Official_Abstract.pdf
PDF 158 KB Posted
- Solicitation number
- W912EE-16-B-0001
About this file
Official Bid Abstract
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_Amendment_0004_W912EE-16-B-0001-0004.pdf | ||
| am_3.pdf | ||
| A22_Amendment_0002_W912EE-16-B-0001-0002.pdf | ||
| A22_Amendment_0001_(W912EE-16-B-0001-0001).pdf | ||
| specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ABSTRACT
For Bids Under Solicitation, W912EE-16-B-0001
Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg
District, other Districts within the Mississippi Valley Division, or Districts adjacent to the Vicksburg District"
PINE BLUFF SAND AND GRAVEL CO.
PINE BLUFF, AR
LINE
ITEM
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0001AA FIRST 815 HOURS 815 HR $ NO BID
0001AB OVER 815 HOURS 815 HR $ NO BID
0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0002AA FIRST 766 HOURS 766 HR $ NO BID
0002AB OVER 766 HOURS 766 HR $ NO BID
0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0003AA FIRST 713 HOURS 713 HR $ NO BID
0003AB OVER 713 HOURS 713 HR $ NO BID
0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0004AA FIRST 744 HOURS 744 HR $ NO BID
0004AB OVER 744 HOURS 744 HR $ NO BID
0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0005AA FIRST 660 HOURS 660 HR $ NO BID
0005AB OVER 660 HOURS 660 HR $ NO BID
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0006AA FIRST 614 HOURS 614 HR $2,300.00 $1,412,200.00
0006AB OVER 614 HOURS 614 HR $2,300.00 $1,412,200.00
0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0007AA FIRST 608 HOURS 608 HR $ NO BID
0007AB OVER 608 HOURS 608 HR $ NO BID
0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0008AA FIRST 542 HOURS 542 HR $ NO BID
0008AB OVER 542 HOURS 542 HR $ NO BID
0009 MOBILIZATION 1 JOB FOR $400,000.00
0010 DEMOBILIZATION 1 JOB FOR $50,000.00
0011 REMOBILIZATION 1 EA $ $1.00
0012 TOWING SERVICE UPSTREAM 300 MI $ $85,500.00
0013 TOWING SERVICE DOWNSTREAM 300 MI $ $57,000.00
0014 SHORELINE 3000 LF $ $1,500.00
TOTAL $3,418,401.00
LINE
ITEM
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0015AA FIRST 363 HOURS 363 HR $ NO BID
0015AB OVER 563 HOURS 563 HR $ NO BID
0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0016AA FIRST 314 HOURS 314 HR $ NO BID
0016AB OVER 514 HOURS 514 HR $ NO BID
0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0017AA FIRST 261 HOURS 261 HR $ NO BID
0017AB OVER 461 HOURS 461 HR $ NO BID
0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0018AA FIRST 292 HOURS 292 HR $ NO BID
0018AB OVER 492 HOURS 492 HR $ NO BID
0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0019AA FIRST 208 HOURS 208 HR $ NO BID
0019AB OVER 408 HOURS 408 HR $ NO BID
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0020AA FIRST 162 HOURS 162 HR $1,900.00 $307,800.00
0020AB OVER 362 HOURS 362 HR $1,700.00 $615,400.00
0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0021AA FIRST 156 HOURS 156 HR $ NO BID
0021AB OVER 356 HOURS 356 HR $ NO BID
0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0022AA FIRST 90 HOURS 90 HR $ NO BID
0022AB OVER 290 HOURS 290 HR $ NO BID
$4,341,601.00
"OPTIONAL LINE ITEMS"
Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg District." The work to be performed by these OPTIONAL LINE
ITEMS will be in the Mississippi River Harbors
TOTAL BASE PLUS OPTION
GREAT LAKES DREDGE AND DOCK COMPANY, LLC
OAK BROOK, IL
LINE
ITEM
NO. DESCRIPTION EST QTY UM
UNIT
PRICE AMOUNT
0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0001AA FIRST 815 HOURS 815 HR $ NO BID
0001AB OVER 815 HOURS 815 HR $ NO BID
0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0002AA FIRST 766 HOURS 766 HR $ NO BID
0002AB OVER 766 HOURS 766 HR $ NO BID
0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0003AA FIRST 713 HOURS 713 HR $ NO BID
0003AB OVER 713 HOURS 713 HR $ NO BID
0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0004AA FIRST 744 HOURS 744 HR $ NO BID
0004AB OVER 744 HOURS 744 HR $ NO BID
0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0005AA FIRST 660 HOURS 660 HR $ NO BID
0005AB OVER 660 HOURS 660 HR $ NO BID
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0006AA FIRST 614 HOURS 614 HR $2,550.00 $1,565,700.00
0006AB OVER 614 HOURS 614 HR $2,550.00 $1,565,700.00
0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0007AA FIRST 608 HOURS 608 HR $ NO BID
0007AB OVER 608 HOURS 608 HR $ NO BID
0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0008AA FIRST 542 HOURS 542 HR $ NO BID
0008AB OVER 542 HOURS 542 HR $ NO BID
0009 MOBILIZATION 1 JOB FOR $125,000.00
0010 DEMOBILIZATION 1 JOB FOR $125,000.00
0011 REMOBILIZATION 1 EA $25,000.00 $25,000.00
0012 TOWING SERVICE UPSTREAM 300 MI $100.00 $30,000.00
0013 TOWING SERVICE DOWNSTREAM 300 MI $25.00 $7,500.00
0014 SHORELINE 3000 LF $1.00 $3,000.00
TOTAL $3,443,900.00
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0015AA FIRST 363 HOURS 363 HR $ NO BID
0015AB OVER 563 HOURS 563 HR $ NO BID
0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0016AA FIRST 314 HOURS 314 HR $ NO BID
0016AB OVER 514 HOURS 514 HR $ NO BID
0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0017AA FIRST 261 HOURS 261 HR $ NO BID
0017AB OVER 461 HOURS 461 HR $ NO BID
0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0018AA FIRST 292 HOURS 292 HR $ NO BID
0018AB OVER 492 HOURS 492 HR $ NO BID
0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0019AA FIRST 208 HOURS 208 HR $ NO BID
0019AB OVER 408 HOURS 408 HR $ NO BID
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0020AA FIRST 162 HOURS 162 HR $2,550.00 $413,100.00
0020AB OVER 362 HOURS 362 HR $2,550.00 $923,100.00
0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0021AA FIRST 156 HOURS 156 HR $ NO BID
0021AB OVER 356 HOURS 356 HR $ NO BID
0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0022AA FIRST 90 HOURS 90 HR $ NO BID
0022AB OVER 290 HOURS 290 HR $ NO BID
$4,780,100.00
OPTIONAL LINE ITEMS"
Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg District." The work to be performed by these OPTIONAL LINE
INLAND DREDGING COMPANY, LLC
DYERSBURG, TN
LINE
ITEM
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0001AA FIRST 815 HOURS 815 HR $ NO BID
0001AB OVER 815 HOURS 815 HR $ NO BID
0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0002AA FIRST 766 HOURS 766 HR $ NO BID
0002AB OVER 766 HOURS 766 HR $ NO BID
0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0003AA FIRST 713 HOURS 713 HR $ NO BID
0003AB OVER 713 HOURS 713 HR $ NO BID
0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0004AA FIRST 744 HOURS 744 HR $ NO BID
0004AB OVER 744 HOURS 744 HR $ NO BID
0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0005AA FIRST 660 HOURS 660 HR $2,700.00 $1,782,000.00
0005AB OVER 660 HOURS 660 HR $2,700.00 $1,782,000.00
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0006AA FIRST 614 HOURS 614 HR $ NO BID
0006AB OVER 614 HOURS 614 HR $ NO BID
0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0007AA FIRST 608 HOURS 608 HR $ NO BID
0007AB OVER 608 HOURS 608 HR $ NO BID
0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0008AA FIRST 542 HOURS 542 HR $ NO BID
0008AB OVER 542 HOURS 542 HR $ NO BID
0009 MOBILIZATION 1 JOB FOR $1,200,000.00
0010 DEMOBILIZATION 1 JOB FOR $392,400.00
0011 REMOBILIZATION 1 EA $1.00 $1.00
0012 TOWING SERVICE UPSTREAM 300 MI $400.00 $120,000.00
0013 TOWING SERVICE DOWNSTREAM 300 MI $350.00 $105,000.00
0014 SHORELINE 3000 LF $5.00 $15,000.00
TOTAL $5,396,401.00
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0015AA FIRST 363 HOURS 363 HR $ NO BID
0015AB OVER 563 HOURS 563 HR $ NO BID
0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0016AA FIRST 314 HOURS 314 HR $ NO BID
0016AB OVER 514 HOURS 514 HR $ NO BID
0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0017AA FIRST 261 HOURS 261 HR $ NO BID
0017AB OVER 461 HOURS 461 HR $ NO BID
0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0018AA FIRST 292 HOURS 292 HR $ NO BID
0018AB OVER 492 HOURS 492 HR $ NO BID
0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0019AA FIRST 208 HOURS 208 HR $2,550.00 $530,400.00
0019AB OVER 408 HOURS 408 HR $2,550.00 $1,040,400.00
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0020AA FIRST 162 HOURS 162 HR $ NO BID
0020AB OVER 362 HOURS 362 HR $ NO BID
0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0021AA FIRST 156 HOURS 156 HR $ NO BID
0021AB OVER 356 HOURS 356 HR $ NO BID
0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0022AA FIRST 90 HOURS 90 HR $ NO BID
0022AB OVER 290 HOURS 290 HR $ NO BID
$6,967,201.00
"OPTIONAL LINE ITEMS"
Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg District." The work to be performed by these OPTIONAL LINE
INDEPENDENT GOVERNMENT ESTIMATE
ITEM
NO. DESCRIPTION EST QTY UM
UNIT
PRICE AMOUNT
0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0001AA FIRST 815 HOURS 815 HR $ NO BID
0001AB OVER 815 HOURS 815 HR $ NO BID
0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0002AA FIRST 766 HOURS 766 HR $ NO BID
0002AB OVER 766 HOURS 766 HR $ NO BID
0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0003AA FIRST 713 HOURS 713 HR $ NO BID
0003AB OVER 713 HOURS 713 HR $ NO BID
0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0004AA FIRST 744 HOURS 744 HR $1,860.00 $1,383,840.00
0004AB OVER 744 HOURS 744 HR $1,860.00 $1,383,840.00
0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0005AA FIRST 660 HOURS 660 HR $ NO BID
0005AB OVER 660 HOURS 660 HR $ NO BID
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0006AA FIRST 614 HOURS 614 HR $ NO BID
0006AB OVER 614 HOURS 614 HR $ NO BID
0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0007AA FIRST 608 HOURS 608 HR $ NO BID
0007AB OVER 608 HOURS 608 HR $ NO BID
0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0008AA FIRST 542 HOURS 542 HR $ NO BID
0008AB OVER 542 HOURS 542 HR $ NO BID
0009 MOBILIZATION 1 JOB FOR $347,400.00
0010 DEMOBILIZATION 1 JOB FOR $357,600.00
0011 REMOBILIZATION 1 EA $ $16,500.00
0012 TOWING SERVICE UPSTREAM 300 MI $ $67,500.00
0013 TOWING SERVICE DOWNSTREAM 300 MI $ $51,000.00
0014 SHORELINE 3000 LF $ $4,560.00
TOTAL $3,612,240.00
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0015AA FIRST 363 HOURS 363 HR $ NO BID
0015AB OVER 563 HOURS 563 HR $ NO BID
0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0016AA FIRST 314 HOURS 314 HR $ NO BID
0016AB OVER 514 HOURS 514 HR $ NO BID
0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,
WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,
AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP
OVER 700 HORSEPOWER
0017AA FIRST 261 HOURS 261 HR $ NO BID
0017AB OVER 461 HOURS 461 HR $ NO BID
0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0018AA FIRST 292 HOURS 292 HR $1,860.00 $543,120.00
0018AB OVER 492 HOURS 492 HR $1,860.00 $915,120.00
0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0019AA FIRST 208 HOURS 208 HR $ NO BID
0019AB OVER 408 HOURS 408 HR $ NO BID
LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER
0020AA FIRST 162 HOURS 162 HR $ NO BID
0020AB OVER 362 HOURS 362 HR $ NO BID
0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET
0021AA FIRST 156 HOURS 156 HR $ NO BID
0021AB OVER 356 HOURS 356 HR $ NO BID
0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT
LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A
DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD
CARRIAGE
0022AA FIRST 90 HOURS 90 HR $ NO BID
0022AB OVER 290 HOURS 290 HR $ NO BID
$5,070,480.00
I CERTIFY THAT I HAVE OPENED, READ AND RECORDED ON THIS ABSTRACT,
ALL OFFERS RECEIVED IN RESPONSE TO THE SOLICITATION.
SIGNATURE AND DATE
TOTAL BASE PLUS OPTION
"OPTIONAL LINE ITEMS"
Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg District." The work to be performed by these OPTIONAL LINE