This document is an amendment to a solicitation for emergency levee repairs. The Army Corps of Engineers is seeking equipment with operators to perform work for Dike District #17 and Dike District #22. The amendment revises the descriptions for fourteen contract line items (CLINs), which include hydraulic excavators of varying sizes, a water truck, hauling of riprap, a dozer, and Davis-Bacon wage rates. The CLIN descriptions now include equipment specifications, estimated hours, hourly rates, mobilization costs, and confirmation that WA20230073 wage rates apply. Bids are due by the extended date specified in the solicitation. The amendment provides additional details on the equipment and services required but does not change other terms and conditions of the solicitation.

View the file

Other files

File Type Posted
W912DW23Q8015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the extended descriptions on CLINs 0001 – 0014. All other terms and conditions remain unchanged. Accordingly, this solicitation is amended as follow s:

SEE CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW23Q8015

X 9B. DATED (SEE ITEM 11)

16-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2023

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW23Q8015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

or SimilarTrack Mounted Hydraulic Excavator w/ Hydraulic Thumb(Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level)Include digging and clean-out buckets.

To:

or Similar Track Mounted Hydraulic Excavator w/ Hydraulic Thumb (Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level) Include digging and clean-out buckets.

Regular Hourly Rate x Est. Quantity = Amount $____________ x 160 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Mobilization/Demobilization Est. Quantity = Amount $____________ x 1 Job $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement as incorporated herein.

CLIN 0002

or SimilarTrack Mounted Hydraulic Excavator w/ Hydraulic Thumb(Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level)Include digging and clean-out buckets36” Compaction Wheel

Track Mounted Hydraulic Excavator w/ Hydraulic Thumb (Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level) Include digging and clean-out buckets36” Compaction Wheel

Regular Hourly Rate x Est. Quantity = Amount $____________ x 160 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Mobilization/Demobilization Est. Quantity = Amount $____________ x 1 Job $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0003

Track Mounted Hydraulic Excavator w/ Hydraulic Thumb(Minimum 160-HP / Minimum Weight 48,000 LBS / Minimum 30 foot reach at ground level)Include digging and clean-out buckets.

Track Mounted Hydraulic Excavator w/ Hydraulic Thumb (Minimum 160-HP / Minimum Weight 48,000 LBS / Minimum 30 foot reach at ground level) Include digging and clean-out buckets.

Regular Hourly Rate x Est. Quantity = Amount $____________ x 160 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Mobilization/Demobilization Est. Quantity = Amount $____________ x 1 Job $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0004

(2000 - 2500 gal Capacity / 22-inch Tank Opening / Fill air gap at top of tank / Minimum pumping rate 550 gpm at 55psi / Pump Drive - direct from truck / Sprinkler Heads – (2) at the front; (1) in the middle at each side; and (2) at the rear.)

(2000 - 2500 gal Capacity / 22-inch Tank Opening / Fill air gap at top of tank / Minimum pumping rate 550 gpm at 55psi / Pump Drive - direct from truck / Sprinkler Heads – (2) at the front; (1) in the middle at each side; and (2) at the rear.)

Regular Hourly Rate x Est. Quantity = Amount $____________ x 160 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Mobilization/Demobilization Est. Quantity = Amount $____________ x 1 Job $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0005

Haul up to Class V Riprap.

Regular Hourly Rate x Est. Quantity = Amount $____________ x 160 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Mobilization/Demobilization Est. Quantity = Amount $____________ x 1 Job $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0006

Regular Hourly Rate x Est. Quantity = Amount $____________ x 160 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Mobilization/Demobilization Est. Quantity = Amount $____________ x 1 Job $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0007

w/ Knife Edges; 4-foot Width.

w/ Knife Edges; 4-foot Width.

Mobilization/Demobilization Est. Quantity = Amount $____________ x 1 Job $____________

CLIN 0008

or SimilarTrack Mounted Hydraulic Excavator w/ Hydraulic Thumb(Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level)Include digging and clean-out buckets.

Track Mounted Hydraulic Excavator w/ Hydraulic Thumb (Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level) Include digging and clean-out buckets.

Regular Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 40 Hours $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0009

or SimilarTrack Mounted Hydraulic Excavator w/ Hydraulic Thumb(Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level)Include digging and clean-out buckets36” Compaction Wheel

Track Mounted Hydraulic Excavator w/ Hydraulic Thumb (Minimum 200-HP / Minimum Weight 80,000 LBS / Minimum 34 foot reach at ground level) Include digging and clean-out buckets36” Compaction Wheel

Regular Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 40 Hours $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0010

Track Mounted Hydraulic Excavator w/ Hydraulic Thumb(Minimum 160-HP / Minimum Weight 48,000 LBS / Minimum 30 foot reach at ground level)Include digging and clean-out buckets.

Track Mounted Hydraulic Excavator w/ Hydraulic Thumb (Minimum 160-HP / Minimum Weight 48,000 LBS / Minimum 30 foot reach at ground level) Include digging and clean-out buckets.

Regular Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 40 Hours $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0011

(2000 - 2500 gal Capacity / 22-inch Tank Opening / Fill air gap at top of tank / Minimum pumping rate 550 gpm at 55psi / Pump Drive - direct from truck / Sprinkler Heads – (2) at the front; (1) in the middle at each side; and (2) at the rear.)

(2000 - 2500 gal Capacity / 22-inch Tank Opening / Fill air gap at top of tank / Minimum pumping rate 550 gpm at 55psi / Pump Drive - direct from truck / Sprinkler Heads – (2) at the front; (1) in the middle at each side; and (2) at the rear.)

Regular Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 40 Hours $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0012

Regular Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 40 Hours $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement

CLIN 0013

Regular Hourly Rate x Est. Quantity = Amount $____________ x 80 Hours $____________

Overtime Hourly Rate x Est. Quantity = Amount $____________ x 40 Hours $____________

Davis Bacon Wage Determination No.: WA20230073 Revision 0 dated 01/06/2023 is applicable to this procurement