER

SUBCLIN 0004AA is added as follows:

0004AA 2,750 Net Ton

SUBCLIN 0004AB is added as follows:

0004AB 1,640 Net Ton

SUBCLIN 0004AC is added as follows:

0004AC 500 Net Ton

SUBCLIN 0004AD is added as follows:

0004AD 5 Each

OPTION FREIGHT CHARGE

FFP

FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN

LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER

SUBCLIN 0005AA is added as follows:

0005AA 2,750 Net Ton

SUBCLIN 0005AB is added as follows:

0005AB 1,640 Net Ton

SUBCLIN 0005AC is added as follows:

0005AC 500 Net Ton

SUBCLIN 0005AD is added as follows:

0005AD 5 Each

OPTION FREIGHT CHARGE

FFP

FREIGHT CHARGE PER TRUCK LOAD TO BE INCUREED ONLY WHEN

LIME IS DELIVERED BUT CANNOT BE SPREAD CUE TO WEATHER

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AA:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0001AD:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AD:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AD:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AD:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AD:

(End of Summary of Changes)

File details come from the government source that posted it. Updated .