SECTION C

STATEMENT OF WORK (SOW)

ARCHITECTURAL & ENGINEERING SERVICES IN SUPPORT OF

REAL PROPERTY PLANNING, PROGRAMMING AND MANAGEMENT SUPPORT

12 December 2016 (Version 9)

1.0 INTRODUCTION.

The United States (U.S.) Army Engineering and Support Center (Huntsville Center) is a Regional Planning Support Center for the U.S. Army Corps of Engineers. Huntsville Center is also a Center of Expertise for DD Forms 1391 and Project Definition Report/Engineering Form 3086 support. Huntsville Center’s worldwide scope creates opportunities for enterprise-level support and the ability to coordinate complex projects across multiple geographic regions and organizations. Customers may include all government agencies. Recent facility and installation planning and programming customers include the Office of the Chief of Staff for Installation Management, Army Reserve Installation Management Directorate, Installation Management Command, Defense Health Agency, Space and Missile Defense Command, Network Enterprise Technology Command, Army Cyber Command, Army Materiel Command, U.S. Navy, various installation garrisons and other Corps of Engineers Districts.

In 2012, Huntsville Center awarded four Architect-Engineer (A-E) Multiple Award Indefinite Delivery Contracts (IDCs) with a total programmatic capacity of $45 million and a period of performance of one base year and four one-year options. The awardees offer highly specialized services to provide technical and planning support. The overall planning and programming supports actions that address the full spectrum of military master planning documentation to include DD Form 1391, Preparation Planning Charrette Process and Engineering Form 3086.

Huntsville Center is a Center of Expertise for these forms which are used to submit requirements and justifications in support of funding requests for military construction to Congress.

2.0 SCOPE.

2.1 DESCRIPTION OF SERVICES. This contract is to provide technical support for the planning, programming and installation/facility management of real property in support of Department of Defense and other government agencies and activities. Technical support includes but is not limited to master planning, identifying and quantifying facility requirements, engineering analyses, geospatial projects, facility management support, facility utilization studies, land use requirements studies and analyses, environmental documentation, energy studies, and project programming and procurement documents. Design, construction and repair services are excluded from this acquisition. These activities may involve projects on any government installation. These objectives shall be achieved through the implementation of an ID/IQ contract.

Task orders will be awarded detailing technical requirements, deliverables and schedules. The A- E shall upon task order award, perform services to meet the requirements of the order as well as complying with all applicable Status of Forces Agreements (SOFA), Federal, State and Local laws, regulations, agreements, Memorandums of Understanding (MOU) and Memorandums of Agreement (MOA) and policies.

2.2 LOCATION OF WORK. Performance is anticipated at contractor facilities and at government facilities and installations in the Contiguous United States, Alaska, Hawaii, U.S. Territories and Possessions, and Outside the Contiguous United States in Germany, Italy, the Republic of Korea, and Afghanistan. Performance may be required for other countries or U.S. Territories not currently listed. The requirements for performing work in other countries not already listed may be added at the task order level as the need arises.

2.3 PERIOD OF PERFORMANCE. Work will be accomplished by individual task orders awarded within a 24-month base ordering period and three 12- month optional ordering periods.

The A-E shall complete all work and services under this contract within the period of time specified in task orders.

2.4 TRAVEL.

Temporary Duty (TDY) travel in support of this contract is anticipated. Where travel requirements are well known and easily estimated, travel costs will be firm-fixed price with the requirements of each task order. Where travel requirements are difficult to determine at the time of award, travel will be expended on a reimbursable basis (with the necessary justification provided in each invoice). Contractor travel will be in accordance with the Joint Travel Regulations. The Contractor shall provide documentation with each invoice that travel and per diem is invoiced in accordance with the items and rates as follows: For travel within the contiguous United States (lower 48), use the per diem rates of the Federal Travel Regulations [FAR 31.205‐46 (a)(2)(i)]; For travel to Alaska, Hawaii, and the outlying areas of the United States [U.S. Territories, Puerto Rico, Guam, U.S. Virgin Islands, and American Samoa] use the per diem rates of Appendix A in the Joint Travel Regulations [FAR 31.205‐46(a)(2)(ii)]; and For travel to foreign locations, use the per diem rates set forth in Section 925, "Maximum Travel Per Diem Allowances for Foreign Areas," prescribed by the Department of State [FAR 31.205‐ 46(a)(2)(iii)].

3.0 APPLICABLE DOCUMENTS.

The documents listed below constitute the core performance requirements for the majority of work considered under this contract and are included by reference in all task orders awarded under this base contract unless specifically excluded. Other documents will be added to task orders as necessary. Such documents may include, but not be limited to, Department of Defense or military service regulation and guidance, Codes, Unified Facilities Criteria, standards, specifications, and/or other reference documents needed to identify and clarify specific work tasks or deliverable products. The contractor shall use the latest published version of all required documents in effect at time of task order award. Conflicts, discrepancies and ambiguities between referenced documents as it relates to a specific task order requirement should be brought to the attention of the Contracting Officer or the Contracting Officer’s Representative (COR).

Army Regulation (AR) 200-2, Environmental Effects of Army Actions http://armypubs.army.mil/epubs/pdf/r200_1.pdf

AR 210-20, Master Planning for Army Installations http://www.apd.army.mil/pdffiles/r210_20.pdf

AR 385-40 Accident Reporting http://www.apd.army.mil/pdffiles/p385_40.pdf

AR 415-15, Army Military Construction Program Development and Execution http://www.apd.army.mil/jw2/xmldemo/p415_15/main.asp

CEHNC 1110-1-1, Design Standards for Architect-Engineers http://www.hnc.usace.army.mil/Portals/65/docs/Directorates/ED/DesingManual/CEHNC%20 1110-1-1%20Design%20%20Manual%20Rev%20%208.pdf

AR 115-11 Geospatial Information and Services http://www.apd.army.mil/pdffiles/r115_11.pdf

AR 420-1, Army Facilities Management http://www.apd.army.mil/pdffiles/r420_1.pdf

DA PAM 415-28, Guide to Army Real Property Category Codes http://www.apd.army.mil/pdffiles/p415_28.pdf

DA PAM 420-1-2, Army Military Construction and Non-Appropriated-Funded Construction Program Development and Execution http://www.apd.army.mil/pdffiles/p420_1_2.pdf

DA PAM 415-15, Military Construction Army (MCA) Program Development http://www.apd.army.mil/jw2/xmldemo/p415_15/main.asp

Department of Army (DA) Pamphlet (PAM) 415-3, Economic Analysis: Description and Methods http://www.apd.army.mil/pdffiles/p415_3.pdf

Engineering Technical Letter (ETL) 1110-3-491, Engineering and Design - Sustainable Design for Military Facilities http://www.dtic.mil/dtic/tr/fulltext/u2/a403122.pdf

Engineering Manual (EM) 385-1-1, U.S. Army Corps of Engineers Safety and Health Manual http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1_English_2003.pdf

IMCOM Public Works Guidance, Maintenance and Repair (M&R) DD Form 1391 Project Submission http://www.imcom.army.mil/portals/0/hq/about/publications/pwd_digest/archives/0f6b70b0- 423d-452d-4585b93502de2d86.pdf (?)

National Environmental Policy Act http://www2.epa.gov/nepa

National Fire Protection Association (NFPA) 1, 2012 Fire Code for determining vehicle access requirements http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=1

NFPA 10, 2013 Standard for Portable Fire Extinguishers http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=10

NFPA 101, 2012 Life Safety Code, for building egress and life safety except as modified in UFC http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=101 3-600-01

NFPA 13, 2013 Standard for Installation of Sprinkler Systems, minimum requirements for design and installation of automatic fire sprinkler systems and exposure protection http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=13

NFPA 20, 2013 Standard for the Installation of Stationary Pumps for Fire Protection, for construction & installation requirements for fire pumps http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=20

NFPA 291, 2013 Recommended Practice for Fire Flow Testing and Marking of Hydrants http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=291

NFPA 30, 2012 Flammable and Combustible Liquids Code, for construction requirements and fire resistance ratings for liquid storage areas http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=30

NFPA 30A, 2012 Code for Motor Fuel Dispensing Facilities and Repair Garages, for occupancy classification, construction requirements and means of egress for repair garages and organizational maintenance shops http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=30A

NFPA 70, 2014 National Electrical Code (NEC) - Article 500 Hazardous Locations & Article 511 Commercial Garages, Repair & Storage http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=70

NFPA 72, 2013 National Fire Alarm and Signaling Code http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=72

NFPA 80, 2013 Standard for Fire Doors and Other Opening Protectives http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=80

NFPA 90A, 2012 Standard Installation of Air Conditioning & Ventilation Systems, for protection of openings, shafts, fire dampers, smoke dampers, penetrations and fan control http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=90A

NFPA 96, 2014 Standard for Ventilation Control and Fire Protection of Commercial Cooking http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=96

OACSIM Real Property Audit Readiness Handbook http://asafm.army.mil/Documents/OfficeDocuments/FinancialOps/Guidances/cfo/fip/aars/aar s12.pdf

Space Planning and Criteria Manual (SPCM)

Training Circular (TC) 25-8, Army Training Ranges https://armypubs.us.army.mil/doctrine/DR_pubs/dr_d/pdf/tc25_8.pdf

Technical Manual (TM) 5-800-4, Programming Cost Estimates for Military Construction https://www.wbdg.org/ccb/ARMYCOE/COETM/ARCHIVES/tm_5_800_4.pdf

TM 5-803-1, Installations Master Planning Principles and Procedures http://armypubs.army.mil/eng/DR_pubs/dr_a/pdf/tm5_803_1.pdf

TM 5-803-5, Installation Design - Improving the Visual Environment https://www.wbdg.org/ccb/ARMYCOE/COETM/tm_5_803_5.pdf

TM5-803-14, Site Planning and Design https://www.wbdg.org/ccb/ARMYCOE/COETM/ARCHIVES/tm_5_803_14.pdf

TM 5-853-1-4, Security Engineering

Installation Management Command (IMCOM) Desk Side Reference

Technical Instructions (TI) 800-01, Design Criteria https://www.wbdg.org/ccb/ARMYCOE/COETI/ti800_01.pdf

Tri-Service CADD Standards https://www.fgdc.gov/participation/working-groups-subcommittees/fwg/fwg-charter-pdf

Unified Facilities Criteria (UFC) 1-200-01 General Building Requirements http://www.wbdg.org/ccb/DOD/UFC/ufc_1_200_01.pdf

UFC 1-200-02 High Performance Sustainable Building Requirements http://www.wbdg.org/ccb/DOD/UFC/ufc_1_200_02.pdf

UFC 2-100-01 Installation Master Planning https://www.wbdg.org/ccb/DOD/UFC/ufc_2_100_01.pdf

UFC 3-210-01A Area Planning, Site Planning and Design https://www.wbdg.org/ccb/DOD/UFC/ARCHIVES/ufc_3_210_01a.pdf

UFC 3-600-01 Fire Protection Engineering for Facilities https://www.wbdg.org/ccb/DOD/UFC/ufc_3_600_01.pdf

UFC 4-010-01 Anti-terrorism (AT) Standards for Buildings http://www.wbdg.org/ccb/DOD/UFC/ufc_4_010_01.pdf

UFC 4-010-02 DOD Minimum Antiterrorism Standoff Distances for Buildings (FOUO) http://www.wbdg.org/ccb/DOD/UFC/ufc_4_010_02.pdf

UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, and Construction http://www.wbdg.org/ccb/DOD/UFC/ufc_4_010_05.pdf

UFC 4-020-01 DoD Security Engineering Facilities Planning Manual http://www.wbdg.org/ccb/DOD/UFC/ufc_4_020_01.pdf

UFC 4-021-01 Design and O&M: Mass Notification Systems, with Change 1, January 2010 https://www.wbdg.org/ccb/DOD/UFC/ufc_4_021_01.pdf

Unified Facilities Guide Specifications (UFGS) http://www.wbdg.org/ccb/DOD/UFC/ufc_1_300_02.pdf

4.0 REQUIREMENTS.

4.1 GENERAL REQUIREMENTS. This contract supports the identification of requirements, master planning, project programming, and technical actions supporting management of Government installations and facilities. The general requirements of this contract are identified in Paragraph 2.0.

4.2 TECHNICAL OBJECTIVES AND GOALS. Specific technical requirements, deliverables and schedules will be set forth by individual task orders.

4.3 SPECIFIC REQUIREMENTS. Technical objectives and goals under this contract include, but are not limited to, the following:

4.3.1 Coordinate and facilitate planning charrettes in support of MILCON documentation and/or Master Plan component development

4.3.2 Produce all tabs in support of the Department of Defense Form (DD Form) 1391

4.3.3 Prepare facility and/or mission Requirements Analyses

4.3.4 Prepare Economic Analyses

4.3.5 Produce programmatic, parametric and construction cost estimates

4.3.6 Prepare Real Property Master Plans (RPMP) to include vision plans, area development plans, installation planning standards, capital improvement plans

4.3.7 Prepare Infrastructure Capacity Analyses

4.3.8 Develop courses of action to meet sustainability requirements and goals

4.3.9 Prepare energy studies such as but not limited to energy load calculation modeling, analyses and recommendations to comply with DOD energy guidelines for sustainable and renewable energy sources as applied to projects and established standards.

4.3.10 Produce and analyze geospatial data, aerial photography, Geographic Information Systems (GIS) data, vector file and other map formats as applied to planning and programming task actions.

4.3.11 Prepare programmatic environmental studies relative to RPMP

4.3.12 Prepare National Environmental Policy Act (NEPA) documentation to support real property actions

4.3.13 Prepare Installation Compatibility Use Zone (ICUZ) Studies

4.3.14 Prepare Airfield Installation Compatibility Use Zone (AICUZ) Studies

4.3.15. Integrated Cultural Resource Management Plans (ICRMP) and Integrated Natural Resources Management Plans (INRMP)

4.3.16 Prepare Business Case Analyses

4.3.17 Prepare Facility Utilization Studies

4.3.18 Perform Facility Condition Assessment Studies to include leading and conducting Installation Status Report (ISR) facility inspection surveys and update ISR

4.3.19 Prepare Force Modernization and Integration Studies

4.3.20 Develop integration schedule to support space re-allocation, installation acceptance of a facility (new construction or renovation) and user assignments

4.3.21. Prepare and produce plans that address resiliency in DoD asset management planning and defense critical infrastructure plans

4.3.22 Prepare and/or review Engineer Form 3086 cost estimates

4.3.23 Prepare Program Business Process Reviews

4.3.24 Prepare renderings, drawings, maps, pamphlets, and graphic displays

4.3.25 Coordinate and facilitate public involvement meetings

4.3.26 Collect, create, enter, edit, maintain as audit data attributes in Department of Defense, US Army enterprise systems of record, and USACE Sustainment Management System (SMS) applications in support of a comprehensive asset management program that includes: Real Estate Management Information Systems (REMIS); Range Facility Management Support Systems (RFMSS), General Fund Enterprise Business System (GFEBS), Headquarters Installation Information System (HQIIS), Army Stationing and Installation Plan (ASIP), Installation Status Report (ISR), Real Property Planning and Analysis System (RPLANS), Army Energy and Water Reporting Systems (AEWRS), Defense Medical Logistics Standard Support (DMLSS), Force Management System Web Site (FMSWeb), Building Information Modeling (BIM), Proactive Real-property Interactive Space Management Systems (PRISMS),

4.3.27 Prepare medical facilities planning, design studies and database support. Efforts will include, but will not be limited to, Healthcare Requirements Analysis (HCRA), Program for Design (PFD), Concept of Operations (CONOPS), market analyses and any and all other studies or undertakings which would support planning level decisions. Database updates will include update of Defense Medical Logistics Standard Support (DMLSS) system, BUILDER and any other system which supports management of real property

4.3.28 Prepare facilities management documentation such as, but not limited to, DD Form 1354, real property record files and attestation memoranda through physical inspection, facility functional adequacy assessments, and real property inventory accounting

4.3.29. Collect, create, enter, edit, maintain data attributes to support Installation Geospatial Information and Services (IGI&S) systems in support of a comprehensive asset management program that includes: the ability to develop and maintain consistent, accurate, and easily accessible spatial data; perform modeling and analysis; conduct Global Positioning Systems (GPS) field data collection, validation, and verification; perform Computer Aided Design and Drafting (CADD) conversion and data migration; and generate cartographically correct maps.

The Contractor shall ensure all spatial data complies with the USACE Architectural/ Engineering/Construction CADD and Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE) Geographic Information System (GIS) standards and all applicable Quality Assurance Plans (QAPs) and provide Federal Geographic Data Committee (FGDC) compliant metadata.

4.3.30 Conduct fire protection and life safety inspections and prepare analyses in accordance with building codes, UFC 3-600-01, and all relative NFPA codes to include the Life Safety Code (NFPA 101). Fire protection analysis shall be conducted by a licensed fire protection engineer

5.0 PERFORMANCE AND COMPLETION OF THE WORK.

5.1 A-E PROJECT MANAGER. The A-E shall perform the work under the direction of a company officer or responsible representative approved by the Contracting Officer. The company officer or representative shall be designated as A-E project manager and shall be responsible for the complete coordination of all work under this contract. All work shall be accomplished with adequate internal controls and review procedures, which will eliminate conflicts, errors, and omissions, and ensure technical adequacy of all outputs.

5.2 PERFORMANCE. The A-E shall be required to initiate the services within 10 calendar days after the task order is issued, unless otherwise indicated on the order, and shall complete all work and services under each task order within the period of performance specified in the task order.

During the performance of the work the A-E shall promptly advise the Contracting Officer of any discrepancies, ambiguities, lack of clarity or missing materials or instruction furnished. Such notification shall be made in writing within 5 calendar days of identification.

6.0 PROJECT CONTROL AND REPORTING. This paragraph establishes policy and procedures for the management and control of all work activities. This paragraph delineates and defines the channels of information and authority and the appropriate control mechanisms and reports necessary to achieve the desired levels of performance. These project control and reporting requirements may be modified by the Contracting Officer (KO) or the Contracting Officer’s Representative (COR) for any task order issued under this contract. If this is done, the specific reporting requirements of modifications will be listed in the task order.

6.1 GENERAL REQUIREMENTS. The A-E shall provide reports as described below when so specified in the individual task order.

6.2 UNSCHEDULED REPORTING. The A-E shall promptly notify the contracting officer of any significant, unforeseen developments that affect the contract price or schedule.

6.3 MONTHLY STATUS REPORT. The A-E shall prepare and submit a monthly status reports (MSR) for each task order to the KO and COR by the 5th day of the following month. Contractor shall submit a MSR for each task order not later than the fifth (5th) calendar day of each month of performance. The MSR shall contain the following information:

Project Name, Location and Contract/Task Order identification

Day/month/year of MSR

Points of Contact (POC’s)

Contract number and task order number.

Correspondence and meeting minutes recording events during the monthly period. Describe discussion, un-resolved issues, and conclusions determined during discussion.

A brief narrative description of the progress made for each project during the reporting period directly related to the statement of work.

Percentage of all work and specific tasks accomplished and to be accomplished within the next reporting period.

The Contractor shall develop a standardized format outlining task paragraph reference, date completed, date acknowledged and accepted by the COR, with task percentage allowance IAW the statement of work (SOW).

Itemized schedule IAW format presented in the task order SOW and as approved by the COR. Basis of approval will be consensus of kickoff schedule by the installation and the contractor; and production and review schedule as coordinated during official on-site meeting. Any contractor proposed changes to schedule shall be submitted solely to the COR before contacting PC team participants.

Itemized meetings (proposed or conducted) that have and have not been accepted by Contacts in the task order statement of work.

Itemized critical and routine issues. Critical issues must be relayed immediately in writing and/or telephonically to KO and COR.

Indicate all significant conferences, meetings, discussions, verbal directions, and telephone conversations relative to the statement of work.

Summary work actions accomplished from Notice to Proceed (NTP) and the date of the

MSR.

COR approved Task Execution Schedule. Any required deviations to report actual schedule shall be pre-approved by the COR prior to reporting on the MSR

Baseline schedule – the original schedule accepted by the customers and COR

MSR shall not contain cost information. MSR shall be attached to each progress payment request and final payment request.

The contractor shall prepare and submit a technical progress report. This report is a subset of the Monthly Status Report and should contain only technical information pertinent to the project.

6.4 MEETING ATTENDANCE. The A-E and/or the appropriate representative(s) shall be required to attend and participate in site visits, conferences, working groups, committee meetings and similar events pertinent to the work required under this contract as directed by the Contracting Officer or the COR. Written records in accordance with paragraph 6.5 shall be provided to the COR for all meetings attended (teleconference or in person). Site visit reports shall be prepared and submitted.

6.5 WRITTEN RECORDS. The A-E shall provide a written record of all significant conferences, meetings, discussions, verbal directions, telephone conversations, etc., with Government representative(s) relative to this contract per task order in which the A-E and/or a designated representative(s) participates. Written records shall be prepared and submitted. These records shall be dated and shall identify the contract number, the task order number, and the SOW paragraph references, if applicable, participating personnel, subject discussed, and conclusions reached. The A-E shall forward to the Contracting Officer or the COR, within seven calendar days or within time limits stated in individual task orders, a reproducible copy of the records.

6.6 CORRESPONDENCE PROCEDURES. The A-E shall serially number all correspondence issued on the contract. All correspondence on the contract shall reference the contract number and task order number. Each submittal shall include a transmittal letter, with date, contract/T.O reference, statement of the nature of submittal, and requirements for Government review with requested date to return comments.

6.7 CONTRACTOR MANPOWER REPORTING DATA. The Office of Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report contractor manpower information (including subcontractor manpower information) required for performance of this contract. The contractor shall submit all the information required in the format specified at the following web address: https://cmra.army.mil/default.aspx. The required information includes:

Contract Number

Task Order Number

Requiring Activity Unit Identification Code (UIC)

Command

Contractor Contact Information

Federal Service Code

Direct Labor Hours

Direct Labor Dollars

Location information (where contractor and subcontractors (if applicable) performed the services)

Contractors shall fill in the above fields on the website. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 15 October of each calendar year. If your particular contract crosses fiscal years, two entries must be made to capture the data for the contract period.

7.0 DELIVERABLES.

7.1 SAFETY AND ACCIDENT REPORTING. The contractor shall prepare and submit their Corporate Safety and Health Program (SHP), as required in 29 CFR 1910.120(b) and/or 29 CFR 1926.65(b). In addition, the contractor shall prepare and submit an Abbreviated Accident Prevention Plan (AAPP). The AAPP shall be submitted to and accepted by Huntsville Center’s Safety Office for each task order involving field activities prior to initiation of any field work to include site investigation, site assessments, performance testing, etc. The AAPP shall be prepared in accordance with the requirements of Engineering Manual (EM) 385-1-1, Safety and Health Requirements Manual. An AAPP must be submitted to the Huntsville Center Safety Office no later than (NLT 10) calendar days prior to travel. In cases where the Government requires travel with insufficient notice to meet this 10-day requirement, the contractor shall submit an AAPP as soon as possible prior to assessment activities. Site visits which involve only conference room or office settings do not require an AAPP. The Contractor shall comply with accident reporting requirements as outlined in the AR 385-40. All accident reports shall be submitted to the Contracting Officer.

7.2 QUALITY CONTROL/OVERSIGHT. The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this contract and each awarded task order. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The Quality Control Plan shall be prepared and delivered to the COR for delivery to the KO within 30 days of contract award. In the event revisions are required the contractor shall return the revised QCP within five (5) working days of receipt of notification to revise. After acceptance of the quality control plan the contractor shall receive the contracting officer's acceptance in writing of any proposed change to his QC system. A Quality Control Plan shall be developed for the overall contract as well as each individual task order as specified in the task order Statement of Work.

7.3 QUALITY ASSURANCE. The Government will perform Quality Assurance (QA) of the Contractor's performance under this contract using the method of surveillance specified in the Quality Assurance Plan (QAP), Attachment 1. The Government will conduct QA inspections on all phases and types of work performed. The Government reserves the right to perform QA inspections at any time.

7.3.1 CONTRACTOR QUALITY CONTROL. In accordance with the QAP, the Contractor shall submit a Quality Control Plan (QC Plan) to the Contracting Officer in accordance. In general, the QCP will include the following parts: purpose, methods of quality surveillance, performance standards, description of deliverables and performance documentation.

7.4 GRAPHIC, DESIGN AND COST ESTIMATING.

7.4.1 COMPUTER-AIDED DESIGN (CAD) SYSTEMS AND GEOGRAPHICAL

INFORMATION SYSTEMS (GIS). Firms must be capable of providing drawings on a CAD system. All in-progress and fielded graphics data, design drawings, survey and GIS data, relational databases and related data generated shall be available on-line to the government through the use of the Internet connection. All final drawings shall be computer generated, plotted and provided in a format and medium that will permit their loading, storage, and use without modification or additional software.

Autodesk products shall be the default standard, though other products (Bentley, AECOsim Building Designer V8i) are still supported. The A-E shall furnish drawings in compliance with the most current Tri-Service CADD Standards which can be found at:

https://cadbimcenter.erdc.dren.mil/Default.aspx

The A-E shall furnish drawings in the size formats indicated in the individual task order. CDs shall be labeled on the front of the CD and on the spine of the jewel case.

7.4.2 SPECIFICATIONS. Current Unified Facilities Guide Specifications (UFGS) shall be the basis of project specifications provided under this project. All specifications shall be processed and delivered in the most current version of SpecsIntact software configuration (at the time of task order award). The automation features of SpecsIntact shall be fully utilized for production of associated registers and reports.

7.4.3 DESIGN ANALYSIS AND PROJECT INFORMATION SHEET. The design analysis for each design submittal shall contain information as required by CEHNC 1110-1-1. The Government will furnish the Project Information Sheet form with each task order as required.

The AE shall provide the completed Project Information Sheet with the final submittal.

7.4.4 COST ESTIMATES. Unless otherwise directed by the KO, cost estimates must be prepared using the Corps of Engineers Micro Computer Aided Cost Estimating System (MCACES) or PC Cost for planning level estimates. Planning level cost estimating for primary facilities shall comply with the Unit Cost Guidance under Program Administration and Execution (PAX) system.

7.4.5 TASK ORDER DELIVERABLES. Task order-specific deliverables will be described in each awarded task order. However, the contractor is required to prepare and submit the task order Quality Status Report (QSR).

8.0 SUBMITTALS.

For each study, investigation or analysis, the A-E shall document its findings in a report that includes an executive summary, the approach, descriptions of each alternative considered, assumptions, rationale, costs, back-up data, and recommendations. Prior to commencing work on each study, the A-E shall submit to the KO or the COR for approval, an outline of its proposed approach and the alternatives to be considered for that study. No study under this contract shall be initiated until specifically authorized by the KO. The A-E shall also submit the draft study reports to the Government and other agencies identified in the specific task orders for review.

After completion of the Government's review, the A-E shall incorporate all agreed upon comments and issue a final report in accordance with the detailed submittal schedule in each task order as required. The A-E shall respond to comments within the agreed to number of days under each specific task order.

8.1 FORMAT FOR SUBMITTALS. Formal narrative and tabular data shall be typed and printed on 8-1/2 x 11-inch sheets with fold outs for maps, sketches, schematics, charts, graphs, and other illustrative material, as necessary. Generally, all formal narrative text shall be typed in lines perpendicular to the longest axis of the sheet. Data, which cannot be clearly described in narrative form, shall be graphically shown. Legible, reproducible graphics, drawings and sketches exceeding 8-1/2 x 11 inches shall be submitted to CEHNC in the number of copies stated in the individual task order. If required in the task order, reproducible sets transmitted with the final submittal shall be of the reverse-printed, polyester-film type. Typed and formal documents 11 x 17 inches or less in size shall be securely bound with hard paper or a flexible material in a durable and attractive manner. The title of the document shall appear on the cover of all submittal documents. All final documents shall be bound in a manner which will facilitate repeated disassembly and reassembly, and the title shall appear on the bound edge, in a secure manner, as well as on the cover. Narrative contents of the document(s) shall be arranged in a logical sequence and organized by sections, unless otherwise specified. A table of contents and index are required for each document. Tabs and/or dividers shall clearly and distinctly divide sections, subsections, appendices, etc. Pages, paragraphs, charts, and graphs shall be numbered.

References to information contained elsewhere within the contents of the document(s) will be properly noted. All data sources used in preparing the information presented in the document(s) shall be appropriately referenced.

8.2 REVIEW COMMENTS FOR SUBMITTALS. The submittals will be reviewed by appropriate Government agencies to evaluate content and determine adequacy. Written comments will be furnished to the A-E by the Contracting Officer or the COR. These comments will be discussed in detail during the presentation and review period. The A-E shall provide written notification of resolution actions for each comment and shall specify the section of the report/plan/specification that was modified. Intentions on noncompliance with any comment shall be substantiated in detail.

8.3 SUMMARY OF SUBMITTALS REQUIRED. The A-E shall implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation, data, and information necessary for the A-E's internal management as well as Government management of this project. Review minutes and materials and action identification shall be included.

8.4 DATA SOURCES. Data sources shall be identified. Assumptions shall be clearly stated, adequately justified and provided with each required submittal.

8.5 DISTRIBUTION. The A-E shall make distribution of the deliverables to the appropriate agencies as described in the individual task orders. The number of copies and nature of each deliverable for each agency will be specified in awarded task orders. Each specified entity will receive only those deliverables that pertain to their function.

9.0 CERTIFICATION OF WORK.

All environmental related work and work requiring a seal for permitting, including design drawings and specifications submitted under the contract, shall contain the seal of a professional engineer registered in the state in which the AE work was performed unless otherwise specified in the individual task order.

10.0 REQUIREMENTS FOR CONTRACTOR DATA.

In accordance with FAR 27.404 (a), the Government will retain unlimited data rights for all data delivered under the contract other than limited rights data or restricted computer software as defined in section 27.404(f).

11.0 GOVERNMENT FURNISHED INFORMATION/EQUIPMENT.

11.1 GOVERNMENT FURNISHED INFORMATION (GFI). Government furnished information such as criteria, study information, and other assistance will be determined prior to issuing a task order. The A-E shall check the items furnished for adequacy and accuracy prior to utilization.

The Government will furnish necessary data or information relating to the particular work required, including current MCACES software with user’s manual and future updates as well as access to specific required information management systems such as, but not limited to, Program Administration and Execution (PAX) software (DD1391 Processor, ECONPAK, PC Cost, and Information System Cost Estimator (ISCE)), Construction Appropriation Programming, Control, and Execution System (CAPCES), Headquarters Installation Information System (HQIIS) and others. The contractor shall prepare and submit a missing, incomplete or ambiguous data report to insure that the Government has provided complete and usable material for the task order.

Access to Government furnished information management systems requires users to obtain a Common Access Card (CAC). The Government-furnished data must be returned upon completion of the contract.

11.2 GOVERNMENT FURNISHED EQUIPMENT (GFE). For specific task actions to sustain and update GFEBS data, the Government will furnish a personal computer imaged to Enterprise Network standards through hand-receipt. Upon completion of the GFEBS task actions, the Contractor shall turn-in the personal computer back to the Government hand-receipt officer in same condition as received. The contractor shall be liable for any damages to Government furnished personal computer.

13.0 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS.

Paragraph 13.1 applies to this contract and all task orders awarded under this contract. Paragraph

13.2 applies to all task orders awarded under this contract for support to DoD customers.

Paragraphs 13.3 through 13.10 apply to all task orders for which contractor employees have an area of performance within a DoD-controlled installation, facility or area. Paragraphs 13.11 through 13.12 apply to all task orders requiring U.S. based contractor employees and associated sub-contractor employees to travel overseas. Paragraphs 13.13 through 13.15 apply to all classified task orders. Additional security requirements may be delineated in individual task orders, including equivalent non-DoD or agency-specific requirements.

13.1 E-VERIFY PROGRAM. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

13.2 INFORMATION SECURITY. At a minimum, all documents submitted to the Government shall be marked For Official Use Only (FOUO) in accordance with the Controlled Unclassified Information sections of Department of Defense (DoD) Manual 5200.01 DoD Information Security Program. The contractor shall put into place a system to prevent the unauthorized disclosure of data, photographs, reports and other material generated or acquired as a result of this contract. Access to data, maps, photographs and similar material under contractor controls shall be limited to those with a valid need.

Paragraphs 13.3 through 13.10 apply to all task orders for which contractor employees have an area of performance within a DoD-controlled installation, facility or area.

13.3 AT LEVEL 1 TRAINING. All contractor employees, to include subcontractor employees, requiring access to DoD installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

13.4 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES.

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

13.5 COMMON ACCESS CARD (CAC). The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

13.5.1 The Government will provide a CAC to a core group of individuals working under this contract who would be expected to visit military installations on a regular basis. The contractor shall provide a list of names and duties to the COR for review and approval. Additional CACs may be provided based upon individual task order requirements. To obtain or renew a CAC, contact the COR for an electronic copy of CEHNC’s “Request for CAC” form and instructions on where to send completed form(s). The following information shall be required to obtain a CAC:

Full name, Social Security Number, Date and Place of birth, task order number, and the name of the Huntsville Center Contracting Officer’s Representative for the task order. Also include the name and phone number of the Contractor agency’s Security Manager.

13.5.2 The CAC is the property of the U.S. Government and is issued by Huntsville Center’s Security and Law Enforcement Office (CEHNC-SL) in accordance with HSPD-12 for the period of contract performance. A CAC issued as a requirement of this contract shall not be used on any other contract or to the personal benefit of the assigned individual. The KO, COR or CEHNC-SL may at any time require that a CAC be returned and the contractor shall comply within 48 hours.

For all CACs issued as a result of this contract, the contractor shall:

13.5.2.1 Maintain comprehensive roster of all individuals (including team members) who have been issued a CAC as a requirement of this contract. The information should include name, primary duty location, date issued, expiration date, and CAC number;

13.5.2.2 Conduct a physical inventory of issued CACs by card number on a regular basis

(but at least every 6 months) and report the results to the COR;

13.5.2.3 Immediately report any CAC that is lost, stolen, damaged or otherwise not available to the KO, COR and/or CEHNC-SL. CAC reporting shall be in accordance with DD Form 1423-1, DIN A014.

13.5.2.4 Secure and return to the Government the CAC of any individual who leaves the employ of the firm (including team members), is reassigned to duties not involving this contract or is not required the continued use of the CAC to perform duties associated with this contract .

The contractor shall return all CACs issued at the termination or expiration of the contract.

13.5.3 For contractors who do not require CAC, but require access to a DoD facility or installation, the contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at locations Outside the Contiguous United States, in accordance with status of forces agreements and other theater regulations.

13.6 SUSPICIOUS ACTIVITY REPORTING TRAINING (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

13.7 CONTRACTOR EMPLOYEES WHO REQUIRE ACCESS TO GOVERNMENT

INFORMATION SYSTEMS. All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DoD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems.

13.8 OPSEC TRAINING. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training.

OPSEC awareness training is available at the following websites: https://www.iad.gov/ ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

13.9 EXPOSURE TO CLASSIFIED AND/OR SENSITIVE MATERIALS AND/OR

SENSITIVE RESTRICTED AREAS. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

13.10 THREAT AWARENESS REPORTING PROGRAM. For all contractors with security clearances, per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a Counterintelligence Agent or other trainer as specified in 2-4b. Therefore, all new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training.

Authorized web-based TARP training for CAC card holders is available at the following website:

https://www.us.army.mil/suite/page/655474 Paragraphs 13.11 and 13.12 apply to all task orders requiring U.S. based contractor employees and associated sub-contractor employees to travel overseas.

13.11 AT AWARENESS TRAINING FOR CONTRACTOR PERSONNEL TRAVELING

OVERSEAS. All U.S. based contractor employees and associated sub-contractor employees traveling overseas will receive the government provided area of responsibility (AOR) specific AT awareness training. The documentation of training completion must be provided to the COR prior to departure.

13.12 CONTRACT REQUIRING PERFORMANCE OR DELIVERY IN A FOREIGN

COUNTRY. All non-local contracting personnel will comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives.

Paragraphs 13.13 through 13.15 apply to all classified task orders.

13.13 OPSEC STANDING OPERATING PROCEDURE (SOP)/PLAN. In accordance with AR 530-1 (Operations Security), the Contractor shall develop an OPSEC SOP/Plan within 90…