W912DW26QA0600002.pdf

PDF 3 MB Posted

Attached to
Skagit County Dike District No. 22 Levee Repair – Equipment w/ Operator
Solicitation number
W912DW26QA060
Issued by

About this file

This is Amendment 0002 to Solicitation W912DW26QA060, issued by the U.S. Army Corps of Engineers, Seattle District on July 14, 2026. The amendment extends the proposal due date from July 16, 2026 at 12:30 PM PDT to July 21, 2026 at 12:30 PM PDT. The contract description has been revised to "PROVIDE ALL EQUIPMENT W/ OPERATOR IN ACCORDANCE WITH THE SCOPE OF WORK," replacing the previous description of providing labor, materials, and equipment for installing a buried clay keyway and resurfacing levee sections. An offer guarantee is now required. The amendment adds an updated Statement of Work dated July 13, 2026 and a Questions and Answers document, both dated July 14, 2026.

The scope requires furnishing earthmoving and support equipment with operators for emergency levee repair work in the lower Skagit River area near Fir Island, Washington, with an anticipated period of performance from July 21, 2026 to October 1, 2026. Required equipment includes three Cat 335F L hydraulic excavators with varying hour allocations, one Cat 320 hydraulic excavator, one steel trench box, one water truck, four dump trucks, porta-potty service, and hydroseed application. Payment is based on actual hours worked at quoted hourly rates for mobilization/demobilization and equipment operation, with the Government furnishing all earthwork materials and fuel responsibility falling to the contractor. Proposals must be submitted to W071 ENDIST SEATTLE KO CONTRACTING DIVISION in Seattle, Washington, with all terms and conditions of the original solicitation remaining in effect except as modified by this amendment.

View the file

Other files

File Type Posted
W912DW26QA0600001.pdf PDF
W912DW26QA060.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is as Block 14 (Description of Amendment/Modification):

follows:

1) Dute date has been extended from 16 July at 12:30pm PDT to 21 July at 12:30 PDT

2) Description in Box 10 of the 1442 has been changed to PROVIDE ALL EQUIPMENT W/

OPERATOR IN ACCORDANCE WITH THE SCOPE OF WORK

3) 13b has been changed from no to yes. Offer guarantee is required

4) Section 00 00 00 description has been changed to PROVIDE ALL EQUIPMENT W/

OPERATOR IN ACCORDANCE WITH THE SCOPE OF WORK

5) Section 01 00 00 requirements text has been changed to PROVIDE ALL EQUIPMENT W/

OPERATOR IN ACCORDANCE WITH THE SCOPE OF WORK

6) Attached Q&A

7) Attached updated SOW

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Contract Description

Provide all labor, materials, and equipment w/ operator necessary to install a buried clay keyway and resurfacing two levee sections with low permeability material in accordance with the statement of work.

PROVIDE ALL EQUIPMENT W/

OPERATOR IN ACCORDANCE

WITH THE SCOPE OF WORK

Offer Guarantee Required true

Response Due Time

12:00 PM 12:30 PM

Response Due Date

16 Jul 2026 21 Jul 2026

W912DW26QA0600002

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

No prior attachments

To:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 DD22

Equipment

SOW

13JUL2026

Rev

SCOPE OF WORK 14 Jul 2026 Attach ment

No

0002 Q&A Q&A 14 Jul 2026 Attach ment

No

The following contract documents were added:

DD22 Equipment SOW 13JUL2026 Rev Q&A

Section 01 00 00 - General Requirements

Miscellaneous text in this section has been modified to:

See Attached SOW

The Requirements text has been modified to:

PROVIDE ALL EQUIPMENT W/ OPERATOR IN ACCORDANCE WITH THE SCOPE OF WORK

W912DW26QA0600002

SCOPE OF WORK

DD22 Emergency Levee Repair

Equipment

7/13/2026 REVISION

1) EQUIPMENT REQUIRED:

Furnish all necessary supplies, materials, earthmoving and support equipment, complete with operator pursuant to this scope of work.

a) Cat 335F L Compact Radius or Similar, Track Mounted Hydraulic Excavator w/ Hydraulic Thumb, Minimum HP 200, Minimum Weight 80,000 LBS, Minimum Reach 30 feet at Ground Level, to include digging and clean-out buckets.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 160 Regular Hours, 80 Overtime Hours

b) Cat 335F L Compact Radius or Similar, Track Mounted Hydraulic Excavator w/ Hydraulic Thumb, Minimum HP 200, Minimum Weight 80,000 LBS, Minimum Reach 30 feet at Ground Level, to include digging and clean-out buckets, and a 36” compaction wheel.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 160 Regular Hours, 80 Overtime Hours

c) Cat 335F L Compact Radius or Similar, Track Mounted Hydraulic Excavator w/ Hydraulic Thumb, Minimum HP 200, Minimum Weight 80,000 LBS, Minimum Reach 30 feet at Ground Level, to include digging and clean-out buckets.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 240 Regular Hours, 120 Overtime Hours

d) 8'x20' Steel Trench Box w/ Knife Edges; 4-foot Width.

(1) 1 per month.

e) Water Truck, Capacity 2000 - 2500 gal, tank opening 22in, Fill air gap at top of tank, min pumping rate 550 gpm at 55psi, pump drive - direct from truck, Sprinkler Heads 2 at the front, 1 at each side in the middle, and 2 at the rear.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 240 Regular Hours, 120 Overtime Hours

f) 10-12 cy Solo Dump truck, haul up to Class V Riprap.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 240 Regular Hours, 120 Overtime Hours

g) 10-12 cy Solo Dump truck, haul up to Class V Riprap.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 240 Regular Hours, 120 Overtime Hours

h) 10-12 cy Solo Dump truck, haul up to Class V Riprap.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 240 Regular Hours, 120 Overtime Hours

i) 10-12 cy Solo Dump truck, haul up to Class V Riprap.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 240 Regular Hours, 120 Overtime Hours

j) Cat 320 or Similar, Track Mounted Hydraulic Excavator w/ Hydraulic Thumb, Minimum HP 160, Minimum Weight 48,000 LBS, Minimum Reach 30 feet at Ground Level, to include digging and clean-out buckets.

(1) 1 each - Mobilization/Movement between Sites/Demobilization

(2) Base – 240 Regular Hours, 120 Overtime Hours

k) Porta-Potty toilet service.

(1) Base – 6 Weeks.

l) Hydroseed.

(1) Base – 1 Acre.

2) LOCATION:

Equipment and operator furnished under this Purchase Order shall be delivered to the lower Skagit River Area near Fir Island, WA, and in coordination with the on-site representative. See attached map for location.

3) WORK TO BE DONE:

The project consists of installing a buried clay keyway and resurfacing two levee sections with low permeability material.

4) PERIOD OF PERFORMANCE:

Work will begin as coordinated by the designated Emergency Management Representative. The anticipated POP is that work will start on or about 21 July 2026 and be completed on or about 1 October 2026.

5) INSPECTION AND SUPERVISION:

All work will be conducted in coordination with the onsite government representative of the Emergency Management Branch, Seattle District, Corps of Engineers.

6) SAFETY REQUIREMENTS:

Operation of equipment shall be conducted in accordance with the requirements of EM 385-1-1, “Safety and Health Requirements Manual”. All personnel are required to have PPE in accordance with EM 385 1-1. EM 385 1-1 can be found at:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

7) SECURITY:

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

8) PAYMENT AND MEASUREMENT:

(a) Payment

i) Mobilization and Demobilization: Payment will be made at the purchase order lump sum price for (items including) Mobilization, Demobilization, and Site to Site Movement payment of which shall constitute full compensation for assembling equipment at site preparatory to starting work, and for removing it there from at completion of the work under direction of the Contracting Officer.

b) Measurement

i) Payment will be based on the actual hours worked as reflected by the US Army Corps of Engineers, Seattle District, rental equipment record. Invoices will show actual hours worked;

partial payments authorized.

9) EMAIL INVOICES TO:

a) POC will be given at time of award.

b) Certified Payrolls and Owner/Operator Statements should be emailed to the POC, if applicable.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

The following questions and answers are provided for information purposes only and will not be incorporated into the award.

1. Equipment Utilization

Can the Government confirm whether the estimated equipment hours listed for each CLIN are for bid evaluation purposes only, or whether they represent the anticipated equipment utilization during contract performance?

ANSWER: The represented CLIN equipment hours represent the Government’s best estimate of hours necessary to complete the work.

2. Multiple Equipment Operations

Will all listed equipment be expected to operate simultaneously, or will equipment be utilized as needed throughout the project based on construction sequencing?

ANSWER: It is anticipated equipment will be utilized, as needed, throughout the project. It is also anticipated that equipment will be ready to do the work when needed, without delay.

3. Mobilization/Demobilization

Does the Mobilization/Demobilization CLIN include all movement between work locations within the project limits, or will inter-site moves be compensated separately?

ANSWER: The CLIN breakdown represents the Government’s best understanding of the entirety of the work. No additional costs should be contemplated outside the CLINS for the proposed project. Therefore, Demob/Remob between sites must be incorporated into the existing CLINS and the work for that effort would best be represented by the Mobilization/Demobilization CLIN.

4. Dump Truck Operations

Can the Government provide the anticipated average haul distance and identify the anticipated borrow source(s), spoil disposal location(s), and/or material stockpile areas associated with the dump truck CLINs?

ANSWER: Material will be provided at staging areas in the immediate vicinity of the working area. Excavated material will be placed on the landward side of the levee at Site 1 as directed by the government. No excavated material will need to be hauled to a disposal site.

5. Material Responsibility

Will borrow material, clay, riprap, and other construction materials be Government-furnished, or is the Contractor responsible for procuring these materials?

ANSWER: All earthwork materials will be furnished by the Government.

6. Fuel

Is the Contractor responsible for furnishing all fuel and lubricants for the rented equipment throughout the duration of the project?

ANSWER: The Government will not have any means to provide fuel and/or lubricants. All efforts should be anticipated to be provided by the Contractor.

7. Work Schedule

What anticipated daily working hours and work week (5-day, 6-day, or 7-day) were used in developing the estimated regular and overtime hours?

ANSWER: The hours were developed based on a 6-day schedule (Mon-Sat)

8. Estimated Quantities

Can the Government provide estimated excavation quantities, clay keyway dimensions, resurfacing quantities, and anticipated riprap quantities?

ANSWER: All material quantities noted on plan set in the solicitation.

9. Site Access

Will all project access roads be prepared and maintained by the Government, or will the Contractor be responsible for access improvements?

ANSWER: The Government will not have any means to provide or maintain access roads. All efforts should be anticipated to be provided by the Contractor.

10. Standby Time

If weather, river conditions, or Government direction delays work, will standby time for equipment and operators be compensated under the hourly bid items?

ANSWER: Barring any extraordinary circumstances, equipment and operators will be compensated under hourly bid items for delays determined by the government representative.

Can we bid some of the equipment or do we have to bid on all of the equipment listed for our bid to be considered?

ANSWER: The intent is to make a single award to the quoter/bidder who provides all the requisite items/equipment. There is currently no intention to make multiple awards as a result of this solicitation.

Will the contract be awarded entirely to the lowest collective responsible, bitter (sic), or will it be awarded as it has typically been awarded before to the lowest bidder for each piece of equipment?

ANSWER: The intent is to make a single award to the quoter/bidder who provides all the requisite items/equipment. There is currently no intention to make multiple awards as a result of this solicitation.

Since these are being bid as firm fixed price, however, they are based on hourly estimates, in the event that the contractor is directed to use more hours will the firm fixed price be adjusted and if so, how will that be adjusted?

ANSWER: Any changes to the contract such as an increase in quantities will be at the direction of the Contracting Officer via a supplemental agreement pursuant to RFO 52.212-4. Any increase in quantities will be at the hourly rate accepted/stated in the original firm-fixed price award.

In the event that the contractor works fewer hours than the firm fixed price. Will the hours be adjusted or will the fixed price that has been entered be paid?

ANSWER: Payment will be made for actual hours worked at the hourly rate accepted/stated in the original firm-fixed price award.

Is there a reason that the ACE(sic) has gone away from the traditional method of hourly contracting and has switched this to a firm fixed price? It seems like it’s a recipe for disaster because once the contract is entered as firm fixed, it will require change orders to ultimately reconcile everything.

ANSWER: Seattle District USACE contracts for equipment rental are firm-fixed price. The quoted price is firm and fixed. The hours are estimated. Payment will be made for actual hours worked at the quoted hourly rate.

There is no way that we can provide a performance bond as there is no performance criteria in this contract. No bonding company will issue a performance Bond based on an hourly contract because it effectively puts them on the hook for an unknown dollar amount and scope of work. Can you eliminate the requirement for a payment and performance Bond? If not, can you revise this to only be a payment bond?

ANSWER: Pursuant to the Revolutionary FAR Overhaul (RFO) Part 28.102 Performance and payment bonds and alternative payment protections for construction contracts 40 U.S.C.

chapter 31, subchapter III, Bonds (formerly known as the Miller Act), requires performance and payment bonds for any construction contract exceeding $150,000.

On page 15, A bid Bond is required, why? Again, there is no contract with a performance criteria in it. A Bond must have a specified contract that it guarantees will be completed. The only thing that a bid Bond guarantees is that the contractor will execute the contract. Can this be eliminated?

ANSWER: Pursuant to the RFO Part 28.101 Bid guarantees, bid guarantees must be required whenever a performance bond or a performance and payment bond is required.

DD22 Equipment SOW 13JUL2026 Rev.pdf
DD22 Equipment SOW 13JUL2026 Rev.pdf
1) EQUIPMENT REQUIRED:
Furnish all necessary supplies, materials, earthmoving and support equipment, complete with operator pursuant to the statement of work.
4) PERIOD OF PERFORMANCE:
5) INSPECTION AND SUPERVISION:
6) SAFETY REQUIREMENTS:
8) PAYMENT AND MEASUREMENT:
(a) Payment

Q&A.pdf