A.074.23_DRAFT_RFP_MDMS_15FEB19_TBD.pdf
PDF 1 MB Posted
- Attached to
- Meter Data Management System (MDMS)
- Solicitation number
- W912DY-19-R-0022
About this file
This is a draft Request for Proposal for a Meter Data Management System requirement. The RFP seeks proposals for operating, sustaining, and maintaining a centralized meter data management system to deliver dependable meter data, normalize consumption data using industry standards, and provide tools to identify energy reduction opportunities. Proposals are due by April 2, 2019. The contract will have a one year base period and four optional one-year extensions, not to exceed five years total. The minimum guarantee for each awardee is to be determined for the base period only. The contract will be awarded on an unrestricted basis using best value tradeoff. The North American Industry Classification System code is 541512 and the Product Service Code is 7035. The requirement is 100% services and subject to Service Contract Labor Standards.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DY19R0022 20-Feb-2019
b. TELEPHONE NUMBER
256-895-1611
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 02 Apr 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DY9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ROBIN L BOATENG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEERING & SUPPORT CENTER
HUNTSVILLE ENGINEERING & SUPPORT CENTER
P.O. BOX 1600
HUNTSVILLE AL 35807-4301
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W912DY 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
US ARMY ENGINEERING & SUPPORT CENTER
LAURA ROCK
475 QUALITY CIRCLE
HUNTSVILLE AL 35806
TEL: 256-895-8126 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$27,500,000
NAICS:
541512
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
EXECUTIVE SUMMARY
ALL ADMINISTRATION AND FUTURE TASK ORDERS UNDER THIS Single Award Task Order Contract
(SATOC) WILL BE ISSUED BY THE U.S. ARMY CORPS OF ENGINEERS, HUNTSVILLE CENTER
(CEHNC).
A.1. Objective The U.S. Army Corps of Engineers, Huntsville Center (CEHNC) primary purpose of this requirement is to operate, sustain, and maintain the centralized MDMS in order to accomplish the primary mission of (1) delivering dependable meter data, (2) use industry standards to normalize data and establish facility energy consumption relative to other facilities, (3) providing tools in an easy-to- use interface to enable facility and energy program managers to: (a) identify and confirm opportunities for energy reduction, support continual advancement and optimization in capabilities and technologies, (b) keep the system in accordance with applicable laws, policies, executive orders, regulations, instructions, and guidance, (c) and continually use system engineering techniques to reduce system sustainment cost and complexity. The required services capability and performance characteristics, to be provided under the proposed contract, will be further defined in the Performance Work Statement (PWS).
Funding is subject to the Availability of Funds (Federally Acquisition Regulation (FAR) 52.232-18 and Limitation of Government’s Obligation Department of Defense Federal Acquisition Regulations (DFARS) 252.232-7007.
A.2. Contract Term. The Contract will have a Period of Performance (PoP) of one (1) year base period and four (4), 12 month options (total not to exceed five years and 6 months). There is no guarantee that the options will be exercised on any or all of the awarded contracts. The Government may extend the contract in accordance with (IAW) FAR 52.217-9, Option to Extend the Term of the Contract and FAR 52.217-8, Option to Extend Services (not to exceed six months).
The North American Industry Classification System (NAICS) code for this SATOC will be 541512, Computer Systems Design Services. The applicable Product Service Code (PSC) for this acquisition is 7035- Information Technology (Support Equipment).
The requirement will be a competed on an unrestricted basis using the “Best Value” trade off method IAW FAR Part
15. This requirement has been determined to be 100% service therefore the Service Contract Labor Standards (formerly known as Service Contract Act) apply. Applicable Wage Determinations can be located at http://www.wdol.gov.
A.3.Capacity for the for the single-award IDC contract pool is $49 Million. Contract capacity may be moved forward and backward between the base and option years as required to support fluctuation in the demand, requirement and fund availability from one year to the next.
A.4. Contract Pricing. Labor rates may be escalated at the beginning of the option period (but See FAR 52.222-43
(b) for limitations) as provided in the schedule; however, the labor rates in effect at the time a task order is awarded will remain in effect through completion of the task order
A.5 The minimum guarantee order for each awardee shall be TBD for the base period only.
A.6. All questions must be submitted in writing no later than TBD (see Instructions to Offerors).
A.7. Proposal Due Date. Proposal submission shall arrive TBD and must be signed.
http://www.wdol.gov/
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Job Base Year Labor
FFP
The Contractor shall provide labor/services in support of the Meter Data Management System program in accordance with the Performance Work Statement.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 1 Job Subcontracting
FFP
The Government will review the Small Business Subcontracting Plan for adequacy ensuring that the required information, percentages and assurances are included. The ceiling for this CLIN is $4 million.
UNIT UNIT PRICE MAX AMOUNT
0003 1 Job Materials Other Direct Costs
FFP
Includes all necessary direct costs not included in direct labor and travel. Contract ordering period for this CLIN will be twelve (12) months from date of award.
Funds are for the purpose of other costs directly related to the attached Performance Work Statement, include but not limited to the purchase of other supplies & materials. Funds for the purpose of ODCs will be proposed on each individual task order and therefore shall not be expended prior to award of individual task order. Signature of the task order by the Contracting Officer constitutes authorization to expend funds. All ODCs are estimated and will be will be negotiated to a fair and reasonable firm fixed price for applicable task orders.
The ceiling for this CLIN is $2 million.
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED Each Contractor Manpower Reporting
FFP
This CLIN is used for pricing the collection and reporting of Contractor Manpower Reporting data. Reporting period will be the period of performance not to exceed twelve months ending 30 September of each Government Fiscal Year and must be reported by 31 October of each calendar year.
UNIT UNIT PRICE MAX AMOUNT
0004 1 Job Travel
FFP
Authorization from the Contracting Officer shall be obtained prior to expenditure of funds. Travel costs will be reimbursed in accordance with the JTR, as prescribed in FAR 31.205-46(a)(2)(i)-(iii). Contract ordering period for this CLIN will be twelve (12) months from date of award. The ceiling for this CLIN is $250,000.00.
UNIT UNIT PRICE MAX AMOUNT
0006 1 Each Minimum Guarantee
FFP
Minimum Guarantee:
The Government limits the minimum guarantee to extend only to the base contract period of performance for this IDC contract and only in the amount of $1,000.00. Funding for this minimum guarantee will be obligated against this contract line item at the time of the base contract award. (NOTE: This is a minimum ordering amount, not a minimum payment). Should the Government fail to award task order(s) with an aggregate value meeting or exceeding the minimum guarantee of $1,000.00 within the period of performance of the base contract, then, ONLY after submittal of proof of contract damages from the contractor, the Government may pay the contractor up to $1,000.00. Following the agency's payment of an amount meeting/exceeding the minimum guarantee under a task order award during the base period, the agency will de-obligate funding for the minimum guarantee.
UNIT UNIT PRICE MAX AMOUNT
0007 1 Job Defense Base Act Insurance
FFP
DBA applies to task orders outside of the Continental US.
UNIT UNIT PRICE MAX AMOUNT
1001 1 Job OPTION OY1 Labor
FFP
The Contractor shall provide labor/services in support of the Meter Data Management System program in accordance with the Performance Work
UNIT UNIT PRICE MAX AMOUNT
1002 1 Job OPTION OY1 Subcontracting
FFP
The Government will review the Small Business Subcontracting Plan for adequacy ensuring that the required information, percentages and assurances are included.
UNIT UNIT PRICE MAX AMOUNT
1003 1 Job OPTION OY1 Materials ODCs
FFP
Includes all necessary direct costs not included in direct labor and travel. Contract ordering period for this CLIN will be twelve (12) months from the date of award.
Funds are for the purpose of other costs directly related to the attached Performance Work Statement, include but not limited to the purchase of other supplies & materials. Funds for the purpose of ODCs will be proposed on each individual task order and therefore shall not be expended prior to award of individual task order. Signature of the task order by the Contracting Officer constitutes authorization to expend funds. All ODCs are estimated and will be will be negotiated to a fair and reasonable firm fixed price for applicable task orders.
UNIT UNIT PRICE MAX AMOUNT
1004 1 Job OPTION OY1 Travel
FFP
Authorization from the Contracting Officer shall be obtained prior to expenditure of funds. Travel costs will be reimbursed in accordance with the JTR, as prescribed in FAR 31.205-46(a)(2)(i)-(iii). Contract ordering period for this CLIN will be one year from the end date of the base year.
UNIT UNIT PRICE MAX AMOUNT
1005 1 Each OPTION OY1 CTR Manpower Reporting
FFP
This CLIN is used for pricing the collection and reporting of Contractor Manpower Reporting data. Reporting period will be the period of performance not to exceed twelve months ending 30 September of each Government Fiscal Year
UNIT UNIT PRICE MAX AMOUNT
2001 1 Job OPTION OY2 Labor
FFP
The Contractor shall provide labor/services in support of the Meter Data Management System program in accordance with the Performance Work
UNIT UNIT PRICE MAX AMOUNT
2002 1 Job OPTION OY2 Subcontracting
FFP
The Government will review the Small Business Subcontracting Plan for adequacy ensuring that the required information, percentages and assurances are
UNIT UNIT PRICE MAX AMOUNT
2003 1 Job OPTION OY2 Materials ODCs
FFP
Includes all necessary direct costs not included in direct labor and travel. Contract ordering period for this CLIN will be twelve (12) months from date of award.
Funds are for the purpose of other costs directly related to the attached Performance Work Statement, include but not limited to the purchase of other supplies & materials. Funds for the purpose of ODCs will be proposed on each individual task order and therefore shall not be expended prior to award of individual task order. Signature of the task order by the Contracting Officer constitutes authorization to expend funds. All ODCs are estimated and will be will
UNIT UNIT PRICE MAX AMOUNT
2004 1 Job OPTION OY2 Travel
FFP
Authorization from the Contracting Officer shall be obtained prior to expenditure of funds. Travel costs will be reimbursed in accordance with the JTR, as prescribed in FAR 31.205-46(a)(2)(i)-(iii). Contract ordering period for this CLIN will be twelve (12) months from date of award.
UNIT UNIT PRICE MAX AMOUNT
2005 UNDEFINED Each OPTION OY2 CTR Manpower Reporting
FFP
This CLIN is used for pricing the collection and reporting of Contractor Manpower Reporting data. Reporting period will be the period of performance not
UNIT UNIT PRICE MAX AMOUNT
3001 1 Job OPTION OY3 Labor
FFP
The Contractor shall provide labor/services in support of the Meter Data Management System program in accordance with the Performance Work
UNIT UNIT PRICE MAX AMOUNT
3002 1 Job OPTION OY3 Subcontracting
FFP
The Government will review the Small Business Subcontracting Plan for adequacy ensuring that the required information, percentages and assurances are
UNIT UNIT PRICE MAX AMOUNT
3003 1 Job OPTION OY3 Materials ODCs
FFP
Includes all necessary direct costs not included in direct labor and travel. Contract ordering period for this CLIN will be twelve (12) months from date of award.
Funds are for the purpose of other costs directly related to the attached Performance Work Statement, include but not limited to the purchase of other supplies & materials. Funds for the purpose of ODCs will be proposed on each individual task order and therefore shall not be expended prior to award of individual task order. Signature of the task order by the Contracting Officer constitutes authorization to expend funds. All ODCs are estimated and will be will
UNIT UNIT PRICE MAX AMOUNT
3004 1 Each OPTION OY3 CTR Manpower Reporting
FFP
This CLIN is used for pricing the collection and reporting of Contractor Manpower Reporting data. Reporting period will be the period of performance not
UNIT UNIT PRICE MAX AMOUNT
4001 1 Job OPTION OY4 Labor
FFP
The Contractor shall provide labor/services in support of the Meter Data Management System program in accordance with the Performance Work
UNIT UNIT PRICE MAX AMOUNT
4002 1 Job OPTION OY4 Subcontracting
FFP
The Government will review the Small Business Subcontracting Plan for adequacy ensuring that the required information, percentages and assurances are
UNIT UNIT PRICE MAX AMOUNT
4003 1 Job OPTION OY4 Materials ODCs
FFP
: Includes all necessary direct costs not included in direct labor and travel.
Contract ordering period for this CLIN will be twelve (12) months from date of award.
Funds are for the purpose of other costs directly related to the attached Performance Work Statement, include but not limited to the purchase of other supplies & materials. Funds for the purpose of ODCs will be proposed on each individual task order and therefore shall not be expended prior to award of individual task order. Signature of the task order by the Contracting Officer constitutes authorization to expend funds. All ODCs are estimated and will be will
UNIT UNIT PRICE MAX AMOUNT
4004 1 Job OPTION OY4 Travel
FFP
Authorization from the Contracting Officer shall be obtained prior to expenditure of funds. Travel costs will be reimbursed in accordance with the JTR, as prescribed in FAR 31.205-46(a)(2)(i)-(iii). Contract ordering period for this CLIN will be twelve (12) months from date of award.
UNIT UNIT PRICE MAX AMOUNT
4005 1 Job OPTION OY4 CTR Manpower Reporting
FFP
This CLIN is used for pricing the collection and reporting of Contractor Manpower Reporting data. Reporting period will be the period of performance not to exceed twelve months ending 30 September of each Government Fiscal Year
UNIT UNIT PRICE MAX AMOUNT
5001 1 Job OPTION 6 mo Extension Labor
FFP
The Government may extend the ordering period in accordance with terms in FAR Clause 52.217-8, Option to Extend Services. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the evaluated rates in the current ordering period will be utilized during this extension period; not to exceed six months.
UNIT UNIT PRICE MAX AMOUNT
5002 1 Job OPTION 6 mo Extension Subcontracting
FFP
The Government may extend the ordering period in accordance with terms in FAR Clause 52.217-8, Option to Extend Services. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the evaluated rates in the current ordering period will be utilized during this extension period; not to exceed six
UNIT UNIT PRICE MAX AMOUNT
5003 1 Job OPTION 6 mo Extension Materials ODCs
FFP
The Government may extend the ordering period in accordance with terms in FAR Clause 52.217-8, Option to Extend Services. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the evaluated rates in the current ordering period will be utilized during this extension period; not to exceed six
UNIT UNIT PRICE MAX AMOUNT
5004 1 Job OPTION 6 mo Extension Travel
FFP
The Government may extend the ordering period in accordance with terms in FAR Clause 52.217-8, Option to Extend Services. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the evaluated rates in the current ordering period will be utilized during this extension period; not to exceed six
UNIT UNIT PRICE MAX AMOUNT
5005 1 Job OPTION 6 mo Extension CMR
FFP
The Government may extend the ordering period in accordance with terms in FAR Clause 52.217-8, Option to Extend Services. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the evaluated rates in the current ordering period will be utilized during this extension period; not to exceed six
UNIT UNIT PRICE MAX AMOUNT
5006 1 Job OPTION 6 mo Extension DBA
FFP
The Government may extend the ordering period in accordance with terms in FAR Clause 52.217-8, Option to Extend Services. In the event that FAR 52.217-8 is utilized prior to the end of the 4th option year, the evaluated rates in the current ordering period will be utilized during this extension period; not to exceed six
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$1,000.00 $49,000,000.00
PERFORMANCE WORK STATEMENT
Performance Work Statement Meter Data Management System (MDMS)
1/18/2019 US Army Engineering and Support Center - Huntsville Alabama
Version 1 Rev 1.0
1.0 BACKGROUND.
Section 543(e)(1) of the National Energy Conservation Policy Act [42 U.S.C. 8253(e)(1)], as amended by the Energy Policy Act of 2005 (EPAct 2005) and the Energy Independence and Security Act of 2007 (EISA 2007) requires
“By October 1, 2012, in accordance with guidelines established by the Secretary …, all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary …. Such data shall be incorporated into existing Federal energy tracking systems and made available to Federal facility managers.”
The “guidelines established by the Secretary” in 42 U.S.C. 8253(e)(1), coordinated with each agency (e.g., Department of Defense [DoD]), taking into consideration expected savings and costs of metering, maintenance, and training, establishes priorities for types and locations of buildings to be metered and establishes exclusions based on cost-effectiveness.
Section 3(f)(ii) of Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade (19 Mar 2015) adds the requirement to install water meters and collect data to improve water conservation and management.
DoD’s guidelines for complying with the metering requirements of the law are incorporated in UFC 1-200-02 High Performance and Sustainable Building Requirements, which references the metering requirements of Department of Defense Instruction (DoDI) 4170.11 (March 16, 2016) as amended by DOD Utilities Meter Policy, 16 April 2013. Together, the DoD policies require advanced metering each applicable building for each utility serving the building (electricity, steam, natural gas, and water), wherein an advanced metering system (AMS) must automatically and reliably collect and analyze regular interval data from advanced meters and distribute information to key stakeholders. DoD directs all Components (e.g., Army, Navy, Air Force) to install sufficient advanced meters to capture 60% of electricity use and natural gas use with a goal of 85% at the Component level by the end of Fiscal Year 2020.
MDMS is the Army’s implementation of DoD’s AMS requirement, the requirements of which are described in Army Directive 2014-10 (Advanced Metering of Utilities, June 4, 2014), Energy and Water Goal Attainment Responsibility Policy for Installations (ASA-IEE Memorandum, Jan 13, 2017), and Sustainable Design and Development Policy Update ( ASA-IEE Memorandum, Jan 17, 2017). To the requirements of the law and DoD, the Army adds 1) the requirement to also meter district chilled water and hot water serving buildings, 2) the requirement for advanced meters to report 15-minute interval data for all utilities to the Army’s MDMS at least hourly, 3) the requirement to install all meters in compliance with Army Metering Program Guidance (HNC UMCS-MCX, Revision 8, May 2016), and 4) the requirement to also meter, where practical, building subsystems according to ASHRAE 189.1-2014 Section 6.3.3 for Water Consumption and Section 7.3.3 for Energy Consumption.
2.0 OBJECTIVE
Regarding the purpose of metering and AMS, DoDI 4170.11 states that “while meters themselves do not constitute a direct energy conservation measure, it is expected that the management of data collected through metering will lead to energy and cost savings. Meter data should be collected, assimilated, interpreted, and made available to facility and energy program managers. This information should serve as the foundation to establishing facility energy efficiency relative to other facilities in the building inventory. It should also serve to identify and confirm opportunities for energy reduction or increased energy efficiency through improved operation procedures, best practices, or energy conservation and retrofit projects.”
Thus, the primary objective of this contract is to implement the chosen COTS in order to operate, enhance, and sustain the Army’s centralized MDMS in order to accomplish the primary mission of (1) delivering dependable meter data, (2) use industry standards to normalize data and establish facility energy consumption relative to other facilities, (3) provide tools in an easy-to-use interface to enable facility and energy program managers to identify and confirm opportunities for energy reduction, (4) support continual advancement and optimization in capabilities and technologies, (5) keep the system in accordance with applicable laws, policies, executive orders, regulations, instructions, and guidance, and (6) continually use system engineering techniques to reduce system sustainment cost and complexity.
3.0 SCOPE & AUTHORITY
The U.S. Army Engineering and Support Center, Huntsville (CEHNC), is a Major Subordinate Command under the U.S. Army Corps of Engineers. CEHNC is the Army Program Management Office responsible for managing the execution of the Army Central Metering Program (AMP) and is available to support other Federal agencies in their compliance with the National Energy Conservation Policy Act using this same contract. Scope of services as may be purchased through the award of task orders under this contract may include the following:
(a) Furnishing a commercial off-the-shelf (COTS) software as a single MDMS Enterprise solution to be the Army’s standard for its meter data analyses; (b) provide operator training for use of the software; (c) provide administration, operation, and maintenance of the MDMS Program’s COTS solution, to include installation level interfaces of gateway devices, software upgrades as required for internet security; (d) provide system security engineering to support the secure configuration and sustainment of the MDMS, to include devices that must interface with the MDMS in accordance with Army and Department of Defense (DoD) requirements; (e) develop the appropriate Risk Management Framework (RMF) packages or the Army’s current accreditation process; (f) maintain the current accreditation package’s artifacts to include periodic reviews in accordance with the MDMS continuous monitoring requirements and no less than annually for accuracy and change management controls to support Federal Information Security Management Act (FISMA) reporting and continuous authorization under RMF; (g) develop Networthiness and/or Asses-Only packages for submission to Network Enterprise Technology Command (NETCOM) or through Enterprise Mission Assurance Support Service (eMASS) for review and approval; (h) operate a call center technical support for software and hardware trouble shooting issues; (i) and provide secure and complete solutions for enabling legacy system compatibility with the Army-wide MDMS. Task orders under this contract may include any node above the meter that assist in delivering dependable meter data. Installation and maintenance of meters or control systems are outside the scope of this contract as they pose a life-safety risk. This base contract vehicle is not in itself a deliverable as those will be addressed in individual task orders, rather this vehicles seeks to define the scope, authority, and range of functional and technical requirements that may be executed under this vehicle.
4.0 GENERAL REQUIREMENTS
4.1 Principal Contract Requirements - The requirements in the following sections of this base contract shall be applied to any task order issued (whether mentioned in the task order or not) under this contract vehicle. Each task order will be negotiated after contract award, and the task order proposal shall include all ancillary costs associated with this base contract.. Additional requirements described in each task order, once awarded, may compliment, emphasize, or add to any requirements or processes mentioned in this paragraph so long as they are within the scope of the contract described in Section 3. Task orders may include multiple task. The Government reserves the right to expand any requirements of any task order so long as the requirement does not force the Contractor to perform outside the scope of what would be considered reasonably within the bounds of this services contract. The Government also reserves the right to absolve the Contractor of requirements under this paragraph ONLY by noting such release in the verbiage of the task order.
4.2 Performance Metrics – All Key Performance Metrics for Quality Assurance associated with requirements in this contract shall be documented in the Quality Assurance Plan for each specific executed task order. The PRS will document Performance Metrics that will be required for every task order.
4.2.3 Quality Assurance – Quality control under this section shall apply to all task orders awarded under this contract. The verbiage of the task order may require additional quality control requirements above and beyond those mentioned in the base contract. The Contractor shall submit a quality assurance plan for the MDMS program within thirty (30) days of award. Individual quality assurance plans should be submitted with each task order.
4.2.4 Quality Management Plan. The Contractor will be required to provide their current Quality Management Plan (QMP) after the base contract is awarded which clearly depicts how the Contractor will minimize errors prior to submittals and final submissions. It will explain how Quality Control (QC) will be implemented to deliver products consistent with contract requirements for the full scope of the contract and all task orders. The QMP must list the names, qualifications, authority, and responsibilities of all members of the Quality Control Team and define and describe the processes in sufficient detail for the entire life cycle of the products expected to be delivered. The government will not prescribe the quality management organization used by the Contractor or it’s processes, but will hold the Contractor responsible for its effectiveness once implemented. Quality management will be provided at all times on all deliverables, and shall be supported for the length of one year after the final deliverable has been submitted to the government. The Contractor is required to implement the controls and processes as defined in the QMP submitted. The government may require the QMP to be updated to address specific task order requirements.
5.0 ROLES AND RESPONSIBILITIES
The Contractor shall furnish a fully staffed team with proven demonstrated relevant experience to operate, enhance, and sustain the US Army’s Meter Data Management System. These individuals will identify themselves as contractors, if applicable, and meet all other personnel requirements. Tasks will be awarded under this base contract, which will be based on defined requirements and negotiated to the quantities of labor hours and Other Direct Costs (ODCs) needed to perform the requirements.
5.1 Labor Rates - All labor CLINs shall be fully loaded to account for hourly base costs, overhead, and any other administrative costs.
5.2 Proposal – The Contractor shall submit with their proposal a rate sheet using the template provided in the Request for Proposal (RFP). The Contractor shall submit a staff, mid-level, and senior rate for each proposed position. No other adjectives shall be used in this contract to described experience level or differentiate between experience levels.
5.3 Teaming Agreements – Teaming Agreements are required for all proposed sub-contractors and are considered binding. Rates and responsibilities should be agreed upon before singing of teaming agreements.
Teaming agreements can only be breached with KO approval once the prime contractor has documented and proven to the KO’s satisfaction that the sub-contractor either a) has delivered unsatisfactory work or b) the subcontractor is refusing to deliver services at rates agreed upon in the base rate table.
5.4 Resumes – Resumes submitted in the proposal shall include commitment letters and are considered binding.
A contractor shall only submit commitment letters for employees that will either a) fulfill a key position designated in section 5 or b) fulfill positions described in the contractors technical proposal. Employees with submitted resumes shall work a majority of their hours on this contract at the agreed rates as long as they are employed by the contractor or sub-contractor within the government requirements. A contractor found submitting resumes solely for the intent of winning award without displaying intent to use those resumes on the award are subject to forfeiture of the award.
5.5 Staff Changes - Contractor shall secure written approval from the Contracting Officer and the Project Manager for proposed staff and/or changes to the roles and responsibilities with respect to specific task orders.
Acceptable professional requirements for key positions are established below.
5.6 Position Experience – Staff level positions shall require 3-8 years of related experience, mid-level requires 9-14 years of related experience, and senior requires a minimum of 15 years of related experience. Postgraduate degrees may be counted as experience equal to the length of the program. Ex: A two (2) year masters counts as two (2) years. Undergraduate degrees may not be counted towards experience. The Contractor shall use the rate that matches the experience of the employees executing task under specific task orders. Proposals on task orders shall include a crosswalk between employees, their positions and rate level, and hours being executed per requirement on specific task orders. The designated Contracting Officer Representative (COR) or Contracting Officer KO) for this vehicle shall approve all resumes for fulfillment of positions included on the binding labor rate table. No position shall be proposed unless it is on the binding labor rate table.
5.7 Required Positions – The Contractor will provide for program and project support at all levels of the Army Command structure, the following are required roles or responsibilities:
5.7.1.1 Program Manager (Key Personnel). The Program Manager (PgM) shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PgM must have nine (9) or more years of demonstrated recent relevant experience in a program/project management or supervisory capacity, a minimum of five (5) or more years of recent relevant experience in the functional area of the program to be managed, and five (5) or more years of demonstrated relevant PMP experience in agile project management. An identified alternative individual meeting the aforementioned requirements shall also be designated to act for the PgM when the PgM is not available. There shall be only one (1) Program Manager position on this contract. Requirements should be properly delegated to project managers if required.
5.7.2 Technical Director (Key Personnel). The Technical Director serves as the Contractor’s technical lead, manages the technical team, provides technical oversight, and is a point of contact on technical matters. The Technical Director must have at least nine (9) years of demonstrated recent relevant experience leading technical teams in fielding Information Technology projects within the Department of Defense. The Technical Director shall have a Bachelor’s degree in engineering, information technology, or related degree from an accredited university or college. The Technical Director must have at least three (3) years of demonstrated recent relevant experience managing a technical team using Agile Project Management methods and will be responsible for managing and leading sprint meetings. The Technical Director must have a thorough understanding of a) Army IT and IA policies, procedures, and regulations and b) Army IT and IA organizational structures and responsibilities. The Technical Director must demonstrate a thorough understanding of sustainment responsibilities for a large-scale DOD system across many DOD Information Networks (DoDIN’s.). There shall be only one Technical Director position on this contract.
5.7.3 Senior Energy Engineer (Key Personnel). The Senior Energy Engineer is responsible for technical oversight of all areas of the contract that deal with the energy calculations, standards, policies, or criteria. The Senior Energy Engineer must have demonstrated recent experience with Government or industry processes, procedures, standards, methodologies, or tools as relative to the assignment. The Energy Engineer must be a licensed Professional Engineer (PE) with at least fifteen (15) years of experience in energy engineering (energy systems design, facility energy modeling, auditing, energy studies, commissioning, and validating and executing energy conservation projects). The person shall have a Bachelor’s degree from an accredited university in either mechanical or electrical engineering. The person shall have at least three (3) years of experience in facility energy modeling and have strong background in mathematical modeling. The Senior Energy Engineer must have a thorough background in DOD, Army and Federal Energy and Sustainability laws, policies, executive orders, regulations, instructions, and guidance. There shall be only one Senior Energy Engineer on this contract.
5.7.4 Senior Information Security Engineer (ISSE). (Key Personnel) The Senior ISSE is responsible for the design, development, implementation, and/or integration of a DOD IA architecture, system, or system component for use within CE (computing environment), NE (network environment), and/or enclave environments. The Senior ISSE must meet the Department of Defense Directive (DoDD) 8570.01 “Information Assurance Training, Certification, and Workforce Management” and DoD 8570-M “Information Assurance Workforce Improvement Program” requirements. The Senior System Security Engineer shall have a Bachelor’s degree in engineering or an information technology field and a minimum fifteen (15) years demonstrated recent relevant experience in the cyber security or information technology sector. The ISSE shall have five (5) years of experience in performing information assurance (now called cybersecurity) and security engineering in the process control industry. The ISSE shall have a minimum of five (5) years of experience in performing information assurance and security engineering in the information technology industry for systems or networks and must have at least three (3) years demonstrated recent relevant experience performing information assurance and security engineering in the Department of Defense to include demonstrated recent relevant experience with the RMF process. The security engineering effort shall include identification, development, and implementation of the Information Assurance (IA) Controls, to include technical, procedural, and documentation requirements as described in DoD and Army requirements and guidelines.
5.8 Certifications – All Contractor personnel shall maintain all certifications, access, documentation, security clearances, and professional licenses required to fulfill their responsibilities or to gain access to systems critical to fulfilling their responsibilities.
5.9 Contractor Man-hours Reporting - The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower (including sub-Contractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the information in the format using the following web address:
https://cmra.army.mil/Login.aspx. Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data. For internal Army analysis, the reports and queries from the database shall not contain proprietary data.
5.10 Qualified Personnel – All contract personnel shall have and maintain all certifications, approvals, clearances, and pathways established (including all requirements for IAT Level I, II, or III designations and Common Access Cards) sufficient for the management of the hosting solution. This shall include employees of vendors providing authorized cloud services.
5.11 Position Technology Refresh – Due to the high rate of evolution of technologies that may be required under this contract vehicle the contract shallhave the opportunity to propose new positions required because of the emergence of new technologies and specific skills required to support the potential new technologies in Option Year 3. No positions in the award base rate table may be re-proposed or renegotiated.
6.0 SOFTWARE
6.1 COTS – The Contractor shall operate, enhance, and sustain the COTS software that serves as the data infrastructure within the MDMS Enterprise solution and is the Army’s standard for meter data analyses.
Approval for customization of COTS software integration shall be signed by the COR and communicated in writing by the COR. Configuring, extending functionality to include interfaces with COTS API, writing functions, and writing formulas with COTS provided tools is not considered customization. The chosen COTS solution for MDMS is OSIsoft PI. The government has already made a significant capital investment in the COTS solution under the current contract and is not seeking to invest or recompete another COTS solution at the time of award. This does not prevent the government from replacing the COTS solution during the execution of this award if requirements, performance, or funding require moving to a new COTS solution. All code whether custom developed or within the COTS tool is the property of the government. This contract does not support development of a non-COTS tool.
6.2 User Interface/User Tools – The Contractor shall provide user interfaces that deliver required functionality to meet program objectives and meet Quality in Use Integrated Measurement (QUIM) metrics as defined in the PRS. The Contractor shall use International Organization for Standardization (ISO) Standard 9241 as guidance for best practices. The Contractor shall maintain support and compliance for all browsers supported in the Army Gold Master Windows baseline.
6.3 Functionality/Capability – The Contractor shall provide functionality and capabilities that support the MDMS mission in meeting its objectives as described in Section 3. The contractor shall work with the government product delivery team, proponents, users, and stakeholders to document required functionality, changes, and upgrades and delivery those functional requirements as needed.
6.4 Performance – The Contractor shall meet performance metrics for software as defined in the PRS and within the QASP associated with individual task orders
6.5 Test Environment – The Contractor shall furnish, maintain, operate, and sustain a development and test environment to (1) build new functionality, (2) test functionality, (3) debug existing functionality, (4) simulate operating conditions, & (5) test interoperability of MDMS components.
6.6 Documentation – The Contractor shall properly document all software and code in order to (a) maintain portability, (b) decrease learning curves, and (c) enhance troubleshooting capabilities through available reference. Software documentation should meet the following objectives:
1. Conceptual – To help understand goals, principles and methods involved in completing a process or task.
2. Instruction – To learn how to complete a procedure
3. Reference – To Search for details when something has been forgotten or when something unexpected happens.
6.7 Version Control – The Contractor shall provide quality version control tools to organize and control revisions in a logical way.
6.8 Management Information System (MIS) – The Contractor shall provide a dashboard, visualization tools, and reports within the COTS solution to provide the Government with metrics to understand and conceptualize the operational health of the MDMS system, statistical usage of the help desk, and the effectiveness of the program to meet objectives.
6.9 Geospatial Integration – The Contractor shall integrate the COTS solution with COTS geospatial tools in order to (a) provide a common operating picture for installations, (b) identify spatial relationships between time-stamped meter data and installation assets, and (c) provide a tool for enhanced analytics involving space-time relationships.
6.10 COTS User Roles – The Contractor shall provide tools to dynamically and trustfully manage user roles, permissions, groups, security, and authentication in compliance with applicable federal, Department of Defense, and Department of the Army Information Assurance & Cyber Security regulation, policies, instructions, and practices.
6.11 New Functionality Capability – The Contractor shall be able to deploy new functionality quickly within the COTS suite of tools without requiring development of new code.
7.0 SYSTEM HOSTING
The Contractor shall provide system hosting in a DoD-approved hosting environment with minimal dependencies on entities outside the Contractor’s team. The environment shall support mature Infrastructure as a Service & Software as a Service capabilities for the Contractor and Government technical teams. The hosting environment must be agile, responsive, and easy to reconfigure server, network, and environment specs.
Authorized Cloud Service Providers through the Federal Risk and Authorization Management Program (FedRAMP) are approved provided they prove the ability to meet all applicable Army and DoD Information
Assurance and Information Technology regulations, standards, policies, and best practices and enable the MDMS to maintain its RMF accreditation.
7.1 Requirements Identification – The Contractor shall initially and periodically conduct requirements analysis in regards to the MDMS hosting solution to determine the needs or conditions to meet for successful mission execution and sustainment of the MDMS hosting solution. Requirements should be documented, actionable, measurable, testable and related to identified business needs or opportunities, and defined to a level of detail sufficient for system design.
7.2 Document – POC List – The Contractor shall develop and maintain a point of contact list for persons serving as a focal point of information attributed with the successful sustainment of the MDMS solution.
7.3 Cybersecurity inherited controls identification – The Contractor shall identify common controls that are employed at the hosting, facility, installation organizational level or serve multiple information systems that are, or should be, referenced as inherited controls in MDMS RMF artifacts and properly documented in eMASS through the RMF process for the MDMS solution.
7.4 Credentials/CAC - The Contractor shall ensure that the MDMS hosting solution meets all applicable DoD Information Assurance and Information Technology regulations, standards, policies, and best practices. Access to the MDMS hosting solution should be available only to properly credentialed individuals who have met IAT Level I, II, or III depending on their position requirements and functions. All users must be properly authenticated according to DoD and DA requirements.
7.5 Ports, Protocols, and Services Management (PPSM) Compliance – The Contractor shall be compliant with DoD Instruction 8551.01 (Ports, Protocols, and Services Management). The Contractor shall use approved standard procedures to control the use of protocols in the Internet protocol suite and associated ports. The Contractor will request PPS changes, updates, and modifications through the NETCOM defined process. The Contractor will ensure new PPS are properly documented and submission of a Component Service Level Assessment (CLSA) is submitted through the Army PPSM Technical Advisory Board (TAG) as needed for a new PPS where required.
7.6 Computer Network Defense (CND) Service Provider Requirement – The contractor shall coordinate and develop MOA with CND service provider, or to achieve waiver.
7.7 Maximum Use of Available Enterprise Service – The Contractor shall ensure maximum use of available Enterprise Services.
7.8 Quality Assurance on Services Received – The contract shall provide within 60 days of award a Quality Assurance Plan to ensure quality of products and services received from the MDMS hosting provider.
8.0 BILLING
The Contractor shall provide tools to support Energy Mangers to automate tenant billing. The billing tools should be available within the COTS system. The MDMS requirements define tools/reports to be given to installation Resource Management (RM), tenants, and users by energy managers. RM handles actual billing through their systems. MDMS does not need to interface or replace actual billing functionality handled by installation RM.
8.1 – The Contractor shall enable MDMS user to produce reimbursable tenant billing documentation that complies with all applicable Army regulations and policies to include but not limited to Army Regulation (AR) 420-41.
8.2 – The Contractor shall incorporate tools to show a tenants meter readings, meter reading dates, current month usage, and usage compared against same month last year.
8.3 – The Contractor shall implement functionality so that once the initial tenant billing report is set-up for a tenant by a MDMS user, the MDMS shall automatically update the report (bill) each month by the 10th of the following month.
8.4 – The Contractor shall implement functionality to implement levelized billing
8.5 – The Contractor shall provide templates within the MDMS of applicable contract forms to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .