AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Invitation for Bids (IFB) W912EE-16-B-0016, Mississippi River Levees, Bolivar County, Mississippi, Pushmataha Mitigation Area Bridge, scheduled to open on 25 Aug 16 at 1430 hours. Referenced IFB is amended as follow s:

SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE-16-B-0016

X 9B. DATED (SEE ITEM 11)

26-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2016

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE-16-B-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

SUMMARY OF CHANGES

SPECIFICATIONS: Section 31 62 16.00 12 is revised and replaced.

Encls Section 31 62 16.00 12

Specifications revised by this amendment have the notation “Revised by Amendment 0002” at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.

(End of Summary of Changes)

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 62 16.00 12

STEEL H-PILES

PART 1 GENERAL

1.1 SCOPE

1.2 REFERENCES

1.3 SUBMITTALS

1.4 QUALITY CONTROL

1.4.1 General

1.4.2 Reporting

1.5 DELIVERY, STORAGE AND HANDLING

PART 2 PRODUCTS

2.1 MATERIALS

PART 3 EXECUTION

3.1 PILE DRIVING EQUIPMENT

3.1.1 Pile Driving Hammers

3.1.2 Pile Driving Leads or Templates

3.1.3 Driving Helmets and Pile Cushions

3.1.4 Cap Blocks

3.1.5 Pile Extractors

3.1.6 Jetting Equipment

3.1.7 Pre-drilling

3.2 PLACING

3.3 DRIVING

3.3.1 Driving Records

3.3.2 Scale

3.3.3 Void Backfill

3.4 CUTOFFS AND UNUSABLE PILING

3.5 DAMAGED AND MISPLACED PILING

-- End of Section Table of Contents --

SECTION 31 62 16.00 12 Page 1 Revised By Amendment 0002

SECTION 31 62 16.00 12

STEEL H-PILES

PART 1 GENERAL

1.1 SCOPE

The work covered by this section consists of furnishing all plant, equipment, labor and materials, and performing all operations in connection with the delivery and installation of steel H-piling.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A572/A572M (2015) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Equipment Description; G, DS

Complete descriptions of pile driving equipment including hammers, extractors, protection caps and other installation appurtenances shall be submitted for approval prior to commencement of work.

SD-02 Shop Drawings

Shop Drawings; G, DS

Shop drawings for H-piling shall show complete dimensions and details of piling and shall show the driving sequence and location of piling. Shop drawings shall include details and dimensions of templates and other temporary guide structures for installing the piling, and shall provide details of the method of handling piling to prevent permanent deflection.

SD-06 Test Reports

Driving Records

SECTION 31 62 16.00 12 Page 2

Records of the pile driving operations shall be submitted after driving is completed. These records shall provide a system of identification which shows the disposition of approved piling in the work, driving equipment performance data, piling penetration rate data, piling dimensions and top and bottom elevations.

SD-07 Certificates

Material Tests

Material test certificates shall be submitted for each shipment and identified with specific lots prior to installing piling.

Identification data should include piling type, dimensions, chemical composition, mechanical properties, section properties, heat number and mill identification mark.

1.4 QUALITY CONTROL

1.4.1 General

The Contractor shall establish and maintain quality control for pile driving operations to assure compliance with contract specification and maintain records of his quality control for all construction operations including, but not limited to, the following:

(1) Driving of H-piling. The driving records shall include the pile number or identification, location, size, length, elevation of tip, cut-off and top of pile, the number of blows and ram drop (in inches) required for each foot of penetration throughout the entire length of the pile, and the number of blows per inch for the last 18 inches of penetration. The record shall include the type and size of the hammer, the rate of operation, the type and dimensions of driving helmet, the cap-block and pile cushion used. The location and elevation of any obstruction or unusual occurrence encountered during driving shall be recorded and immediately reported to the Contracting Officer. His directed action shall also be recorded.

(2) Recording uplift and vertical tolerances after driving, pulled and redriven piles, and removal and disposal of damaged piles.

(3) Plumbness of piling.

(4) Penetration depth.

(5) Stockpiling.

1.4.2 Reporting

The original and two copies of these records and tests, as well as the records of corrective action taken, shall be furnished to the Government daily. Format of the report shall be as prescribed in Section

01 45 04.00 09 CONTRACTOR QUALITY CONTROL.

1.5 DELIVERY, STORAGE AND HANDLING

Materials delivered to the site shall be in a new and undamaged condition and shall be accompanied by certified test reports. The manufacturer's logo and mill identification mark shall be stamped on each unspliced piling

SECTION 31 62 16.00 12 Page 3 at a minimum of two locations. All piling shall be stored and handled in the manner recommended by the manufacturer to prevent permanent deflection, distortion or damage to the interlocks. Storage of piling should also facilitate required inspection activities.

PART 2 PRODUCTS

2.1 MATERIALS

Steel for H-piling shall conform to the requirements of ASTM A572/A572M Grade 50. The H-piling shall be of the shape and sections shown on the shop drawings. Piling shall have standard square ends, unless otherwise specified or directed. Lengths of piling shall be as shown on the drawings. All steel H-piling shall be furnished full length.

PART 3 EXECUTION

3.1 PILE DRIVING EQUIPMENT

The Contractor shall select the proposed pile driving equipment and submit equipment descriptions of the proposed equipment for approval as required in paragraph SUBMITTALS.

3.1.1 Pile Driving Hammers

Pile driving hammers shall be of the impact type and shall be hydraulic, steam, air or diesel hammers of the single acting, double-acting, or differential acting type. The size or capacity of hammers shall be as recommended by the manufacturer for the pile type, weight, and soil formation to be penetrated. Boiler, compressor, or engine capacity shall be sufficient to operate hammers continuously at the full rated speed so that a single-acting hammer obtains a full upward stroke of the ram, a double-acting hammer operates at or near the blows per minute at which the hammer is rated, and a differential type hammer obtains a slight rise of the hammer base during each upward stroke. Single-acting hammers shall have a scale (in inches) fixed to the hammer's ram guide and a pointed indicator fixed on the ram to allow reading of the hammer's stroke. Both the scale and indicator shall be easily legible to observers on the ground.

Hammers shall have a gage to monitor hammer bounce chamber pressure for diesel hammers or pressure at the hammer for air and steam hammers. This gage shall be operational during the driving of piles and shall be mounted in an accessible location for monitoring by the Contractor and the Contracting Officer. Two spare operational bounce chamber readout units shall be available on site. The Contractor shall provide bounce chamber pressure gage correction tables and charts for the type and length of hose to be used with the pressure gage to the Contracting Officer.

3.1.2 Pile Driving Leads or Templates

The Contractor shall provide lateral support of the pile during driving and pulling. Provide two intermediate support for the pile in the leads or in a template shall be provided to reduce the unbraced length of the pile during driving and pulling.

3.1.3 Driving Helmets and Pile Cushions

A driving helmet including a pile cushion shall be used between the top of the pile and the ram to prevent impact damage to the pile. The driving helmet and pile cushion combination shall be capable of protecting the head

SECTION 31 62 16.00 12 Page 4 of the pile, minimize energy absorption and dissipation and transmit hammer energy uniformly over the top of the pile. The driving helmet shall fit loosely around the top of the pile so that the pile is not restrained by the helmet if the pile tends to rotate during driving. The pile cushion may be of solid wood or of laminated construction, completely cover the top surface of the pile, and be retained by the driving helmet. Minimum thickness of the pile cushion shall be 3 inches and the thickness shall be increased so as to be suitable for the size and length of pile, character of subsurface material to be encountered, hammer characteristics, and the required driving resistance.

3.1.4 Cap Blocks

The cap block (hammer cushion) used between the driving cap and the hammer ram may be of solid hardwood block with grain parallel to the pile axis and enclosed in a close-fitting steel housing or may consist of aluminum and approved industrial type plastic laminate disks stacked alternately in a steel housing. Steel plates shall be used at the top and the bottom of the cap block. The cap block shall be replaced if it has been damaged, highly compressed, charred, or burned or has become spongy or deteriorated in any manner. If a wood cap block is used, it shall not be replaced during the final driving of any pile. Under no circumstances will the use of small wood blocks, wood chips, rope, or other material permitting excessive loss of hammer energy be permitted.

3.1.5 Pile Extractors

Pile extractors may be vibratory and/or impact pile driving hammers.

Impact hammers are required for pulling piles not extractable with vibratory hammers. For the use of the vibratory hammer, weight indicator shall be attached to the crane during extraction.

3.1.6 Jetting Equipment

Jetting will not be allowed.

3.1.7 Pre-drilling

Piles shall not be pre-drilled.

3.2 PLACING

H-piling shall be driven as accurately as practicable in the correct locations, true to line both laterally and longitudinally and to the vertical or batter lines, all as indicated in the drawings. A lateral deviation from the correct location at the cut-off elevation of not more than 3 inches will be permitted. A variation in slope of not more than 1/4-inch per foot of longitudinal axis will be permitted. The correct relative position of group piling shall be maintained by the use of templates or by other approved means. Any H-pile driven out of correct location shall be pulled and redriven by the Contractor at no additional cost to the Government.

3.3 DRIVING

H-piling shall be driven by an approved steam, air or diesel drop, single acting, double-acting, or differential- acting pile driving hammer. The size and capacity of the hammer shall be as recommended by the manufacturer for the pile weights and soil formations to be penetrated. No drilling or

SECTION 31 62 16.00 12 Page 5 jetting will be allowed before or during driving operations. The hammer shall be operated at all times at the steam or air pressure and at the speed recommended by the manufacturer. Boiler or compressor capacity shall be sufficient to operate the hammer continuously at full rated speed. To determine ram drop, the Contractor shall attach a scale (in inches) to the pile hammer and an indicator on the pile ram . Installation of both devices shall be in such a manner that displacement of the ram will be indicated on the scale. Both the scale and the indicator shall be easily legible to observers on the ground during operations. Piling shall be protected during driving by a cushion and cap of approved design. Pile drivers shall have firmly supported leads extending to the lowest point the hammer must reach to maintain the hammer in proper alignment at all times.

Each pile shall be driven continuously and without voluntary interruption until the required depth of penetration has been attained. Deviation from this procedure will be permitted only in case the driving is stopped by causes which could not reasonably have been anticipated. Steel H-piling shall be driven in full lengths. Splicing of H-piling will not be allowed. The full length piling shall be cut by either an exothermic method or by any other method approved by the Contracting Officer. Any pile that cannot be driven to the required depth because of an obstruction shall, as directed by the Contracting Officer, be pulled and another pile driven adjacent thereto, be cut off and used, or be abandoned as directed by the Contracting Officer. The Contractor shall make observations to detect any uplift of piling already driven and uplifted piling shall be backdriven to the original penetration, at no additional cost to the Government. Piling shall not be driven within 100 feet of concrete less than 7 days old nor within 30 feet of concrete less than 28 days old. The Contractor shall provide every facility for the Contracting Officer to inspect and record data relative to pile driving operations. This data shall include blows and ram drop (in inches) per foot of pile penetration, final tip elevation, and blows per inch prior to seating.

3.3.1 Driving Records

The Contractor shall develop driving record forms for recording the pile driving operations, obtain approval of this form, and compile complete records of the operations. Pile driving records shall include pile dimensions and location, pile identification number, casting date, date driven, original pile length, cutoff and tip elevations, description of hammer used, rated hammer energy, observed stroke and rate of hammer operation (blows per minute), air or steam pressure at the hammer or bounce chamber pressure, length of pressure hose, penetration under the combined weight of the pile and hammer, number of blows required for each foot of penetration throughout the entire length of each pile and for each inch of penetration in the last foot of penetration, time for start and finish of driving, total driving time in minutes and seconds for each pile, cushion information including changes during driving, and any other information as required or requested. Record shall also include information such as unusual driving conditions, interruptions or delays during driving, observed pile damage, heave detected in adjacent piles, records of restriking, depth and description of voids formed adjacent to the pile, and any other pertinent information.

3.3.2 Scale

A scale (inches) shall be fixed to the hammer's ram guide and a pointed indicator on the ram, near the scale, to allow a reading of the ram drop .

Installation of both scale and indicator shall be in such a manner that the drop of the ram can be read by observing the highest and the lowest

SECTION 31 62 16.00 12 Page 6 position of the indicator and scale. Both the scale and the indicator shall be easily legible to observers on the ground during operations. The Contractor shall record in the pile driving record the ram drop of the pile hammer when recording the blows per foot as specified in paragraph

"DRIVING."

3.3.3 Void Backfill

Voids occurring around piles as a result of pile driving or due to any other cause and abandoned holes for piles that have been pulled shall be filled to within 3 feet of the adjacent ground surface with a tremie-placed slurry (from bottom to top of hole). The slurry shall consist of one part portland cement, two parts bentonite, and six parts sand mixed with enough water to produce a slurry viscous enough to thoroughly fill the voids. The upper 3 feet of the hole shall be filled with earth and compacted to the same density as the surrounding soil.

3.4 CUTOFFS AND UNUSABLE PILING

Cutoffs, excess and damaged piles, unless specified otherwise herein above, shall become the property of the Contractor and shall be removed at the Contractor's expense.

3.5 DAMAGED AND MISPLACED PILING

Any pile which is damaged because of internal defects or by improper handling or driving, or which is otherwise damaged by fault of the Contractor so as to impair it for its intended use, or any pile driven out of proper location, shall be removed and replaced. All work of removal and cost of replacement shall be borne by the Contractor at no additional expense to the Government. The Contracting Officer may require the Contractor to pull certain selected piling after driving for inspection to determine the condition of the piling. Any pile so pulled and found to be damaged to such extent as, in the opinion of the Contracting Officer, would impair its usefulness in the completed structure, shall be removed from the site of the work and the Contractor shall furnish and drive a new pile to replace the damaged pile. Piling pulled and found to be sound and in a satisfactory condition as determined by the Contracting Officer's Representative shall be redriven. Any holes which remain as a result of pulling operations shall be filled as specified in paragraph "Void Backfill."

-- End of Section --