Solicitation Amendment W912DW26QA0440001 SF 30.pdf
PDF 4 MB Posted
- Solicitation number
- W912DW26QA044
About this file
This is Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by the U.S. Army Corps of Engineers (USACE) for contract W912DW26QA044 on May 21, 2026. The amendment updates descriptions for all Contract Line Items (CLINs) and revises Performance Work Statement (PWS) section 1.4.
The contract provides annual crane inspection, certification, and repair maintenance services at Chief Joseph Dam in Bridgeport, Washington. The contractor must inspect and certify seven cranes: two 165-ton overhead cranes with dual trollies (each with 82.5-ton main hooks and 25-ton auxiliary hooks), one 18-ton tail race gantry crane, one 50-ton intake gantry crane, one Link Belt HTC-8690 mobile crane, one Grove RT855B mobile crane, and one National 23-ton mobile crane. All inspections must comply with ASME B30 industry standards, EM 385-1-1 safety requirements, and OSHA regulations. The contractor is responsible for providing as-needed repair maintenance and state certification documentation. The scope includes eight separate CLINs: CLINs 0001-0007 for individual crane inspections and CLIN 0008 for repair maintenance and state certification. The contract period runs from July 1, 2026 through June 30, 2027 (base year), with four optional one-year renewal periods through June 30, 2031. The contractor must deliver Microsoft Excel spreadsheets documenting all inspections and work performed within ten days of completion. Inspections are scheduled Monday through Thursday, 7:00 a.m. to 4:00 p.m., through the project Mechanical Supervisor at (509) 686-3521. The Government provides certified crane operators, riggers, signalmen, rigging equipment, PPE, and man lifts; the contractor furnishes all other labor, equipment, materials, and supplies. Key personnel include a Contract Manager with availability between 0700-1600 Monday through Thursday. All contractor personnel must pass E-Verify employment eligibility verification and comply with personal identity verification requirements per FAR 52.204-9.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_W912DW26QA044 CJD Crane Inspection and Repair Maintenance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
The purpose of this amendment is the following:
1). Descriptions for all CLINs have been updated.
2). The PWS section 1.4 has been revised, with changes in red.
Please see the following continue pages for complete details:
W912DW26QA0440001
Performance Work Statement
Part 1: General Information
1. GENERAL: This is a non-personal services contract to provide annual Crane Inspections and Repair Maintenance for 7 Cranes at Chief Joseph Dam, Bridgeport WA. The Government does not exercise any continuous supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the prime Contractor
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary in to inspect, certify, repair maintenance and test the project's Cranes and associated equipment in accordance with (IAW) federal regulations, EM 385-1-1 annual inspection requirements and the most current edition of the American Society of Mechanical Engineers (ASME) B30 standards. The contractor shall provide a Microsoft Excel spreadsheet in hard copy and digital format showing all inspections, and work performed. The contractor shall meet the standards of this contract.
1.2 Background: Chief Joseph Dam is the second largest hydropower producing dam in the United States. It is the largest hydropower producing dam operated by the US Army Corps of Engineers. The single powerhouse is over a third of a mile long and holds 27 house-sized turbines. Alone, it produces enough power to supply the whole of Seattle metropolitan area. Power produced here is marketed by the Bonneville Power Administration. Crane inspections are conducted annually with IAW federal regulation guidelines, the current edition of the EM-385-1-1 and ASME B30 standard guidelines.
1.3 Objectives:
1.3.1 Conduct Annual Maintenance Inspections/Certification for:
(2) 165-ton crane with two (2) trollies, each have one (1) 82.5-ton main hook and 25-ton aux hook per trolly.
Tail Race Crane 18 Ton Intake Crane 50 Ton with Hammerhead Link Belt HTC-8690 Grove RT855B National 23 Ton (Boom Truck/Ford chassis)
1.4 : The contractor shall 1) inspect all 7 Cranes - 2 165-ton Crane, Tail Race Crane, Intake Crane, Scope Link Belt, Grove, National 23 Ton and 2) provide as needed Repair Maintenance at Chief Joseph Dam project and certify with the state if the Cranes are deemed safe. The contractor shall accomplish all inspections/certification to IAW ASME B30 standards. Please see the following CLINs below:
CLIN 0001: 165-Ton Crane - Overhead CLIN 0002: 165-Ton Crane - Overhead CLIN 0003: Tail Race Crane - Gantry (Overhead)
CLIN 0004: Intake Crane - Gantry (Overhead) CLIN 0005: Link Belt - Mobile CLIN 0006: Grove - Mobile CLIN 0007: National 23 Ton - Mobile CLIN 0008: Provide as needed repair maintenance at CJD project & certify with the state if the Cranes are deemed safe
1.5 :Period of Performance
The period of performance shall be base year plus four optional years as follows:
Base Year: July 1 2026 to June 30 2027 Option Year 1: July 1 2027 to June 30 2028 Option Year 2: July 1 2028 to June 30 2029 Option Year 3: July 1 2029 to June 30 2030 Option Year 4: July 1 2030 to June 30 2031
1.6 General Information:
1.6.1 : The contractor is responsible for coordination hours for conducting Hours of Operation business with Chief Joseph Dam. Chief Joseph maintenance staff hours are generally available between the hours of 0700 and 1600, Monday thru Thursday except Federal holidays or when the Government facility is closed die to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.6.2 : Contractor is not required to perform services on holidays.Recognized Holidays
New Year's Day Labor Day
Martin Luther King Jr.'s Birthday Columbus Day
President's Day Veteran's Day
Memorial Day Thanksgiving Day
Juneteenth Christmas Day
Independence Day
1.6.3 : The work to be performed under this contract will be:Place of Performance
- Chief Joseph Dam, HWY 17 and Pearl hill Rd. Bridgeport, WA. 98813
1.6.4 :Security Requirements
All contractors and all associated sub-contractors' employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The contractor should also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
The contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system.
1.6.4.1 : The contractor shall be responsible for safeguarding all Government Physical Security equipment, information and property provided for contractor use. At the close of each work period, Government facility, equipment, and materials shall be secured.
1.6.4.2 Key Control: NOT APPLICABLE
1.6.4.3 Lock Combinations: NOT APPLICABLE
1.6.5 : Special Qualifications All contractor personnel performing inspections, and certifications shall be qualified, certified, and authorized to work and inspect cranes. Contractor shall submit current relevant certifications to perform inspections on cranes. Inspectors will perform inspections only on the crane(s) type(s) they are certified and qualified to inspect.
1.6.6 Key Personnel: The following personnel are considered key personnel by the government:
Contract Manager/Alternate Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and the alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority of act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0700 to 1600, Monday through Thursday, except Federal holidays or when the Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
Marshall Grip - CJD Environmental Compliance
Michael Mellum - CJD Chief of Maintenance
William Dodson - CJD Mechanical Supervisor
Scott Bennett - CJD Chief of Tech
Jeremy Draggoo - CJD Electrical Supervisor
Matt Goe - CJD Crane Operator
1.6.7 : Identification of Contractor Employees All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.8 Data Rights: Government Rights: The Government has unlimited rights to all documents /material produced under this contract. All documents and materials produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer.
All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
PART 2: DEFINITIONS & ACRONYMS
2. :DEFINITIONS and Acronyms
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the Government.
2.1.3. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.4. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.5. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people that are listed in the proposal.
2.1.6. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government party.
2.1.7. QUALITY ASSURANCE. The Government procedures to verify that services being performed by the contractor are performed according to acceptable standards.
2.1.8. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.9. QUALITY CONTROL. All necessary measures taken by the contractor to assure that the quality of a product or service shall meet contract requirements.
2.1.10. SUBCONTRACTOR. One that enters a contract with a prime contractor. The Government does not have a contract with the subcontractor.
2.1.11. WORKDAY. The number of hours per day the contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
ATO Antiterrorism Officer
CCE Contracting Center of Excellence
CFR Code of Federal Regulations
CJD Chief Joseph Dam
CONUS Continental United States (excludes Alaska and Hawaii)
COTR Contracting Officer's Technical Representative
COTS Commercial-Off-the-Shelf
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center
DOD Department of Defense
ECS Emergency Closure System
FAR Federal Acquisition Regulation
HIPAA Health Insurance Portability and Accountability Act of 1996
KO Contracting Office
LWSC Lake Washington Ship Canal
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QAR Quality Assurance Representative
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
RA Requiring Activity
TE Technical Exhibit
PART 3: GOVERNMENT FURNISHED PARTY, EQUIPMENT, AND SERVICES
3. : GOVERNMENT FURNISHED ITEMS AND SERVICES
3.1. Services: The Government will provide a certified crane operator, riggers, signalmen, associated rigging, PPE, and a man lift.
3.2 Facilities: The Government will provide loading and unloading areas along with an area for supplies and contractor's equipment only during the period of inspection at CJD. Materials or equipment may not be stored prior to commencement, or after completion of work.
3.3 Utilities: All utilities in the facility will be available for the contractor's use in performance of tasks outlined in this PWS. If utilities are needed, the following is required: The contractor shall instruct employees in utilities requirement and conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
3.4 Equipment: The Government will provide a certified crane operator, riggers, signalmen, associated rigging, and a man lift. The contractor will provide their own individual, personal PPE as required to conduct inspections.
3.5 Materials: The Government will not provide any new material(s) for this contract.
PART 4: CONTRACTOR FURNISHED ITEMS AND SERVICES
4. :CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
4.1 General: The contractor shall furnish all supplies, equipment, materials, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS. The contractor shall provide a Microsoft Excel spreadsheet in hard copy and digital format showing all inspections and work performed.
4.2 Secret Facility Clearance: NOT APPLICABLE
4.3. Materials: The contractor shall provide all material for the work specified.
4.4. Equipment: The contractor shall provide the equipment needed to meet the requirements under Section 1.3 of this PWS.
PART 5: SPECIFIC TASKS
5. :Specific Tasks
5.1. Basic Services.
5.1.1 ANNUAL CRANES INSPECTIONS AND CERTIFICATION
1) Cranes annual inspections shall be performed in buildings and at the Cranes locations within the CJD project.
2) Inspections conducted will include all required annual inspection requirements IAW ASME B30 industry standards.
3) Contractor will prepare certification documentation of inspected cranes to the WA state Dpt. of L&I for certificates of compliance per crane.
4) Contractors shall provide the Government with all necessary data pertaining to inspections which may be required to maintain, repair, and operate cranes. If any of the Cranes being inspected at the Chief Joseph Dam experience a failure within the contract period, which requires re-certification through the state, the contractor will be available to re-certify the Cranes.
5) All inspections shall be scheduled through the project Mechanical Supervisor at (509) 686- 3521. Inspections shall be performed during the hours of 7:00 A.M. to 4:00 P.M., Monday through Thursday.
5.2 Repair Maintenance: Repair maintenance as needed to bring Cranes back to service.
5.3 Deliverables: Provide a Microsoft Excel spreadsheet in hard copy and digital format showing all inspections, and work performed. The contractor shall perform to the standards
5.4 Work Area: The contractor shall maintain a clean working area.
5.5 Specifications:
See additional specs and requirements in Appendix I, as applicable.
PART 6: APPLICABLE PUBLICATIONS
6. APPLICABLE Publications (Current Editions)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures. EM 385-1-1 USACE Safety and Health Requirements
6.2 The Contractor shall comply with ASME B30 crane industry standards, OSHA 29 CFR
1910.179 -180, 29 CFR 1917.50, 29 CFR 1926.554 and 29 CFR 1926, Subpart CC.
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Standard Performance Threshold
Method of Surveillance
PRS # 1
The contractor shall provide all labor, equipment, materials and supplies necessary to perform annual inspections on:
• (2) 165-ton crane with two (2) trollies, each have one (1) 82.5-ton main hook and 25-ton aux hook per trolly.
• Tail Race Crane 18 Ton
• Intake Crane 50 Ton with Hammerhead
• Link Belt HTC-8690
• Grove RT855B
• National 23 Ton (Boom Truck/Ford chassis) Inspections will be IAW ASME B30 industry standards
Maintenance and inspection results shall be documented to include all inspected items as well as any discrepancies or items that have been replaced. Any discrepancies shall be annotated along with comments and provided to the Government within 10 days of the completion of the inspection.
Zero deviation from standard.
100% Inspection: QAR will inspect Cranes upon completion and upon complaint. Upon complaint the QAR will inspect.
PRS # 2
Repair maintenance as needed to bring Cranes back to service
Maintenance and inspection results shall be documented to include all inspected items as well as any discrepancies or items that have been replaced. Any discrepancies shall be annotated along with comments and provided to the Government within 10 days of the completion of the inspection.
Zero deviation from standard.
100% Inspection: QAR will inspect Cranes upon completion and upon complaint. Upon complaint the QAR will inspect.
PRS # 3
The contractor shall provide a Microsoft Excel spreadsheet in hard copy and digital format showing all inspections and work performed.
Contractor will prepare certification documentation of inspected Cranes to the WA state Dpt. of L&I for certificates of compliance per Crane.
Maintenance and inspection results shall be documented to include all inspected items as well as any discrepancies or items that have been replaced. Any discrepancies shall be annotated along with comments and provided to the Government within 10 days of the completion of the inspection.
Zero deviation from standard.
100% Inspection: QAR will inspect Cranes upon completion and upon complaint. Upon complaint the QAR will inspect.
PRS # 4
The contractor shall maintain a clean working area.
All inspection tools and materials shall be removed and or disposed of by the contractor upon completion of services.
Zero deviation from standard.
100% Inspection: QAR will inspect area upon completion of services.
DELIVERABLES SCHEDULE
Contractor shall submit the following documents prior to the very first site visit after contract award.
Deliverable Frequency # of Copies Medium/Format Submit To MSDS or SDS for
One time – the plan 1 Copy (Copy can Copy can be sent Copy can be emailed to the respective POC for each site:
Chief Joseph Dam: William Dodson
William.l.dodson@usace.army.m il Hwy 17 and Pearl Hill Rd.
Bridgeport, WA. 98813 shall be provided at be sent electronically using least one week prior electronically) any Microsoft to the first scheduled compatible format.
on site workday.
6.3 RATINGS:
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
• EXCEPTIONAL: Performance significantly exceeds contract requirements to the Government’s benefit.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor must present this corrective action plan to the QAR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
6.5 FREQUENCY OF MEASUREMENT:
a. Frequency of Measurement. One Time for Annual Safety Tests
During contract/order performance, the QAR shall make one report upon completion of the contract work or upon a valid complaint as specified in the Performance Standards Summary Matrix.
Prepared by: Mikal Miller, CJD Contract Performance Specialist
Mikal Miller
Signature - CJD Contracting Performance Specialist
Appendix I
Additional Specifications and Requirements Applicable to the Contract as Required:
PART 1: GENERAL
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B30.4 (2020); Portal and Pedestal Cranes
ASME B30.5 (2021); Mobile and Locomotive Cranes
ASME B30.10 (2019); Hooks
ASME B30.16 (2017); Overhead, Underhung and Stationary Hoists
ASME B30.17 (2020); Cranes and Monorails-with Underhung Trolley or Bridge
ASME B30.23 (2016); Personnel Lifting Systems
ASME B30.30 (2019); Ropes
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.179 Overhead and gantry cranes.
29 CFR 1910.180 Crawler Locomotive and truck cranes.
29 CFR 1917.50 Certification of marine terminal material handling devices (See also mandatory appendix I, of this part).
29 CFR 1926.554 Overhead Hoists.
29 CFR 1926 Subpart CC Cranes and Derricks in Construction.
UNITED STATES ARMY CORPS OF ENGINEERS USACE) PUBLICATIONS
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.4 DEFINITIONS
1.4.1 Terminology
Terms used are defined in, ASME B30 series (2016-2021), which hereinafter includes any reference to the "Governing Code."
Continuation of Supplies or Services and Prices/Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Description 165-Ton Crane. See attached PWS for complete details 165-Ton Crane - Overhead. See attached PWS for complete details
INFORMATION FROM TO
Description 165-Ton Crane. See attached PWS for complete details 165-Ton Crane - Overhead. See attached PWS for complete details
INFORMATION FROM TO
Description Tail Race Crane. See attached
PWS for complete details Tail Race Crane - Gantry (Overhead). See attached PWS for complete details
INFORMATION FROM TO
Description Intake Crane. See attached PWS for complete details Intake Crane - Gantry (Overhead).
See attached PWS for complete details
INFORMATION FROM TO
Description Link Belt. See attached PWS for complete details Link Belt - Mobile. See attached PWS for complete details
INFORMATION FROM TO
Description Grove. See attached PWS for complete details Grove - Mobile. See attached PWS for complete details
INFORMATION FROM TO
Description National 23 Ton. See attached PWS for complete details National 23 Ton - Mobile. See attached PWS for complete details
Option Line Item 1001
INFORMATION FROM TO
Description Option Year 1: 165-Ton Crane. See attached PWS for complete details Option Year 1: 165-Ton Crane - Overhead. See attached PWS for complete details
Option Line Item 1002
INFORMATION FROM TO
Description Option Year 1: 165-Ton Crane. See attached PWS for complete details Option Year 1: 165-Ton Crane - Overhead. See attached PWS for complete details
Option Line Item 1003
INFORMATION FROM TO
Description Option Year 1: Tail Race Crane.
See attached PWS for complete details
Option Year 1: Tail Race Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 1004
INFORMATION FROM TO
Description Option Year 1: Intake Crane. See attached PWS for complete details Option Year 1: Intake Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 1005
INFORMATION FROM TO
Description Option Year 1: Link Belt. See attached PWS for complete details Option Year 1: Link Belt - Mobile.
See attached PWS for complete details
Option Line Item 1006
INFORMATION FROM TO
Description Option Year 1: Grove. See attached
PWS for complete details Option Year 1: Grove - Mobile. See attached PWS for complete details
Option Line Item 1007
INFORMATION FROM TO
Description Option Year 1: National 23 Ton. See attached PWS for complete details Option Year 1: National 23 Ton - Mobile. See attached PWS for complete details
Option Line Item 2001
INFORMATION FROM TO
Description Option Year 2: 165-Ton Crane. See attached PWS for complete details Option Year 2: 165-Ton Crane - Overhead. See attached PWS for complete details
Option Line Item 2002
Description Option Year 2: 165-Ton Crane. See attached PWS for complete details Option Year 2: 165-Ton Crane - Overhead. See attached PWS for complete details
Option Line Item 2003
INFORMATION FROM TO
Description Option Year 2: Tail Race Crane.
See attached PWS for complete details
Option Year 2: Tail Race Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 2004
INFORMATION FROM TO
Description Option Year 2: Intake Crane. See attached PWS for complete details Option Year 2: Intake Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 2005
INFORMATION FROM TO
Description Option Year 2: Link Belt. See attached PWS for complete details Option Year 2: Link Belt - Mobile.
See attached PWS for complete details
Option Line Item 2006
INFORMATION FROM TO
Description Option Year 2: Grove. See attached
PWS for complete details Option Year 2: Grove - Mobile. See attached PWS for complete details
Option Line Item 2007
INFORMATION FROM TO
Description Option Year 2: National 23 Ton. See attached PWS for complete details Option Year 2: National 23 Ton - Mobile. See attached PWS for complete details
Option Line Item 3001
INFORMATION FROM TO
Description Option Year 3: 165-Ton Crane. See attached PWS for complete details Option Year 3: 165-Ton Crane - Overhead. See attached PWS for
Option Line Item 3002
INFORMATION FROM TO
Description Option Year 3: 165-Ton Crane. See attached PWS for complete details Option Year 3: 165-Ton Crane - Overhead. See attached PWS for complete details
Option Line Item 3003
INFORMATION FROM TO
Description Option Year 3: Tail Race Crane.
See attached PWS for complete details
Option Year 3: Tail Race Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 3004
INFORMATION FROM TO
Description Option Year 3: Intake Crane. See attached PWS for complete details Option Year 3: Intake Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 3005
INFORMATION FROM TO
Description Option Year 3: Link Belt. See attached PWS for complete details Option Year 3: Link Belt - Mobile.
See attached PWS for complete details
Option Line Item 3006
INFORMATION FROM TO
Description Option Year 3: Grove. See attached
PWS for complete details Option Year 3: Grove - Mobile. See attached PWS for complete details
Option Line Item 3007
INFORMATION FROM TO
Description Option Year 3: National 23 Ton. See attached PWS for complete details Option Year 3: National 23 Ton - Mobile. See attached PWS for complete details
Option Line Item 4001
Description Option Year 4: 165-Ton Crane See attached PWS for complete details Option Year 4: 165-Ton Crane - Overhead. See attached PWS for complete details
Option Line Item 4002
INFORMATION FROM TO
Description Option Year 4: 165-Ton Crane. See attached PWS for complete details Option Year 4: 165-Ton Crane - Overhead. See attached PWS for complete details
Option Line Item 4003
INFORMATION FROM TO
Description Option Year 4: Tail Race Crane.
See attached PWS for complete details
Option Year 4: Tail Race Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 4004
INFORMATION FROM TO
Description Option Year 4: Intake Crane. See attached PWS for complete details Option Year 4: Intake Crane - Gantry (Overhead). See attached PWS for complete details
Option Line Item 4005
INFORMATION FROM TO
Description Option Year 4: Link Belt. See attached PWS for complete details Option Year 4: Link Belt - Mobile.
See attached PWS for complete details
Option Line Item 4006
INFORMATION FROM TO
Description Option Year 4: Grove. See attached
PWS for complete details Option Year 4: Grove - Mobile. See attached PWS for complete details
Option Line Item 4007
INFORMATION FROM TO
Description Option Year 4: National 23 Ton. See attached PWS for complete details Option Year 4: National 23 Ton - Mobile. See attached PWS for
| IDCode: J |
| Page: 1 |
| Pages: 24 |
| AmendNo: 0001 |
| EffDate: 21 MAY 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912DW |
| AdmCode: |
| IssuedBy: W071 ENDIST SEATTLE |
KO CONTRACTING DIVISION, 4735 EAST MARGINAL WAY SOUTH
SEATTLE, WA 98134-2329
UNITED STATES
HIEN HO, EMAIL: HIEN.HO@USACE.ARMY.MIL TELEPHONE: 2065733260
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912DW26QA044 |
| SolDate: 19 MAY 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: ROBERT L. GONZALEZ |
| ContDate: |
| CODate: 21 MAY 2026 |