W912DW19R0027_Combined_Synopsis_Solicitation,_Amd_0002,_19Sep19_Cultural_Resource_Survey_HAHD_and_MMD.pdf
PDF 79 KB Posted
- Solicitation number
- W912DW19R0027
About this file
Amendment 0002, W912DW19R0027
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis/Solicitation
Cultural Resource Survey and Monitoring at Howard A. Hanson Dam and Mud Mountain Dam
W912DW19R0027
Amendment 0002
Date. September 19, 2019
1. The Contractor can perform shovel tests in lieu of auger tests when performing subsurface surveying. PWS, Part 5 verbiage has been changed as follows:
AS READS: auger
AS CHANGED: auger and/or shovel
2. Use of boat(s) in reservoir: Conditions in the water elevation at Eagle Gorge reservoir vary at different times of the year. For safety reasons, a boat operator with a good understanding of the reservoir and adjacent areas is required; therefore, HAHD operations staff will provide a boat and an operator as required.
File details come from the government source that posted it.