RFQ_W912DY-19-Q-0252_Belvoir_Fitness_Equipment_-_Builing_2444.pdf
PDF 3 MB Posted
- Solicitation number
- W912Dy-19-Q-0252
About this file
Request for Quote
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1_W912DY19Q0252_Belvoir_Fitness_Equipment.pdf | ||
| Vendor_Questions_-_Belvoir,_Fitness_Equipment.pdf | ||
| FBO_RFQ_Provisions-Clauses_May_2019.pdf | ||
| IF-135_-_FURNITURE_PLAN_-_LEVEL_1_-_SECTOR_5.dwg | DWG drawing | |
| ATT7_TechReview_Belvoir_Fitness_Equipment.docx | DOCX document | |
| Att_1_Belvoir_Nolan_Bldg_Fitness_Equipment.xlsx | XLSX spreadsheet | |
| IF-135_-_Room_GF147.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DY19Q0252 12-Aug-2019
b. TELEPHONE NUMBER
256-895-1185
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 12 Sep 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DY9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JASON P UNDERWOOD
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEERING & SUPPORT CENTER
475 QUALITY CIRCLE
HUNTSVILLE AL 35806
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W912DY 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE AA AL
TEL: 256-895-1110 FAX:
FAX:
TEL: 256-895-1110 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
339920
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF11
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DY19Q0252
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Fitness Equipment: Belvoir, Bldg 2444
FFP
The contractor shall provide fitness equipment in support of the Huntsville Center Centrally Managed Furnishings Program for Fort Belvoir, VA, Nolan, Building 2444, in accordance with the attached Line Items, Item Descriptions and Statement of Work.
**** This package is SUBJECT TO THE AVAILABILITY OF FUNDS. No award will be made until funds are available.
****Please submit quotes valid for 120 days.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job OPTION Storage: Belvoir, Bldg. 2444
FFP
***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.
These two options for storage can be unilaterally exercised by the Contracting Officer for a combined total maximum of six months of storage per building.
Storage shall be a Firm Fixed Price amount of ________ per month, for a total amount of ________ for six months. Storage should take into account all costs necessary to store furnishings secure from theft, damage, and weather elements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NET AMT
CLAUSES INCORPORATED BY REFERENCE
252.211-7003 Item Unique Identification and Valuation MAR 2016 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
INSTRUCTIONS TO QUOTERS
1. FURNITURE INSTALL INFORMATION:
A. Estimated award date is: 27 September 2019
B. Required install dates are as follows:
Cardiovascular Equipment - Fort Belvoir, VA, Building 2444 Install Start not earlier than: 2 December 2019 Install Completion not later than: 16 December 2019
Cardiovascular Equipment - Fort Belvoir, VA, Building 2444 Contractor Furniture Install Start Date (FISD): _______________________________ (insert date, not After Receipt of Order)
Contractor Furniture Install Completion Date (FICD): ____________________________
Weight Equipment - Fort Belvoir, VA, Building 2444 Install Start not earlier than: 15 January 2020 Install Completion not later than: 30 January 2020
Weight Equipment - Fort Belvoir, VA, Building 2444 Contractor Furniture Install Start Date (FISD): _______________________________
Contractor Furniture Install Completion Date (FICD): ____________________________
C. Specific install instructions are contained in the Statement of Work (SOW), Attachment # 3.
2. SHIPPING/STORAGE INFORMATION
A. The contractor must ship goods on an FOB Destination basis.
B. Contractors must quote six month’s storage cost in the SF-1449 form to be considered eligible for award. If a storage fee is not included in pricing, the contractor’s quote may be considered a non-conforming response to the solicitation. A quote for six months of storage is required for when the need for storage is identified prior to leaving the Continental United States (CONUS), and a quote for storage is required for when the need for storage is identified after items have departed CONUS. These two options for storage can be unilaterally exercised by the Contracting Officer for a combined total maximum of six months of storage. Storage needed for partial shipments or production runs will be prorated by the price of the items stored relative to the total price of the items ordered. Storage will only be funded by Modification and at the discretion of the Contracting Officer. Storage will be a Firm Fixed Price amount. Contractors should take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. If storage is required in excess of 6 months, a new amount will be negotiated. If the storage cost is incurred, fast payment procedures may be implemented in accordance with FAR 52.213-1. If storage is required, payment may be approved for 85% of the total supplies only. Installation and the remaining 15% of supplies will be approved for payment once all responsibilities have been completed as set forth in the contract. Contractor shall coordinate delivery and installation with Government Technical Representative (TR) shown in the SOW, and save records of these communications with the goal of successful delivery and installation. This requirement for coordination includes, but is not limited to, communicating with the Government TR prior to shipping items in order to prevent unnecessarily expensive storage costs.
C. A Certification of Conformance must be provided by the contractor for any order that will be stored in a warehouse for which the contractor desires partial payment in advance of installation of the furnishings. FAR 52.246-15 addresses how to complete a certificate of conformance.
D. Destination/Ship to Address and Transportation Information: See Table 1 in SOW, Attachment # 3.
3. INSPECTION AND ACCEPTANCE
Inspection and Acceptance must be by the Government TR. See Table 1 in SOW, Attachment # 3.
4. LIST OF ATTACHMENTS
ATTACHMENT # 1 – LINE ITEM PRICING 2 pages ATTACHMENT # 2 – FURNITURE ITEM DESCRIPTIONS (FID) 45 pages ATTACHMENT # 3 – STATEMENT OF WORK 11 pages ATTACHMENT # 4 – CONTRACTOR PERFORMANCE EVALUATION 2 pages ATTACHMENT # 5 – ACCIDENT PREVENTION PLAN 7 pages ATTACHMENT # 6 – ORDER COMPLETION STATEMENT 1 page ATTACHMENT # 7 – TECHNICAL DOCUMENTS CHECKLIST 29 pages
5. CONTRACTING OFFICER’S INSTRUCTIONS AFTER AWARD
A. Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO) or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
B. The contractor is responsible to coordinate the installation of its items with the site Technical Representative at least 30 days before the installation start date. At this time any special security/install instructions will be provided by the Government to that contractor. The contractor should refer to the Statement of Work (Attachment #3) for additional installation instructions. If additional days for installation are needed, a justification should be provided at the time of quote for approval by the Contracting Officer.
C. Security issues (e.g. getting on and off post), logistical discussions of the installation process must be coordinated with the Furniture Management Officer (FMO).
D. If a subcontracted item is found to be unavailable after award and Government acceptance of a substituted item is requested, the contractor must submit to the Contracting Officer copies of the contract terms and conditions along with the technical data sheets for the proposed substitute item.
E. Safety Plans. The contractor is responsible for submitting a completed safety plan within one month after contract award, or where expedited installation is required NLT 10 days before installation. NO installation will be permitted without an approved safety plan. The contractor must not begin installing items until a safety plan has been submitted to and approved by the Government. All safety plans must be emailed to:
furnishinginvoices@usace.army.mil
F. The contractor must comply with all laws, rules and regulations of the installation, including but not limited to, the following: No weapons of any kind are to be carried by any person or transported in any vehicle entering an Army installation. Truck drivers carrying any kind of weapon will be denied access to the Army installation.
G. If requested by the Contracting Officer, the contractor shall provide reports for quoted items.
6. INVOICES
A. Partial order invoices will not be accepted. Invoices may be submitted for one building of a multi-building delivery order only with the approval of the Contracting
Officer, following the complete installation of the one building by the contractor and acceptance by the Government.
B. All invoices must be sent FurnishingInvoices@usace.army.mil for processing.
C. The contractor shall return a signed Attachment # 6, Order Completion Statement, with the final invoice. Invoices shall not exceed the contract amount. A final invoice submitted without a signed Order Completion Statement will be rejected.
THE FOLLOWING PARAGRAPHS WILL DROP OFF WHEN AN AWARD IS MADE ON
THIS RFQ.
7. INSTRUCTIONS TO CONTRACTORS
A. The contractor must provide pricing for all items listed in the RFQ for the quote to be accepted by the Government.
B. The contractor must complete the furniture installation schedule under FURNITURE INSTALL INFORMATION and include in the quote submission.
C. All quoted items must meet the specifications defined in the Attachment # 2 Furniture Item Descriptions (FID).
D. Name brand and model numbers must be provided for all quoted items, including pass-thru items and those manufactured by the Contractor.
E. Technical Data Sheets Required. Current and complete cut sheets for all items specified in the FID must be provided by the contractor, unless otherwise specified. All salient features of items specified in the FID must be addressed on the cut sheets.
When the contractor provides more than one cut sheet for an item specified in the FID, the cut sheets and supporting documentation shall be highlighted or contain other markings that bring immediate attention to information, and enables the Government to remove all doubt whether a contractor has or has not met the specifications shown in Attachment #2. The burden of providing information, which must be organized and sequential according to the FID, is the responsibility of the contractor. The Government shall not be held responsible for contractor information that is not organized and sequential according to Attachments # 1 & 2, or not highlighted (if within a larger document and used as proof), which prevents conclusive comparisons between the contractor’s quoted items and the requirements during technical review.
F. Electronic Price Quote is Required. Attachment #1, “Line Item Pricing,” will be provided in an Excel spreadsheet format by the Government. The offeror must submit the completed Attachment #1 in Excel format to the Government by the deadline for submission of quotes set forth in this RFQ.
G. Attachment # 7, “Technical Documents Checklist,” will be provided in Word format by the Government. The contractor must submit a completed Attachment # 7 in Word format to the Government by the deadline for submission of quotes set forth in this RFQ.
H. Product samples are not acceptable for this RFQ, unless otherwise directed by the Contracting Officer.
I. Multiple quotes are not acceptable for this RFQ. If multiple quotes are received, only one quote (as determined by the Contracting Officer) will be evaluated by the Government.
J. The contractor should list any specific special features, warranty, and environmental and energy efficiency features applicable to its quoted products.
K. The contractor is bound by the monthly storage fee quoted for an option for a maximum period of six months that may be unilaterally exercised by the contracting officer in one-month increments. If a storage fee is not included in the contractor’s quote, the contractor’s quote may be considered a non-conforming response to the solicitation.
L. When drawings are included as attachments, they are for visualization purposes only. The FID takes precedence over drawings unless otherwise stated. Site conditions may not align with drawings. Post-award site verifications are the responsibility of the Contractor.
M. The contractor must submit the following with its quotation:
Company Name:
Cage Code:
Taxpayer Identification Number:
Duns Number:
POC Name:
Email Address:
Phone Number:
Mailing address
N. The Contractor must be actively registered in the System for Award Management (SAM) with no exclusions.
8. SUBMISSION, MODIFICATION AND REVISION OF QUOTES
A. Contracting documents (SF1449, SF30, Attachment # 1 in Excel format, Attachment # 7 in Word format) and technical documents (cut sheets and other supporting documents demonstrating quoted items meet the FID requirements) together create the quote. The terms, “quote,” “RFQ response,” and “response” have the same meaning in this section.
B. Quotes shall be submitted by the contractor to the Government in email, using as many emails as required to deliver a complete quote. When multiple emails are used to deliver a complete quote, contractors shall state their number to the Government.
Currently, Huntsville Center supports up to 10MB of content per email.
C. It is recommended that contractors use AMRDEC SAFE, a File Transfer Protocol (FTP) site located at https://safe.amrdec.army.mil/SAFE/ as a backup method of submitting their quotes. If an FTP site is used, the contractor shall inform the Contract Specialist in email no later than the due date and time for quotes, as well as provide a functioning link, username, and password.
D. The Government must have in its possession the contractor’s entire quote by the RFQ due date and time.
E. Contractors shall return to the Government in the same Word version format received, their responses to the Government’s requests for clarification.
F. Contractors shall not merge into a single PDF document both the technical documents (cut sheets and other supporting documents demonstrating quoted items meet the FID requirements) and the contracting documents (SF18, SF30, Attachment #1 in Excel format, Attachment # 7 in Word format).
G. Contractors shall not intentionally quote items that do not meet the specifications of the primary requirements. The primary requirements for Administrative Office Furniture (Admin) are defined as office furniture systems and, if included in the FID, wood casegoods. The Government’s intent is to receive timely quotes that are organized, complete and technically acceptable, with no need or a minimal need for clarifications.
Quotes that do not meet the specifications of the primary requirements (documented during technical review) may receive no further consideration for award.
9. NON-CONFORMING RESPONSES
The Government is not required to accept non-conforming responses. Non-conforming responses may not receive a technical evaluation, and may not receive consideration for award. The following types of responses are considered non-conforming:
A. A contractor’s quote that does not meet the specifications of the primary requirements.
B. A contractor’s submittal of technical documents (cut sheets and other supporting documents demonstrating quoted items meet the FID requirements) and contracting documents (SF18, SF30, Attachment # 1 in Excel, and Attachment # 7 in Word) merged into a single PDF document.
C. A contractor’s submittal of technical documents that is incomplete or is not organized and sequential according to the FID preventing a conclusive comparison between the contractor’s quote and the Government’s requirement.
D. A contractor’s failure to respond to the Government’s request for clarifications in the same Word format received, in order for the Government to be able to continue to record communications with the contractor on the same form.
E. A contractor’s submittal of electronic documents whose file names do not reflect their general content, which do not enable the reader to locate information without opening documents repeatedly to be reminded of their contents, and which harm the Government’s ability to perform technical review or other examination.
10. LATE RESPONSES / NON-RESPONSIVENESS
Late responses are in all cases contractor responses that are not in the Government’s possession by the stated due date and time.
11. AMENDMENTS
The Government may amend the RFQ for reasons that include extending the due date for submission of quotes, construction delays of buildings to be furnished, changing market conditions or Government requirements, or for other reasons that clarify the needs of the Government.
12. QUESTIONS
A. Questions may be submitted by contractors within the time period specified in the RFQ package. When the term “hour” is used to describe the time period for questions, then it means sequential hours without interruption (24 hours = 1 calendar day), unless otherwise specified.
B. Notifications to the Government from contractors regarding limited- or non-available items, or potential errors in the Government’s specifications are welcomed.
C. A contractor’s request to change the Government’s requirement before quotes are due may not be addressed because it does not clarify the requirement for all potential quoters, and if accepted would change the requirement.
13. DOWN-SELECT PROCESS
A. It is the Government’s intent to select a target of three (3) quotes for a complete technical evaluation to determine whether the quoted products comply with the FID.
The Contracting Officer has discretion to include more or less than three (3) quotes in the down-select. The down-select will be based on price, receipt of completed Attachment # 7 - Technical Documents Checklist and the contractor’s confirmation of their ability to meet the Government’s Furniture Installation Start and Completion Dates.
B. At any time following the down-select, the Government may, at the discretion of the Contracting Officer, engage in exchanges with one or more of the contractors whose quotes were down-selected, or consider additional quotes for evaluation.
14. EVALUATION CRITERIA
A. Technical Evaluation – Technical will be rated “Acceptable” if all line items meet the specifications shown in the Attachment #2 Furniture Item Description (FID).
B. Schedule – Schedule will be rated “Acceptable” if the contractor install dates are within the dates shown below.
Cardiovascular Equipment - Fort Belvoir, VA, Building 2444 Install Start not earlier than: 2 December 2019 Install Completion not later than: 16 December 2019
Weight Equipment - Fort Belvoir, VA, Building 2444 Install Start not earlier than: 15 January 2020 Install Completion not later than: 30 January 2020
C. Past Performance – Past Performance will be rated “Acceptable” or “Unacceptable.”
The Government will use any available information to evaluate past performance.
D. Price – Evaluated price will be the contractor’s total quoted price, which includes all supplies, services, shipping, storage and optional items.
E. The Government may, at the discretion of the Contracting Officer, engage in exchanges with contractors. However, the Government reserves the right to make award without further exchanges.
15. SELECTION OF QUOTES FOR AWARD
The successful contractor will be the one whose quote is rated acceptable on technical, schedule and past performance, and provides the best value to the Government. Best value will be determined by the quote that is technically acceptable and has the lowest total evaluated price.
W D H
1 4 ea E1 Treadmill 27.1 (4) in: GF147 $0.00 2 2 ea E2 Elliptical Cross Trainer 27.2 (2) in: GF147 $0.00 3 1 ea E3 Cross Trainer 27.3 (1) in: GF147 $0.00 4 1 ea E4 Rower 27.4 (1) in: GF147 $0.00 5 2 ea E5 Indoor Upright Cycle 27.5 (2) in: GF147 $0.00
6 1 ea E5A Ergometer Indoor Upright Cycle 27.6 (1) in: GF147 $0.00
7 2 ea E6 Recumbent Bike 27.7 (2) in: GF147 $0.00 8 1 ea E7 Stair Mill 27.8 (1) in: GF147 $0.00 9 3 ea E8 Adjustable Bench 27.9 (3) in: GF147 $0.00 10 2 ea E9 Flat Bench 27.10 (2) in: GF147 $0.00
11 1 ea E10 Decline/Abdominal Bench 27.11 (1) in: GF147 $0.00 12 1 ea E11 Dumbbell Set 27.12 (1) in: GF147 $0.00 13 2 ea E12 Dumbbell Rack 27.13 (2) in: GF147 $0.00 14 1 ea E13 Kettlebell Set 27.14 (1) in: GF147 $0.00 15 1 ea E14 Kettlebell Rack 27.15 (1) in: GF147 $0.00 16 1 ea E15 Medicine Ball Set 27.16 (1) in: GF147 $0.00 17 1 ea E16 Medicine Ball Rack 27.17 (1) in: GF147 $0.00 18 4 ea E17 Weight Bar 27.18 (4) in: GF147 $0.00 19 2 ea E18 Hex/Trap Bar 27.19 (2) in: GF147 $0.00 20 2 ea E19 Curl Bar 27.20 (2) in: GF147 $0.00 21 1 ea E20 Bar Weights 27.21 (1) in: GF147 $0.00 22 4 ea E21 Weight Collars 27.22 (4) in: GF147 $0.00 23 2 ea E22 TRX Band 27.23 (2) in: GF147 $0.00 24 2 ea E23 Battle Rope 27.24 (2) in: GF147 $0.00 25 5 ea E24 Fitness Mat 27.25 (5) in: GF147 $0.00 26 1 ea E25 Fitness Mat Hanger 27.26 (1) in: GF147 $0.00 27 1 ea E26 55CM Stability Ball 27.27 (1) in: GF147 $0.00 28 1 ea E27 65CM Stability Ball 27.28 (1) in: GF147 $0.00 29 2 ea E28 Foam Roller 27.29 (2) in: GF147 $0.00 30 2 ea E29 Ab Roller 27.30 (2) in: GF147 $0.00 31 2 ea E30 Bosu Ball 27.31 (2) in: GF147 $0.00
Model Quoted
Item Code
Vendor Quoted
Admin NC, Ft. Belvoir, VA - Fitness Equipment, PN TBD
FID Items Total Cost
Item #DescriptionUnit Unit CostLocation
Product Line Quoted# Qty
Dimensions
Attachment #1 Page 1 of 2
W D H Model Quoted
Item Code
Vendor Quoted
Admin NC, Ft. Belvoir, VA - Fitness Equipment, PN TBD
Total Cost Item #DescriptionUnit Unit CostLocation
Product Line Quoted# Qty
Dimensions
32 1 ea E31 3-in-1 Wood Plyobox 27.32 (1) in: GF147 $0.00 33 1 ea E32 Attachment Pack 27.33 (1) in: GF147 $0.00 34 1 ea E33 Back Extension 27.34 (1) in: GF147 $0.00 35 1 ea E34 Leg Raise 27.35 (1) in: GF147 $0.00 36 1 ea E35 Multi-Station Transformer 27.36 (1) in: GF147 $0.00 37 1 ea E36 Leg Extension Machine 27.37 (1) in: GF147 $0.00 38 1 ea E37 Leg Press Machine 27.38 (1) in: GF147 $0.00 39 1 ea E38 Leg Curl Machine 27.39 (1) in: GF147 $0.00
40 1 ea E39 Hip Abduction/Adduction Machine 27.40 (1) in: GF147 $0.00
41 1 ea E40 Bicep Curl Machine 27.41 (1) in: GF147 $0.00 42 1 ea E41 Fly/Rear Delt Machine 27.42 (1) in: GF147 $0.00
43 1 ea E42 Shoulder/Overhead Press Machine 27.43 (1) in: GF147 $0.00
44 1 ea E43 Assisted Dip/Chin Machine 27.44 (1) in: GF147 $0.00
45 1 ea E44 Gripper 27.45 (1) in: GF147 $0.00
46 1 ea E45 Plate-Loaded Seated Calf Raise 27.46 (1) in: GF147 $0.00
47 1 ea E46 Half-Rack 27.47 (1) in: GF147 $0.00 48 1 ea E47 Smith Machine 27.48 (1) in: GF147 $0.00 49 1 ea E48 Wood Platform 27.49 (1) in: GF147 $0.00 50 2 ea E49 Sanitation Station, Metal 27.50 (2) in: GF147 $0.00 51 1 ea E50 Digital Clock 27.51 (1) in: GF147 $0.00 52 2 ea E51 Box Fan 27.52 (2) in: GF147 $0.00 53 1 ea E52 Outdoor Pull-up Bar 27.53 (1) in: TBD $0.00
$0.00
LS $0.00
LS $0.00
$0.00
Furniture Subtotal:Evaluated Items - Installation & Shipping:
Installation of Furniture.
Shipping. Per Note 1 below.
*NOTE 1: Shipping is only allowed on ancillary items.
GRAND TOTAL:
Attachment #1 Page 2 of 2
Furniture Item Descriptions (FID) Ft. Belvoir, VA – Fitness Equipment, PN TBD
Attachment #2 Page 1 of 45
Attachment #2
ADMIN RM
Attachment #2 Page 2 of 45
TABLE OF CONTENTS PAGE NO.
1.0 GENERAL
1.1 Submittal Requirements
1.1.1 RFQ Response
1.1.2 Non-Conforming RFQ Response
1.2 Submittal and Clarifications Format
1.3 Post Award Submittal
1.4 Contractor General Notes
2.0 Construction Requirements - Panel Supported Work Stations – NOT USED
3.0 Construction Requirements - Freestanding Integrated Desk Systems – NOT USED
4.0 Construction Requirements - Metal/Laminate Desks – NOT USED
5.0 Construction Requirements - Metal/Laminate Open Frame Technical Work Stations –
NOT USED
6.0 Construction Requirements - Metal Furniture: Lateral Files, Vertical Files, Storage
Towers/Cabinets, and Bookcases – NOT USED
7.0 Construction Requirements - Laminate Tables, Metal Bases – NOT USED
8.0 Construction Requirements - Laminate Training Tables – NOT USED
9.0 Construction Requirements - Wood Casegoods, Executive II – NOT USED
10.0 Construction Requirements - Wood Casegoods, Executive III – NOT USED
11.0 Construction Requirements - Wood Conference Tables, Executive II – NOT USED
12.0 Construction Requirements - Wood Conference Tables, Executive III – NOT USED
13.0 Construction Requirements - Laminate Casegoods – NOT USED
14.0 Construction Requirements - Laminate Conference Tables – NOT USED
15.0 Construction Requirements - Ergonomic Seating – NOT USED
16.0 Construction Requirements - Executive Seating – NOT USED
17.0 Construction Requirements - Ergonomic Task Stool – NOT USED
18.0 Construction Requirements - Traditional Executive Seating – NOT USED
19.0 Construction Requirements - Seating, Metal Frame – NOT USED
20.0 Construction Requirements - Seating, Tablet Arm – NOT USED
21.0 Construction Requirements - Seating, Wood Frame – NOT USED
22.0 Construction Requirements - Lounge Seating – NOT USED
23.0 Construction Requirements - Industrial Storage Cabinet – NOT USED
24.0 Ancillary Items – NOT USED
25.0 Construction Requirements - Benching Systems - NOT USED
26.0 Construction Requirements - Console Systems – NOT USED
27.0 Construction Requirements – Fitness Equipment
27.1 Item No. E1: Treadmill
27.2 Item No. E2: Elliptical Cross Trainer
27.3 Item No. E3: Cross Trainer
27.4 Item No. E4: Rower
27.5 Item No. E5: Indoor Upright Cycle
27.6 Item No. E5A: Ergometer Indoor Upright Cycle
27.7 Item No. E6: Recumbent Bike
27.8 Item No. E7: Stair Mill
27.9 Item No. E8: Adjustable Bench
27.10 Item No. E9: Flat Bench
Attachment #2 Page 3 of 45
27.11 Item No. E10: Decline/Abdominal Bench
27.12 Item No. E11: Dumbbell Set
27.13 Item No. E12: Dumbbell Rack
27.14 Item No. E13: Kettlebell Set
27.15 Item No. E14: Kettlebell Rack
27.16 Item No. E15: Medicine Ball Set
27.17 Item No. E16: Medicine Ball Rack
27.18 Item No. E17: Weight Bar
27.19 Item No. E18: Hex/Trap Bar
27.20 Item No. E19: Curl Bar
27.21 Item No. E20: Bar Weights
27.22 Item No. E21: Weight Collars
27.23 Item No. E22: TRX Band
27.24 Item No. E23: Battle Rope
27.25 Item No. E24: Fitness Mat
27.26 Item No. E25: Fitness Mat Hanger
27.27 Item No. E26: 55CM Stability Ball
27.28 Item No. E27: 65CM Stability Ball
27.29 Item No. E28: Foam Roller
27.30 Item No. E29: Ab Roller
27.31 Item No. E30: Bosu Ball
27.32 Item No. E31: 3-in-1 Wood Plyobox
27.33 Item No. E32: Attachment Pack
27.34 Item No. E33: Back Extension
27.35 Item No. E34: Leg Raise
27.36 Item No. E35: Multi-Station Transformer
27.37 Item No. E36: Leg Extension Machine
27.38 Item No. E37: Leg Press Machine
27.39 Item No. E38: Leg Curl Machine
27.40 Item No. E39: Hip Abduction/Adduction Machine
27.41 Item No. E40: Bicep Curl Machine
27.42 Item No.E41: Fly/Rear Delt Machine
27.43 Item No. E42: Shoulder/Overhead Press Machine
27.44 Item No. E43: Assisted Dip/Chin Machine
27.45 Item No. E44: Gripper
27.46 Item No. E45: Plate-Loaded Seated Calf Raise
27.47 Item No. E46: Half-Rack
27.48 Item No. E47: Smith Machine
27.49 Item No. E48: Wood Platform
27.50 Item No. E49: Sanitation Station, Metal
27.51 Item No. E50: Digital Clock
27.52 Item No. E51: Box Fan
27.53 Item No. E52: Outdoor Pull-up Bar
Attachment #2 Page 4 of 45
1.0 General
Item descriptions and quality requirements, as described in the FID (Furniture Item Descriptions), are for the quality, functional performance and design intent of the furnishings required for this project. Products quoted that meet all functional and quality requirements, including all salient features listed in the product descriptions, will be considered responsive provided they are fully compliant with the RFQ requirements.
Compliance shall be determined by performance, features, quality, design intent, and value. Any item descriptions, salient features or quality requirements listed within this document are not intended to be proprietary.
1.1 Submittal Requirements
All manufacturers shall provide manufacturer’s technical documentation and manufacturer’s construction specifications for each item quoted for verification the proposed products meet all requirements listed in the FID. The RFQ response shall be submitted in the format outlined below.
1.1.1 RFQ Response
RFQ technical responses are the documents which, together with contractual documents (SF18, SF30, Attachment 1 in Excel), make up an overall RFQ response (the quote). RFQ technical responses shall be clearly organized into (1) Adobe Acrobat (PDF) document. The PDF document shall be searchable and include book marks for each item number and be organized per item number of the FID. Each RFQ is a separate contract activity, and specifications from previous projects will not be retrieved and reviewed. All product specifications and information presented shall be legible.
All technical documentation related to each item number shall be located within the same tab in the RFQ response and shall be submitted in the following order:
1. Product Information Required for Each Item Number:
a. Item number for each product submitted in the RFQ response.
b. Manufacturer, product line, and model number for each item and its components.
c. Overall dimensions.
d. Product image.
e. Fabric and finish options proposed for RFQ pricing that have been priced for each item.
2. Drawings:
a. Provide plan view drawings clearly legible and labeled showing legend of components and dimensions for each freestanding desk and panel-supported work station, including clusters.
b. Provide elevations or isometrics.
i. Elevations required with stacking/segmented drawings for panel tiles
c. Electrical and data shall be on a separate drawing from itemized component drawing. Drawing shall be clearly legible and labeled, identifying all locations of electrical and data/communication outlets.
Attachment #2 Page 5 of 45
3. Product Specific Compliance Documentation:
a. Provide published, detailed, technical documentation including, but not limited to, specification guides, price catalogs, and manufacturer’s published GSA Price List to demonstrate compliance with requirements.
b. Highlight, circle, or mark the model, size, type, and any optional features proposed in the RFQ response.
4. Technical Supporting Compliance Documentation:
a. Provide manufacturer’s technical and construction specifications demonstrating compliance to requirements.
b. Documentation shall only be submitted once for multiple items from the same product line.
c. Clearly indicate the item numbers that submitted documentation supports.
5. Testing Documentation:
a. Contractors are NOT required to submit testing documentation with quotes; however, the Contracting Officer reserves the right to request actual copies of test reports at any time before or after award.
6. Environmental Documentation:
a. Contractors are NOT required to submit environmental documentation with quotes; however, the Contracting Officer reserves the right to request actual copies of environmental documentation at any time before or after award.
b. Provide certification for Indoor Air Quality (GREENGUARD or equivalent).
c. Provide documentation regarding recycled content and recyclability for all products submitted.
7. Warranty Documentation:
a. Warranty documentation is required to be submitted for seating only.
b. Contractors are NOT required to submit warranty documentation with quotes; however, the Contracting Officer reserves the right to request actual copies of warranties at any time before or after award.
c. Although all other items do not require warranty documentation, the contractor is responsible for providing warranty coverage as required in the FID.
d. Provide any additional or extended warranty that exceeds manufacturer’s standard warranty; extended warranty shall be clearly stated on manufacturer’s letterhead and include a verifiable digital signature containing encryption or handwritten signature, date, and title of the company official accepting technical responsibility.
e. Some warranties may exceed GSA warranties. Refer to item descriptions for specific warranty requirements by product type.
1.1.2 Non-Conforming RFQ Response
Submittal of product brochures shall not be acceptable in place of technical documentation or construction specifications. Submittal of a general price list containing large amounts of items not relevant to the procurement is not acceptable. Extended warranties shall not be typed onto the manufacturer’s current warranty. Submittals not in compliance with Section 1.1.1 of the FID shall be considered non-conforming and declined.
Attachment #2 Page 6 of 45
1.2 Submittal and Clarifications Format
The RFQ shall be submitted via electronic communications as stated in Section 1.1.1.
The technical supporting documentation shall be submitted in a searchable Adobe Acrobat (PDF) document and organized and bookmarked by item number of the FID.
Embedded objects, i.e. embedded links, files, images within clarification responses, shall be considered non-conforming.
1.3 Post Award Submittal
Refer to Statement of Work (SOW).
1.4 Contractor General Notes
1. All products proposed to be installed within one office, suite, or area shall consist of items of one style and finish. All products shall be free of rough or sharp edges.
Proposed products shall include all components necessary to provide a complete and stable unit. Items shall have consistent quality standards as described and required in the FID.
2. Although such work is not specifically indicated, furnish and install all supplementary or miscellaneous items, appurtenances, and devices incidental to, or necessary for, sound, secure, and complete installation.
3. Awarded contractor is responsible for verifying all existing field conditions i.e.
including, but not limited to base-infeed requirements and electrical conditions.
Contractor shall coordinate with power plans
4. Provide end user with a full color way with a minimum of three options of different patterns solid and/or textured textiles and varying colored fabrics within the same manufacturer or graded in range for selection after award.
5. Awarded contractor shall coordinate locations of equipment with end user.
6. Plans provided may not match project requirements in all instances. Follow FID descriptions and configurations and Attachment 1 quantities and locations.
7. Provide a proposed layout of fitness equipment to show appropriate clearances.
END OF SECTION
Attachment #2 Page 7 of 45
2.0 Construction Requirements - Panel Supported Work Stations – NOT USED
3.0 Construction Requirements - Freestanding Integrated Desk Systems – NOT USED
4.0 Construction Requirements - Metal/Laminate Desks – NOT USED
5.0 Construction Requirements - Metal/Laminate Open Frame Technical Work
Stations – NOT USED
6.0 Construction Requirements - Metal Furniture: Lateral Files, Vertical Files, Storage
Towers/Cabinets, and Bookcases – NOT USED
7.0 Construction Requirements - Laminate Tables, Metal Bases – NOT USED
8.0 Construction Requirements - Laminate Training Tables – NOT USED
9.0 Construction Requirements - Wood Casegoods, Executive II – NOT USED
10.0 Construction Requirements - Wood Casegoods, Executive III – NOT USED
11.0 Construction Requirements - Wood Conference Tables, Executive II – NOT USED
12.0 Construction Requirements - Wood Conference Tables, Executive III – NOT USED
13.0 Construction Requirements - Laminate Casegoods – NOT USED
14.0 Construction Requirements - Laminate Conference Tables – NOT USED
15.0 Construction Requirements - Ergonomic Seating – NOT USED
16.0 Construction Requirements - Executive Seating – NOT USED
17.0 Construction Requirements - Ergonomic Task Stool – NOT USED
18.0 Construction Requirements - Traditional Executive Seating – NOT USED
19.0 Construction Requirements - Seating, Metal Frame – NOT USED
20.0 Construction Requirements - Seating, Tablet Arm – NOT USED
21.0 Construction Requirements - Seating, Wood Frame – NOT USED
22.0 Construction Requirements - Lounge Seating – NOT USED
23.0 Construction Requirements - Industrial Storage Cabinet – NOT USED
24.0 Ancillary Items – NOT USED
Attachment #2 Page 8 of 45
25.0 Construction Requirements - Benching Systems - NOT USED
26.0 Construction Requirements - Console Systems – NOT USED
27.0 Construction Requirements – Fitness Equipment
Warranty Requirements:
1. Manufacturer’s Standard Commercial Warranty
General Requirements:
1. Joints shall be welded.
2. Non-marring floor glides and/or levelers.
3. All equipment shall be commercial rated and have a manufacturer’s standard commercial warranty.
27.1 Item No. E1: Treadmill
Overall Dimensions: 32-36”W x 76-83”D x 52-64”H
a. Commercial grade treadmill
b. User weight capacity 400 lb., maximum
c. Heavy-duty welded steel frame construction
d. Multi-ply tread belts are fusion-seamed for strength, flexibility, and quiet travel over
18mm phenolic deck or high density fiberboard
Researched product lines:
Life Fitness-Integrity Series True Fitness-650 Commercial Treadmill Sport Art-T635A Treadmill
Item image is for general illustration purposes only, and it is not an exact representation of the requirement.
Attachment #2 Page 9 of 45
e. Workout profiles shall include, at a minimum, endurance and fit tests, running, interval, cardiovascular, walking, and custom
f. LED matrix or illuminated console shall display feedback to include distance, calories, time, manual, fat burn, heart rate programs, and workout profile progress
g. Contact heart rate monitoring
h. Heart rate control with telemetric with strap
i. Cool down mode feature shall be included
j. Safety key stop system feature
k. Provide iPod / Smartphone compatible functions and charging cable
l. Include water bottle or cup holder
m. Speed range: 0.5 to 14 mph
n. Elevation range: 0% to 15%
o. Lift wheels
p. Levelers
q. Manufacturer’s standard commercial warranty
Finish:
a. Deck, Console and Handles: Manufacturer’s standard selection
b. Metal: Manufacturer’s standard powder coat paint selection
27.2 Item No. E2: Elliptical Cross Trainer
Overall Footprint: 36”W x 48”D
a. Provide elliptical trainer of commercial quality with eight levels of smooth magnetic resistance
b. Workout profiles shall include, at a minimum, endurance and fit tests, running, interval, cardiovascular, walking, and custom
Researched product lines:
Life Fitness-Integrity Series True Fitness-PS100 Elliptical Sport Art-Elliptical
Attachment #2 Page 10 of 45
c. LED matrix or LCD illuminated console shall display feedback to include distance, calories, time, manual, fat burn, heart rate programs, and workout profile progress
d. Magnetic resistance levels: 8 minimum
e. Integrated reading rack
f. Support handle bars
g. Contact heart rate monitoring
h. Transport wheels for easy mobility
i. User weight capacity 350 lbs.
j. Oversized non-slip pedals
k. Include water bottle or cup holder
l. Levelers
m. Shall meet Navy PFA official testing requirements
n. Manufacturer’s standard commercial warranty
a. Deck, Console and Handles: Manufacturer’s standard selection
27.3 Item No. E3: Cross Trainer
Overall Footprint: 36”W x 72”D
Researched product lines:
Life Fitness/Cybex-SPARC
Attachment #2 Page 11 of 45
a. Provide elliptical trainer of commercial quality with a minimum of (8) levels of resistance and (3) incline settings
b. Workout profiles shall include, at a minimum, circuit training and interval training
c. Graphic display shall display feedback to include distance, time, and watts
d. Support handle bars with multiple hand positions
e. User weight capacity 400 lbs.
f. Oversized non-slip pedals
g. Include water bottle or cup holder
h. Levelers
i. Manufacturer’s standard commercial warranty
a. Console and Handles: Manufacturer’s standard selection
27.4 Item No. E4: Rower
Overall Footprint: 36”W x 78”D
a. Provide row machine of commercial quality with a minimum of (5) exercise programs and (10) levels of resistance
b. Machine shall use air or water wheel resistance
c. Shall have padded seat
d. Shall have an aluminum seat rail for seat to slide
Researched product lines:
Life Fitness-Row GX Trainer Water Rower Promaxima-Rower Cascade Health and Fitness-Cascade Air Rower Mag
Attachment #2 Page 12 of 45
e. Foot rest shall have straps to secure feet
f. Graphic display shall display feedback to include distance, time, and watts
g. Support handle bars with multiple hand positions
h. User weight capacity 350 lbs.
i. Levelers
j. Transport wheels for easy mobility
k. Manufacturer’s standard commercial warranty
a. Vinyl: Manufacturer’s standard selection
b. Console and Handles: Manufacturer’s standard selection
c. Metal: Manufacturer’s standard powder coat paint selection
27.5 Item No. E5: Indoor Upright Cycle
Overall Footprint: 20”W x 52”D
a. Provide an upright indoor cycle of commercial quality with a minimum of (10) levels of resistance
b. Machine shall use magnetic resistance
c. Shall have padded seat that adjusts vertically and horizontally
Researched product lines:
Life Fitness-IC5 Indoor Cycle Promaxima-Training Cycle/Indoor Bike Cascade Health and Fitness-Cascade CMXPro Power Exercise Bike
Attachment #2 Page 13 of 45
d. Foot pedals shall have straps to secure feet
e. Graphic display shall display feedback to include distance, time, and watts
f. Support handle bars with multiple hand positions
g. User weight capacity 350 lbs.
h. Transport wheels for easy mobility
i. Manufacturer’s standard commercial warranty
27.6 Item No. E5A: Ergometer Indoor Upright Cycle
Overall Footprint: 20-22”W x 43-52”D
a. Provide an upright indoor cycle of commercial quality with an adjustable turn knob/brake to increase/decrease resistance
b. Machine shall use belt mechanism
c. Shall have padded seat that adjusts vertically and horizontally
d. Foot pedals shall have straps to secure feet
e. LED matrix or LCD illuminated console shall display feedback to include distance, calories, time, manual, fat burn, heart rate programs, and workout profile progress
f. Support handle bars with multiple hand positions
Pooboo-Indoor Cycling Bike
Attachment #2 Page 14 of 45
g. Handle bars shall adjust in height
h. Integrated reading rack
i. User weight capacity 250 lbs.
j. Transport wheels for easy mobility
k. Manufacturer’s standard commercial warranty
27.7 Item No. E6: Recumbent Bike
Overall Footprint: 27”W x 66”D
a. Provide a recumbent bike of commercial quality with a minimum of (10) levels of resistance
b. Machine shall use magnetic resistance
c. Shall have a seat pad and angled back pad
d. Shall have an aluminum seat rail for seat to slide to adjust for user heights
e. Foot pedals; provide straps to secure feet, if available
f. Graphic display shall display feedback to include distance, time, and watts
g. Include water bottle or cup holder
Researched product lines:
Life Fitness-Recumbent Exercise Bike Promaxima-Recumbent Bike Cascade Health and Fitness-Cascade CMXRT Recumbent Exercise Bike
Attachment #2 Page 15 of 45
h. Integrated reading rack
i. Support handle bars with multiple hand positions
j. Contact heart rate monitoring
k. User weight capacity 400 lbs.
l. Levelers
m. Manufacturer’s standard commercial warranty
27.8 Item No. E7: Stair Mill
Overall Footprint: 29-33”W x 50-62”D x 78-88”H
a. Provide a stair mill of commercial quality with a minimum of (5) exercise programs and (10) levels of resistance
b. Machine shall have revolving stairs
c. Stairs shall be non-slip and a minimum of 7”D
d. Graphic display shall display feedback to include distance, time, and watts
Researched product lines:
Life Fitness-PowerMill Climber Promaxima-Centurion Stepmill True Fitness-Palisade Cimber
Attachment #2 Page 16 of 45
e. Include water bottle or cup holder
f. Integrated reading rack
g. Support handle bars with multiple hand positions
h. Contact heart rate monitoring
i. Shall have step(s) for access on/off machine
j. User weight capacity 400 lbs.
k. Levelers
l. Manufacturer’s standard commercial warranty
a. Decking, Console and Handles: Manufacturer’s standard selection
27.9 Item No. E8: Adjustable Bench
Overall Dimensions: 30-34””W x 52-58”D x 16-18”H
Bench Requirements:
a. Provide commercial quality bench
b. Ergonomic handles for easy adjustments
c. -10°, 0°, 30°, 45°, and 60° adjustment increments shall be included
d. Wheels for easy mobility
e. Manufacturer’s standard commercial warranty
a. Metal: Manufacturer’s standard selection
b. Vinyl: Manufacturer’s standard selection
27.10 Item No. E9: Flat Bench
Life Fitness-Signature SAMB Sport Art-A991 Adjustable Bench True Fitness-XFW-7500
Attachment #2 Page 17 of 45
Overall Dimensions: 30-34””W x 45-54”D x 16-18”H
b. Rubber feet
c. Rubber hand grips
d. Manufacturer’s standard commercial warranty
27.11 Item No. E10: Decline/Abdominal Bench
Overall Dimensions: 24-34”W x 54-68”D x 16-34”H
Life Fitness-Signature SFB Sport Art-A992 Flat Bench True Fitness-XFW-7000
Researched product lines:
Life Fitness-Decline/Abdominal Bench Promaxima-Adjustable Decline/Sit-up Bench Atlantic Fitness-Adjustable Decline/Sit-up Bench
Attachment #2 Page 18 of 45
b. Ergonomic handles for easy adjustments
c. Decline adjustment increments shall be included
d. Foam rollers for legs and feet
27.12 Item No. E11: Dumbbell Set
a. 5-100lb hex dumbbell set
Researched product lines:
Life Fitness-Hammer Strength Hexagonal Dumbbells Promaxima-Hex Rubber Dumbbell Set
Attachment #2 Page 19 of 45
b. Provide hex dumbbell pairs in 5 lb. increments
i. Weights including 3lb, 8lbs, 12lbs
c. Hex dumbbells shall be made with high quality cast iron and completed with a baked on gray enamel finish
d. Hex dumbbells to feature a knurled, solid steel, contoured handle for an extra comfortable grip
a. Metal: Manufacturer’s standard powder coat paint selection
27.13 Item No. E12: Dumbbell Rack
Overall Dimensions: 54-90”W x 23-30”D x 32-48”H
Power Rack Requirements:
a. Provide commercial quality 3-Tier Dumbbell Rack
b. Stores a minimum of 15 pairs of dumbbells
c. Rack shall be heavy gauge steel with 4-side welded and deburred construction
d. Rack shall have rubber feet to prevent movement
27.14 Item No. E13: Kettlebell Set
Life Fitness-3-Tier Dumbbell Rack Promaxima-Dumbbell Rack 3-Tier Rogue–3 Tier Dumbbell Rack
Attachment #2 Page 20 of 45
a. 10-50 lb. set of kettlebells
b. Provide (5) kettlebells in 10 lb. increments
c. Rubber base on trays provided to protect kettlebells and reduce noise
d. Kettlebells shall be comprised of durable steel and coated with latex free material
e. Provide handle design to offer freedom and comfort during exercise
f. Kettlebells shall be color coded for weight identification
g. Manufacturer’s standard commercial warranty
a. Kettlebell Coating: Manufacturer’s standard selection
27.15 Item No. E14: Kettlebell Rack
Overall Dimensions: 45-54”W x 20-26”D
Iron Company-Aeromat Safe-Drop Kettlebell Medicine KBMB-8SET Life Fitness-Premium Kettlebells Hampton Fitness-Kettle Bell Set
Researched product lines:
Life Fitness-Rack Promaxima-2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.