W912DW19R0027_Combined_Synopsis_Solicitation,_Amd_0002,_19Sep19_Cultural_Resource_Survey_HAHD_and_MMD.pdf

PDF 79 KB Posted

Attached to
Cultural Resource Survey and Monitoring at Howard A. Hanson Dam and Mud Mountain Dam
Solicitation number
W912DW19R0027
Issued by

About this file

Amendment 0002, W912DW19R0027

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Combined Synopsis/Solicitation

Cultural Resource Survey and Monitoring at Howard A. Hanson Dam and Mud Mountain Dam

W912DW19R0027

Amendment 0002

Date. September 19, 2019

1. The Contractor can perform shovel tests in lieu of auger tests when performing subsurface surveying. PWS, Part 5 verbiage has been changed as follows:

AS READS: auger

AS CHANGED: auger and/or shovel

2. Use of boat(s) in reservoir: Conditions in the water elevation at Eagle Gorge reservoir vary at different times of the year. For safety reasons, a boat operator with a good understanding of the reservoir and adjacent areas is required; therefore, HAHD operations staff will provide a boat and an operator as required.

File details come from the government source that posted it.