PLA Special Notice - CDC Design Build 24OCT24.pdf
PDF 344 KB Posted
- Solicitation number
- W912DW25R0XUG
About this file
This document is a Project Labor Agreement (PLA) Market Survey regarding the construction of a Child Development Center at Mountain Home Air Force Base in Idaho. The project will involve demolishing two existing buildings and constructing a new medium-sized facility with child activity areas, administrative and support spaces, as well as associated site work and utilities. The estimated construction cost range is between $25 million and $100 million, with a 540-day period of performance. The U.S. Army Corps of Engineers Seattle District is seeking industry comments on the potential use of a PLA for this large-scale construction project, including whether PLAs have been used on similar projects in the local area and if there are any skilled labor shortages in the region that could impact the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PLA Special Notice - CDC Design Build Amended 14NOV24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLA Market Survey Child Development Center at MHAFB, Idaho
Subject: Child Development Center located at Mountain Home Air Force Base, Idaho.
NAICS Code: 236220 – Commercial and Institutional Building Construction.
Product Service Code: Y1CZ Construction of Other Education Buildings
THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY. THIS IS NOT A
REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID.
THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS
AVAILABLE AT THIS TIME.
This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The Corps of Engineers Seattle District is soliciting comments from the construction community addressing the potential use of PLA for large scale construction projects (exceeding $35 million) within Mountain Home Air Force Base, Idaho.
DESCRIPTION OF WORK:
The Child Development Center is located at the Mountain Home Air Force Base in Mountain Home, Idaho. The Child Development Center is a medium size facility that includes infant, pre-toddler, toddler, and preschooler child activity areas, administrative and staff space, and facility support spaces: lobby, restrooms, storage rooms, and kitchen. Building systems include concrete foundation, concrete floor slabs, masonry walls, metal framed roof system, standing seam metal roof, information systems, fire protection and alarm systems, electronic access control, cybersecurity measures, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, fencing, utilities and connections, exterior lighting, paving, parking, sidewalks, storm drainage, information systems, landscaping, and signage. Provide connection to streets and access roads, earthwork, grading, concrete pads, electrical and communication utilities. Incorporate mass timber design, including, but not limited to beams, walls, girders, columns, and roof system. The facility shall not exceed 36,745 SF with a 40M PA. Period of Performance (POP) is expected to be 540 days.
The project will demolish building 2623 (1,034 SM) and 2630 (861 SM) (Total: 1,895 Square Meters).
Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01.
MAGNITUDE:
In accordance with DFARS 236.204, the magnitude of the estimated cost of construction (ECC) range for this project is between $25,000,000 and $100,000,000.
FACTORS TO BE CONSIDERED:
Some of the factors that may be considered regarding PLA use are:
PLA Market Survey Child Development Center at MHAFB, Idaho
1. The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades.
2. There is a shortage of skilled labor in the region in which the construction project will be sited.
3. Completion of the project will require an extended period of time.
4. PLAs have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project.
5. A PLA will promote the agency’s long term program interests, such as facilitating the training of a skilled workforce to meet the agency’s future construction needs.
6. Any other factors that the agency decides are appropriate.
FEDERAL ACQUISITION REGUATIONS (FAR) 22.502 DEFINITIONS:
Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U. S.C. 158(f).
FAR 22.503 – POLICY:
a. PLA are a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of PLAs in connection with large-scale construction projects.
b. An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a PLA with one or more labor organizations if the agency decides that the use of PLAs will:
1. Advance the Federal Governments interest in achieving economy and efficiency in
Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and;
2. Be consistent with law. (Refer also to FAR 52.222-33 Notice of Requirement for PLA and FAR 52.222-34 PLA).
INDUSTRY COMMENTS:
The construction community is invited to comment on the use of PLAs using the following questions:
1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
File details come from the government source that posted it. Updated .