A02_SOW_Quarterboats_Fire_Alarm_Replacement1.pdf

PDF 222 KB Posted

Attached to
FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, PERSONNEL AND LABOR NECESSARY TO COMPLETE FIRE ALARM SYSTEM REPLACEMENT
Solicitation number
W912EE-16-T-0035
Issued by

View the file

Other files

File Type Posted
A22_Bidding_Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mat Sinking Unit Fire Alarm System Replacement

Scope of Work

The Mat Sinking Unit requires the replacement of its two fire alarm systems on Quarterboats 9401 and

9501 to a more modern system. The existing systems on both of these quarterboat barges consist of

Siemens Ceberus Pyrotronics System 3 alarm panels. The existing panels indicate the location of the fire or trouble by giving the zone, which only narrows down the location to about 8 different detector locations. The Mat Sinking Unit requires replacing this current system with an addressable system that will indicate which specific device/location is in alarm state. The new panels shall be wired to all existing devices that the old panels were wired to including all detectors, horns, auxiliary panels, pull stations, etc. All new alarm equipment shall be installed in accordance with NFPA and OSHA requirements along with 46 CFR 161.002 to ensure it is approved for marine use by the Coast Guard.

The Mat Sinking Unit has three Quarterboat barges that are always tied together, each one with a separate alarm system. The Mat Sinking Unit requires the contractor to install the necessary equipment that will allow the alarm panel on each barge to communicate with each other and relay alarm messages between each other. The Mat Sinking Unit requires wireless equipment to be installed to reduce the need for complicated wiring between each barge. Both alarm panels are required to be identical to the new Notifier alarm panel on Quarterboat 9901, which is the NFS-640 so that information can be relayed between each panel. All equipment shall be UL certified.

The Mat Sinking Unit also requires new voice annunciator panels to be installed in the alarm panel room of each of the three Quarterboats. The current annunciator panels (Federal Signal SelecTone Command model 300SCW – 1 Series A allow for up to four tones/sounds to be played. The newly installed annunciator system should be able to make each barge go into alarm mode no matter which barge the alarm is on. The tones/sounds should then specify which barge the alarm is coming from. The Mat Sinking

Unit will require at least twelve different tone options as listed below:

Fire! 94!

Fire! 95!

Fire! 99!

Man Overboard! 94!

Man Overboard! 95!

Man Overboard! 99!

Abandon Ship! 94!

Abandon Ship! 95!

Abandon Ship! 99!

3 Other Tone Openings to Allow for Future Additions

Testing & Annual Inspection

Once all equipment is installed, the contractor is required to inspect and test all fire alarm equipment, components, and devices in accordance with the Code of Federal Regulations and Corps of Engineers .

All current alarm equipment, components, and information are listed below:

Quarterboat 9401

Siemens Pyrotronics Alarm Panel in Electrical Room

Federal Signal SelecTone Command Annunciator Panel

300SCW – 1 , Series A

111 Ionization Smoke Detectors (17 Above Ceiling)

5 Thermal Detectors in Machinery Space and Fire Pump Room

17 Manual Pull Stations

14 Audible Devices

One Exhaust Fan Shutdown Relay

Quarterboat 9501

Siemens Pyrotronics Alarm Panel in Electrical Room

Federal Signal SelecTone Command Annunciator Panel

300SCW – 1, Series A

108 Ionization Smoke Detectors (17 Above Ceiling)

4 Thermal Detectors in Machinery Space and Fire Pump Room

20 Manual Pull Stations

27 Audible Devices

One Exhaust Fan Shutdown Relay

Quarterboat 9901

Notifier NFS-640 Alarm Panel in Electrical Room

Federal Signal SelecTone Command Annunciator Panel

300SCW – 1, Series A

110 Ionization Smoke Detectors (20 Above Ceiling)

20 Thermal Detectors

27 Manual Pull Stations

38 Audible Devices

2 Exhaust Fan Shutdown Relays

Site Visit

The Quarterboat barges are available for a site visit/wireless equipment test upon request. Please call

Nathan Jabour 601-415-0944.

Period of Performance

The contractor shall begin February 1, 2017 once the Mat Sinking Unit returns from working on the

Mississippi River. All work shall be completed no later than March 17th, 2017.

Security Requirements

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures

(provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation

Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity

Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection

Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and

Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the

Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.