ABSTRACT - 23B0007 Duwamish Dredging Final.xls
XLS spreadsheet 51 KB Posted
- Solicitation number
- W912DW24C0002
About this file
This document is an abstract of offers for a construction contract solicitation to perform maintenance dredging of the Duwamish Waterway in Seattle, Washington. The solicitation was issued on July 24, 2023 by the Department of the Army Corps of Engineers Seattle District, with offers due by September 18, 2023. The small business set-aside project involves dredging and disposal of sediments from station 254+00 to 275+56, with optional additional dredging and water quality monitoring. The government estimate for base items is $678,225 and $328,520 for optional items, for a total of $1,006,745. Three offers were received, with apparent low from American Construction Co. Inc. at $1,108,200, 9.5% above the government estimate. The second low offer was from HME Construction at $1,793,750, 56.2% above the estimate. The third low offer was from Camenzind Dutra JV LLC at $4,473,050, 126% above the estimate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| E.01 W912DW24C0002 Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
front page
| ABSTRACT OF OFFERS - CONSTRUCTION | ||
| 1. Solicitation No. W912DW23B0007 | ||
| 2. Date Issued: 24 Jul 2023 | ||
| 3. Date Opened: 18 Sep 2023 | ||
| 4. Issuing Office: | ||
| Department of the Army | ||
| Corps of Engineers, Seattle District | ||
| P.O. Box 3755 | ||
| Seattle, WA 98124-2255 | ||
| 5. Project Title: | ||
| FY23 Duwamish Waterway Dredging, Seattle, WA | ||
| Small business Set Aside: Yes | ||
| 6. Number of Amendments Issued: 1 | ||
| 1st Apparent low = American Construction Co. Inc., $1,108,200.00. | ||
| % Difference From GE: 9.5% | ||
| 2nd Apparent low = HME Construction, $1,793,750.00. | ||
| % Difference From GE: 56.2% | ||
| 3rd Apparent low = Camenzind Dutra JV LLC, $4,473,050.00. | ||
| % Difference From GE: 126% | ||
| I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. | ||
| SIGNATURE: | Bid Opening Officer: M. Scott Houts |
&CPage 1
Gov' Est
| 8. GOVERNMENT ESTIMATE | |||||
| (Check A, B or C and Complete D, E F) | |||||
| A. Hired Labor | |||||
| B. Reasonable Contract (w/out profit) XX | |||||
| C. Reasonable Contract (w/ profit) | |||||
| 7A. ITEM | 7B. DESCRIPTION OF OFFERED ITEM | 7C. EST | 7D. UNIT | 7E. UNIT | 7F. AMOUNT |
| NUMBER | QTY | PRICE | |||
| BASE ITEMS | |||||
| 1000 | Mobilization and Demobilization | 1 | JOB | $ 240,000.00 | $ 240,000.00 |
| 2000 | Dredging and Disposal (Sta. 254+00 to 275+56 | 60,000 | CY | $ 7.25 | $ 435,000.00 |
| 3000 | Water Quality Monitoring | 5 | DAY | $ 645.00 | $ 3,225.00 |
| TOTAL BASE ITEMS | $ 678,225.00 | ||||
| OPTIONAL ITEMS | |||||
| 4101 | Additional Dredging and Disposal | 3,000 | CY | $ 7.25 | $ 21,750.00 |
| 4102 | Additional Dredging and Disposal | 40,000 | CY | $ 7.25 | $ 290,000.00 |
| 5101 | Additonal Water Quality Monitoring | 1 | DAY | $ 645.00 | $ 645.00 |
| 5102 | Additional Water Quality Monitoring | 25 | DAY | $ 645.00 | $ 16,125.00 |
| TOTAL OPTIONAL ITEMS | $ 328,520.00 | ||||
| TOTAL BASE & OPTIONAL | $ 1,006,745.00 |
&CPage 2
Ktr Page 1
| 9. OFFERS | |||||||||||
| NO. 1 | NO. 2 | NO. 3 | |||||||||
| A. Company: American Construction Co. Inc. | A. Company: HME Construction, Inc. | A. Company: Camen zind Dutra JV LLC | |||||||||
| Address: 1501 Taylor Way | Address: 6801 NW Old Lower River ROAD | Address: 792 Montrose Ave. | |||||||||
| City, State: Tacoma, WA 98421 | City, State: Vancouver, WA 9860 | City, State: Palo Alto, CA 94303-4720 | |||||||||
| Kevin Culbert, kevinc@americanconstco.com(253) 254-0118 | Kaytlind Kasinger, kaytlind.wilderson@hmeconst.com (360) 695-4553 | Kurt Camenzin, kurt@camenzinddredging.com, (707) 648-2378 | |||||||||
| B. Bid Security | Type/Amt : | 20% Bid Bond-YES | B. Bid Security | Type/Amt : | 20% Bid Bond -YES | B. Bid Security | Type/Amt : | 20% Bid Bond -YES | |||
| Business Size: | Small Business | Y | Business Size: | Small Business Y | Business Size: | Small Business Y | |||||
| C. Amendments Acknowledged: 1 | C. Amendments Acknowledged: 1 | C. Amendments Acknowledged: 1 | |||||||||
| D. ITEM | 7C. EST | E. UNIT | F. AMOUNT | D. ITEM | 7C. EST | E. UNIT | F. AMOUNT | D. ITEM | 7C. EST | E. UNIT | F. AMOUNT |
| NO. | QTY | PRICE | NO. | QTY | PRICE | NO. | QTY | PRICE | |||
| BASE LINE ITEMS | BASE LINE ITEMS | BASE LINE ITEMS | |||||||||
| 1000 | 1 | $ 175,000.00 | $175,000.00 | 1000 | 1 | $ 700,000.00 | $ 700,000.00 | 1000 | 1 | $ 1,550,000.00 | $ 1,550,000.00 |
| 2000 | 60,000 | $ 9.00 | $540,000.00 | 2000 | 60,000 | $ 11.25 | $ 675,000.00 | 2000 | 60,000 | $ 30.00 | $ 1,800,000.00 |
| 3000 | 5 | $ 200.00 | $1,000.00 | 3000 | 5 | $ 750.00 | $ 3,750.00 | 3000 | 5 | $ 1,550.00 | $ 7,750.00 |
| TOTAL BASE ITEMS | $716,000.00 | TOTAL BASE ITEMS | $ 1,378,750.00 | TOTAL BASE ITEMS | $ 3,357,750.00 | ||||||
| OPTIONAL ITEMS | OPTIONAL ITEMS | OPTIONAL ITEMS | |||||||||
| 4101 | 3,000 | $ 9.00 | $27,000.00 | 4101 | 3,000 | $ 9.50 | $ 28,500.00 | 4101 | 3,000 | $ 25.00 | $ 75,000.00 |
| 4102 | 40,000 | $ 9.00 | $360,000.00 | 4102 | 40,000 | $ 9.50 | $ 380,000.00 | 4102 | 40,000 | $ 25.00 | $ 1,000,000.00 |
| 5101 | 1 | $ 200.00 | $200.00 | 5101 | 1 | $ 250.00 | $ 250.00 | 5101 | 1 | $ 1,550.00 | $ 1,550.00 |
| 5102 | 25 | $ 200.00 | $5,000.00 | 5102 | 25 | $ 250.00 | $ 6,250.00 | 5102 | 25 | $ 1,550.00 | $ 38,750.00 |
| OPTION ITEMS | TOTAL | $392,200.00 | OPTION ITEMS TOTAL | $ 415,000.00 | OPTION ITEMS TOTAL | $ 1,115,300.00 | |||||
| GRAND TOTAL | $1,108,200.00 | GRAND TOTAL | $ 1,793,750.00 | GRAND TOTAL | $4,473,050.00 | ||||||
| Standard Form 1419 (2001) | |||||||||||
| COE SEATTLE DISTRICT (VERSION 3/01) |
&CPage 3
File details come from the government source that posted it. Updated .