TO0001PWS_AttachQ_AAPP-Limitied_Scope_Template.pdf

PDF 259 KB Posted

Attached to
Initial Outfitting and Transition Services at Ft Bliss TX
Solicitation number
W912DY15R0024
Issued by

About this file

Task Order 0001 PWS Attachment Q

View the file

Other files

File Type Posted
A21_SolAttch9-TaskOrder0001PWS_Amend_2_4_August_2015.pdf PDF
TO0001PWS_AttachN_PropertyBook_2Apr2015.xlsx XLSX spreadsheet
TO0001PWS_AttachT_LifecycleReport.xlsx XLSX spreadsheet
TO0001PWS_AttachG_SiteVisitPresentation_22July2015.pdf PDF
A21_IOT_Ft_Bliss_Solicitation_Amend1_31July2015.pdf PDF
A21_SolAttch9-TaskOrder0001PWS_Amend_1_31_July.pdf PDF
A21_SolAttch1-BlissQASP_Amend1_31July2015.docx DOCX document
A21_SolAttch6-PriceProposal_Amend1__30July2015.xlsx XLSX spreadsheet
TO0001PWS_AttachH_KeyPersonnelQuals.docx DOCX document
TO0001PWS_AttachO_ArmyITCHESS _ITES-2S_Ordering_Guide.pdf PDF
TO0001PWS_AttachU_Acronyms.xlsx XLSX spreadsheet
TO0001PWS_AttachP_AAPP-Site_Visit.pdf PDF
TO0001PWS_AttachC_ConstructionContract Division27Specificationssection.pdf PDF
A21_SolAttch9-TaskOrder0001PWS_15Jul2015.doc DOC document
TO0001PWS_AttachM_EquipmentReuseChecklist.xlsx XLSX spreadsheet
TO0001PWS_AttachK_DMLSSDataMigrationTemplate.xlsx XLSX spreadsheet
TO0001PWS_AttachS_Sample_Customer_Concurrence_and_Release_Forms.pdf PDF
TO0001PWS_AttachJ_DMLSSDataMigrationOverview.pdf PDF
A21_SolAttch8-KeyPerLOC_15Jul2015.docx DOCX document
A21_SolAttch6-PriceProposal_15Jul15.xlsx XLSX spreadsheet
A21_IOT_Ft_Bliss_Solicitation_15_July_2015.pdf PDF
TO0001PWS_AttachL_DMLSSMigrationReference.xlsx XLSX spreadsheet
A21_SolAttch5-PropData_15Jul2015.docx DOCX document
TO0001PWS_AttachE_ExistingWBAMCfloorplans.pdf PDF
A21_SolAttch1-BlissQASP_15Jul2014.docx DOCX document
A21_SolAttch7-PastPerformanceForm_15Jul2015.pdf PDF
TO0001PWS_AttachV_TransitionCommitteeCharter.pdf PDF
TO0001PWS_AttachD_DepartmentListing.pdf PDF
TO0001PWS_AttachF_InstallationSitePlan.pdf PDF
TO0001PWS_AttachB_2013MEDCOMInteriorDesignMasterPlanVol_1-4.pdf PDF
A21_SolAttch4-KeySubLOC_15Jul2015.docx DOCX document
A21_SolAttch3-SBPlan_15Jul2015.docx DOCX document
TO0001PWS_AttachR_Schedule_of_Values_and_Invoice_Logic_Summary.pdf PDF
A21_SolAttch2-PPQ_15Jul2015.docx DOCX document
TO0001PWS_AttachA_AcquisitionRoughOrderofMagnitude(ROM)Listing.xlsx XLSX spreadsheet
TO0001PWS_AttachI_SampleIMS.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IAP Worldwide Services Ft. Campbell IO&T Accident Prevention Plan

ABBREVIATED ACCIDENT PREVENTION PLAN

FOR INITIAL OUTFITTING AND TRANSITION (IO&T)

U.S. ARMY CORPS OF ENGINEERS HUNTSVILLE ENGINEERING AND

SUPPORT CENTER

Scope: This Accident Prevention Plan established the Accident Prevention Plan for the contractor that is to minimize or eliminate the hazards associated with the handling, transporting, off loading, and installation of furniture and furnishings for military installations of the Armed Forces of the United States.

Purpose: The Accident Prevention Plan is a document that details how the safety and health requirements of OSHA; other regulatory codes and documents; and the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385‐1‐1 are to be accomplished.

Contractor Information:

Contractor Name: IAP Worldwide Services

Contractor Address: 7315 N. Atlantic Avenue, Cape Canaveral, FL 32920

Contract Number: W912DY‐10‐D‐0044

Task Order Number: 0002

Contractor Site Supervisor/Lead Person: Mr. Ronald Gibson, 251‐752‐7676, gibson3908@bellsouth.net

Installation: Ft. Campbell Troop Medical/Dental Clinic Bldg. 7973 Stryke Blvd. Fort Campbell, KY 42223

Installation Contact: Mr. Santos Aquino, Inventory Management Specialist, 270‐798‐8349, Santos.r.aquinomulero@us.army.mil

U.S. Army Corps of Engineers, Huntsville

Project Manager: Mr. Gerald Ramos, 256‐426‐7864, gerald.f.ramos@usace.army.mil

Contractor Safety Plan Preparer:

Signature: Date: 14 July 2011

Keller Army Community Hospital IO&T Attachment 15.12 a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box

Accident Prevention Plan

Contractor Personnel:

Team Leader/SSHO: Ronnie Gibson, 256‐426‐7864

Delivery/Assembly Team:

Name: Company:

Name: Company:

Name: Company:

Name: Company:

Hazard Evaluation:

Check ALL activities below that can be expected during the work of this task order. The activities and the hazards are found in the Activity Hazard Analysis on pages 5 and 6.

(X) Slips/Trips/Falls

(X) Squatting and Bending

(X) Caught Between (Pinch Points)

(X) Traffic Hazards ( ) Climbing

(X) Material Handling by Hand

(X) Material Handling by Equipment

(X) Lifting

(X) Foot Hazards

(X) Hand Tools

(X) Motor Vehicle Operations

(X) Weather ( ) Other (list)

Responsibilities:

Project Manger shall:

‐ Oversee and direct the work activities to include plan for safety and health of all persons involved.

‐ Document that employees are trained in the phases of the work activities to be performed.

‐ Document that all equipment is maintained in proper working order and used correctly.

‐ Document that personal protective equipment as lumbar supports, gloves, and others equipment needed is available and used.

‐ Perform an Activity Hazard Analysis of new or unique jobs or tasks and the safety and health measures to be used to minimize hazards.

‐ Conduct Safety meeting with the crew prior to task activities beginning.

a0mx9gfr Text Box

Accident Prevention Plan

Employees shall:

‐ Follow the prescribed methods for performing the task to be performed.

‐ Wear protective equipment as required for each task of the work. Perform task in manners to protect themselves and others in the area. Protect the public from work activities and the equipment being used.

‐ Inspect equipment prior to its use and remove defective equipment from service immediately.

‐ Use personal protective equipment such as lumbar support, gloves, and others as required.

Accident Reporting:

‐ The Project Manager shall report all accidents to the U.S. Army Corps of Engineers, Huntsville

Engineering and Support Center Project Manager immediately.

‐ All injuries, including First Aid cases, are to be recorded on OSHA Log 300 or similar report.

‐ All accidents shall be reported and submitted to the U.S. Army Corps of Engineers, Huntsville

Engineering and Support Center Project Manager.

‐ The Contractors man‐hours worked and accident experience will be reported to U.S. Army Corps of

Engineers, Huntsville Engineering and Support Center Project Manager by the first of each calendar month.

‐ Each accident will be investigated and reported on ENG Form 3394 and the report will be reported to CEHNC within 5 days. http://www.hnd.usace.army.mil/safety/Safety_Pol_Reg_Docs.aspx

Work Activities:

The following activities are principal in the work of this contract. Additional hazards and activities may require a Hazard Assessment of the additional work and an Activity Hazard Analysis of the work, the associated hazards, and control measures to be taken when performing the activity.

1. Equipment/Furniture Handling – Manual ‐ ‐ Employees shall be trained in safe lifting techniques.

‐ ‐ Mechanical or motorized equipment will be utilized when loads are too heavy or bulky in shape or size – by trained and bonded third party vendors.

‐ ‐ Material shall not be suspended above workers or the public.

‐ ‐ Children and other persons shall not be allowed in the area work activities. Personal

Protective Equipment as lumbar support belts or other devices shall be used to minimize the risk of sprains or strains.

2. Hand and Power Tools ‐ Employees shall be trained in safe use of hand and power tools.

‐ Hand or power tools will not be utilized by IAP personnel when work is being performed by the installers.

‐ Children and other persons shall not be allowed in the area work activities.

Accident Prevention Plan

Emergency Planning:

Emergency Response Numbers:

MEDICAL

Ambulance (Off post) 911 Ambulance (On post) 911 Emergency Room 270‐798‐8000

FIRE

On post emergency 911 Off post emergency 911

POLICE

Military Police 270‐798‐2677 Off post emergency 911

DUTY OFFICER 270‐798‐8388

OPERATOR 270‐798‐2151

Training:

The Contractor is responsible for briefing employees as well as any subcontractor personnel on the site, in all areas of the Accident Prevention Plan and special training as listed below:

‐ Material Lifting – Manual. Proper lifting techniques and the use of the “Buddy system” ‐ Accident reporting for injuries and property damage.

‐ Emergency Procedures for knowing and reporting accidents, fires, and other emergencies.

Job Safety Analysis & Activity Hazard Analysis (AHA) A Job Safety Analysis form must be completed to analyze jobsite conditions and identify any worksite/environmental hazards or challenges and an Activity Hazard Analysis (AHA) is to be developed for each principal steps of the work. AHA’s are to detail the work phase, the associated hazards, and the corrective measures used to minimize or eliminate the hazards.

AHA’s for the principal job steps are enclosed below. If other activities are identified, an AHA for this step or phase, an AHA is to be developed, reviewed, and accepted for this work. The newly created AHA is to be reviewed by the Supervisor and Approved prior to performing the work.

a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box a0mx9gfr Text Box

Job Safety Analysis Form

Task ________________________

Effective Date _______ # of Pages ____ of ____ Department ____________________________

Prepared By:

Date:

Reviewed By:

Date:

Approved By:

Date:

1. Equipment Operated

2. Environmental Conditions Inside Outside Cold Heat Wet Dust Vapors/Mist Noise Vibration Other ___________________

3. Primary Job Functions & Position Lifting Grasping Pushing Sitting Reaching Bending Kneeling Standing Pulling Squatting Other ____________

4. Physical Demands Continuously (C) 67-100% Occasionally (O) 1-33%

Frequently (F) 34-66% Not Applicable (N) 0% Standing ____ Walking ____ Sitting ____ Pushing ____ Pulling ____ Climbing ____ Stooping ____ Bending ____ Kneeling ____ Reaching ____ Carrying (______ lbs. _____ distance)

5. Potential Hazards Controlled By Impact PPE Procedure Training Guards Chemical Contact PPE Procedure Training Guards Caught on or between PPE Procedure Training Guards Fall or Slip PPE Procedure Training Guards Over Exertion PPE Procedure Training Guards Cumulative Trauma PPE Procedure Training Guards Other PPE Procedure Training Guards

6. List of Specific Hazards

7. Chemical List

8. PPE Eye Face Eye Face Head Clothing Hand Other Foot Respiratory Other

9. Procedure - step by step

Activity Hazard Analysis

Principal Step

Loading/Unloading

Furniture/Furnishing

Hazards

Manual Lifting – Strains & Sprains

Fork Lifts/Pallet Jacks – Strains & Sprains

Motorized Equipment (Forklift)

Slips, trips, falls, cuts, abrasions from paper material/boxes

Vehicular traffic

Hand and Power Tools

Control Measures

IAP will employ the services of a Furniture vendor for all furniture installation to include loading/unloading. The following is still provided:

Employees are to be trained in proper lifting techniques.

Forklift operators will be trained, carry appropriate certification and perform pre‐operational checks on the equipment.

Forman to use more than one person for size and weight of load.

Personal Protective Equipment

(PPE)

‐ Gloves ‐ Lumbar Supports ‐ Leather or protective shoes/boots

Check/Clear pathways Plan routes‐avoid overhangs, secure ramps and ladders, illuminate area if after dark

PPE – gloves

Place vehicle cones in street and turn wheels into curb (Uphill and Downhill) Check vehicle.

Inspect tools before use, and remove if defective. Do not use electrical tools in wet locations.

Do not throw or drop tools from above.