specs.pdf
PDF 1 MB Posted
- Solicitation number
- W912EE-16-B-0003
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_OfficialAbstract_16B3.pdf | ||
| A22_am_04_16B03.pdf | ||
| am_03_16B03.pdf | ||
| am_02_16B03.pdf | ||
| W912EE-16-B-0003_Amd01.pdf | ||
| 385-1-1.pdf | ||
| Summary.pdf | ||
| 16b0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. W912EE-16-B-0003
DATE: 0 9 M a y 2016
SPECIFICATIONS FOR
FC/MR&T, YAZOO RIVER BASIN
YALOBUSHA RIVER WATERSHED
WEBSTER, CALHOUN, AND CHICKASAW COUNTIES, MS
MISSISSIPPI DELTA HEADWATERS PROJECT
RISER PIPE GRADE CONTROL STRUCTURES
RP-10-03
THIS PROCUREMENT IS A COMPETITIVE 8(A) SET-ASIDE.
COMPETITION IS LIMITED TO 8(A) BUSINESS DEVELOPMENT
(BD) PARTICIPANTS LOCATED WITHIN THE GEOGRAPHICAL
AREA SERVICED BY THE MISSISSIPPI DISTRICT OFFICE,
AND OTHER 8(A) CONSTRUCTION FIRMS HAVING A SBA
APPROVED BONA FIDE PLACE OF BUSINESS WITHIN THE
GEOGRAPHICAL BOUNDARIES OF THE STATE OF
MISSISSIPPI.
Building Strong®
Serving the Army Serving the Nation
VICKSBURG DISTRICT
4155 CLAY STREET
VICKSBURG, MS 39183-3435 CEMVK-EC-TC
INQUIRIES
REGARDING THIS SOLICITATION SHOULD BE
MADE TO THE FOLLOWING:
http://www.projnet.org/projnet
Plans and specifications will be available on the Federal Business Opportunities (FBO) Web Page at: http://www.fedbizopps.gov/
W912EE-16-B-0003
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SOLICITATION, OFFER, AND AWARD (SF1442)
00010 BIDDING SCHEDULE
00100 INSTRUCTIONS TO BIDDERS
00600 REPRESENTATIONS AND CERTIFICATIONS
00700 CONTRACT CLAUSES
00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS
01 22 00.00 09 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02.00 09 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 09 CONTRACTOR QUALITY CONTROL
01 57 20.00 09 ENVIRONMENTAL PROTECTION
01 57 23.00 09 STORM WATER POLLUTION PREVENTION PLAN
DIVISION 05 - METALS
05 60 00.00 09 WELDING
DIVISION 13 - SPECIAL CONSTRUCTION
13 60 00.00 09 MISCELLANEOUS ITEMS
DIVISION 31 - EARTHWORK
31 06 00.00 09 ENGINEERING FABRIC
31 11 00.00 09 CLEARING AND GRUBBING
31 23 03.00 09 EXCAVATION, BACKFILL, PIPE FILL, EMBANKMENT, AND CONTROL
OF WATER
31 32 13.19 09 LIME TREATMENT
31 37 00.00 09 STONE PROTECTION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 02.00 09 TOPSOIL, FERTILIZING, SEEDING AND MULCHING
DIVISION 33 - UTILITIES
33 42 29.00 09 CORRUGATED METAL PIPE
-- End of Project Table of Contents –
PROJECT TABLE OF CONTENTS Page 1
W807PM61050203
WEBSTER, CALHOUN, AND CHICKASAW COUNTIES, MS
MISSISSIPPI DELTA HEADWATERS PROJECT
RISER PIPE GRADE CONTROL STRUCTURES, RP-10-03
DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment, and constructing nine (9) riser pipe grade control structures in Webster, Calhoun, and Chickasaw Counties, Mississippi. Principle features of work include clearing and grubbing; excavation, backfill, pipe fill, embankment, and control of water; engineering fabric; stone protection; corrugated metal pipe; topsoil, fertilizing, seeding and mulching; lime treatment; welding; concrete work; storm water pollution prevention; and environmental protection.
The estimated value of the proposed work is between $1,000,000 and $5,000,000.
x
OLIVER C. MEEKS (601)631-7249
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09 May 2016
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SEE SPECIAL NOTICES TO BIDDERS
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by
GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within 10 calendar days and complete it within (160 calendar days after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 00 80 00.00 09
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 14 June 2016 (date). IIf this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
VICKSBURG CONTRACTING OFC
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE
PAGE
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(601)631-7261 FAX: TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 964145
US ARMY CORPS OF ENGRS FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
26. ADMINISTERED BY W912EE
VICKSBURG CONTRACTING OFFICE
4155 CLAY STREET
VICKSBURG, MS 39183-3435
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror)OFFER
WEBSTER, CALHOUN, AND CHICKASAW COUNTIES, MS
MISSISSIPPI DELTA HEADWATERS PROJECT
RISER PIPE GRADE CONTROL STRUCTURES
RP-10-03
BIDDING SCHEDULE
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0001 YRW-10-02 1 JOB FOR _______________
0002 YRW-10-04 1 JOB FOR _______________
0003 YRW-10-08 1 JOB FOR _______________
0004 YRW-10-13 1 JOB FOR _______________
0005 YRW-10-19 1 JOB FOR _______________
0006 YRW-10-20 1 JOB FOR _______________
0007 YRW-10-21 1 JOB FOR _______________
0008 YRW-10-22 1 JOB FOR _______________
0009 YRW-10-23 1 JOB FOR _______________
TOTAL: ______________________________
NOTES:
(a) THIS PROCUREMENT IS A COMPETITIVE 8(A) SET-ASIDE. COMPETITION IS LIMITED
TO 8(A) BUSINESS DEVELOPMENT (BD) PARTICIPANTS LOCATED WITHIN THE
GEOGRAPHICAL AREA SERVICED BY THE MISSISSIPPI DISTRICT OFFICE, AND OTHER 8(A)
CONSTRUCTION FIRMS HAVING A SBA APPROVED BONA FIDE PLACE OF BUSINESS WITHIN
THE GEOGRAPHICAL BOUNDARIES OF THE STATE OF MISSISSIPPI.
(b) FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT
AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE.
(c) All technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. See SNTB Page entitled “TECHNICAL INQUIRIES
AND QUESTIONS”.
(d) The SF 1442, Bidding Schedule, and Section 00600 (Representations, Certifications and other Statements of Bidders) must be accurately completed and returned with your offer or it may be rejected as nonresponsive.
(e) Lack of registration in the System for Award Management (SAM) database will make a bidder ineligible for award. SEE CONTRACT CLAUSE 52.204-7
ENTITLED, "SYSTEM FOR AWARD MANAGEMENT".
(f) Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS
BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR ANY ITEM, HIS BID
WILL BE DECLARED NONRESPONSIVE.
(g) All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "lump sum", "job" or "each".
(h) If a bid or modification to a bid based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.
(i) All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
(j) Award will be made as a whole to the lowest responsive, responsible bidder as may be in the best interest of the Government.
(k) VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS:
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx
Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/
Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/
Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html
U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/
Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_counc il_-guide_to_hiring_veterans_0.pdf
Section 00100 - Bidding Schedule/Instructions to Bidders
SPECIAL NOTICES
1. INVITATION FOR BIDS (IFB) NO. W912EE-16-B-0003
FOR: FC/MR&T, Yazoo River Basin, Yalobusha River Watershed, Webster, Calhoun, and Chickasaw Counties, MS, Mississippi Delta Headwaters Project, Riser Pipe Grade Control Structures, RP-10-03
TO OPEN: 14 JUN 2016, 1400 HOURS, LOCAL TIME AT PLACE OF BID OPENING. BID
OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE AT
http://155.76.244.230/bids/bids.htm
2. SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE RECEIVED UNTIL DATE AND
TIME OF BID OPENING.
3. THIS PROCUREMENT IS A COMPETITIVE 8(A) SET-ASIDE. COMPETITION IS LIMITED
TO 8(A) BUSINESS DEVELOPMENT (BD) PARTICIPANTS LOCATED WITHIN THE
GEOGRAPHICAL AREA SERVICED BY THE MISSISSIPPI DISTRICT OFFICE, AND OTHER 8(A)
CONSTRUCTION FIRMS HAVING A SBA APPROVED BONA FIDE PLACE OF BUSINESS WITHIN
THE GEOGRAPHICAL BOUNDARIES OF THE STATE OF MISSISSIPPI. ALL OTHER FIRMS ARE
DEEMED INELIGIBLE TO SUBMIT A BID.
4. PRE-BID CONFERENCE: NOT APPLICABLE.
5. YOUR ATTENTION IS DIRECTED TO SECTION 00100, INSTRUCTIONS, CONDITIONS,
AND NOTICES TO BIDDERS, CLAUSE ENTITLED “SUBMISSION OF BIDS”. IT IS THE
BIDDER’S RESPONSIBILITY TO ENSURE THAT BIDS SENT BY COMMERCIAL CARRIER ARE
CLEARLY IDENTIFIED AS CONTAINING A SEALED BID ON THE OUTERMOST ENVELOPE. THIS
INCLUDES, BUT IS NOT LIMITED TO, BIDS SENT VIA: FEDERAL EXPRESS, AIRBORNE
EXPRESS, EXPRESS COURIER SERVICES, INC., EXPRESS MAIL - U.S. POSTAL SERVICE,
UNITED PARCEL SERVICE AND PUROLATOR.
6. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE
WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
7. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT CLAUSE
ENTITLED, “AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION”,
WHICH WILL APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
8. NOTE THE PERFORMANCE AND PAYMENT BOND REQUIREMENT OF THE CONTRACT
CLAUSE “BID GUARANTEE”. A BID BOND, PERFORMANCE BOND AND PAYMENT BOND WILL
NOT BE REQUIRED UNLESS TOTAL BID IS $30,000 OR MORE.
9. SEE SECTION 00 80 00.00 09, SPECIAL CONTRACT REQUIREMENTS, CLAUSE ENTITLED
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK”.
10. SEE SECTION 01 00 00.00 09, GENERAL CONTRACT REQUIREMENTS CLAUSE,
ENTITLED, “PAYMENT INVOICES” WHICH WILL APPLY TO THE CONTRACT RESULTING FROM
THIS SOLICITATION. THE FEDERAL ACQUISITION REGULATION REQUIRES THAT THE
“REMIT TO” ADDRESS OF THE INVOICE MATCH THE “REMIT TO” ADDRESS ON THE
CONTRACT OR A PROPER NOTICE OF ASSIGNMENT.
11. MAIL BIDS TO THE VICKSBURG DISTRICT HEADQUARTERS BUILDING, PLANS AND
SPECIFICATIONS ROOM, ROOM 120, 4155 CLAY STREET, VICKSBURG, MISSISSIPPI
39183-3435. BIDS SENT BY COMMERCIAL CARRIER SHALL BE CLEARLY MARKED ON THE
OUTER ENVELOPE AS CONTAINING A “SEALED BID”. BIDS MUST BE RECEIVED PRIOR TO
THE EXACT TIME SET FOR BID OPENING.
12. HAND CARRIED BIDS MUST BE DELIVERED TO THE PLANS AND SPECIFICATIONS
ROOM, ROOM 120, IN THE VICKSBURG DISTRICT HEADQUARTERS BUILDING, 4155 CLAY
STREET, VICKSBURG, MISSISSIPPI 39183-3435. ALL BIDS MUST BE RECEIVED PRIOR TO
THE EXACT TIME SET FOR BID OPENING. NOTE: BIDS DELIVERED LATER THAN 15
MINUTES PRIOR TO THE TIME SET FOR THE BID OPENING SHALL BE DELIVERED DIRECTLY
TO ROOM 103, BID OPENING ROOM, RATHER THAN ROOM 120, THE PLANS AND
SPECIFICATIONS ROOM.
13. BIDS WILL NOT BE ACCEPTED NOR SHALL BIDS BE WITHDRAWN TELEGRAPHICALLY
OR BY ELECTRONIC COMMERCE.
14. IN ACCORDANCE WITH THE PROVISIONS OF SUBPART 36.201 (EVALUATION OF
CONTRACTOR PERFORMANCE) OF THE FEDERAL ACQUISITION REGULATION (FAR),
CONSTRUCTION CONTRACTOR’S PERFORMANCE SHALL BE EVALUATED THROUGHOUT THE
PERFORMANCE OF THE CONTRACT. THE UNITED STATES ARMY CORPS OF ENGINEERS
(USACE) FOLLOWS THE PROCEDURES OUTLINED IN ENGINEERING REGULATION 415-1-17 TO
FULFILL THIS FAR REQUIREMENT. FOR CONSTRUCTION CONTRACTS AWARDED AT OR ABOVE
$100,000.00, THE USACE WILL EVALUATE CONTRACTOR’S PERFORMANCE AND PREPARE A
PERFORMANCE REPORT USING THE CONSTRUCTION CONTRACTOR APPRAISAL SUPPORT SYSTEM
(CCASS), WHICH IS NOW A WEB-BASED SYSTEM. AFTER AN EVALUATION (INTERIM OR
FINAL) IS WRITTEN UP BY THE USACE, THE CONTRACTOR WILL HAVE THE ABILITY TO
ACCESS, REVIEW AND COMMENT ON THE EVALUATION FOR A PERIOD OF 30 DAYS.
ACCESSING AND USING CCASS REQUIRES SPECIFIC SOFTWARE, CALLED PKI
CERTIFICATION, WHICH IS INSTALLED ON THE USER’S COMPUTER. THE CERTIFICATION
IS A DEPARTMENT OF DEFENSE REQUIREMENT AND WAS IMPLEMENTED TO PROVIDE
SECURITY IN ELECTRONIC TRANSACTIONS. THE CERTIFICATION SOFTWARE COULD COST
APPROXIMATELY $110 - $125 PER CERTIFICATE PER YEAR AND IS PURCHASED FROM AN
EXTERNAL CERTIFICATE AUTHORITIES (ECA) VENDOR. CURRENT INFORMATION ABOUT THE
PKI CERTIFICATION PROCESS AND FOR CONTACTING VENDORS CAN BE FOUND ON THE WEB
SITE: http://www.cpars.navy.mil/. IF THE CONTRACTOR WISHES TO PARTICIPATE
IN THE PERFORMANCE EVALUATION PROCESS, ACCESS TO CCASS AND PKI CERTIFICATION
IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
15. ELECTRONIC FUNDS TRANSFER (EFT)
PURSUANT TO FAR 52.232-5 AND 52.232-33, ALL PAYMENTS UNDER THIS CONTRACT WILL
BE MADE BY ELECTRONIC FUNDS TRANSFER (EFT). CONTRACTORS ARE REQUIRED TO
COMPLETE FORM: UFC-DISB-4.
THE FORM AND COMPLETION INSTRUCTIONS MAY BE DOWNLOADED FROM THE U. S. ARMY
CORPS OF ENGINEERS FINANCE CENTER AT: HTTP://WWW.FC.USACE.ARMY.MIL (CLICK ON
"DIRECTORATES" AT THE TOP OF THE PAGE, THEN CLICK ON "DIRECTORATE OF
ACCOUNTING OPERATIONS" AND THEN “EFT DIRECT DEPOSIT FORM”)
THE “INSTALLATION EROC” FOR THE VICKSBURG CONSOLIDATED CONTRACTING OFFICE IS
“B4."
16. BID PACKAGE ATTACHMENTS
SECTION 00600, REPRESENTATIONS AND CERTIFICATIONS, ATTACHMENTS 1, CORPORATE
SEAL CERTIFICATES, 2, PAST PERFORMANCE DATA, 3, DESCRIPTION OF CONTRACTOR’S
PLANT, AND 4, SUBCONTRACTS, ARE TO BE COMPLETED (AS APPLICABLE) AND INCLUDED
IN THE BID PACKAGE SUBMITTED BY THE OFFEROR.
17. TECHNICAL INQUIRIES AND QUESTIONS
TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THIS SOLICITATION ARE TO BE
SUBMITTED VIA BIDDER INQUIRY IN PROJNET AT HTTPS://WWW.PROJNET.ORG . BIDDERS
ARE ENCOURAGED TO SUBMIT QUESTIONS AT LEAST 5 DAYS PRIOR TO BID OPENING IN
ORDER TO ENSURE ADEQUATE TIME IS ALLOTTED TO FORM AN APPROPRIATE RESPONSE AND
AMEND THE SOLICITATION, IF NECESSARY. TO SUBMIT AND REVIEW INQUIRY ITEMS,
PROSPECTIVE VENDORS WILL NEED TO USE THE BIDDER INQUIRY KEY PRESENTED BELOW
AND FOLLOW THE INSTRUCTIONS LISTED BELOW THE KEY FOR ACCESS. A PROSPECTIVE
VENDOR WHO SUBMITS A COMMENT /QUESTION WILL RECEIVE AN ACKNOWLEDGEMENT OF
THEIR COMMENT/QUESTION VIA EMAIL, FOLLOWED BY AN ANSWER TO THE
COMMENT/QUESTION AFTER IT HAS BEEN PROCESSED BY OUR TECHNICAL TEAM.
ALL TIMELY QUESTIONS AND APPROVED ANSWERS WILL BE MADE AVAILABLE THROUGH
PROJNET. APPROVED ANSWERS TO ALL TIMELY QUESTIONS WILL ALSO BE POSTED ON THE
FEDBIZOPS IN THE FORM OF A REPORT GENERATED FROM PROJNET AS SOON AS THE
COMMENT/QUESTION ENTERING PERIOD IS OVER AND ALL ANSWERS ARE ALL FINALIZED.
THE SOLICITATION NUMBER IS: W912EE-16-B-0003
THE BIDDER INQUIRY KEY IS: 5IRJ6D-CURZSN
SPECIFIC INSTRUCTIONS FOR PROJNET BID INQUIRY ACCESS:
1. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
2. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
3. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
4. EMAIL. ENTER THE EMAIL ADDRESS YOU WOULD LIKE TO USE FOR
COMMUNICATION.
5. CLICK CONTINUE. A PAGE WILL THEN OPEN SAYING THAT A USER ACCOUNT
WAS NOT FOUND AND WILL ASK YOU TO CREATE ONE USING THE PROVIDED FORM.
6. ENTER YOUR FIRST NAME, LAST NAME, COMPANY, CITY, STATE, PHONE,
EMAIL, SECRET QUESTION, SECRET ANSWER, AND TIME ZONE. MAKE SURE TO REMEMBER
YOUR SECRET QUESTION AND ANSWER AS THEY WILL BE USED FROM THIS POINT ON TO
ACCESS THE PROJNET SYSTEM.
7. CLICK ADD USER. ONCE THIS IS COMPLETED YOU ARE NOW REGISTERED
WITHIN PROJNET AND ARE CURRENTLY LOGGED INTO THE SYSTEM.
SPECIFIC INSTRUCTIONS FOR FUTURE PROJNET BID INQUIRY ACCESS:
1. FOR FUTURE ACCESS TO PROJNET, YOU WILL NOT BE EMAILED ANY TYPE OF
PASSWORD. YOU WILL UTILIZE YOUR SECRET QUESTION AND SECRET ANSWER TO LOG IN.
2. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
3. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
4. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
5. EMAIL. ENTER THE EMAIL ADDRESS YOU USED TO REGISTER PREVIOUSLY IN
PROJNET.
6. CLICK CONTINUE. A PAGE WILL THEN OPEN ASKING YOU TO ENTER THE
ANSWER TO YOUR SECRET QUESTION.
7. ENTER YOUR SECRET ANSWER AND CLICK LOGIN. ONCE THIS IS COMPLETED
YOU ARE NOW LOGGED INTO THE SYSTEM.
18. PRIOR TO BID OPENING, IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION
PART 14.303 (b) MODIFICATION OR WITHDRAWAL OF BIDS, “A BID MAY BE WITHDRAWN
IN PERSON BY A BIDDER OR ITS AUTHORIZED REPRESENTATIVE IF, BEFORE THE EXACT
TIME SET FOR OPENING OF BIDS, THE IDENTITY OF THE PERSONS REQUESTING
WITHDRAWAL IS ESTABLISHED AND THAT PERSON SIGNS A RECEIPT FOR THE BID.”
THE FOLLOWING STEPS WILL BE REQUIRED BY THE VICKSBURG CONTRACTING OFFICE:
1. CONTRACTOR MUST PRESENT A LETTER VERIFYING THEY ARE A
REPRESENTATIVE OF THE COMPANY.
2. CONTRACTOR MUST SHOW VALID PICTURE ID.
3. VICKSBURG DISTRICT CONTRACTING OFFICE WILL HAVE THE REPRESENTATIVE
SIGN A RECEIPT FOR BID.
GENERAL NOTICES
1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA
AUTHORITY: Emergency Jobs Appropriations Act of 1982; WRDA 1986 (Sec 103e)
APPROPRIATION: FY 2016 Energy and Water Development Appropriations Bill
FUNDING CITATION: 96X3112
2. NEGOTIATIONS AFTER SEALED BIDDING.
The Government has the option to reject all bids received in response to the sealed bid advertisement and initiate negotiation. Negotiations will include soliciting offers from each responsible bidder that submits a bid in response to the Invitation for Bids. If, after bid opening, the Contracting Officer determines that negotiations are in the best interest of the Government, the following steps will be followed:
(a) An amendment to the sealed bid advertisement will be issued to each responsible bidder changing the Invitation for Bids Number to Request for Proposals Number. The amendment will also make any necessary changes to the scope of the work.
(b) A cover letter signed by the negotiator will accompany the amendment explaining the procedures to be followed during negotiations.
3. BID, PERFORMANCE AND PAYMENT BONDS.
A bid bond is required with bid package. Performance and payment bonds with be required after award. See Section 00700, Contract Clauses 52.228-1, BID GUARANTEE and 52.228-15, PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION.
4. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS.
The right is reserved, as the interest of the Government may require, to revise or amend the specifications and/or drawings prior to the date set for opening bids. Such revisions or amendments, if any, will be announced by amendment or amendments to this Invitation for Bids. Copies of such amendments as may be issued will be furnished to all prospective bidders. If the revision or amendments are of a nature which require material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the District Engineer will enable bidders to revise their bids. In such case, the amendments will include an announcement of the new date for opening bids.
5. BUSINESS INTEGRITY.
The apparent successful bidder as a condition for award of any contract resulting from this solicitation may be required to execute a certificate related to Business Integrity.
6. CONDITIONS AFFECTING THE WORK.
Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications, or related documents.
7. BIDDER'S QUALIFICATIONS.
Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and the plant available to be used in performing the work.
8. SITE OF THE WORK.
Bidders are advised that for purpose of applicability of the Davis-Bacon Act and other contract labor standard provisions, "the site of the work" under the contract to be awarded pursuant to this Invitation may not be limited to the physical place(s) where the construction called for in the contract will remain when work on it has been completed. The "site of the work" may include other adjacent or nearby property used by the Contractor or Subcontractors during such construction. For example, fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., will be considered part of the site of the work provided they are dedicated exclusively or nearly so to performance on the contract and are so located in proximity to the actual construction location that it would be reasonable to include them.
9. INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE, AND BONDS.
a. Specifications, Invitation No. W912EE-16-B-0003, Bidding Schedule, Plant and Equipment Schedule, drawings listed in Special Contract Requirements entitled "CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS," Construction Contract Clauses, and Wage Determination Decisions No. MS160001 01/08/2016 MS1 of the Secretary of Labor, are parts of this Invitation.
b. (1) An offeror (bidder) electing to use individual sureties for either bid guarantees or performance and payment bonds must submit, concurrently with the bonds and required affidavits, a statement of both the business and personal names of the persons and/or brokerages firms through whom the bonds or the guarantees were obtained, together with the address and telephone number of the persons and/or brokerage firms.
(2) Offerors or bidders should note that some individual sureties and brokers of individual sureties have been debarred or suspended from offering themselves or others as sureties to the Government. Offerors or bidders are responsible for ascertaining the current status of their sureties and brokers.
(3) Failure to provide the required information or the submission of bid guarantees obtained from debarred or suspended sureties or brokers may cause rejection of the offer (bid).
10. DEFINITIONS
(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.
(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
(c) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of l978 is the Armed Services Board of Contract Appeals, addressed as follows: Recorder, Armed Services Board of Contract Appeals, Skyline 6, 7th Floor, 5109 Leesburg Pike, Falls Church, Virginia 22041-3208.
(d) "Small business concern" means a concern including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in 13 CFR 121.
(1) Size Standards for Construction and Special Trades. (a) Construction. A concern is small if its average annual receipts for its preceding 3 fiscal years did not exceed $36.5 million.
(b) Dredging. A concern is small if (1) its average annual receipts for its preceding 3 fiscal years did not exceed $27.5 million, and (2) at least 40 percent of the yardage in the contract's plans and specifications is dredged with equipment owned by the concern or obtained from another small business dredging concern.
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
(a) Definitions. As used in this provision—
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional System for Award Management records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
“Registered in the System for Award Management (SAM) database” means that—
(1) The Offeror has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see Subpart 4.14), into the SAM database; and
(2) The offeror has completed the Core, Assertions, and Representations and Certification, and Points of contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process.
(4) The Government has marked the record “Active”.
(b) (1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov.
(End of Provision)
52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM
DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND
STANDARDIZATION NFORMATION SYSTEM (ASSIST) (APR 2014)
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST (https://assist.dla.mil/online/start/);
(2) Quick Search (http://quicksearch.dla.mil/);
(3) ASSISTdocs.com (http://assistdocs.com).
(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--
(1) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
(End of provision)
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation
(1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation. The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.
(End of provision)
52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)
Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.
(End of provision)
52.214-5 SUBMISSION OF BIDS (MAR 1997)
(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.
(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.
(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.
(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
(End of provision)
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
(End of provision)
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
(End of provision)
52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)
(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.
(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--
(1) Lump sum bidding;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of subparagraphs (1) through (3) above.
(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.
(d) Alternate bids will not be considered unless this solicitation authorizes their submission.
(End of provision)
52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)
(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.
(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.
(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
(End of provison)
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
Offers submitted in response to this solicitation shall be in terms of U.S.
dollars. Offers received in other than U.S. dollars shall be rejected.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Economic Area-Memphis, Tennessee, Non-SMSA (Non-Standard Metropolitan Statistical Area) counties
Goals for minority participation for each trade
Goals for female participation for each trade
26.5% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR
60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Memphis, Tennessee, Non-SMSA Counties, which includes Webster, Calhoun, and Chickasaw Counties, Mississippi.
(End of provision)
52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS
(FEB 2016)
By submission of its offer, the offeror represents that, if it is subject to the reporting requirements of 38 U.S.C. 4212(d) (i.e., if it has any contract containing Federal Acquisition Regulation clause 52.222-37, Employment Reports on Veterans), it has filed the most recent VETS-4212 Report required by that clause.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Contracting Officer U .S. Army Corps of Engineers Vicksburg District 4155 Clay Street Vicksburg, Mississippi 39183-3435
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours (8:00 a.m. to 4:45 p.m., Monday through Friday) by contacting: U.S. Army Corps of Engineers, Mr. Lamar Jenkins, Acting Area Engineer, Greenwood Area Office, 100 Moore Street, Greenwood, MS 38930-4512, telephone (6620 453-5531.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of clause)
ATTACHMENTS
General Decision Number: MS160001 01/08/2016 MS1
GENERAL WAGE DECISION
General Decision Number: MS160001 01/08/2016 MS1
Superseded General Decision Number: MS20150001
State: Mississippi
Construction Type: Heavy Flood Control
Counties: Mississippi Statewide.
*RIVER, HARBOR AND FLOOD CONTROL PROJECTS FOR CONSTRUCTION OF ALL RIVER,
HARBOR AND FLOOD CONTROL WORK ON THE MISSISSIPPI RIVER AND TRIBUTARIES-
(EXCLUDING ANY CONTRACTS FOR ANY PHASE OF CONSTRUCTION OF A LOCK AND DAM)
MISSISSIPPI - EXCEPT THE METROPOLITAN AREAS OF GREENVILLE, NATCHEZ AND
VICKSBURG
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016
* SUMS1991-004 12/18/1991
Rates Fringes
CARPENTER........................ $ 7.25
Laborers:
AIR TOOL OPERATOR........... $ 7.25
CHAIN SAW OPERATOR OR FILER. $ 7.25
REVETMENT & DIKES........... $ 7.25
UNSKILLED................... $ 7.25
Power equipment operators:
ASPHALT PLANT DRYER
OPERATOR, ASPHALT
DISTRIBUTOR, ASPHALT
ROLLER, BULLDOZER (ROUGH,
INCLUDING DISC, PLOW, OR
ROLLER), MOTOR PATROL
(HAUL ROADS), TRENCHING
MACHINE (18" & UNDER),
SELF-PROPELLED ROLLER
(EXCEPT ASPHALT, END DUMP
EQUIPMENT (OFF HIGHWAY),
MIXER (CONCRETE UP TO 21
CU. FT.), BOTTOM DUMP
EUCLIDS (& LIKE EQUIPMENT). $ 7.25 .05
BULLDOZER (FINISHER, PUSH
CAT & ON BARGES), MOTOR
PATROL FINISHER, SCRAPER &
LIKE EQUIPMENT, FRONT END
LOADER, BACKHOE (TRACTOR
MOUNTED) ASPHALT FINISHER
OR SPREADING MACHINE, WELL
POINT SYSTEM OPERATOR,
SELF PROPELLED LOADER
(CONVEYOR TYPE)............. $ 7.25 .05
FIREMAN (HEAVY
CONSTRUCTION), PILEDRIVER,
LEADSMAN, WINCHMAN.......... $ 7.25 .05
OILER, PUMP, GREASER,
TRACTOR (FARM TYPE
INCLUDING DISC, PLOW OR
ROLLER)..................... $ 7.25 .05
PILEDRIVER OPERTOR,
MECHANIC (HEAVY
EQUIPMENT), CRANES,
DERRICKS, DRAGLINES,
WELDER, POWER SHOVELS &
BACKHOES, MIXER (CONCRETE,
21 CU. FT. & OVER),
ASPHALT PLANT OPERATOR,
TRENCHING MACHINE (OVER
18")........................ $ 7.75 .05
Truck drivers:
1 1/2 TONS OR LESS.......... $ 7.25
OVER 1 1/2 TONS............. $ 7.25