Amendment 0006 for W912DW25B0009 (GH North Jetty)_15DEC2025.pdf

PDF 389 KB Posted

Attached to
W912DW25B0009 Grays Harbor North Jetty Repair - Bid Opening Details
Solicitation number
W912DW25B0009
Issued by

About this file

This document is an Amendment of Solicitation for the FY25 Grays Harbor North Jetty Repair project located in Ocean Shores, Washington. The U.S. Army Corps of Engineers, Seattle District (USACE) is seeking a contractor for major maintenance and repair of sections of the North Jetty that have sustained significant damage, including areas with wave overtopping that have reduced the crest width. The procurement is a 100% Small Business Set Aside, with bids due by 10:00 AM Pacific Time on 15 January 2026. Bidders must submit electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module and will be required to provide a bid bond of 20% of the bid price or $3 million, whichever is less.

Key changes in Amendment 0006 include lifting the previous suspension, removing all Project Labor Agreement (PLA) requirements, extending the solicitation and bid opening dates, and updating wage determinations. The project requires furnishing all labor, materials, and equipment to perform work according to contract specifications. Contractors must begin performance within 14 calendar days of award and complete the work within the specified performance period. The contract will be awarded to the responsible bidder whose offer is most advantageous to the government, considering only price and price-related factors. Bidders must be registered in the System for Award Management (SAM) and comply with all solicitation requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 16

2. AMENDMENT /MODIFI CATION NO. 3

. EFFECTIVE DATE

15-Dec-2025

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE W912DW 7. ADMINISTERED BY (If other than item 6) CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINALWAYSOUTH, BLDG. 1202

SEATTLE WA 98134-2388

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

9A. AMENDMENT OF SOLICITATION NO.

W912DW25B0009

X 9B. DATED (SEE ITEM 11)

25-Jul-2025

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15 and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0006

See Continuation Pages for Complete Details:

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W912DW25B0009

2. TYPE OF SOLICITATION

X SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

25-Jul-2025

PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE W912DW 8. ADDRESS OFFER TO (If Other Than Item 7) CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

TEL: FAX: 206-764-6817

See Item 7

TEL: FAX:

9. FOR INFORMATION

CALL:

A. NAME

HIEN HO

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Project Title: FY25 Grays Harbor North Jetty Repair, Ocean Shores, WA

Acquisition for major maintenance and repair sections of the North Jetty w hich have sustained the most damage including areas w here w ave overtopping has reduced the crest w idth and crest of the jetty. The w ork is located on the Grays Harbor North Jetty - Ocean Shores, Washington.

Furnish all labor, materials, and equipment to perform all w ork in accordance w ith attached contract, provisions, clauses, and technical specifications.

IMPORTANT NOTICE: Please see Section 00 21 00 for detailed instructions on bid submittal and bid opening procedures. In addition, this solicitation requires a Project Labor Agreement (PLA), see section 00 21 00 and applicable clauses.

11. The Contractor shall begin perf ormance w ithin 1_4 calendar days and complete it w ithin calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _5_2_._2_1_1_-1_0 .)

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed off ers in original and 1 copies to perform the w ork required are due at the place specif ied in Item 8 by 10:00 AM (hour) local time 15 Jan 2026 (date). If this is a sealed bid solicitation, off ers must be publicly opened at that time. shalSl ealed envelopes containing offers be marked to show the off eror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 9_0 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

W912DW25B0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0006

Summary of Changes for Amendment 0006

1 . The IFB suspension issued in Amendment 0005 is hereby lifted.

2 . SF 1442 Box 10 “IMPORTANT NOTICE” is revised to remove the PLA langua ge requirements.

3 . SF1442 Box 13 A – the solicita tion due date is extended to 10:00 AM Pacific Time, 15 January 2026.

4 . Bid opening is extended to 10:30 AM Pacific Time, 15 January 2026.

5. Removal of all requirements for Project Labor Agreements (PLA)

6 . Section 00 21 00 – “INSTRUCTIONS TO OFFERORS” is hereby updated to include the following sections:

• Section 9 (d) (PROJECT LABOR AGREEMENT (PLA) REQUIREMENT) is Removed in red.

• Section 11 (BID OPENING PROCEDURE) has been updated in red.

7. Clauses 52.222-33 Notice of RequirementFor ProjectLabor Agreement & 52.222-34 Project Labor Agreement are Removed.

8 . Wa ge determination is updated.

9 . The attached revised sections are to be replaced in their entirety. All portions of the revised sections shall apply whether or not changes have been indicated.

1 0 . IMPORTANT NOTICE: Bidders must acknowledge receipt of this amendment bynumbers anddate on offer.

SECTION 00 10 00 – SOLICITATION

The required response date/time has changedfrom 16-Dec-2025 09:30 AM to 15-Ja n-2026 10:00 AM

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

RETURN THE FOLLOWING WITH YOUR BID:

1. SF 1442 – Solicitation, Offer, and Award

2. Bid Guarantee:

Bid Bond -- The a m ount of the bid guarantee shall be 20 percent (20%) of the bid price or $3 Million, whicheveris less. Bid Bonds (SF24)must be accompaniedby a Powerof Attorneycontaining a n original or electronic signature from the surety,which must be affixedto the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will be accepted if accompanied by a certification from a current officer of the surety attesting to its authenticity and continuing validity.

NOTE: Digital scans, or photographed or otherwise reproduced images, of ink signatures are not considered acceptable "electronic signatures." If a required submitted document does not contain electronic signatures, you must submit original hard-copy documents.

Current SF24 forms a re ava ila ble at thefollowing website: http://www.gsa.gov/portal/forms/type/TOP.

3. Joint Venture Proposal/Bid Requirements:

When proposingas a jointventure, a ll members of thejointventure shallsign the SF 1442 andthe bid bond unless a written agreementby thejointventure is furnished with theproposaldesignatingonefirm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreementsha llbe submittedwith the proposal.Fa ilure to comply with the foregoingrequirements may elimina te the proposalfrom further consideration. If this is an 8(a ) or HUBZone joint venture, the offeror sha ll ensure that it complies with the applica ble requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively. Regardless of anyagreement, a ll members of the JV sha ll sign the contract and performance and payment bonds.

CAUTION TO BIDDERS:

1 . BUSINESS HOURS: For the Seattle District Corps of Engineers a re from 7:30 A.M to 4:00 P.M.

Pacific Time, Monday through Friday.

BEFORE SIGNING AND SUBMITTING THIS OFFER, PLEASE TAKE NOTE OF THE

FOLLOWING AS FAILURE TO EPRFORM ANY ONE OF THESE ACTIONS MAY CAUSE

YOUR OFFER TO BE REJECTED.

2 . AMENDMENTS: Have youacknowledgedreceipt of ALL amendments? If in doubt as to the number of amendments issued, please contact the representative listed on the Information page.

3 . AMENDED SECTIONS: if any of the amendments furnished amended sections, the amended sections must be used in submitting your offer.

4 . MISTAKE IN OFFER: Have you reviewedyour offer price for possible errors in ca lculation or work left-out?

5 . OFFER ACCEPTANCE PERIOD: The minimum offer acceptanceperiod is specified in block 13D of SF 1442, Solicita tion, Offer, and Awa rd. Plea se ensure that you allow at lea st the stated number of calendar days for the Government to accept your offer.

http://www.gsa.gov/portal/forms/type/TOP

6 . SYETEM AWARD MANAGEMENT: The Offeror is required before receipt of contract award to ensure thattheir firm is registered in the Government web site entitled System for Awa rd Management (SAM) and that all information required is current and up to date.

7 . GOVERNMENT SECURITY REQUIREMENTS: The Offeror’s bis sha ll be submitted electronica lly,a s describedbelowin Item 9,Bid Submitta ls.The InvitationforBid (IFB) will provide the receipt date for bid submittal. The Offeror’s bid shall not contain classified da ta . The use of hyperlinks in bid in prohibited.

8 . COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS: Copies of the solicita tion and amendments a re ava ila ble by INTERNEST ACCESS ONLY. All solicita tion documents will be posted to the U.S. Government’s Contract Opportunities website at: https://www.SAM.gov under Solicitation number W912DW25B0009. A list of interested vendors (potential offerors and subcontractors) is availa ble on the web site (registra tion required) with thesolicitation announcement.

9. BID SUBMITTALS:

a. PIEE Submission: Theonly authorized transmission method for bids in response to this solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module online submission. NO OTHER TRANSMISSION METHODS (E-

MAIL, FACSIMILE,REGULAR MAIL, HAND CARRIED, ECT.) WILL BE ACCEPTED.

b . Bid Submission Instructions: The Offeror shall submit its bid electronically through the PIEE Solicita tion Module. When posting a bid, ensure electronic files a re clea rly identified with the solicita tion number, company name, volume, section, and or/item. The minimum required naming format for files is a s follows:

W912DW25B0009_Company Name_Item

Bids will not be accepted if submitted bymail orhand carriedand willnot be evaluated. Bids sent throughproprietary or third-party File Tra nsfer Protocol (FPT) sites or DoD Sa fe will not be accepted. The Offeror is responsible to confirm the bid has been received. All bids received after the exacttime specifiedfor receiptsha ll be treated a s late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR) and this solicitation.

c. PIEE Registration: For PIEE registration, training, and instructions for postingan offer, refer to the following links: PIEE Registra tion: https://piee.eb.mil

Note: There are two vendor roles (Proposal Manger, Proposal View Only) for PIEE Solicita tion Module. The Proposal Manager role is required to submit a n offer to a solicita tion. Plea se be advisedthat whenusingthe PIEE Solicita tion Module, the user’s ema il address in PIEE must match the email address on file in SAM.Gov.

PIEE Solicita tion Module

Training and instructions are accessible through PIEE – Web Based Training (WBT) a t https://pieetraining.eb.mil/wbt d . Project Labor Agreement (PLA) Requirement: ***See FAR Provision 52.222-33 Notice of Requirement for Project Labor Agreement, and FAR Clause 52.222-34 Project Labor Agreement,fordefinitions andrequirements pertainingto the use of a PLA for this contract.

All Offerors shall submit a n offer subject to PLA requirements in accordance with FAR 22.504,Generalrequirements forproject la boragreements.Any PLArea chedpursuant to the PLA requirements in the Solicita tion does notchange theterms ofthe contract or provide for any price adjustmentby the Government. Failure to timely submit a copy of the Offeror’s executed PLA m a y m ake their bid considered nonresponsive and not eligible for award.

https://www.sam.gov/ https://piee.eb.mil/ https://pieetraining.eb.mil/wbt

10. DOD PROCUREMENT TOOLBOX:

a. For Frequently Asked Questions (FAQ) and additional tra ining, go to the DoD Procurement Toolbox – eBusiness – Solicitation Module at https://dodprocurementtoolbox.com/site-pages/solicitation-module b . In the unlikely eventthe PIEE system and/orSolicita tion Module is not operational, and the Offeror is unable to access or use the system, the Offeror shall immediately notify the ContractingOfficerand Contract Specia list.Notifica tion mustoccur prior to the submission deadlineand shallbe in writing throughauthorizedemailidentified in the solicita tion. If a n alternate methodfor bid submission is authorized via email due to the system outages, the Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method.

c. Ensure a ll documentationsubmitted meets supportedfile extensionsidentified in PIEE FAQS.

Na rra tive portions of the offer shall be in Adobe Acrobat Portable Document Format (PDF) searchable text format. Embeddedsoundor video (e.g., MPEG) files a re not authorized and shall not be included.

11. BID OPENING PROCEDURE:

a. The virtual opening will occur 30 minutes after the due date and time for receipt of bids.

Virtua l bid opening is scheduled for 15 January 2025 at 10:30 A.M. Pacific time. Plea se use the following information: Microsoft Teams Meeting

The link to join the meeting/view on-line is:

https://dod.teams.microsoft.us/l/meetupjoin/19%3adod%3ameeting_52cd1e55a32d4764b124f 5c47e2f91c7%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a 7 8f3163d27582%22%2c%22Oid%22%3a%22100e493c-9ff5-48bc-94fe- 18c6d80a4e97%22%7d

Meeting ID: 993 995 396 50

Pa sscode: a R6Pn2E5

Join by Phone: +1 601-262-2433,,620563317# United States, Vicksburg

Phone conference ID: 620 563 317# b . The bid openingwill begin promptlyat 10:30 A.M. so plea se a llow time for connecting by audio and/or resolving any technical difficulties before the beginning of proceedings.

1 2 . BID EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay, a s a direct charge, any costs incurred in the preparation and submission of a bid.

1 3 . ACCURACY IN BID: Bid must set forth full, accurate, and complete information as required bythis IFB, (includingattachments). The penaltyfor makingfalse statements is prescribed in 18 U.S.C. 1001.

1 4 . BASIS OF AWARD: Per FAR 14.408(a)(3), awardwill be made to the responsible bidder whose bid, responsive to the invitation, will be most advantageous to the Government, consideringonly price and the price-rela ted factors included in the invitation. Awa rd shall not be made until a ll required approvals have been obtained and the award otherwise conforms to FAR 14.103-2.

https://dodprocurementtoolbox.com/site-pages/solicitation-module https://dodprocurementtoolbox.com/site-pages/solicitation-module https://dod.teams.microsoft.us/l/meetupjoin/19%3adod%3ameeting_52cd1e55a32d4764b124f5c47e2f91c7%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7%208f3163d27582%22%2c%22Oid%22%3a%22100e493c-9ff5-48bc-94fe-18c6d80a4e97%22%7d https://dod.teams.microsoft.us/l/meetupjoin/19%3adod%3ameeting_52cd1e55a32d4764b124f5c47e2f91c7%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7%208f3163d27582%22%2c%22Oid%22%3a%22100e493c-9ff5-48bc-94fe-18c6d80a4e97%22%7d https://dod.teams.microsoft.us/l/meetupjoin/19%3adod%3ameeting_52cd1e55a32d4764b124f5c47e2f91c7%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7%208f3163d27582%22%2c%22Oid%22%3a%22100e493c-9ff5-48bc-94fe-18c6d80a4e97%22%7d https://dod.teams.microsoft.us/l/meetupjoin/19%3adod%3ameeting_52cd1e55a32d4764b124f5c47e2f91c7%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7%208f3163d27582%22%2c%22Oid%22%3a%22100e493c-9ff5-48bc-94fe-18c6d80a4e97%22%7d

1 5 . SPECIAL CONTRACT REQUIREMENT:Subject to USACE Alert 22-004, the ContractingOfficer will remove the clause from a resultant award when the offeror represents that it is not a foreign person, in response to the certification/representation a t FAR 52.229-11.

THIS PROCUREMENT IS: 100% Small Business Set Aside

SITE VISIT: See FAR 52.236-27 Alt I

BIDDING DOCUMENTS: Informationon the IFB can be found onthe following website [https://SAM.gov and https://piee.eb.mil.]

FOR INQUIRIES AND ADMINISTRATIVE MATTERS: Contact thefollowing individuals Monday through Friday between the hours of 7:00 A.M. and 2:30 P.M Pacific Time:

Na me: Hien Ho Ema il Address: hien.ho@usace.army.mil

TECHNICAL QUESTIONS:

1 . All inquiries rega rdingthis solicita tion are to be submittedvia ProjNet [https://www.projnet.org].telephone and email inquiries will not be accepted. ProjNet is a web-based program that allows bidders to post questions rega rdingthis solicita tion a nd to view all questions by other bidders and answers by USACE.

2 . To access the ProjNet website the first time:

a. Step 1: Click the Bid tab b . Step 2: Click Bidder Inquiry. (The Agency USACE)

Enter the following information for access:

1 ) The Bidder Inquiry Key: KN8FN6-HPRJP4

2 ) Va lid business contact information (e.g. Company name, contact person, business address, phone number, and email address). (required on first project only)

3 ) Establish Secret Questionand Answer which willbe used as a password (required onfirst project only)

For subsequentaccess, use yourema il address, the Bid Inquiry Key and response to the Secret Question to access ProjNet.

3 . Submit technical questions. When a n answer is posted to a question, the question and answer is then ava ila ble for a ll other bidders to review.

4 . For questions about ProjNet,plea secontactthe Call Centerhelp desk from 8:00 A.M.to 5:00 P.M. Central Time:

ProjNet Ca ll Centernumbers: 833-389-1097 and 217-367-3273 or ema il: staff@projnet.info (preferred)

BIDDERS ARE URGED and expected to inspectthe site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable. In no event, will a fa ilure to inspect the site constitute grounds for withdrawal of a bid after opening or fora claim after contract award.

https://piee.eb.mil/ mailto:hien.ho@usace.army.mil http://www.projnet.org/ mailto:staff@projnet.info

No response will be posted to inquiries after the Close of Business onthe third business day preceding the solicita tion duedate. All bidders will be held to have viewed the questions and responses in ProjNet prior to bid submission. Nothing in this solicita tion is changed unless a n amendment is sent out.

The following have been deleted (and will not be included in an awarded contract):

52.222-33 Notice of Requirement for Project

Labor Agreement

JAN 2024

(a) Definitions. As used in this provision, the following terms are defined in clause 52.222-34, Project Labor Agreement, of this solicitation "construction," "labor organization," "large-scale construction project," and "project labor agreement." (b) Offerors shall— (1 ) Negotiate or become a party to a project labor agreement with one or more labor organizations for the term of the resulting construction contract; and (2 ) Require its subcontractors to become a party to the resulting project labor agreement.

(c ) The project labor agreement reached pursuant to this provision shall-- (1 ) Bind the Offeror and subcontractors engaged in construction on the construction project to comply with the project labor agreement;

(2 ) Allow the Offeror and all subcontractors to compete for contracts and subcontracts without regard to whether they are otherwise parties to collective bargaining agreements;

(3 ) Contain guarantees against strikes, lockouts, and similar job disruptions;

(4 ) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising during the term of the project labor agreement;

(5 ) Provide other mechanisms for labor-management cooperation on matters of mutual interest and concern, including productivity, quality of work, safety, and health; and (6 ) Fully conform to all statutes, regulations, Executive orders, and agency requirements.

(d ) Any project labor agreement reached pursuant to this provision does not change the terms of the resulting contract or provide for any price adjustment by the Government.

(e ) The Offeror shall submit to the Contracting Officer a copy of the project labor agreement with its offer.

(End of Provision)

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been deleted (and will not be included in an awarded contract):

52.222-34 Project Labor Agreement JAN 2024

(a ) Definitions. As used in this clause-- Construction means construction, reconstruction, rehabilitation, modernization, alteration, conversion, extension, repair, or improvement of buildings, structures, highways, or other real property.

Labor organization means a labor organization a s defined in 29 U.S.C. 152(5) of which building and construction employees are members.

Large-scale construction project means a Federal construction project within the United States for which the total estimated cost of the construction contract(s) to the Federal Government is $35 million or more.

Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is a n agreement described in 29 U.S.C. 158(f).

(b ) The Contractor shall maintain in a current status throughout the life of the contract the project labor agreement entered into prior to the award of the contract.

(c ) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts with subcontractors engaged in construction on the construction project.

(End of Provision)

The following have been added by full text:

SECTION 00 72 00 - GENERAL CONDITIONS

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractorwithin a period 60 180 calendar days prior to the end of performance period. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

WAGE DETERMINATION

"General Decision Number: WA20250046 12/12/2025

Superseded General Decision Number: WA20240046

State: Washington

Construction Type: Heavy including water and sewer line construction

County: Grays Harbor County in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Modification Number Publication Date 0 01/03/2025 1 02/07/2025 2 03/21/2025 3 06/06/2025 4 06/27/2025 5 07/18/2025 6 08/22/2025 7 08/29/2025 8 09/05/2025

9 09/12/2025 10 09/26/2025 11 12/12/2025

CARP0360-010 06/01/2025

Rates Fringes

CARPENTER........................$ 63.98 19.13

ELEC0076-005 08/31/2025

ELECTRICIAN......................$ 65.14 26.56

ENGI0302-001 06/01/2025

Power equipment operators:

Group 1A ................. $ 61.56 27.57 Group 1AA. ............... $ 62.47 27.57 Group 1AAA. .............. $ 63.35 27.57 Group 1 ....................$ 60.67 27.57 Group 2 ....................$ 59.88 27.57 Group 3 ....................$ 59.23 27.57 Group 4 ....................$ 55.43 27.57

Zone Differential (Add to Zone 1 rates):

Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30

BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)

GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom; Excavator/Trackhoe, Backhoes: Over 90 metric tons

GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over;

excavator/Trackhoe, backhoes: over 50 metric tons to 90 metric tons

GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work;;

Excavator/Trackhoe, backhoes: over 30 metric tons to 50 metric tons; Loader- overhead 6 yards to, but not including 8 yards; Dozer D-10

GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;

Crane-overhead, bridge type-20 tons through 44 tons;;

Excavator/Trackhoe, backhoe: 15 to 30 metric tons;

Loaders-overhead under 6 yards; Mechanic; Drilling Machine;

Grader (finishing)

GROUP 3 - Cranes-thru 19 tons with attachments; A-frame crane over 10 tons;; Dozers-D-9 and under; Roller-Plant Mix;

Excavator/Trackhoe, backhoe: under 15 metric tons;

Forklift: 3000 lbs and over with attachments; Oiler; Grader (non-finishing);Boom Truck over 10 tons

GROUP 4 - Cranes-A frame-10 tons and under; Roller-other than plant mix; Forklift: under 3000 lbs with attachments; Boom Truck 10 tons and under

IRON0086-012 07/07/2025

Ironworker (REINFORCING &

STRUCTURAL)......................$ 57.94 34.52

LABO0252-002 06/01/2025

ZONE 1:

Rates Fringes

LABORER

GROUP 2A....................$ 40.88 16.72

GROUP 3.....................$ 50.38 16.96

GROUP 4.....................$ 51.52 16.99

GROUP 5.....................$ 52.31 17.01

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):

ZONE 2 - $1.00

ZONE 3 - $1.30

BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,

TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.

TOWNSEND, PT. ANGELES, AND BREMERTON

ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall

LABORERS CLASSIFICATIONS

GROUP 2A: Flagger

GROUP 3: General or Common Laborer; Chipping Guns (Under 30 lbs)

GROUP 4: Chipping Guns (Over 30 lbs); Groutmen; Pipe Layer

GROUP 5: Mason Tender-Brick; Mason Tender-Cement/Concrete;

Grade Checker

PAIN0300-005 07/01/2025

PAINTER (Brush, Roller and Spray)...........................$ 41.24 14.70

PLAS0528-004 06/01/2024

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 54.16 21.27

* TEAM0174-002 06/01/2025

Rates Fringes

Truck drivers:

ZONE A:

GROUP 1:...................$ 55.43 27.52

GROUP 2:...................$ 54.59 27.52

ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates.

ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates.

*Zone pay will be calculated from the city center of the following listed cities:

BELLINGHAM CENTRALIA RAYMOND OLYMPIA

EVERETT SHELTON ANACORTES BELLEVUE

SEATTLE PORT ANGELES MT. VERNON KENT

TACOMA PORT TOWNSEND ABERDEEN BREMERTON

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Dump Trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment.

GROUP 2 - Dump trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with less than 16 yards capacity.

HAZMAT PROJECTS

Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:

LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical ""splash suit."" LEVEL A: +$.75 per hour - This level utilizes a fully-encapsulated suit with a self-contained breathing apparatus or a supplied air line.

SUWA2009-037 08/07/2009

LABORER: Landscape..............$ 14.67 0.00

PIPEFITTER.......................$ 30.00 8.35

TRUCK DRIVER: Water Truck.......$ 24.36 8.30

TRUCK DRIVER: 10 Yard Truck.....$ 24.61 8.34

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council http://www.dol.gov/agencies/whd/government-contracts http://www.dol.gov/whd/govcontracts number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via mailto:davisbaconinfo@dol.gov mailto:BCWD-Office@dol.gov email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

(End of Summary of Changes) mailto:dba.reconsideration@dol.gov

SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
Summary of Changes for Amendment 0006
5. Removal of all requirements for Project Labor Agreements (PLA)
7. Clauses 52.222-33 Notice of RequirementFor ProjectLabor Agreement & 52.222-34 Project Labor Agreement are Removed.
SECTION 00 10 00 – SOLICITATION
The required response date/time has changedfrom 16-Dec-2025 09:30 AM to 15-Ja n-2026 10:00 AM
SECTION 00 21 00 - INSTRUCTIONS
INSTRUCTIONS TO OFFERORS
1. SF 1442 – Solicitation, Offer, and Award
3. Joint Venture Proposal/Bid Requirements:
CAUTION TO BIDDERS:
BEFORE SIGNING AND SUBMITTING THIS OFFER, PLEASE TAKE NOTE OF THE FOLLOWING AS FAILURE TO EPRFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR OFFER TO BE REJECTED.
9. BID SUBMITTALS:
W912DW25B0009_Company Name_Item
10. DOD PROCUREMENT TOOLBOX:
11. BID OPENING PROCEDURE:
The link to join the meeting/view on-line is:
TECHNICAL QUESTIONS:
The following have been deleted (and will not be included in an awarded contract):
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been deleted (and will not be included in an awarded contract): 52.222-34 Project Labor Agreement JAN 2024
SECTION 00 72 00 - GENERAL CONDITIONS
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
"General Decision Number: WA20250046 12/12/2025
CARP0360-010 06/01/2025
CARPENTER........................$ 63.98 19.13
ELEC0076-005 08/31/2025
ELECTRICIAN......................$ 65.14 26.56
ENGI0302-001 06/01/2025
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
IRON0086-012 07/07/2025
LABO0252-002 06/01/2025 ZONE 1:
GROUP 2A....................$ 40.88 16.72
GROUP 3.....................$ 50.38 16.96
GROUP 4.....................$ 51.52 16.99
GROUP 5.....................$ 52.31 17.01
LABORERS CLASSIFICATIONS
PAIN0300-005 07/01/2025
PLAS0528-004 06/01/2024
CEMENT MASON/CONCRETE FINISHER...$ 54.16 21.27
* TEAM0174-002 06/01/2025
ZONE A:
GROUP 1:...................$ 55.43 27.52
GROUP 2:...................$ 54.59 27.52
TRUCK DRIVERS CLASSIFICATIONS
HAZMAT PROJECTS
SUWA2009-037 08/07/2009
PIPEFITTER.......................$ 30.00 8.35
WAGE DETERMINATION APPEALS PROCESS
================================================================ END OF GENERAL DECISION"