This is a virtual Industry Day presentation from the US Army Corps of Engineers Seattle District regarding solicitation W912DW25B0004 for repairs to the Grays Harbor North Jetty in Washington state.
The project involves major maintenance repairs to approximately 7,500 feet of the north jetty requiring 100-125k tons of new quarry stone. Key requirements include: minimum stone density of 167 lb/ft3, armor stone sizes between 10-35 tons, and all work must be performed from land. The project will raise crest heights from +20' to +23' MLLW in the outer jetty section and restore the jetty root and channel side slopes. Construction is planned for FY25-27, with an anticipated award in September 2025. The work schedule includes one year for rock procurement followed by 2-3 years of active jetty repairs, with an in-water work window of July 16 - February 14. The presentation also covers small business program requirements and requests industry feedback on potential option items and the use of Lowest Price Technically Acceptable (LPTA) versus Invitation for Bids procurement approach.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| List of attendees (Industry Day).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRAYS HARBOR NORTH
JETTY INDUSTRY DAY
(VIRTUAL)
Seattle District Navigation Section Solicitation #: W912DW25B0004
- Remain muted
- Raise hand if you have a comment or question
MEETING ETIQUETTE
PROJECT OVERVIEW
- This major maintenance action seeks to repair sections of the north jetty which have sustained the most damage including areas where wave overtopping has reduced the crest width and crest height of the jetty.
- New repairs would perform major maintenance of up to 7,500 feet of north jetty (100-125k tons new quarry stone)
- The total project schedule may last up to 42 months depending on quarry sources and availability of suitable stone and project funding.
4NORTH JETTY DAMAGE AREAS – AREA 1
(HEAD & TRUNK)
Low crest near jetty root
5NORTH JETTY DAMAGE AREAS – AREA 2
(ROOT)
6NORTH JETTY DAMAGE AREAS – AREA 3
(TAIL)
Tidal scour, jetty subsidence, and shoreline erosion near City Wastewater Treatment Facility
NORTH JETTY – MAJOR MAINTENANCE PLANS
- All work from land. Minimum stone density, 167 lb/ft3.
Required armor stone sizes, 10-35 tons.
- Outer jetty (trunk & head) last repaired in 1976. Plan is to raise design crest height from +20 to +23’ MLLW to incorporate changes in wave height and mean sea level since original construction.
- Jetty root last repaired in 2000. Repair back to +23’ MLLW and restore channel side sideslopes that have failed in areas.
- Inner jetty (tail) last repaired in 1942. Will raise to +20’ MLLW. Full cross-section reconstruction (filter, core, armor layers)
NORTH JETTY – MAJOR MAINTENANCE STATUS
- Environmental documents (ESA, NEPA, CWA, CZMA, Section 106) are being finalized
- Plans and Specifications are in progress
- Anticipated award of September 2025
- Construction would be in FY25-27 (Year 1: rock procurement, Year 2-3 active jetty repair)
- In-water work window: 16 July - 14 FEB 2025
We want your feedback on the following items:
1. A large amount of the work may be classified as Option Items.
2. Considering solicitating as a Lowest Price Technically Acceptable (LPTA) Request for Proposal versus an Invitation for Bids.
NORTH JETTY – FEED BACK ITEMS
USACE NWS OFFICE OF SMALL BUSINESS PROGRAMS
General Advice:
• Get engaged, EARLY o Understand anticipated SB involvement
a. Small Business Commitment Document
b. Subcontracting Plan – USACE goals are based on historical data, market info o Utilize SAM.gov and FPDS for subcontracting opportunities
• Build relationships, NOW o SBA SubNet – https://subnet.sba.gov/client/dsp_Landing.cfm o FPDS - https://www.fpds.gov/fpdsng_cms/index.php/en/ o Request agency info on recent awards with a subcontracting plan o Request assistance to source SBs (utilize your APEX Accelerators)
• Understand other than small contractor responsibilities under FAR 52.219-9 o Good Faith Efforts (FAR 19.705-7) o eSRS reporting requirements
USACE NWS OFFICE OF SMALL BUSINESS PROGRAMS
Enshané Nomoto Small Business Professional Enshane.Nomoto@usace.army.mil (best initial contact method) Tel: 253-316-3990
General Email: cenws-sb@usace.army.mil USACE NWS SB Homepage:
https://www.nws.usace.army.mil/Business-With-Us/Small-Business/
QUESTIONS?
Future questions should be emailed to the contracting team:
Contracting Officer:
Alex Marcinkiewicz alex.r.marcinkiewicz@usace.army.mil
Contracting Specialist:
Hien Ho hien.ho@usace.army.mil
File details come from the government source that posted it. Updated .