Attachment_0005_-_BMD_Statement_of_Work.pdf
PDF 227 KB Posted
- Attached to
- Ballistic Missile Defense Program Architectural & Engineering Services Federal contract opportunity
- Solicitation number
- W912DY-18-R-0062
About this file
This is a statement of work for an indefinite delivery contract to provide architectural and engineering services in support of the Ballistic Missile Defense Program. The contract will have a base period of 36 months and an option period of 24 months for a total period of performance of five years. Services will include designs for new and existing facilities such as missile launch, radar, test and evaluation sites as well as administrative buildings. Additional services may include environmental documentation, permits, studies, geotechnical investigations and program support. Work will be issued through firm-fixed price and cost-plus-fixed-fee task orders to support facilities in the United States, territories, and other missile defense installations. Overseas work may also be required in Europe, Asia and Australia. The total contract value to be shared among awardees is $249 million with a minimum guarantee of $2,500 per contract. The award is anticipated in fiscal year 2020.
Attachment 0005 - BMD Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.02.02_-_ProjNet_Questions_-_BMD_-_23_May_2019_-_Amd_02.pdf | ||
| A.02.02_-_Synopsis_-_BMD_-_23_May_2019_-_Amd_02.pdf | ||
| Synopsis_-_BMD_-_20_May_2019_-_Amd_01.pdf | ||
| ProjNet_Questions_-_BMD_-_20_May_2019.pdf | ||
| Synopsis_-_BMD_-_01_May_2019.pdf | ||
| Attachment_0002_-_Sample_Letter_of_Commitment_for_Key_Subcontractor.pdf | ||
| Attachment_0003_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_0004_-_Small_Business_Participation_Plan.pdf | ||
| Attachment_0001_-_Sample_Letter_of_Commitment_for_Key_Personnel.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 0005
STATEMENT OF WORK (SOW)
ARCHITECTURAL & ENGINEERING (A&E) SERVICES
INDEFINITE DELIVERY CONTRACT (IDC)
IN SUPPORT OF THE
MISSILE DEFENSE PROGRAM
26 February 2019
1.0 GENERAL
1.1 Objective
The objective of this indefinite delivery contract (IDC) is to provide the full spectrum of facility engineering and architectural services exclusively in support of the Ballistic Missile Defense System Mandatory Center of Expertise (BMDS-CX1), U.S. Army Engineering and Support Center, Huntsville and its customers. Task orders will be issued which will describe the scope of work (specific objectives, goals, and deliverables to be fulfilled) for each requirement. The contractor is expected to provide all labor, materials, logistical, and administrative support in the performance of the task orders awarded under this contract and will perform and deliver all work in keeping with commonly accepted practices, quality, and professional standards for the Architect-Engineer industry and in keeping with all applicable local, installation, state, federal, and host-nation requirements.
1.2 Location of Work
This acquisition will require the firms to have the capability to respond to multiple task order requests for work in diverse locations throughout the Contiguous United States, Alaska, Hawaii, US Territories and possessions; USACE Transatlantic Division (TAD), North Atlantic Division (NAD), and Pacific Ocean Division (POD) such as Europe, Asia, and Australia; and other Missile Defense Installations. No other locations shall be added to the base IDC after award.
Excluding site visits for fact-finding, consultation, and information gathering, all work Outside of the United States and Outlying areas (as defined in FAR 2.101) will be at the Firm's United States Place of Performance.
1.3 Background
(MD-CX) Engineer Regulation 1110-2-8163 outlines roles and responsibilities for the new CX.
Huntsville Center (then Huntsville Division) stood up in 1967 with the primary mission of supporting Sentinel/Safeguard. Since that time, the Center continues to adapt to the changing needs of the country and to expand its portfolio – always maintaining technical expertise in Missile Defense. Due to that expertise, and the proximity of Huntsville Center to the Missile
1 Throughout this document the terms "ballistic missile defense" and "missile defense" are used interchangeably.
Similarly for the terms BMD and MD as acronyms for these terms.
Defense Agency's location on Redstone Arsenal, Alabama, MDA requested establishing a formal CX, and Headquarters, USACE approved the CX in 2016. The MD-CX provides standard USACE support and technical expertise to missile defense agencies, and ensures standardization of design where applicable; maintains technical expertise; leverages technical knowledge; and assures consistency and efficiency in delivery of MD facilities and infrastructure. This acquisition will provide contract capacity to support this center of expertise.
1.4 Spiral Design Considerations
Because the missile threat changes quickly, the Department of Defense needs maximum flexibility for in this execution of this unique program. In order to successfully achieve the goal of deployment, facility designs required by this contract and weapons system designs (prepared by others) must run concurrently. Various elements of facilities designs are likely to be completed prior to the completion of system designs within these facilities. The strategy is to proceed under basic engineering parameters that will minimize the impact on the criteria and ultimately the facility design. Facility criteria may be technically complex or atypical due to the specialized needs of the missile defense weapons system. In addition, the spiral development concept being used to develop the missile defense systems result in frequent technology and criteria evolution, requiring maximum flexibility in the support facilities design.
2.0 DESCRIPTION OF SERVICES
2.1 Facility Types
This contract will provide technical support for the design of new facilities and sites in support of the deployment of MD sites for the Government. This support is for the development and rehabilitation of tactical, tactical support, and non-tactical facilities supporting the Missile Defense mission including missile control buildings, industrial workshops, power plants, communications facilities, administration buildings, ancillary structures, new and rehab road work, utility work, and building systems work, and various other facilities as needed to meet the MD mission. To successfully complete these projects requires specialized engineering services including, but not limited to, High-Altitude Electromagnetic Pulse (HEMP), Reliability, Availability, Maintainability (RAM), and Failure Mode, Effects, and Criticality Analyses (FMECA) design and analysis. These designs require firm experience in radar, missile launch and command and control facilities, communications infrastructure in support of command control and battle management systems, tactical support facilities, non-tactical facilities and various other facilities that may be required to support the MD mission.
2.2 Services
Specific requirements are expected to include, but will not be limited to the following:
Design of facilities and sites including the preparation of design criteria, A-E designs, specifications, design-related analyses and studies.
Economic analyses and cost estimates.
Additional support may include the following: environmental documentation; permits;
special studies; other environmental activities as required by federal, state, and local laws and regulations; feasibility studies, geotechnical investigations and topographical mapping services, programmatic support services, as-builts, and engineering and design during construction.
3.0 TASK ORDERS
3.1 The general requirements outlined in the contract will be implemented by the Government's issuance of task orders under this contract. Each task order will provide specific requirements and supplemental information in the execution of the work. Task Orders will be firm-fixed price (FFP) or cost plus fixed fee (CPFF), both of which will include all labor, travel, and other direct costs (ODCs) for each task order. Travel shall be per the Joint Travel Regulation (JTR). Each task order will include (at a minimum):
(1) Details of specific tasking, expectations, exceptions, and deliverables;
(2) Task order schedule and milestones to include deadlines and constraints;
(3) Points of contact;
(4) Government-furnished information helpful or necessary for the execution of the project (by inclusion or reference);
(5) Format of deliverables, number of copies, and delivery addresses.
3.2 Whenever the Government shall invite the Architect-Engineer to submit a proposal for the preparation of specified Architect-Engineer services, the Contracting Officer (KO) shall furnish to the Architect-Engineer preliminary criteria together with the desired period of time for completion of the work.
3.3 The Architect-Engineer shall submit to the KO within the time required in the proposal request a list of the personnel needed, an estimate of the time required by each of such personnel for performance of the work and an itemized list of the cost of materials and travel. He shall at the same time submit his proposal for the work, including the time for its completion.
3.4 The KO shall issue a task order setting forth the completion date and a lump sum price for the work which are mutually agreeable.
3.5 Profit (or fee, in the case of CPFF) will be negotiated on a task order by task order basis.
Profit for each task order will be evaluated using weighted guidelines in accordance with DFARS 215.404-71 as applied in EFARS 15.404-73-101.
3.6 Selection of an A-E firm under this IDC will be based on qualifications among those who have been awarded this IDC contract.
3.7 Unless otherwise expressly stated in the task order issued, all work performed under each task order will abide by the requirements of this base contract. Where there is a conflict, the requirements of the task order will take precedence over the requirements of the base contract.
3.8 The A-E shall initiate the services within 10 calendar days after the task order is issued, unless otherwise indicated on the order, and shall complete all work and services under each task order within the period of performance specified in the task order. During the execution of the work the A-E shall promptly notify the KO in writing of any discrepancies, ambiguities, or lack of clarity in the materials or instruction furnished. Such notification shall be made in writing within 10 days of the event.
3.9 The performance schedule and required delivery date for each product produced under this contract will be reflected in the appropriate task order. Optional services may be exercised in accordance with the schedule established for each project under each task order.
3.10 In the case of CPFF task orders, the contractor’s invoices will be supplemented with officially certified documentation that is sufficiently granular to justify actual costs, as deemed sufficient by the KO.
4.0 TECHNICAL CRITERIA & STANDARDS
4.1 All work shall be in full compliance with the most current version of all codes, criteria, standards, and regulations at the time of task order award, as relevant and applicable to each project. Additional references may be provided in the scope of each task order for the purposes of bringing awareness to the A-E Contractor. This will not preclude the contractor from the responsibility of possessing, acquiring, understanding, and applying a professional understanding of codes, criteria, and regulations associated with the tasking.
4.2 Additional resources and tools can be found at the Whole Building Design Guide at www.wbdg.org including the Unified Facilities Criteria and the Unified Facilities Guide Specifications which shall be consulted.
4.3 Additionally, the U.S. Army Corps of Engineers maintains a repository of Technical Letters (ETL’s), Construction Technical Letters (CTL’s), Technical Manuals (TM’s), Technical Instructions (TI’s), Engineering Regulations (ER’s), etc. which may be applicable to work performed under this contract. Also, the USACE Huntsville Design Center Design Manual (CEHNC 1110-1-1) will be an important resource for design requirements. Additional information can be found at:
http://www.hnc.usace.army.mil/Missions/EngineeringDirectorate/TECHINFO.aspx
4.4 The following information and criteria are made a part of this contract by reference, as applicable to the requirements of the specific task order. Some applicable Federal, state/commonwealth, and industry standards are referenced below. All applicable standards, including those that are not referenced or listed, constitute criteria for designs delivered under this contract:
a. U.S. Army Corps of Engineers, Engineering and Support Center, Huntsville (USAESCH), Design Manual, CEHNC 1110-1-1 or the District Design Manual for http://www.hnc.usace.army.mil/Missions/EngineeringDirectorate/TECHINFO.aspx
Military Construction for the geographic USACE district (http://www.hnd.usace.army.mil/engr/), including all applicable publications listed in the Design Manual.
b. A/E/C CADD Standards (https://cadbimcenter.erdc.dren.mil).
c. Base Installation Design Guides
d. Federal Acquisition Regulation (FAR) (http://www.arnet.gov/far/).
e. Core UFC’s listed in UFC 1-200-01 DoD Building Code (General Building
Requirements)
f. UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.
g. UFC 3-600-01, Fire Protection Engineering for Facilities
h. UFC 1-200-02, High Performance and Sustainable Building Requirements
i. National Fire Protection Association (NFPA) standards and codes
j. Americans with Disabilities Act Accessibility Guidelines (ADAAG)
k. Uniform Federal Accessibility Standards (UFAS)
l. Headquarters, U.S. Army Corps of Engineers Standard Detail No. 40-06-04, and changes thereto, February 1991, Lighting fixtures (STD DET 40-06-04).
m. ANSI/EIA/TIA standards.
n. U.S. Army Corps of Engineers Engineer Technical Letters (ETL’s), Construction
Technical Letters (CTL’s) Technical Manuals (TM’s), Technical Instructions (TI’s) and Engineering Regulations (ER’s).
o. U.S. Green Building Council, LEED Rating Systems. http://www.usgbc.org/Default.aspx
p. 32 CFR Part 651, Environmental Analysis of Army Actions
q. AR 415-15, Army Military Construction and Non appropriated Funded Construction
Program Development and Execution:
http://www.aschq.army.mil/supportingdocs/r415_15.pdf
r. MII - Micro Computer Aided Cost Estimating System (2nd Generation) - available from HNC upon request.
http://www.usgbc.org/Default.aspx http://www.aschq.army.mil/supportingdocs/r415_15.pdf
4.5 In the event that a code, criteria, standard, regulation, or instruction changes during design, the A-E will make a reasonable attempt to accommodate the changes as the design progresses.
In the case of FFP task orders, if such a change requires significant re-work to the design, the A- E Contractor shall first contact the Contracting Officer Representative (COR) or KO to discuss possible resolution options, to include task order modification. In some cases a particular standard may be replaced by something more relevant to the service customer or installation. In these cases, the substitution will be specifically addressed in the task order.
4.6 Other documents identified as necessary to the performance of this contract will be called out in specific task orders. Such documents may include, but not be limited to, standards, specifications, host nation agreements, Facility Requirement Documents (FRDs) and other reference documents needed to identify and clarify the specific work tasks or deliverable products.
4.7 Information Technology (IT). The contractor shall assure that all designed systems be compatible and integrate with existing or proprietary government systems, as applicable.
4.8 Sustainable Design. Recommend that sustainable design meet UFC 1-200-02 High Performance and Sustainable Building Requirements unless required to be more stringent at the TO level by the DoD Component policy.
4.9 Value Engineering (VE) Studies. The A-E shall participate in VE studies of facility designs developed by the A-E that have a construction working estimate of $2M or more.
5.0 MANAGEMENT & ORGANIZATION
5.1 Program Manager
The contractor must designate a company officer or responsible representative as A-E Program Manager. The A-E Program Manager is responsible for the complete coordination and execution of all work under this contract to include work provided by sub-contractors and consultants.
5.2 Project Manager
The contractor must designate a Project Manager for each task order awarded. The Project Manager is responsible for the coordination and execution of all work under each task order to include work provided by sub-contractors and consultants.
5.3 Contractor Key Personnel Replacement
The contractor shall not replace any personnel without the written concurrence of the KO. Prior to utilizing other than previously specified personnel in awarded task orders, the contractor shall notify the Government KO and the COR for that task order. This notification shall be no later than 10 calendar days in advance of any proposed substitution and shall include justification (including resume(s) and labor category of proposed substitution(s)) in sufficient detail to permit evaluation of the impact on task order performance. Substitute personnel qualifications shall be equal to, or greater than those of the personnel being substituted. If the Government KO and the COR determine that the proposed substitute personnel is unacceptable, or that the reduction of effort would be so substantial as to impair the successful performance of the work under the contract, the contractor may be subject to default action as prescribed by FAR 52.249- 8, Default (Fixed-Price Supply and Service).
5.4 Organizational Conflicts of Interest
The work to be performed may create an actual or potential organizational conflict of interest on future acquisitions. Contractors should refer to FAR subpart 9.5 – ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST. An organizational conflict of interest can arise when a contractor possesses an economic incentive that renders it unable, or potentially unable, to provide impartial assistance or advice; or an unfair competitive advantage in obtaining a contract as a result of access to nonpublic information about a competitor or procurement. When an organizational conflict of interest arises it can have serious implications for the contractor that can range from disclosure obligations to disqualification from an award. Contractors should also refer to FAR subpart 36.209 -- Construction Contracts With Architect-Engineer Firms. “No contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative.”
Accordingly, some restrictions on the future activities of the contractor and its subcontractors may be required. And, these restrictions may include prohibiting the contractor or its subcontractors from participating in a contract or a task order. However, in future procurements, the contractor or its subcontractors may request a determination of its ability to participate in a particular procurement from the KO.
6.0 QUALITY CONTROL
The A-E Contractor is responsible for the professional quality, technical accuracy, and coordination of all designs, drawings, specifications, and other work or materials produced and furnished by the A-E’s Contractor’s staff as well as that of any sub-consultants. The A-E Contractor must perform and deliver all work in keeping with commonly accepted practices, quality, and professional standards for the Architect-Engineer industry. All work must be accomplished with adequate internal controls and review procedures to ensure quality and technical adequacy of all deliverables in accordance with ER 1110-1-12 Engineering Quality Management. The A-E shall correct or revise any error or deficiencies in the work, regardless of review, approval, acceptance, or payment by the Government. The responsibility to assure product quality continues even after final payment is made to the A-E Contractor. Corrections and changes resulting from review of the submitted work are for the A-E Contractor to correct without additional compensation. The A-E Contractor may be liable for damages to the Government caused by negligent performance, pending a review of the situation. The submittals will be reviewed by appropriate Government agencies and entities to evaluate conformance and AE Contractor’s effective quality control. The A-E Contractor will conduct all project reviews in the Dr. Checks system. Dr. Checks is a part of the Projnet database and can be accessed at https://www.projnet.org. The A-E Contractor shall provide written notification of resolution actions for each comment in the Dr. Check system.
6.1 Quality Management Plans
Within 30 days of base contract award, submit a Quality Management Plan (QMP) for review and acceptance by the KO. The QMP shall broadly describe the processes by which the A-E Contractor intends to ensure quality with respect to broad product lines that may be required of this contract (discussed in para. 1.3). The QMP shall be written with sufficient detail as to determine fault, generate lessons learned, and recommend internal improvement in the event that a failure in quality occurs. The QMP shall be reviewed annually and resubmitted as improvements are made and submitted for acceptance by the KO.
A task order-specific QMP shall be written and submitted within 15 days of task order award. It will discuss the items described in the base QMP, but with details specific to how the A-E intends to ensure quality on the task order. Work will not begin until the task-level QMP is approved and accepted by the COR.
6.2 Government Review & Evaluation
The Government will review project submittals and work processes in accordance with each task order’s Work Oversight Plan (WOP). The purpose of this review is to evaluate the adequacy of the contractor’s quality control system as applied to the products and methods employed on each task order. No less than annually, and at the conclusion of each task order, the COR will evaluate the contractor’s performance though the Contractor Performance Assessment Reporting System (CPARS) in the following categories (as applicable): Management, Quality, Schedule, and Cost. Other factors may be evaluated as applicable.
The A-E shall implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation, data, and information necessary for the A-E's internal management as well as Government management of this project.
Review minutes and materials and action identification shall be included in the Summary of Submittals.
The submittals will be reviewed by appropriate Government agencies to evaluate content and determine adequacy. The A&E Contractor will conduct all project reviews in the Dr. Checks system. The A&E Contractor shall provide written notification of resolution actions for each comment in the Dr. Check system. These comments will be discussed in detail during the presentation and review period. The A-E shall provide written notification of resolution actions for each comment in Dr. Checks. Intentions on noncompliance with any comment shall be substantiated in detail.
Each task order will define the submittals of draft, progress, and final deliverables that will be reviewed by appropriate Government agencies and entities to evaluate conformance and Contractor’s effective quality control to the task order. The A-E Contractor shall provide written notification of resolution actions for each comment in the Dr Check system. The time frame for
Government review varies however; this process is typically completed within 14-21 calendar days. The Dr Checks review process for a single submittal review is described in Appendix A of Section J. The A-E Contractor may choose to perform work, at its own risk, during the Government review and comment resolution period, however, comments resulting from that review must be incorporated into the design prior to the next submittal. In the event a subsequent design phase is not authorized, the A-E Contractor shall incorporate all available review comments into the design to complete the current phase. The lack of review or quality of review by the Government does not preclude the A-E Contractor from being completely responsible for the quality of all deliverables.
6.3 Certification of Work
All design drawings and specifications submitted under the contract shall contain the seal of a professional engineer registered in the state in which the A-E work was performed. Other documentation shall contain certification required by the state in which the work was performed.
7.0 COMMUNICATION
7.1 Meetings & Teleconferences
Periodic meetings shall be scheduled whenever requested by the A-E Contractor or directed by the KO or the COR for the resolution of questions or problems encountered in the performance of the work. The A-E Contractor and/or the appropriate representative(s) shall be required to attend and participate in all conferences, working groups, and committees pertinent to the work required under this contract as directed by the KO or the COR.
7.2 Written Records
Maintain (and provide upon request) a written record of all significant conferences, meetings, discussions, verbal directions, telephone conversations, etc., with Government representative(s) relative to this contract per task order in which the A-E Contractor and/or a designated representative(s) participates. These records shall be dated and shall identify the contract number, the task order number, and the SOW paragraph references, if applicable, participating personnel, subject discussed, and conclusions reached. Minutes of significant meetings shall be provided to participants.
The A-E shall serially number all correspondence issued on for each task order. All correspondence on the task order shall reference the contract number and task order number.
7.3 Monthly Status Reports
Provide a monthly progress report of each task order currently in progress no later than the 8th calendar day of every month. Include a copy of the report as an attachment to each official invoice and electronically transmit copies to the MD-CX COR, the HNC A-E Contracts & Criteria Branch as well as the Government Project Managers (PMs) and CORs associated with the individual task order. Status must include the following but may contain other useful information:
(1) Salient project information (project title, description, task order number, and location);
(2) Period of performance of the task order,
(3) Name of project team members, their role, and contact information;
(4) A concise narrative on the current status of work performed;
(5) Current schedule (major milestones only);
(6) Areas of risk or concern;
(7) Requested government actions and due-outs;
(8) Recommendations for problem resolution; and
(9) 30-day look ahead
(10) Financial Report. Status of actual cost expenditures and technical progress as compared with projections and to review the schedule milestones (only for Cost-Plus task orders). The report shall be by A-E contract task order and be rolled up by project and program. The report shall be automated with each awarded Work Task Proposal providing the baseline. Actual expenditures shall be entered into the system and a report shall be produced. Work and schedule planned, actual, and progress for the current period and cumulatively and variances as well as budget and estimate at completion shall be provided. The A-E shall list each deliverable and percent complete. For each task which is outside the variance thresholds, the A-E shall prepare a Cost/Schedule Variance Report detailing the events leading up to the variance, proposed corrective measures, and a discussion of the impact of the variances on the program. A copy of the Variance Report shall be attached.
(11) Lost Design Tracking. The A-E shall track and report lost effort associated with approved Engineering Change proposals (ECPs), abandoned design effort, or other factors as appropriate.
If any information in the technical progress report is classified, this section of the monthly progress report shall be sent under separate cover through a secure network.
7.4 Proactive Communication
When responding to RFPPs and during the prosecution of the work the A-E Contractor shall promptly advise the KO of any discrepancies, ambiguities, or lack of clarity in the materials or instruction furnished.
7.5 Critical Issues
If, during the execution of work, the A-E Contractor becomes aware of critical information which has an immediate, significant, and compelling impact to the project in terms of safety, scope, schedule, cost, quality, or timely execution, the A-E Contractor shall inform the government PM, COR, and/or KO of the concern and its potential impacts. While such communication is immediate, its distribution must be limited. This is to ensure the concern is properly vetted before a broader discussion takes place.
7.6 Contractual Direction & Authorized Changes to the Contract/Task Order
ONLY the KO may authorize changes to the scope of the base contract or awarded task order.
The A-E Contractor shall immediately notify the COR or KO in the event that anyone except the KO requests that work be performed that is contrary to, in excess of, or less than the scope and intent of the awarded task order. The A-E Contractor shall not execute such changes unless concurrence is given by the KO, normally through a task order modification. The Government PM, CX Project Director, CX Program Manager, or COR is authorized to coordinate routine technical matters. The A-E Contractor shall consult the COR or KO before proceeding with any work where it is unclear whether a request is within the scope of the task order.
7.7 Public Disclosure of Information
The A-E Contractor shall make no public announcement or disclosure relative to information contained or developed under this contract, except as authorized by the KO.
8.0 SUBMITTAL FORMATTING
8.1 Reports & Studies
Formal narrative and tabular data shall be typed and printed on 8-1/2 x 11-inch sheets with fold outs for maps, sketches, schematics, charts, graphs, and other illustrative material, as necessary.
Generally, all formal narrative text shall be typed in lines perpendicular to the longest axis of the sheet. Data, which cannot be clearly described in narrative form, shall be graphically shown.
Legible reproducible drawings and sketches exceeding 8-1/2 x 11 inches shall be submitted to CEHNC in the number of copies stated in the individual task order. Typed and formal documents 11 x 17 inches or less in size shall be securely bound in hard paper or a flexible material in a durable and attractive manner. The title of the document shall appear on the cover of all submittal documents. All final documents shall be bound in a manner which will facilitate repeated disassembly and reassembly, and the title shall appear on the bound edge, in a secure manner, as well as on the cover. Narrative contents of the document(s) shall be arranged in a logical sequence and organized by sections, unless otherwise specified. A table of contents and index are required for each document. Tabs and/or dividers shall clearly and distinctly divide sections, subsections, appendices, etc. Pages, paragraphs, charts, and graphs shall be numbered with master pagination across all pages of the document. References to information contained elsewhere within the contents of the document(s) will be properly noted. All data sources used in preparing the information presented in the document(s) shall be appropriately referenced.
For each study, investigation, or analysis, the A-E shall document its findings in a report that includes an executive summary, the approach, descriptions of each alternative considered, assumptions, rationale, costs, back-up data, and recommendations. Data sources shall be identified. Assumptions shall be clearly stated, adequately justified and provided with each required submittal.
8.2 Design Deliverables
All CAD, BIM, and GIS data for formal submittals shall be provided on a compact disk (CD).
With prior approval, other digital media may be used for the submissions. All final drawings shall be computer generated, plotted and provided in a format and medium that will permit their loading, storage, and use without modification. The A-E shall furnish drawings in compliance with the Tri-Service CAD/BIM Standards. Final drawings shall also be delivered in a compatible format on CD. Each CD shall contain an index of all drawings. All reference files shall be included on the CD with appropriate pointers allowing the CD to be run on a standalone computer with no requirement for other data files to be resident on the hard drive. CD’s shall not contain any irrelevant drawings or extraneous elements and shall have all necessary files in the correct directories as required by the index sheet. The A-E shall deliver a complete set of instructions for use describing all required setups, font selections, and other relevant information required for viewing and plotting drawings. Additionally, the A-E shall furnish drawings in the size formats indicated in the individual task order. CDs shall be labeled on the front of the CD and on the spine of the jewel case.
8.3 Specifications
Current United Facilities Guide Specifications (UFGS) shall be the basis of project specifications provided under this project. All specifications shall be processed and delivered using SpecsIntact software. The automation features of SpecsIntact shall be fully utilized for production of associated registers and reports.
8.4 Design Analysis and Project Information Sheet
The design analysis for each design submittal phase shall contain information as required by
CEHNC 1110-1-1.
8.5 Cost Estimates
Cost estimates must be prepared using the 2nd Generation - Corps of Engineers Micro Computer Aided Cost Estimating System (MII).
8.6 Electronic Bid Sets
Plans and specifications shall be provided, as required in a task order, in the electronic formats that are compatible with the Government’s electronic solicitation protocol.
9.0 SAFETY & ACCIDENT REPORTING
The A-E Contractor shall adhere to safe work practices and to local safety rules for each site.
Prior to the performance of any work on site, the A-E Contractor shall prepare, submit, and will have obtained approval on the appropriate type of Accident Prevention Plan as specified in each task order. These plans are to be prepared and executed in accordance with the EM 385-1-1 as appropriate. There are three potential types of plans:
(1) Site-Visit Abbreviated Accident Prevention Plan (SV-AAPP): This plan would be used when the firm is visiting either an actual construction site or data-gathering location only for the purposes of data-gathering or meetings. There would be no direct participation in construction activities and interaction with hazardous equipment.
(2) Abbreviated Accident Prevention Plan (AAPP): This plan would be used when the firm is visiting an actual construction site and where there may be some limited interaction with construction and associated equipment. This could include regular involvement at the site's resident office, and some commissioning activities.
(3) Accident Prevention Plan (APP): This plan would be used when the firm is fully involved in a number of construction-related activities. This could include continuous involvement at the construction site, the performance of hazardous materials surveys, and measurement & verification work involving commissioning activities.
A template of each Accident Prevention Plan type is included as an attachment to this base IDC but it is the Contractor’s responsibility to verify that the current/up to date form is used.
The contractor shall be required to comply with all federal, state and local SOH requirements, to include OSHA standards and EM 385-1-1 (whichever is the most stringent) other measures as necessary. Also the contractor is required to conform to installation safety requirements. The A- E Contractor shall comply with accident reporting requirements as outlined in the AR 385-40.
All accident reports shall be submitted to the KO.
10.0 ANTI-TERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
In accordance with DoD Directive 5205.02e and the AFARS which states the responsibility for OPSEC is that of the requiring activity; Subpart 5107.91 - Integrating Antiterrorism and Operations Security; 5107.9100 Scope: Policy for integrating antiterrorism (AT) and operations security (OPSEC) considerations into Army contracts; and 5107.9101 Policy implementation of AT and OPSEC considerations in the requirements package is the responsibility of the requiring activity. Customer security requirements (i.e. OPSEC training, etc.) will be provided in the task order.
The contractor shall demonstrate the ability to obtain secret security clearances as well as store and process classified material in accordance with Executive Order #13526.
11.0 CONTRACTOR MANPOWER REPORTING
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: www.ecmra.mil. The required information includes:
(1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative;
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;
(5) Estimated direct labor hours (including sub-contractor);
(6) Estimated direct labor dollars paid this reporting period (including subcontractor);
(7) Total payments (including subcontractor);
(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);
(9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);
(10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language, and,
(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).
As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site. Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data.
For internal Army analysis, the reports and queries from the database shall not contain proprietary data.
12.0 MISCELLANEOUS REQUIREMENTS
12.1 Electronic File Storage, Transmission, & Access
The A-E Contractor shall provide a web base project information system to manage the storage and transmission of project deliverables with stakeholders and the Project Delivery Team (PDT).
Access to relevant data and databases shall be available on-line to the government.
12.2 Permits
The contractor is responsible for identifying, obtaining and renewing all permits from Federal, state, local, or installation agencies to carry out the requirements specified in this contract or detailed on an individual task order.
12.3 Government Furnished Property:
Furnished Government property shall be determined at the task order level. If provided, the Government will furnish property to the Contractor through hand-receipt. Upon completion of the task actions, the Contractor shall turn-in the Government furnished property back to the Government hand-receipt officer in same condition as received. The contractor shall be liable for any damages to Government furnished personal computer.
12.4 Government Furnished Information:
Government furnished information such as criteria, study information, and other assistance will be determined prior to issuing a task order. The A-E shall check the items furnished for adequacy and accuracy prior to utilization. The Government will furnish necessary data or information relating to the particular work required. The Contractor shall prepare and submit a missing, incomplete or ambiguous data report to insure that the Government has provided complete and usable material for the task order. The Government-furnished data must be returned upon completion of the contract.
12.5 Unlimited Rights:
In accordance with DFARS Part 227 (Patents, Data, and Copyright), DFARS 252.227-7025 (Limitation on the Use or Disclosure of Government Furnished Information Marked with Restrictive Legends) and DFARS 252.204-7000 (Disclosure of Information), the Government shall have unlimited rights, in all drawings, designs, specifications, notes and other works developed in the performance of this contract, including the right to use the same on any other Government design or construction without additional compensation to the Contractor.
In accordance with FAR 27.404 (a), the Government will retain unlimited data rights for all data delivered under the contract other than limited rights data or restricted computer software as defined in section 27.404(f).