This is a Request for Information (RFI) issued by the U.S. Army Corps of Engineers, Seattle District, for market intelligence regarding a potential multi-year, multi-party Other Transaction Authority (OTA) framework agreement under 10 U.S.C. § 2808a for military construction projects. The RFI is issued solely for acquisition planning and market intelligence purposes and does not constitute a solicitation or binding commitment; no contract will be awarded as a result of this RFI, and participation is strictly voluntary.
The primary near-term focus is the Sentinel Operations and Maintenance Complex (OMC) packages and Operations Group Facility (OGF) at Malmstrom Air Force Base, Montana, with potential expansion to other military installations within the Seattle District's area of responsibility across Washington, Montana, Idaho, and Oregon (including Fairchild AFB, Mountain Home AFB, Joint Base Lewis-McChord, and Air National Guard sites). The five near-term facility packages under consideration include: Consolidated Maintenance Facility (CMF) estimated at $200M-$300M for approximately 181,000 SF; Integrated Training Center (ITC) estimated at $100M-$200M for approximately 77,000 SF; Missile Handling Complex (MHC) estimated at $100M-$200M for approximately 50,000 SF; Integrated Command Center (ICC) estimated at $100M-$200M; and Operations Group Facility (OGF) estimated at $200M-$300M. The NAICS code is 236220 (Commercial and Institutional Building Construction, $45 Million size standard). Design work is being performed by Jacobs Engineering with maturity ranging from 35% to 95% completion.
The proposed framework would feature a multi-year period of approximately 5-7 years with multiple parties selected through a single or limited number of OTA agreements, flexibility to employ various OTA methods (Construction Management at Risk, Progressive Design-Build, construction-only collaborative approaches), project authorization through bilateral project orders defining scope, price or guaranteed maximum price (GMP), schedule, and method, and geographic flexibility to support sequential and concurrent facility packages. The Government seeks industry feedback on framework attractiveness and executability, commercial terms, structure of competition, on-ramping mechanisms, and project order selection. Responses must be submitted via an online questionnaire at https://forms.osi.apps.mil/r/dnW9AUb6aj by 10:00 AM PDT on October 20, 2026, with optional supplemental capability statements (not exceeding 5 pages) submitted via email to Kyla Couch, Contract Specialist, at kyla.m.couch@usace.army.mil with subject line "RFI Response – Malmstrom Sentinel OTA – [Firm Name]."
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Army Corps of Engineers – Seattle District | Sentinel Program & MILCON – Market Intelligence
RFI – Multi-Project OTA Framework | AF Installations | Page 1 of 3 | FOR OFFICIAL USE / INDUSTRY DISTRIBUTION
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
SEATTLE DISTRICT
REQUEST FOR INFORMATION (RFI)
ADVANCE NOTICE TO INDUSTRY: Potential Use of Other Transaction Authority (OTA)
Framework for Military Construction
Primary Near-Term Focus: Sentinel OMC Packages & OGF at Malmstrom AFB
Notice Type Request for Information / Market Intelligence (Special Notice)
Authority 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants)
NAICS Code Primarily 236220 – Commercial and Institutional Building Construction (Size Standard:
$45 Million)
Geographic Scope Primarily Malmstrom Air Force Base, MT but we are considering including other Military installations within Seattle District area of responsibility across Washington, Montana, Idaho, and Oregon. Military Installations include but are not limited to: Malmstrom Air Force Base, Fairchild Air Force Base, Mountain Home Air Force Base, Joint Base Lewis- McChord, Air National Guard Sites
Industry Day TBD (details will be announced separately if held)
Response Link https://forms.osi.apps.mil/r/dnW9AUb6aj
Response Deadline 10:00AM PDT on 20 October 2026
Point of Contact Kyla Couch, Contract Specialist | kyla.m.couch@usace.army.mil
1. NOTICE AND DISCLAIMER
This is a Request for Information (RFI) issued solely for market intelligence and acquisition planning purposes.
This announcement does not constitute a Solicitation, Request for Proposal (RFP), Request for Qualifications (RFQ), or invitation for bid. No solicitation is currently available. Participation is strictly voluntary. The Government will not award any agreement or contract as a result of this RFI, nor will it reimburse respondents for any costs incurred in preparing or submitting a response. Submission of a response does not obligate the Government in any way and will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.
While Other Transaction Authority is not subject to the Federal Acquisition Regulation (FAR) or FAR-based small-business set-aside rules, the NAICS code above is provided for market-intelligence purposes to help the Government understand the size and demographics of the interested industrial base.
2. PURPOSE
The U.S. Army Corps of Engineers (USACE), Seattle District, is conducting market intelligence to assess industry capability, capacity, interest, and feedback regarding the potential establishment of a multi-year, multi-party Other Transaction Authority (OTA) framework agreement under 10 U.S.C. § 2808a. The framework would enable Seattle District to execute a multitude of OTA methods with multiple parties over numerous years, with individual projects or packages authorized through project orders.
While the near-term primary focus is the Sentinel Operations and Maintenance Complex (OMC) packages (OMC includes Consolidated Maintenance Facility, Integrated Training Center, Missile Handling Center, and Integrated Command Center) and Operations Group Facility (OGF) at Malmstrom Air Force Base, the Government is also interested in industry feedback on a vehicle broad enough to support construction of numerous facilities at military installations under Seattle District’s area of responsibility.
RFI – Multi-Project OTA Framework | AF Installations | Page 2 of 3 | FOR OFFICIAL USE / INDUSTRY DISTRIBUTION
3. PROJECT BACKGROUND – PRIMARY NEAR-TERM FOCUS
The Sentinel (Ground Based Strategic Deterrent) program is modernizing the Nation’s land-based intercontinental ballistic missile force. At Malmstrom AFB, the Air Force is constructing a suite of new facilities collectively referred to as the OMC, together with the OGF. These facilities replace aging Minuteman III infrastructure and provide purpose-built command, maintenance, training, missile-handling, and operations capabilities for the Sentinel weapon system.
Primary near-term facilities under consideration include (approximate sizes based on current planning data; final designs may vary):
• Consolidated Maintenance Facility (CMF) (Est. Magnitude: $200M-$300M) – Approximately 181,000 SF. Administrative offices, maintenance shops, drive-thru high bays with overhead cranes and vehicle exhaust systems sized for Transporter Erectors (TE), Payload Transporters (PT), and Missile Transporters (MT); vault and secure storage; loading dock and shipping/receiving areas.
• Integrated Training Center (ITC) (Est. Magnitude: $100M-$200M) – Approximately 77,000 SF. High-bay and single-story technical training labs, shops, and classrooms consolidating wing-level maintenance, security forces, cyber-defense, and operations training on Sentinel-unique systems and devices.
• Missile Handling Complex (MHC)(Est. Magnitude: $100M-$200M) – Two facilities totaling approximately 50,000 SF. Three-bay transfer facility with embedded rails for Sentinel missile handling and a companion three-bay facility for positioning and storage of mission-ready transporters/erectors.
• Integrated Command Center (ICC)(Est. Magnitude: $100M-$200M) – Centralized operations facility supporting day-to-day mission control, status and security monitoring, weapons-systems management, cyber defense, and real-time leadership situational awareness.
• Operations Group Facility (OGF)(Est. Magnitude: $200M-$300M) – Multi-story office and collaboration space supporting planning and operations functions, enhancing span of control, and providing associated support spaces (administrative, training, supply, and dispatch functions).
Design for these packages is being performed by Jacobs Engineering under existing design contracts. Design maturity varies by package (35% to 95%, with a majority at 95% completion). The Air Force treats the OMC as one project under a single aggregated DD Form 1391. Utility Infrastructure, which serves the entire OMC campus, is currently being addressed under a separate OT method. (See Sam.gov Notice ID: W912DW26S1CE0, Title:
Request for Information - Sentinel Utility Infrastructure, Malmstrom Air Force Base, MT).
4. POTENTIAL ACQUISITION STRATEGY – FRAMEWORK CONCEPT
Seattle District is exploring the feasibility of establishing one large overarching Other Transaction agreement (or a limited number of agreements) under 10 U.S.C. § 2808a that would function as a flexible multi-year framework.
Key characteristics under consideration include:
• Multi-year period of performance sufficient to support sequential and concurrent facility packages across the Sentinel beddown and related MILCON workload. It is anticipated to be approximately 5 years with the potential to extend to a total of 7 years.
• Multiple parties – Potential for single-agreement or multiple-agreement structure allowing the Government to select among qualified parties for individual project/sub-agreement opportunities.
• Multitude of OTA methods – Flexibility to apply Construction Management at Risk (CM@Risk), Progressive Design-Build, construction-only collaborative approaches, or other commercially adapted methods on a project-by-project basis depending on design maturity, risk profile, and schedule drivers.
• Project orders – Individual work packages or scopes would be authorized through bilateral project orders that define scope, price (or GMP), schedule, and method, analogous to task/project orders under an overarching agreement.
• Geographic and mission flexibility – While Malmstrom Sentinel packages (OMC and OGF) are the immediate focus, the framework is considering the possibility/capability for other MILCON workload assigned to Seattle District (anticipated to cover areas across Washington, Montana, Idaho, and Oregon. Military Installations include but are not limited to: Malmstrom Air Force Base, Fairchild Air Force Base, Mountain Home Air
Force Base, Joint Base Lewis-McChord, Air National Guard Sites).
The Government seeks industry input on whether this type of multi-party, multi-method, multi-year OT framework is attractive and executable, what commercial terms would make it successful, and how best to structure competition, on-ramping, and project order competition or selection.
RFI – Multi-Project OTA Framework | AF Installations | Page 3 of 3 | FOR OFFICIAL USE / INDUSTRY DISTRIBUTION
5. RESPONSE INSTRUCTIONS
Interested parties are requested to submit responses by completing the online questionnaire at https://forms.osi.apps.mil/r/dnW9AUb6aj
The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices.
If necessary, interested parties may also submit a brief capabilities statement containing relevant information not otherwise addressed in the questionnaire. Capability statements shall not exceed 5 pages in length. The Government requests that firms avoid duplicating information already provided through the questionnaire.
Supplemental capability statements are requested to be submitted via email to the individual(s) listed below no later than 10:00 AM Pacific Time on 20 October 2026. Late responses may still be considered at the Government’s discretion but are not guaranteed review prior to strategy finalization.
Kyla Couch, Contract Specialist Military/Environmental/Interagency & International Services (IIS) Branch Contracting Division, Seattle District, Northwestern Division Email: kyla.m.couch@usace.army.mil Subject line: “RFI Response – Malmstrom Sentinel OTA – [Firm Name]”
The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a.
Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates.
https://forms.osi.apps.mil/r/dnW9AUb6aj mailto:kyla.m.couch@usace.army.mil