W912DW22R0008 AFD Spillway Recoating and repairs.pdf
PDF 8 MB Posted
- Attached to
- AFD Spillway Gate Recoating and HSS Weld Repair
- Solicitation number
- W912DW22R0008
About this file
This document outlines a solicitation for a fixed price economic price adjustment contract. The solicitation is for spillway gate recoating and HSS weld repairs at Albeni Falls Dam in Oldtown, Idaho. All work on the 11 spillway gates must be completed within 1,085 calendar days of contract award. The scope of work includes removing gates one at a time for off-site recoating, weld repairs, replacing roller chains and seals, and reinstalling gates. Proposals are due to the Army Corps of Engineers by August 28, 2022 and will be evaluated based on past performance, technical approach, schedule, and price. Award is to the responsible offeror with an acceptable technical proposal and lowest total price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY21_P2-480971_AFDSG-00-CS101_AMDTR0002.pdf | ||
| 00 72 00-A_R0002.docx | DOCX document | |
| 22R00080002.pdf | ||
| AFD Spillway 22R0008 - Site Visit.pdf | ||
| W912DW22R0008 A1.pdf | ||
| W912DW22R0008-REFERENCE DRAWING.pdf | ||
| W912DW22R0008 - DRAWING COMPILATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DW22R0008
Albeni Falls Dam Spillw ay Gate Recoating and HSS Weld Repairs, Oldtow n, ID.
CHARLES D IDLE 206-316-3998
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Jul-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1085 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________28 Aug 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
206-764-6817FAX:TEL: 206-316-3168 TEL: FAX:
W912DW22R0008 89
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
SECTION TITLE
SF1442 Construction Solicitation
00 10 00 Price Schedule
00 21 00 Instructions, Conditions and Notice to Offerors
00 21 16 Proposal Submission
00 22 00 Evaluation Criteria
00 45 00 Representations and Certifications and other Statements of Offerors, and Pre-Award Information
00 62 00 Corporate Certificate
00 72 00 Contract Clauses
00 73 00 Supplementary Conditions, which include the following:
a) Davis-Bacon General Wage Decision
01 00 00 Technical Specifications
PRICE SCHEDULE
BID SCHEDULE
NOTE: For all CLIN items, see specification section 01 22 00.00 10 MEASUREMENT AND PAYMENT for additional information.
CLIN
Item # Description of Item Quantity Unit Unit Price Amount
BASE ITEMS
0001 Rehabilitate the Spillway Gate Assembly. (See Note 6)
3 EA $__________ $_______________
0002 Spillway Gate Hydraulic Steel Structure weld repairs
150 LF $__________ $_______________
0003 Upper Leaf Seal Assembly: Materials 3 EA $__________ $_______________
0004 All work for O&M manuals as specified in Section
01 78 23 OPERATIONS AND MAINTENANCE
MANUALS from preparation to final approval.
1 JOB N/A $60,000
0005 All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $25,000
TOTAL ALL BASE ITEMS 0001-0005 $_____________________
OPTIONAL ITEMS
0006 Upper Leaf Seal Assembly: Installation 3 EA $_________ $_______________
0007 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0008 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0009 Rehabilitate the Spillway Gate Assembly. (See Note 6)
1 EA $_________ $_______________
0010 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0011 Rehabilitate the Spillway Gate Assembly. (See Note 6)
1 EA $_________ $_______________
0012 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0013 Rehabilitate the Spillway Gate Assembly. (See Note 6)
1 EA $_________ $_______________
CLIN
Item # Description of Item Quantity Unit Unit Price Amount 0014 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0015 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0016 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0017 Rehabilitate the Spillway Gate Assembly. (See Note 6)
1 EA $_________ $_______________
0018 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0019 Rehabilitate the Spillway Gate Assembly. (See Note 6)
1 EA $_________ $_______________
0020 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0021 Rehabilitate the Spillway Gate Assembly. (See Note 6)
1 EA $_________ $_______________
0022 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0023 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0024 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0025 Rehabilitate the Spillway Gate Assembly. (See Note 6)
1 EA $_________ $_______________
0026 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0027 Rehabilitate the Spillway Gate Assembly #11, Maintenance Gate. (See Note 7)
1 EA $_________ $_______________
0028 Spillway Gate Hydraulic Steel Structure weld repairs
50 LF $_________ $_______________
0029 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0030 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0031 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
CLIN
Item # Description of Item Quantity Unit Unit Price Amount 0032 Spillway Gate Hydraulic Steel Structure additional weld repairs
50 LF $_________ $_______________
0033 Upper Leaf Seal Assembly: Materials and Installation
1 EA $_________ $_______________
0034 Upper Leaf Seal Assembly: Materials and Installation
1 EA $_________ $_______________
0035 Upper Leaf Seal Assembly: Materials and Installation
1 EA $_________ $_______________
0036 Upper Leaf Seal Assembly: Materials and Installation
1 EA $_________ $_______________
0037 Upper Leaf Seal Assembly: Materials and Installation
1 EA $_________ $_______________
0038 Upper Leaf Seal Assembly: Materials and Installation
1 EA $_________ $_______________
0039 Upper Leaf Seal Assembly: Materials and Installation
1 EA $_________ $_______________
TOTAL ALL OPTION ITEM 0006-0039 $_____________________
TOTAL ALL ITEMS 0001-0039 $_____________________
LF = Linear Foot GSF= Gross Square Footage CY = Cubic Yard EA = Each PR = Pair SQ = Square Feet IN2 = Square Inches IN3 = Cubic Inches
NOTES:
1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2) To better facilitate the receipt and proposal process, all modifications to proposals shall be submitted on copies of the latest Bid Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
3) Offerors must insert a price on all entry amount lines of numbered items of the Bid Schedule. Failure to do so will result in the offer being unacceptable.
4) The dollar amount established in Item Nos. 0004, and 0005 shall not be revised by Offerors.
5) Award of optional items will be made in accordance with specification Section 00 72 00 SPECIAL CLAUSES, Paragraph “OPTION FOR INCREASED QUANTITY”.
6) Rehabilitation of the spillway gates include all work except the weld repairs and new Upper Leaf seal assembly replacements, which are captured in their own separate bid-items.
7) Rehabilitation of the spillway gate #11, or also referred to as the Maintenance Gate, include all work except the weld repairs, which are captured in their own separate bid-items. The reason to distinguish this gate from the others, is that both Upper and Lower Leaves seal assemblies have a different configuration compared to gates 1 through 10.
Gate #11 requires both Upper and Lower Leaves seal assemblies to be replaced as part of this contract and the work must be captured in Item 0027.
8) Labor shall not be adjusted. Only the materials identified for CLINs 0001 through 0003 and option CLINs 0006 through 0039 are subject to Economic Price Adjustment (EPA) in accordance with FAR Clause 52.216-4 Economic Price Adjustment - Labor and Material.
Please see the Table below for additional information on the schedule of materials. The EPA Table price per pound shall only account for the actual cost of material and shall not be burdened by other associated costs.
a. This is a not to exceed (NTE) quantity. EPA will be based on actual quantity performed. Thetotal quantity for EPA will not exceed the amount as specified in the Table above. When submitted for EPA consideration, the quantity shall be rounded to the nearest pound.
b. The CLIN schedule shall be submitted fully completed and error free. The offeror shall input a two (2) decimal price in the “Price Per Pound.” All final monetary extensions in two decimal positions only. Example: $0.27, not $0.27458.
CLIN ITEM MATERIAL NOT-TO-EXCEED
QUANTITY (IN U.S.
POUNDS)(1)
PRICE PER POUND (IN USD) (2)
0001 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 16950
0001 Track and Guide Spring Bolts
Steel 900
0001 Guide Springs Steel 1050 0001 Corrosion
Protection System
Steel 900
0001 Corrosion Protection System
Magnesium 5100
0009 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0009 Track and Guide Spring Bolts
Steel 350
0009 Guide Springs Steel 400 0009 Corrosion
Protection System
Steel 300
0009 Corrosion Protection System
Magnesium 1700
0011 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0011 Track and Guide Spring Bolts
Steel 350
0011 Guide Springs Steel 400 0011 Corrosion
Protection System
Steel 300
0011 Corrosion Protection System
Magnesium 1700
0013 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0013 Track and Guide Spring Bolts
Steel 300
0013 Guide Springs Steel 350 0013 Corrosion
Protection System
Steel 300
0013 Corrosion Protection System
Magnesium 1700
0017 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0017 Track and Guide Spring Bolts
Steel 300
0017 Guide Springs Steel 350
0017 Corrosion Protection System
Steel 300
0017 Corrosion Protection System
Magnesium 1700
0019 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0019 Track and Guide Spring Bolts
Steel 300
0019 Guide Springs Steel 350 0019 Corrosion
Protection System
Steel 300
0019 Corrosion Protection System
Magnesium 1700
0021 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0021 Track and Guide Spring Bolts
Steel 300
0021 Guide Springs Steel 350 0021 Corrosion
Protection System
Steel 300
0021 Corrosion Protection System
Magnesium 1700
0025 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0025 Track and Guide Spring Bolts
Steel 300
0025 Guide Springs Steel 350 0025 Corrosion
Protection System
Steel 300
0025 Corrosion Protection System
Magnesium 1700
0027 Track Plates, Rollers, Roller Chain Links, Roller Pins
Stainless Steel 5650
0027 Track and Guide Spring Bolts
Steel 300
0027 Guide Springs Steel 350 0027 Corrosion
Protection System
Steel 300
0027 Corrosion Protection System
Magnesium 1700
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
Section 00 21 00 - Instructions
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFEROR
1. General Description of Work
2. Disclosure of the Magnitude of Construction
3. Copies of Solicitation Documents and Amendments
4. Offeror’s Questions and Comments
5. Small Business Size Standard / NAICS Code:237990
6. Proposal Expenses and Pre-Award Costs
7. Pre-Proposal Site Visit
8. Accuracy in Proposals
9. Proposal Submittals
10. Bid Guarantee
11. Subcontractin Plan
12. Solicitation Provisions
1. General Description of Work:
Contract Title: Albeni Falls Dam Spillway Gate Recoating and HSS Weld Repairs, Oldtown, ID.
Albeni Falls Dam Spillway Recoating and HSS Weld Repairs, Oldtown, Idaho. All work on the 11 spillway gates is expected to be completed within the required 1,085 days period of performance. This period of performance starts with a base of three (3) spillway gates, with the remaining eight (8) as options as funding becomes available. The successful Offeror is required to accomplish all on-site work in the Scope of work (SOW) during the Dam’s four-day work week and 10-hour days.
Much of the work will occur offsite and will not fall under those restrictions. Exceptions will be considered at the Contracting Officer’s discretion. In addition, only one gate at a time can be removed at a time.
The scope of work in this prospective contracting action includes the activities listed below.
a. Remove one gate at a time to an off-site location. The Government using the existing crane will remove the gate from the spillway. The contractor will be responsible for transferring to the vehicle and transportation to an off-site location
b. Remove the existing coating system from all the painted components of the gates, until only the bare metal is exposed
c. Initial Inspection of all the welds (including all welds in addition to the ones uniquely identified within the drawings) and components of the gates as indicated in the RFP
d. Repair all deficient welds identified in the RFP documents
e. Repair all additional welds that do not meet the acceptance requirement stablished for the initial inspection, as requested in the RFP documents
f. Document any critical pitting identified after the coating is removed from the structural components
g. Reinspect all structural welded connections which have been repaired as part of this contract.
h. Replace the Lower Leaf and Upper Leaf roller chains and adjustment of the chain tension by shimming the proper joints
i. Repair the Lower Leaf and Upper Leaf roller chain tracks and remove any shims that are located at incorrect joints
j. Replace all the guide springs on both Lower and Upper Leaf of each gate
k. Replace all the seals of the Lower Leaf for each gate.
l. Inspect all the seals of the Upper Leaf and replace any Upper Leaf Seal
Assembly when indicated by the contracting officer.
m. Add corrosion protection
n. Recoat all the necessary metal surfaces once the repairs have been completed, as indicated in the RFP documents.
2. Disclosure of the Magnitude of Construction:
In accordance with DFARS 236.204(ii) “Disclosure of the Magnitude of Construction Projects,” the magnitude of the project is estimated between $10,000,000 and $25,000,000.
3. Copies of Solicitation Documents and Amendments:
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at: https://piee.eb.mil/ under Solicitation Number W912DW22R0008
It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
4. Offeror’s Questions and Comments:
Offeror Inquiry
I. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
a. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and then click continue.
b. From this page you may view all bidder inquiries or add inquiry.
c. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
d. The Solicitation Number is: W912DW22R0008 http://www.projnet.org/projnet
e. The Bidder Inquiry Key is: P5R9JD-GPZMHA
II. The Bidder Inquiry System will be unavailable for new inquires 3 business days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
III. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
IV. The call center operates weekdays from 8AM to 5PM
U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
V. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
5. Small Business Size Standard / NAICS Code:
NAICS code 237990 (Other Heavy and Civil Engineering Construction) Small business size standard $39,500,000.00
6. Proposal Expenses and Pre-Award Costs:
This Request for Proposals (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
7. Pre-Proposal Site Visit:
A Pre-Proposal Conference and Site Visit will be conducted on August 09, 2022, at Albeni Falls Dam, Oldstown, Idaho.
Due to COVID-19, social distancing will be strictly observed and the gathering will remain outdoors. Guidelines are as follows:
• Each Offeror will be limited to two representatives, including all subs and partners, for each site visit.
• Offerors are required to provide the names, company affiliation, address, phone number, and driver’s license number to Teresa King, whose contact information follows these instructions, within 48 hours of receipt of this proposal to be included on the site visit list.
• To prevent large gatherings, all participants must provide their own transportation to Albeni Falls Dam main gate for vehicle and participant clearance. While on site, attendees should limit congregation to groups of 6 participants or less during the site visit.
• Once cleared, participants will proceed to the upper parking area and remain in their vehicles until the Government representative escorts the participants into the secured transformer area.
• No questions will be answered during the site visit. All questions must be posted to DrChecks to ensure all participants get the same information.
• Attendees names will be recorded by the Government representative through verbal communication.
• Masks covering both nose and mouth will be worn at all times while on site.
• Social distancing (at least six feet distance) will be strictly observed.
• Restroom facilities may not be readily available.
The Government retains the right to cancel this event should Washington State and the Seattle District COVID-19 posture regress to a more restrictive level.
The Corps of Engineers (COE) on-site point of contact is Mrs. Teresa King, (206) 305-8128, Teresa.L.King@usace.army.mil
OFFERORS ARE URGED AND EXPECTED to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the Contract, to the extent such information is reasonably obtainable. In no event will a failure to inspect the site constitute grounds for withdrawal of an offer or for a claim after award of the Contract.
8. Accuracy in Proposals:
Proposals must set forth full, accurate, and complete information as required by this RFP (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
9. Proposal Submittals:
In strict compliance with guidance relating to the current situation with COVID-19 and social distancing, the only authorized transmission methods for proposals in response to this solicitation is electronically via PIEE.
Offer Submission Instructions
The Offeror shall submit its offer electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at https://piee.eb.mil/. When posting an offer, ensure electronic files are clearly identified with the solicitation number, company name, volume, section, and or/item. The minimum required naming format for files is as follows:
mailto:Teresa.L.King@usace.army.mil https://piee.eb.mil/
Solicitation Number_Company Name_Item
Offers will not be accepted if submitted by mail or hand carried and will not be evaluated. Offers sent through proprietary or third party File Transfer Protocol (FTP) sites or DoD SAFE will not be accepted. The Offeror is responsible to confirm the offer has been received. All offers received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR) and the solicitation.
For PIEE registration, training, and instructions for posting an offer, refer to the following links:
PIEE Registration_ https://piee.eb.mil/ Note: There are two vendor roles (Proposal Manager, Proposal View Only) for PIEE Solicitation Module. The Proposal Manager role is required to submit an offer to a solicitation. Please be advised that when using the PIEE Solicitation Module, the user’s email address in PIEE must match the email address on file in SAM.gov.
PIEE Solicitation Module_ Training and instructions are accessible through PIEE – Web Based Training (WBT) at https://pieetraining.eb.mil/wbt/ (For instructions specific to posting an offer, select ‘Solicitation Module’ -- ‘Proposals (Offers)’ – ‘Posting Offer’)
For Frequently Asked Questions (FAQs) and additional training, go to the DoD Procurement Toolbox – eBusiness -- Solicitation Module at https://dodprocurementtoolbox.com/site-pages/solicitation-module
In the unlikely event the PIEE system and/or Solicitation Module is not operational, and the offeror is unable to access or use the system, the Offeror shall immediately notify the Contracting Officer and Contracting Specialist. Notification must occur prior to the submission deadline and shall be in writing through authorized email identified in the solicitation. If an alternate method for offer submission is authorized via email due to system outages, the Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method.
Contracting Specialiest – Charles Idle charles.d.idle@usace.army.mil Contracting Officer – Camilla Allen Camilla.allen@usace.army.mil
Ensure all documentation submitted meets supported file extensions identified in PIEE FAQs. Narrative portions of the offer shall be in Adobe Acrobat Portable Document Format (PDF) searchable text format. Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included.
See Section 00 21 16 for detailed content requirements for Volumes I and II.
https://pieetraining.eb.mil/wbt/ https://dodprocurementtoolbox.com/site-pages/solicitation-module mailto:charles.d.idle@usace.army.mil mailto:Camilla.allen@usace.army.mil
RECEIPT OF SUBMISSIONS:
For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded into the PIEE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
10. Bid Guarantee:
The Standard Form (SF) 24, dated 08/2016, shall be used for the submission of your bid bond and can be obtained from https://www.gsa.gov/reference/forms#SF. Submit the bid bond via email with your proposal.
Submit an electronic bid bond with your proposal. Bid Bonds (SF24) must be accompanied by a Power of Attorney containing an original or electronic signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will be accepted if accompanied by a certification from a current officer of the surety attesting to its authenticity and continuing validity.
NOTE: Digital scans, or photographed or otherwise reproduced images, of ink signatures are not considered acceptable "electronic signatures." If a required submitted document does not contain electronic signatures, you must submit original hard-copy documents.
11. Subcontracting Plan
Submission Requirements (NOTE: This requirement only applies to the successful offeror if it is other than a Small Business.)
If the Offeror proposing on this solicitation is a large business concern, in accordance with the definaition as identified in FAR Clause 52.219-1, “SMALL BUSINESS
PROGRAM REPRESENTATION”, UPON NOTIFICATION THAT IT IS THE
APPARENT SUCCESSFUL Offeror, the firm must submit a small business subcontracting plan in accordance with FAR Clause 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN. The subcontracting plan format will be provided to the apparent successful offeror if it is a large business. The goals established for small business, small disadvantage buiness, woman-owned business, HUBZone business, Service-disabled verteran-owned small business participation are:
Goals. The U.S. Army Corps of Engineers consider the following goals reasonable and achievable for the performance of the reultant contract:
Small Business -10% HUBZone Small Business - 2% Service-Disabled Veteran-Owned Small Business - 1% Veteran Owned Small Businesses – 2% http://www.gsa.gov/reference/forms#SF
Small Disadvantage Business - 3% Women-Owned Small Business -5%
The Small Business Subcontracting Plan shall be thorough, complete, and in accordance with FAR Clause 52.219-9 and DFARS Clause 252.219-7003, as it will be incorporated into the contract upon award of the contract to the Offeror, if acceptable and upon final approval of the Contracting Officer. The Plan shall include a description of the types of services the firm proposes to subcontract with small buiness (SB, small disadvantaged business (SDB), woman-owned small business (WOSB), HUBZone buiness, and sercie-disabled verteran-owned small business (SDVOSB), along with the proposed percentages of their participation, to demonstrate a plan to meet the subcontracting goals that will apply to these contracts. The offeror shall provide specific information on proposed subcontracted effort for this project.
12. Solicitation Provisions
See the applicable Provisions for this Solicitation in Section 00 21 00 and Section 00 45 00.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-17 Ownership or Control of Offeror AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-20 Predecessor of Offeror AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (NOV
2021) - Alternate I
OCT 1997
52.215-2 Audit and Records--Negotiation JUN 2020 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
FEB 1999
52.225-11 Buy American--Construction Materials Under Trade Agreements
JAN 2021
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
52.228-1 Bid Guarantee SEP 1996 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.215-7008 Only One Offer JUL 2019
CLAUSES INCORPORATED BY FULL TEXT
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA (NOV 2021)—ALTERNATE III (OCT 1997)
(a) Exceptions from cost or pricing data.
(1) In lieu of submitting cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial product and commercial service exception. For a commercial product and commercial service exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--
(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;
(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;
(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation , access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for cost or pricing data. If the offeror is not granted an exception from the requirement to submit cost or pricing data, the following applies:
(1) The offeror shall prepare and submit cost or pricing data and supporting attachments in accordance with Table 15-2 of FAR 15.408.
(c) Submit the cost portion of the proposal via the following electronic media: Electronic Spreadsheet
As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Fixed Price with Economic Price Adjustment contract resulting from this solicitation.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Contracting Officer U.S. Army Corps of Engineers – Seattle District 4735 E. Marginal Way S., Building 1202 Seattle, WA 98134-2388
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.acquisition.gov
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
If applicable, the solicitation will be altered via amendment
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 21 16 - Instructions to Proposers
PROPOSAL SUBMISSION
PROPOSAL SUBMISSION
The proposal submission instructions are contained in Section 00 21 16 of the Request for Proposal (RFP). Section 00 21 16 of the solicitation contains specific information on what must be furnished with the proposal and identifies evaluation criteria that will be used in evaluating proposals received.
1. INTRODUCTION
1.1 Your firm is invited to submit a proposal in response to Request for Proposal (RFP) Number W912DW22R0008 for the project entitled “Albeni Falls Dam Spillway Gate Recoating and HSS Weld Repairs.”
The Government intends to procure this requirement on a competitive basis in accordance with the provisions set forth in FAR Part 15 Contracting by Negotiation and within this RFP.
1.2. A fixed-price contract with economic price adjustment construction contract will be awarded to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with FAR Part 15 procedures. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.
Proprietary information shall be clearly marked.
2. GENERAL PROPOSAL REQUIREMENTS
2.1 Proposal Format
The proposal shall be organized into the following two volumes:
a. Volume 1: Technical Proposal, 1 electronic copy (defined in paragraph 3 of this Section)
b. Volume 2: Price Proposal, 1 electronic copy (defined in paragraph 3 of this Section)
2.2 Content – General
The submission shall be clearly indexed and logically assembled.
Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information will be deemed as if no support for that criterion was provided. Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the RFP. Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
2.3 Table of Contents
A Table of Contents should be incorporated within both Volumes.
2.4 Page Numbering
All pages of each volume shall be appropriately identified with complete company name, date, page number, and RFP number in the header and/or footer.
3. ELECTRONIC PROPOSAL SUBMITTAL REQUIREMENTS
3.1 File format
The electronic proposal shall be Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Text must be searchable. Please use Arial font, type 11.
3.2 Number of files
The proposal contents shall be presented as a separate PDF file for each Volume – (1) Technical Proposal, (2) Price Proposal.
3.3 Method of submission
Proposals shall be submitted using the Procurement Integrated Enterprise Environment Solicitation Module at https://piee.eb.mil. See Section 00 21 00 for detailed offer submission instructions.
REQUIRED SECTIONS FOR SUBMITTAL
Proposals shall be organized as indicated below:
REQUIRED SECTIONS FOR VOLUME 1: TECHNICAL PROPOSAL
Table of Contents
Tab 1: Factor 1: Past Performance Tab 1a – Relevancy of Past Performance (Include Attachment A) Tab 1b – Past Performance Questionnaires (Include PPQ)
Tab 2: Factor 2: Offeror Capabilities Tab 3: Factor 3: Project Schedule
REQUIRED SECTIONS FOR VOLUME 2: PRICE PROPOSAL
Table of Contents Factor 4: Price Proposal
Tab 1: Cover Letter Tab 2: SF1442, Solicitation, Offer and Award Tab 3: Pricing Schedule (Include Attachment C) Tab 4: Representations and Certifications Tab 5: Most recent Financial Statement Tab 6: Bid Bonds
4. DETAILED CONTENT REQUIREMENTS FOR VOLUME 1: TECHNICAL
PROPOSAL
Technical Proposal, Volume 1: Consists of three (3) factors. This section shall be specific and complete, demonstrating a thorough understanding of the requirements. It shall include, where applicable, diagrams and/or charts. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.
PAGE LIMITS:
Factor 1 – Not to exceed thirty (30) pages, not including PPQs or CPARs.
Factor 2 – Not to exceed twenty (20) pages Factor 3 – Not to exceed five (5) pages See Section 00 22 00 for submission requirements for Evaluation Factors 1 - 3.
5. DETAILED CONTENT REQUIREMENTS FOR VOLUME 2: PRICE
PROPOSAL
This volume shall consist of all information, required to support proposed prices.
Price Proposal, Volume 2 (TABS 1-6)
TAB 1: Cover Letter: Submit a cover letter as the first page of this volume. The cover letter shall reflect the following information:
a. RFP number.
b. Name, address, e-mail address, and telephone numbers of the firm signing the SF 1442.
c. Names, titles, e-mail addresses, telephone numbers of person(s) authorized to negotiate on the firm's behalf with the Government in connection with this RFP.
d. Name, title, and signature of the person(s) authorized to sign the proposal.
e. A statement specifying agreement with all terms, conditions, and provisions included in the RFP and agreement to furnish any and all items upon which prices are offered at the proposed item prices.
f. A statement indicating compliance with all insurance requirements stated herein and that evidence of such will be provided after Contract award.
g. Organizational Conflicts of Interest (OCI) Disclosure: See Section 00 22 00 for requirements.
h. Final Proposal Revisions: If required to submit a Final Proposal Revision following evaluation of initial proposals, the accompanying cover letter must identify all changes made to the firm's initial proposal.
i. Prime Offeror: If the Offeror is submitting as a Joint Venture (JV), the Unique
Entity Identifier (UEI) and CAGE Code for each firm representing the JV must be included.
TAB 2: SF1442, SOLICITATION, ALL AMENDMENTS AND OFFER
This tab will not be rated but will be evaluated for responsiveness. The SF1442 shall be filled out completely by the offeror and signed by an official that is authorized to bind the company. The offeror shall also acknowledge all amendments to the solicitation in Block 19 of the 1442.
TAB 3: Pricing Schedule
Section 00 10 00. Provide a completed pricing schedule along with a price breakdown as described in Section 00 22 00.
TAB 4: COMPLETED REPRESENTATIONS AND CERTIFICATIONS
Section 00 45 00, Representations, Certifications and Pre-Award information, fill in all information to include company information, banking information and bonding/surety information of the firm signing the SF1442.
Include a completed corporate certificate as found in section 00 62 00.
TAB 5: Most recent Financial Statement TAB 6:
Bid Bonds
PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
The Government is not responsible for costs incurred in the preparation of a proposal or for any other costs incurred prior to the execution of a contract.
Section 00 22 00 - Supplementary Instructions
EVALUATION CRITERIA
A. BASIS FOR AWARD
The award of this Contract will be made to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with FAR 15 procedures. This solicitation will result in the award of a fixed price with economic adjustment construction contract.
The evaluation of each proposal will be solely on the basis of evaluation factors found in this section (00 22 00). The Government will evaluate each proposal on an Acceptable/Unacceptable basis only with respect to the evaluation factors (criteria) described herein.
In order to be considered for award, a proposal must be rated Acceptable in every non-price factor. Award will be to the Offeror who presents the Acceptable technical proposal (Factors 1 through
3) with the overall lowest price (Based on a total of all line items on the Bid Schedule)
The Offeror’s proposal shall contain a response to all factors and meet the minimum submittal requirements stated.
In accordance with FAR 15.306(a)(3) the Government intends to evaluate proposals and make award without discussions. An Offeror’s initial proposal shall contain the Offeror’s best offer/terms.
Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
B. FACTORS TO BE EVALUATED
The following evaluation factors will be used to evaluate each proposal:
FACTOR 1 - Past Performance: Each offeror’s past performance will be reviewed to determine recency, relevancy and quality.
FACTOR 2 – Offeror Capabilities: Evaluation of the offeror’s proposal shall address the technical approach and schedule as it applies to the Summary of Work (SOW). A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each proposal, the Government will assign a rating and write a narrative evaluation reflecting the identified findings.
FACTOR 3 – Project Schedule: Evaluation of the offeror’s proposal shall address the technical approach and schedule as it applies to the Summary of Work (SOW). A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each proposal, the Government will assign a rating and write a narrative evaluation reflecting the identified findings.
FACTOR 4 – Price: The resulting contract will be fixed-price with economic price adjustment. Price reasonableness will be utilized in the evaluation of the proposal. Offers will also be analyzed to determine if the prices are unbalanced (FAR 15.404-1(g)).
C. EVALUATION APPROACH
All proposals shall be subject to evaluation by the Source Selection Team (SST).
1. The overarching evaluation approach for all factors is as follows:
a. Adequacy of Response. The proposal will be evaluated to determine whether the offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine whether each requirement has been addressed in the proposal in accordance with the proposal submission section of the
RFP.
b. Feasibility of Approach. The proposal will be evaluated to determine whether the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine whether successful performance is contingent upon proven devices and techniques. The proposal will be evaluated to determine whether the offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.
2. The Non-Price Evaluation Factors are as follows:
2.1 Factor 1- Past Performance: The Government will
evaluate the offeror’s record of past and current performance to the required work during performance of the awarded contract. The past performance evaluation considers an offeror's demonstrated recent and relevant record of performance in supplying products and services required to meet the contract’s requirements. The recency and relevance of the information, source of the information, context of the data, and general trends in contractor's performance shall be considered. There are three aspects to the past performance evaluation: recency, relevancy (including context of data), and quality of performance (including general trends in contractor performance and source information). These will be combined to establish one past performance rating for each Offeror.
2.1.1 Relevancy of Past Performance, Tab 1a
The Offeror shall submit information on at least three (3) projects, but no more than five (5) projects to demonstrate the offeror’s recent and relevant experience. If more than five (5) projects are submitted only the first five projects will be evaluated. Relevant means that submitted projects are similar in terms of scope, and complexity as work described in Section 01 11 00.00 26 Summary of Work of the solicitation. The relevancy of each Offeror’s submitted Past Performance projects will be rated based on the completeness and technical details of each project’s narrative describing the work performed (i.e. how well the project’s scope is described)and how pertinent the work is to the Section 01 11 00.00 26 Summary of Work, as well as the depth and breadth of each project’s scope (i.e. how many of the Section 01 11 00.00 26 Summary of Work technical requirements are covered by the project’s scope).
Offerors shall ensure each project meets the definition of a ‘project’ below.
2.1.2 Past Performance Relevant Experience Submission Criteria
Criteria for the Offeror’s Factor 1:
a. Submit information of at least three (3), but no more than five (5) projects to demonstrate the offeror’s relevant past work experience and subsequent performance. Experience must be demonstrated for 1) Welding Repairs, 2) Coating or Recoating, and 3) Gate Repairs and Fabrication. The projects submitted to demonstrate experience for all three do not have to be the same. The combined experience demonstrated by the submitted projects must cover the general relevancy requirements and the specific relevancy requirements.
b. Ensure submitted projects are relevant to the work requirements noted in Section 01 11 00.00 26 of the RFP individually or in combination thereof.
c. Ensure each submitted project meets the definition of a ‘project’, as defined below; AND
d. Submitted projects shall be at least 75% physically completed, not based on amount invoiced, within the last seven (7) years prior to the solicitation issue date. At least 75% physically completed means at least 75% of the contractual requirements have been accomplished.
e. Submit Past…