W912DW22B0003- FY22 Everett Snohomish Dredging_Abstract (Final).pdf
PDF 359 KB Posted
- Attached to
- FY22 Snohomish/Everett Clamshell Dredging Federal contract opportunity
- Solicitation number
- W912DW22B0003
About this file
This abstract of offers summarizes bids received in response to Solicitation Number W912DW22B0003 issued by the Department of the Army Corps of Engineers Seattle District. The solicitation is for a construction project to perform maintenance dredging of approximately 150,000 cubic yards of sediment from the Snohomish River Federal Navigation Channel in Everett, Washington via mechanical clamshell dredge, with placement at the Port Gardner open water disposal site. The work window is from October 16, 2022 through February 14, 2023. The apparent low bids were submitted by American Construct Co. Inc. at $1,111,000, HME Construction, Inc. at $1,522,355, and Duwamish-Pacific JV at $1,646,250. The solicitation is set aside for small businesses with a NAICS code of 237990 and size standard of $30 million in average annual receipts.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. Solicitation No. W912DW22B0003
2. Date Issued: 05 May 2022
3. Date Opened: 07 JUN 2022
4. Issuing Office:
Department of the Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle, WA 98124-2255
5. Project Title:
100% Small Business Set Aside
6. Number of Amendments Issued: 1
1st Apparent low = American Construct Co. Inc.
% Difference From GE: -69.7%
2nd Apparent low = HME Construction, Inc.
% Difference From GE: -46.8%
3rd Apparent low = Duwamish-Pacific, JV
% Difference From GE: -40.2%
SIGNATURE: Bid Opening Officer: Gregory Cook
FY22 Snohomish River Clamshell Dredging, Everett, WA
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
8. GOVERNMENT ESTIMATE
(Check A, B or C and Complete D, E F) A. Hired Labor B. Reasonable Contract (w/out profit) XX C. Reasonable Contract (w/ profit)
7A. ITEM 7B. DESCRIPTION OF OFFERED ITEM 7C. EST 7D. UNIT 7E. UNIT 7F. AMOUNT
NUMBER QTY PRICE
BASE ITEMS
1000 Mobilization and Demobilization 1 JOB 579,580.00$ 579,580.00$
Dredging & Disposal (Sta. 78+00 to Sta.
90+00) 130,000 CY 12.98$ 1,687,400.00$
3000 Water Quality Monitoring 5 DAY 625.00$ 3,125.00$ 2,270,105.00$
Additional Dredging & Disposal (Sta. 78+00 to Sta. 90+00)
2101 Additional Dredging & Disposal 20,000 CY 13.01$ 260,200.00$ 2102 Additional Dredging & Disposal 40,000 CY 13.02$ 520,800.00$ 3000 Additional Water Quality Monitoring 3101 Additional WQ Monitoring 1 DAY 625.00$ 625.00$ 3102 Additional WQ Monitoring 25 DAY 150.00$ 3,750.00$
785,375.00$ 3,055,480.00$
TOTAL ESTIMATED AMOUNT BASE ITEMS:
OPTIONAL ITEMS
TOTAL OPTIONAL ITEMS
TOTAL BASE & OPTIONAL
OFFERS
NO. 1 NO. 2 NO. 3
A. Company: American Construction Co. Inc. A. Company: HME Construction, Inc. A. Company: Duwamish-Pacific, JV Address: 1501 Taylor Way Address: 6801 NW Old Lower River Road Address: 6627 Ellis Avenue South City, State: Tacoma, WA 98421 City, State: Vancouver, WA 98660 City, State: Seattle, WA 98108 email: kevinc@americanconstco.com (253) 254-0118 email: greg.speyer@hmeconst.com, (360) 695-4553 email: (206) 930-930-0459 Zach Martin B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond Business Size: Size here SB Business Size: Size here SB Business Size: Size here SB
C. Amendments Acknowledged: 1 C. Amendments Acknowledged: 1 C. Amendments Acknowledged: 1
D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT
NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE
BASE
ITEMS BASE ITEMS BASE ITEMS
0001 1 265,000.00$ 265,000.00$ 0001 1 541,855.00$ 541,855.00$ 0001 1 475,000.00$ 475,000.00$ 0002 130,000 6.50$ 845,000.00$ 0002 130,000 7.50$ 975,000.00$ 0002 130,000 9.00$ 1,170,000.00$ 0003 5 200.00$ 1,000.00$ 0003 5 1,100.00$ 5,500.00$ 0003 5 250.00$ 1,250.00$
TOTAL BASE ITEMS 1,111,000.00$ TOTAL BASE ITEMS 1,522,355.00$ TOTAL BASE ITEMS 1,646,250.00$
OPTIONAL ITEMS OPTIONAL ITEMS OPTIONAL ITEMS
2000 2000 2000 2101 20,000 6.00$ 120,000.00$ 2101 20,000 6.00$ 120,000.00$ 2101 20,000 7.00$ 140,000.00$ 2102 40,000 6.00$ 240,000.00$ 2102 40,000 6.00$ 240,000.00$ 2102 40,000 6.00$ 240,000.00$ 3000 3000 3000 3101 1 200.00$ 200.00$ 3101 1 2,500.00$ 2,500.00$ 3101 1 250.00$ 250.00$ 3102 25 200.00$ 5,000.00$ 3102 25 500.00$ 12,500.00$ 3102 25 250.00$ 6,250.00$
TOTAL OPTIONAL ITEMS 365,200.00$ TOTAL OPTIONAL ITEMS 375,000.00$ TOTAL OPTIONAL ITEMS 386,500.00$ TOTAL BASE + OPTIONS 1,476,200.00$ TOTAL BASE + OPTIONS 1,897,355.00$ TOTAL BASE + OPTIONS 2,032,750.00$
Standard Form 1419 (2001)
COE SEATTLE DISTRICT (VERSION 3/01)
| 2022-06-08T13:55:49-0700 | |
| COOK.GREGORY.ALLEN.1109082143 |
File details come from the government source that posted it. Updated .