Matboat 4801 Fuel Tank Cleaning
Scope of Work
The Mat Sinking Unit requires cleaning of the two fuel tanks on Matboat 4801. The specifications of the requirements are listed below:
Matboat 4801 Fuel Tanks
Two 5,000 gallon diesel tanks
Microbial Treatment
Kill all microbial growth in fuel, fuel tank and fuel water interface using a BioPreferred microbiocide (64% biobased content). Supply MSDS and product documentation.
Clean Fuel Tanks
Remove all water, contaminates, bacteria, and fungi from the fuel.
Circulate fuel to wash fuel tank walls
Use demulsifiers to remove water
No water disbursing chemicals
Supply MSDS and product documentation
Filter Fuel
Filter through oil/water separators and fuel filters
Remove all water and contaminates 10 microns or smaller
Dispose of dirty water, dirty filters, and other contaminates
Polish Fuel
Use Beta rated filters to polish fuel
Must meet Tier 3 pollution specifications
Fuel Treatment
Treat polished fuel with diesel fuel treatment containing:
Lubricity agents
Cetane improvers (4 points or greater)
Oxygen scavengers
Corrosion Inhibitors and Stabilizers
Supply documentation and MSDS
Warranties and Guarantees
Sample and visually inspect every 90 days for one year
Re-filter at 180 days
180 day re-cleaning warranty in case of dirty fuel or tanks for any reason
Date of Performance
The contractor shall schedule services with the technical point of contact immediately after award of contract.
Service will be required after the current Mat Sinking season. Initial servicing is required to be completed by
August 5, 2016.
Site Visit
Site visits will be given upon request during the solicitation period. To schedule a site visit, call Nathan Jabour at
601-415-0944.
Questions
All questions may be referred to Nathan Jabour, 601-415-0944, or Bill Kelly, 601-415-9560.
Sustainability Requirements
The United States Department of Agriculture (USDA) designates certain biobased products for federal procurement and specifies minimum biobased content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred’s minimum biobased content level. Visit the BioPreferred web site for the complete list of designated products and the associated minimum biobased content level requirements.
Security Requirements
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost
Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition
(FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
File details come from the government source that posted it. Updated .