This document provides a sample task order for meter data management system operations and maintenance services. The task order outlines six tasks including acquiring and implementing a commercial off-the-shelf software solution, maintaining risk management framework authorization, migrating the system from the Defense Information Systems Agency to a commercial cloud vendor, implementing system engineering processes, providing energy engineering expertise, and conducting ongoing operations and maintenance. Offerors are requested to provide detailed implementation plans, labor and cost estimates, and schedules for each task. The period of performance will consist of completing the initial tasks and then one year of sustainment. Proposals are due no later than April 5, 2019.
Amendment 0001 Attachment VIII Sample Task Order
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT VIII
PERFORMANCE WORK STATEMENT
Meter Data Management System (MDMS) Operations and Maintenance Sample Task Order (TO) XX
Version 1.0 2/21/2019
Revision 0.0
1.0 BACKGROUND
Regarding the purpose of metering, Department of Defense Instruction 4170.11 states that “while meters themselves do not constitute a direct energy conservation measure, it is expected that the management of data collected through metering will lead to energy and cost savings. Meter data should be collected, assimilated, interpreted, and made available to facility and energy program managers. This information should serve as the foundation to establishing facility energy efficiency relative to other facilities in the building inventory. It should also serve to identify and confirm opportunities for energy reduction or increased energy efficiency through improved operation procedures, best practices, or energy conservation and retrofit projects.”
1.1 OBJECTIVE
The primary objective of this Sample Task Order is to accomplish the MDMS primary mission of (1) delivering dependable meter data, (2) use industry standards to normalize data and establish facility energy consumption relative to other facilities, (3) provide tools in an easy-to-use interface to enable facility and energy program managers to identify and confirm opportunities for energy reduction, (4) support continual advancement and optimization in capabilities and technologies, (5) keep the system in accordance with applicable laws, policies, executive orders, regulations, instructions, and guidance, and (6) continually use system engineering techniques to reduce system sustainment cost and complexity.
1.2 SCOPE OF WORK
1.2.1 Schedule - The order of tasks issued in section 1.2 do not reflect the order of execution of tasks. In addition it is expected that tasks will be worked concurrently if possible.
1.2.2 Task 0001 Acquire and Implement the COTS Software Solution
1.2.3 Task 0002 Maintain the MDMS Authorization
1.2.4 Task 0003 Migrate MDMS enterprise environment from Defense Information Systems Agency – Oklahoma City to a Commercial Cloud Vendor.
1.2.5 Task 0004 Implement and Sustain System Engineering and Quality Control Processes
1.2.6 Task 0005 Energy Engineering
1.2.7 Task 0006 Operations and Maintenance
1.2.8 The MDMS Enterprise System at the beginning of this task Order is MDMS Version 2 with two pilot OSIsoft PI installations. For this sample task order use the following assumptions.
- MDMS Version 2 will be running at 118 installations at the start of this task order, while OSIsoft PI will be running at 2 installations.
- 12,500 meters will be reporting to MDMS.
- 80 gateways will require sustainment.
- All meters will at a minimum have a meter number, timestamp, and raw reading in kWh.
- Median facility square footage of 33,000 sf.
2.0 Task 0001 Acquire and Implement the COTS Software Solution
2.1 The Contractor shall implement OSIsoft PI System as provided by the Government and maintain the license for the Government.
2.2 The Contractor shall include in the proposal the implementation strategy for implementing OSIsoft PI at all garrisons and sunsetting MDMS V2.
2.3 The Contractor shall provide a detailed labor effort breakout for this task in the format provided in Appendix A.
2.4 The Contractor shall provide a detailed schedule for this task.
2.5 The Contractor shall recommend and then implement functional MDMS capabilities at the energy manager, garrison, major command, and enterprise level. The proposal shall at a minimum identify:
2.5.1 The user tools to be provided at each level, the justification for each tool, and how they will provide cost savings to the program.
2.5.2 The user tools required to manage the MDMS program by providing insight into system health and reliability; support data calls; and support programmatic decision making, coordination, control, analysis, and visualization.
2.5.3 The geospatial tools used to support a Common Operating Picture (COP) for MDMS situational awareness and the geospatial tools used for advanced analysis.
2.5.4 The contractor shall be responsible for a) sustainment of the meter Army Common Installation Picture geospatial feature database, b) submission of the meters feature and metadata to the Army Installation Atlas, c) development and sustainment of the Quality Assurance Plan for this feature.
2.5.5 Any other improvements or enhancements that are cost effective, reduce sustainment footprint, increase reliability, or reduce sustainment costs.
2.5.6 All capabilities not included above but required by relevant DOD, Army, or federal policy, law, regulation, or instructions.
2.6 The Contractor shall provide in the proposal a training approach for the new functionality.
2.7 The Contractor shall provide as part of the proposal a system architect drawing as well as any other relevant drawings for the proposed MDMS solution.
2.8 Customization of the implementation of the COTS software will only be allowed if determined that (a)
COTS cannot meet technical requirements, (b) custom development does not increase sustainment costs, (c) does not increase or create dependence on specialized or costly labor, (d) does not increase implementation timelines, and (e) does not create a dependency that would provide an unfair advantage to Contractor.
3.0 Task 0002 Maintain the Risk Management Framework (RMF) Authorization
3.1 The Contractor shall maintain the MDMS RMF Authorization.
3.2 The Contractor shall include in the proposal a plan to maintain the RMF authorization At a minimum the plan shall include:
3.2.1 Position and/or responsibilities required by DOD, Army, of Federal policy, law, regulation, and instruction to fulfill this requirement.
3.2.2 Site applicable DOD, Army, or Federal regulation, law, policy, or instructions.
3.2.3 The Contractor’s approach for future reauthorization and annual self assessments.
3.3 The Contractor shall provide a detailed labor effort breakout for this task in the format provided in Appendix A.
3.4 The Contractor shall provide a detailed schedule for this.
4.0 Task 0003 Migrate to Cloud
4.1 The Contractor shall migrate MDMS from DISA to an approved DOD commercial cloud provider.
4.2 The Contractor shall provide in the proposal an implementation plan to migrate MDMS from DISA to an approved DOD commercial cloud provider. The plan at a minimum shall include:
4.2.1 Evaluation of cybersecurity and .mil network requirements.
4.2.2 Identify and Quantify sustainment requirements.
4.2.3 Evaluate all applicable Software as a Service (SaaS), Infrastructure as a Service (IaaS), and Platform as a Service (PaaS) options from each approved DOD provider studied by the contractor.
4.2.4 Define what services the Government should inherit from each provider as well as services that can be managed by the Cloud Service provider.
4.2.5 Identify whether Machine Learning /AI or other technologies provided by Cloud Service Provider can be of benefit to the Government.
4.3 The Contractor shall provide a detailed labor effort breakout for this task in the format provided in
4.4 The Contractor shall provide a detailed schedule for this task in the format provided in Appendix A.
5.0 Task 0004 System Engineering
5.1 The Contractor shall implement a system engineering process to reduce system sustainment costs and system complexity and support the objective described in section 1.1.
5.2 The Contractor shall include in the proposal a plan to implement and sustain their system engineering process.
5.3 The Contractor shall provide a detailed labor effort breakout for this task in the format provided in
Appendix A.
5.4 The Contractor shall provide a detailed schedule for this task.
5.5 The Contractor shall provide reports, whitepapers, and proposals for improvements to the overall AMP program as inefficiencies or bugs are discovered.
6.0 Task 0005 Energy Engineering
6.1 The Contractor shall serve as the Energy Engineering subject matter experts for the MDMS to ensure the system provides functional requirements based on sound Energy Engineering principals and science.
6.2 The Contractor shall provide, as part of the proposal, an implementation plan to ensure the MDMS system is providing functional tools based on sound Energy Engineering principals and science. At a minimum the proposal shall include:
6.2.1 How to model and benchmark facilities.
6.2.2 Commissioning Tools.
6.2.3 Energy Engineering Functions that should be included as features in the MDMS tool.
6.2.4 Site relevant Federal, DOD, and Army policies, regulations, instructions and laws.
6.2.5 Site relevant Industry best practices.
6.3 The Contractor shall provide a detailed labor effort breakout for this task in the format provided in
6.4 The Contractor shall provide a detailed schedule for this task.
7.0 Task 0006 Operation & Maintenance
7.1 The Contractor shall provide continuing Operation and Maintenance support for MDMS,
7.2 The MDMS Enterprise System for the terms of this Task Order is MDMS Version 2 and OSIsoft PI until Task 0001 and Task 0003 are completed. At that point MDMS V2 will be sunsetted.
7.3 The Contractor shall in supporting the database of record for meter data and meter metadata propose a database management plan. The Contractor shall also proposes a plan for enterprise management of the Army Common Installation Picture (CIP) geospatial to include submission of geospatial meter data to the Army Information Atlas (AIA) and for developing a Quality Assurance Plan for submitting data to
AIA.
7.4 The Contractor shall provide a detailed labor effort breakout for this task in the format provided in Appendix A.
7.5 The Contractor shall provide a detailed schedule for this task.
7.6 The Contractor shall provide as part of the proposal an Operation and Maintenance plan. At a minimum the proposal shall include:
7.6.1.1 Program Management Philosophy and Strategy
7.6.1.2 Support for Data Calls
7.6.1.3 Program Outreach and Support
7.6.1.4 Support for adding value driven functionality
8.0 Schedule
The period of performance of this task will be part a) the time to complete Tasks 0001 and Task 0003, and part b) 1 year of sustainment once Task 0001 and Task 0003 are completed. Tasks 0002, 0004, 0005, and 0006 are perpetual and will be included throughout the period of performance. The Contractor shall in the proposal break out the labor for each task separately for part a and part b using the provided format in Appendix A and shall provide the schedule for the period of performance.
Part A: Task 001, 002, 003, 004, 005, and 006 for as long as required to complete Task 001 & Task 003.
Part B: Task 002, 004, 005, and 006 for 1 year after completion of Part A.