W912DW19B0012_AMENDMENT_NO._0002_YTC_REPAIR_BAYS.pdf

PDF 801 KB Posted

Attached to
Vehicle Maintenance Facility, Yakima Training Center, WA
Solicitation number
W912DW19B0012
Issued by

About this file

W912DW19B0012 AMENDMENT NO. 0002

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Invitation for Bid (IFB) W912DW19B0012, Vehicle Maintenance Facility, Yakima Training Center, Yakima, Washington Amendment No. 0002

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW19B0012

X 9B. DATED (SEE ITEM 11)

27-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2019

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW19B0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT NO. 0002

1. The purposes of this Amendment No. 0002 are to:

1.1 Incorporate revised specification sections:

Section 01 30 00 Section 01 35 26 Section 01 45 00.00 10 Section 08 71 00 Section 25 10 10,

1.2 Incorporate FAR 52.208-9, Contractor Use of Mandatory Sources of Supply or Services (May 2014), in by reference; and,

1.3 Incorporate updated Wage Determination WA20190020 Modification No. 3 Dated 28 June 2019.

2. The bid due date and time remains unchanged as a result of the Amendment No. 0002.

3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

4. NOTICE TO BIDDERS: Bidders must acknowledge receipt of all amendments including this amendment by number and date on SF1442.

5. All other terms and conditions remain unchanged.

Enclosures

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added by reference:

52.208-9

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: WA20190020 06/28/2019 Superseded General Decision Number: WA20180045 State: Washington Construction Type: Building County: Yakima County in Washington.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

beta.SAM.gov Page 1 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 Modification Number Publication Date 0 01/04/2019 1 02/15/2019 2 03/15/2019 3 06/28/2019

ASBE0007-002 01/01/2019

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 53.62 15.87

BRWA0001-002 06/01/2017

Rates Fringes

BRICKLAYER.......................$ 39.46 16.15

CARP0770-017 06/01/2018

Rates Fringes CARPENTER (Excluding Acoustical Ceiling Installation)

EAST OF 120TH MERIDIAN......$ 28.71 16.40

WEST OF 120TH MERIDIAN......$ 29.05 13.93

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima beta.SAM.gov Page 2 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

ELEC0112-014 06/01/2018

Rates Fringes

ELECTRICIAN......................$ 43.50 20.54

ENGI0302-017 07/01/2018

West of the 120th Meridian Rates Fringes Power equipment operators:

Group 1A...................$ 44.44 19.97 Group 1AA..................$ 45.09 19.97 Group 1AAA.................$ 45.73 19.97 Group 1.....................$ 43.79 19.97 beta.SAM.gov Page 3 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 Group 2.....................$ 43.23 19.97 Group 3.....................$ 42.74 19.97 Group 4.....................$ 40.01 19.97

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Trackhoe: Over 90 metric tons GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Loaders-overhead, 8 yards and over; Trackhoe: over 50 metric tons to 90 metric tons GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Trackhoe: over 30 metric tons to 50 metric tons; Loader- overhead 6 yards to, but not including 8 yards; Dozer D-10; Screedman; Scrapers: 45 yards and over; Grader/Blade GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;

Drilling machine; Trackhoe: 15 to 30 metric tons;

Horizontal/directional drill operator; Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Compactor;

Scraper: under 45 tons GROUP 3 - Cranes-thru 19 tons with attachments; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under 100 tons; Trackhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments

ENGI0370-018 06/01/2018

Rates Fringes beta.SAM.gov Page 4 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 27.51 15.95

GROUP 2.....................$ 27.83 15.95

GROUP 3.....................$ 28.44 15.95

GROUP 4.....................$ 28.60 15.95

GROUP 5.....................$ 28.76 15.95

GROUP 6.....................$ 29.04 15.95

GROUP 7.....................$ 29.31 15.95

GROUP 8.....................$ 30.41 15.95

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Compactor; Rollers, all types on subgrade, including seal and chip coatings GROUP 2: Fork Lift GROUP 3: Bulldozer (up to D-6 or equivalent) GROUP 4: Drills (churn, core, calyx or diamond); Oiler;

Loaders (overhead & front-end, under 4 yds. R/T); Vacuum Drill (reverse circulation drill under 8 inch bit) GROUP 5: Trackhoe (hoe Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar) GROUP 6: Asphalt Roller; Trackhoe (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.

incl. 8 yds.); Scrapers, all, rubber-tired beta.SAM.gov Page 5 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 GROUP 7: Trackhoe (Hoe Ram) (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers) GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over) BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0086-009 07/01/2018

Rates Fringes IRONWORKER (Reinforcing, Structural, and Ornamental)......$ 33.18 27.82

* LABO0348-006 06/01/2019

Rates Fringes

LABORER

GROUP 2....................$ 26.51 11.94

GROUP 3....................$ 29.01 11.94

GROUP 4....................$ 29.71 11.94

GROUP 5....................$ 30.22 11.94

beta.SAM.gov Page 6 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019

BASE POINTS: CHELAN, SUNNYSIDE, WENATCHEE, AND YAKIMA

ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 radius miles from the respective city hall

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):

ZONE 2 - $2.25

LABORERS CLASSIFICATIONS

GROUP 2: Flagman GROUP 3: Chipping Gun (under 30 lbs.); Form Stripping GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;

Gunite; Vibrating Plate GROUP 5: Mason Tender-Brick; Mason Tender-Cement/Concrete;

Grade CheckeR

PAIN0005-026 06/01/2008

Rates Fringes Painters: (Parking Lot and highway Striping)................$ 26.50 11.40

PAIN0005-027 04/15/2013

Rates Fringes Painters:

BRUSH, ROLLER AND SPRAY.....$ 15.58 10.23

PAIN0054-001 06/01/2008

Rates Fringes beta.SAM.gov Page 7 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019

DRYWALL FINISHER/TAPER...........$ 22.78 8.88

PAIN0054-004 10/01/2005

Rates Fringes FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22

PLAS0072-009 06/01/2018

Rates Fringes

PLASTERER........................$ 29.07 14.13

Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee Zone 1: 0-45 radius miles from the main post office Zone 2: Over 45 radius miles from the main post office

PLUM0598-017 06/01/2018

Rates Fringes PLUMBER (including HVAC Pipe Installation)....................$ 50.43 30.16

ROOF0189-014 07/01/2018

Rates Fringes ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs).....$ 27.43 12.78

SFWA0699-005 04/01/2017

Rates Fringes beta.SAM.gov Page 8 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 SPRINKLER FITTER (Fire Sprinklers)......................$ 33.20 15.84

SHEE0066-021 06/01/2017

Rates Fringes Sheet metal worker...............$ 34.75 20.68

SUWA2009-033 05/22/2009

Rates Fringes LABORER: Common or General......$ 14.50 0.00 LABORER: Handheld Drill.........$ 17.17 5.36 LABORER: Irrigation.............$ 11.58 0.00 LABORER: Landscape..............$ 11.08 0.00 LABORER: Pipelayer..............$ 17.25 4.40 OPERATOR: Backhoe...............$ 19.59 0.00 OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 22.05 7.35 OPERATOR: Concrete Pumper.......$ 22.30 5.27 OPERATOR: Excavator.............$ 25.02 5.43 OPERATOR: Mechanic..............$ 24.33 4.33 OPERATOR: Oiler.................$ 23.76 8.71 OPERATOR: Roller................$ 19.08 0.00 OPERATOR: Screed................$ 19.08 0.00 beta.SAM.gov Page 9 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019

PIPEFITTER.......................$ 23.88 6.62

TILE SETTER......................$ 25.51 0.00

TRUCK DRIVER: Dump Truck........$ 11.87 0.00 TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

beta.SAM.gov Page 10 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates beta.SAM.gov Page 11 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling beta.SAM.gov Page 12 of 14 https://beta.sam.gov/wage-determination/WA20190020/3/document 7/22/2019 On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 beta.SAM.gov Page 13 of 14

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

beta.SAM.gov Page 14 of 14

(End of Summary of Changes)

YTC Repai r Bays ( Pant her ) 19005 Yaki ma Tr ai ni ng Cent er , WA W912DW19B0012

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 30 00

ADMI NI STRATI VE PERSONNEL REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 CONTRACTOR' S PROJECT MANAGER

1. 4 SUPERI NTENDENT

1. 5 SEI SMI C CONSULTANT

1. 5. 1 Qual i f i cat i ons

1. 5. 2 Dut i es

1. 5. 3 Addi t i onal Sect i on Ref er ences

1. 5. 4 Qual i t y Cont r ol Fi el d I nspect i ons

1. 6 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE ( UAI 31. 105- 101)

1. 7 PAYMENT FOR MATERI ALS DELI VERED OFF- SI TE ( UAI 5152. 232- 9000)

1. 8 PROJECT PHOTOGRAPHS

1. 8. 1 Gener al

1. 8. 2 Pr ogr ess Phot ogr aphs

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 30 00 Page 1 R0002

SECTI ON 01 30 00

ADMI NI STRATI VE PERSONNEL REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)

ASCE 7 ( 2010; Er r at a 2011; Supp 1 2013) Mi ni mum Desi gn Loads f or Bui l di ngs and Ot her Structures ( 2017) Mi ni mum Desi gn Loads f or Bui l di ngs and Ot her St r uct ur es

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EP 1110- 1- 8 ( 2014) Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 310- 04 ( 2013; Ch 1 2016) Sei smi c Desi gn of Buildings ( 2013; wi t h Change 1) Sei smi c Desi gn of Bui l di ngs

UFC 4- 010- 01 ( 2012; Ch 1 2013) DoD Mi ni mum Ant i t er r or i sm St andar ds f or Bui l di ngs ( 2012; wi t h Change 1) DoD Mi ni mum Ant i t er r or i sm St andar ds f or Bui l di ngs

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Submi t r esumes and/ or document at i on descr i bi ng t he r equi r ed and r el evant t r ai ni ng and/ or exper i ence f or t hese posi t i ons.

Pr oj ect Manager ; G

Super i nt endent ; G

SD- 02 Shop Dr awi ngs

Seismic and Bl ast Pl ans and Det ai l s; G

SD- 03 Pr oduct Dat a

SECTI ON 01 30 00 Page 2 R0002 g3endnp9 Highlight

Pr ogr ess Phot ogr aphs; G

SD- 06 Test Repor t s

Qual i t y Cont r ol Fi el d I nspect i ons; G

Seismic /Blast Consul t ant ; G

1. 3 CONTRACTOR' S PROJECT MANAGER

I dent i f y as Pr oj ect Manager , an i ndi v i dual wi t hi n t he on- si t e wor k or gani zat i on who i s r esponsi bl e f or over al l management of t he pr oj ect and have t he aut hor i t y t o act i n al l mat t er s f or t he Cont r act or . The Pr oj ect Manager shal l not hol d any ot her dut i es. The Pr oj ect Manager must have a bachel or ' s degr ee i n engi neer i ng, ar chi t ect ur e, or const r uct i on management , wi t h a mi ni mum of f i ve year s const r uct i on exper i ence wi t h r el evant mul t i - di sci pl i nar y and schedul e- cr i t i cal wor k, or at l east t en ( 10) year s exper i ence as a Pr oj ect Manager wi t h r el evant mul t i - di sci pl i nar y and schedul e- cr i t i cal wor k on pr oj ect s s i mi l ar t o t he scope and compl exi t y of t hi s Cont r act . The Pr oj ect Manager must be empl oyed by t he pr i me Cont r act or .

I dent i f y i n t he pl an an al t er nat e t o ser ve i n t he event of t he Pr oj ect Manager ' s absence. The r equi r ement s f or t he al t er nat e ar e t he same as t he Pr oj ect Manager .

1. 4 SUPERINTENDENT

I dent i f y as Super i nt endent , an i ndi v i dual wi t hi n t he on- si t e wor k or gani zat i on who i s r esponsi bl e f or over al l super vi s i on of t he pr oj ect and have t he aut hor i t y t o act i n al l mat t er s f or t he Cont r act or . The Superintendent may al so ser ve as t he SSHO or CQCshal l not hol d any ot her duties . The Super i nt endent must have a mi ni mum of t en year s const r uct i on exper i ence on pr oj ect s s i mi l ar t o t he scope and compl exi t y of t hi s Cont r act , i ncl udi ng a mi ni mum of f i ve year s const r uct i on exper i ence as a s i t e Super i nt endent . Thi s Super i nt endent must be empl oyed by t he pr i me Cont r act or .

I dent i f y i n t he pl an an al t er nat e t o ser ve i n t he event of t he Super i nt endent ' s absence. The r equi r ement s f or t he al t er nat e ar e t he same as t he Super i nt endent . The Super i nt endent or t hei r al t er nat e must be on- si t e at al l t i mes whi l e wor k i s bei ng per f or med.

1. 5 SEISMIC/BLAST CONSULTANT

The Cont r act or shal l empl oy a sei smi c/blast consul t ant as par t of t he const r uct i on t eam t o eval uat e t he sei smi c and bl ast desi gn f or al l component s, per f or m cal cul at i ons t o suppor t sei smi c r est r ai nt and bl ast mi t i gat i on desi gn, pr ovi de det ai l s and l ayout s, and r evi ew, st amp, and si gn al l submi t t al s.

1. 5. 1 Qualifications

The sei smi c/blast consul t ant shal l be a pr of essi onal engi neer wi t h 5 year s exper i ence i n t he ar ea of sei smi c f or ce r est r ai nt and bl ast mi t i gat i on, and be empl oyed by a engi neer i ng f i r m wi t h mi ni mum of 10 year s ' exper i ence speci al i z i ng i n sei smi c and bl ast desi gn.

SECTI ON 01 30 00 Page 3 R0002 g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight

1. 5. 2 Duties

The sei smi c/blast consul t ant ' s dut i es wi l l i ncl ude, but ar en' t necessar i l y l i mi t ed t o:

a. Desi gn of non- st r uct ur al component s t hat ar e per manent l y at t ached t o t he st r uct ur e and t hei r suppor t s and at t achment s, and const r uct ed t o r esi st t he ef f ect s of ear t hquake mot i ons i n accor dance wi t h ASCE 7, UFC 3- 310- 04, or f or ce r equi r ement s def i ned i n UFC 4- 010- 01.

b. Def i ni t i on of pr oj ect sei smi c val ues and bl ast s r equi r ement s t o be i ncl uded i n t he const r uct i on document s.

c. Pr ovi s i on of f l oor pl ans on a f l oor - by- f l oor basi s l ocat i ng al l component s gr ound mount ed, wal l mount ed ( l ouver s) , and suspended f r om t he st r uct ur e ( duct wor k, cabl e t r ays, condui t , pi pi ng, mechani cal devi ces, et c. ) t o be anchor ed or br aced i n t he same pl ai n.

d. Pr ovi s i on of dat a and det ai l s f or each component ei t her gr ound mount ed and or suspended f r om t he st r uct ur e i ncl udi ng:

1) Det ai l s i l l ust r at i ng al l suppor t br aci ng component s ( i . e. sei smi c c l i ps, r od st i f f eni ng, v i br at i on i sol at i on hanger s, br acket s, swaged f i t t i ngs, cabl e, wedgy, et c. ) , met hod of connect i on, and speci f i c concr et e anchor s wi t h manuf act ur er dat a and appl i cabl e Eval uat i on Ser vi ce Repor t ( ESR) .

2) Br aci ng r equi r ement s f or mechani cal equi pment / r od hung i n t abl e f or mat l i s t i ng t he equi pment t ag ( i ndi v i dual pi ece of equi pment ) , equi pment wei ght , r od t ot al ver t i cal l oad, ver t i cal suppor t r od di amet er , and f our - way spl ayed br aci ng r equi r ement s ( br ace r eact i on, mi ni mum br ace assembl y, br ace anchor age; concr et e f or m deck, concr et e met al deck or r oof t r uss) .

3) I nst al l at i on r equi r ement s f or sei smi c pr ot ect i on of suspended duct wor k, suspended el ect r i cal ( condui t ) , pi pi ng and cabl e t r ays.

Pr ovi de maxi mum spaci ng of hanger s and br aci ng component s.

4) Pr ovi s i on of manuf act ur er cut sheet s and pr oduct dat a ( wei ght s, di mensi ons, access panel s et c. ) f or each component bei ng br aced.

e. Pr ovi di ng sei smi c f or ce equat i ons and cal cul at i ons f r om ASCE 7, Chapt er 13 sei smi c r est r ai nt f or nonst r uct ur al component s and UFC 3- 310- 04 i ncl udi ng:

1) Equi pment wei ght , wi dt h, hei ght , hei ght t o C. G. , eccent r i c i t y,

2) Sei smi c For ce Fp and Fv, and

3) Anal ysi s M ( over t ur ni ng) , M ( r esi st i ng) , t ensi on per s i de, shear , number of connect i ons per s i de, t ensi on per connect i on, shear per connection

The sei smi c/blast consul t ant shal l submi t sei smi c and bl ast pl ans and det ai l s f or Gover nment appr oval . The Cont r act or shal l i nst al l al l sei smi c restraints and bl ast mi t i gat i on pr ovi s i ons i n accor dance wi t h t he sei smi c /blast consul t ant ' s appr oved pl ans and det ai l s.

SECTI ON 01 30 00 Page 4 R0002 g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight g3endnp9 Highlight

1. 5. 3 Addi t i onal Sect i on Ref er ences

The f ol l owi ng speci f i cat i on sect i ons cont ai n addi t i onal i nf or mat i on and i nst r uct i ons r egar di ng component s t o be sei smi cal l y br aced: 13 48 00

SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT, 13 48 00. 00 10 SEISMIC

PROTECTI ON FOR MECHANI CAL EQUI PMENTSEI SMI C BRACI NG FOR MI SCELLANEOUS

EQUIPMENT, and 26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT.

1. 5. 4 Qual i t y Cont r ol Fi el d I nspect i ons

At i nt er val s det er mi ned by t he Cont r act i ng Of f i cer , t he sei smi c/blast consul t ant shal l conduct a mi ni mum of t hr ee on- si t e i nspect i ons of al l i nst al l ed br aci ng, r est r ai nt s, and ot her sei smi c and bl ast pr ovi s i ons t o ver i f y compl i ance wi t h desi gn pl ans and det ai l s, and submi t QC f i el d i nspect i on r epor t s f or each i nspect i on.

1. 6 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE ( UAI 31. 105- 101)

a. Thi s c l ause does not appl y t o t er mi nat i ons. See UAI 5152. 249- 9000 BASI S FOR SETTLEMENT OF PROPOSALS and FAR Par t 49.

b. Al l owabl e cost f or const r uct i on and mar i ne pl ant and equi pment i n sound wor kabl e condi t i on owned or cont r ol l ed and f ur ni shed by a cont r act or or subcont r act or at any t i er shal l be based on act ual cost dat a f or each pi ece of equi pment or gr oups of s i mi l ar ser i al and ser i es f or whi ch t he Gover nment can det er mi ne bot h owner shi p and oper at i ng cost s f r om t he cont r act or ' s account i ng r ecor ds. When bot h owner shi p and oper at i ng cost s cannot be det er mi ned f or any pi ece of equi pment or gr oups of s i mi l ar ser i al or ser i es equi pment f r om t he cont r act or ' s account i ng r ecor ds, cost s f or t hat equi pment shal l be based upon t he appl i cabl e pr ovi s i ons of EP 1110- 1- 8, Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e, Regi on VI I I .

Wor ki ng condi t i ons shal l be consi der ed t o be aver age f or det er mi ni ng equi pment r at es usi ng t he schedul e unl ess speci f i ed ot her wi se by t he cont r act i ng of f i cer . For equi pment not i ncl uded i n t he schedul e, r at es f or compar abl e pi eces of equi pment may be used or a r at e may be devel oped usi ng t he f or mul a pr ovi ded i n t he schedul e. For f or war d pr i c i ng, t he schedul e i n ef f ect at t he t i me of negot i at i ons shal l appl y. For r et r oact i ve pr i c i ng, t he schedul e i n ef f ect at t he t i me t he wor k was per f or med shal l appl y.

c. Equi pment r ent al cost s ar e al l owabl e, subj ect t o t he pr ovi s i ons of FAR

31. 105( d) ( i i ) and FAR 31. 205- 36. Rat es f or equi pment r ent ed f r om an or gani zat i on under common cont r ol , l ease- pur chase ar r angement s, and sal e- l easeback ar r angement s, wi l l be det er mi ned usi ng t he schedul e, except t hat act ual r at es wi l l be used f or equi pment l eased f r om an or gani zat i on under common cont r ol t hat has an est abl i shed pr act i ce of l easi ng t he same or s i mi l ar equi pment t o unaf f i l i at ed l essees.

d. When act ual equi pment cost s ar e pr oposed and t he t ot al amount of t he pr i c i ng act i on exceeds t he smal l pur chase t hr eshol d, t he cont r act i ng of f i cer shal l r equest t he cont r act or t o submi t ei t her cer t i f i ed cost or pr i c i ng dat a, or par t i al / l i mi t ed dat a, as appr opr i at e. The dat a shal l be submi t t ed on St andar d For m 1411, Cont r act Pr i c i ng Pr oposal Cover Sheet .

1. 7 PAYMENT FOR MATERI ALS DELI VERED OFF- SI TE ( UAI 5152. 232- 9000)

a. Pur suant t o FAR cl ause 52. 232- 5, Payment s Under Fi xed Pr i ced

SECTI ON 01 30 00 Page 5 R0002 g3endnp9 Highlight

Const r uct i on Cont r act s, mat er i al s del i ver ed t o t he cont r act or at l ocat i ons ot her t han t he si t e of t he wor k may be t aken i nt o consi der at i on i n maki ng payment s i f i ncl uded i n payment est i mat es and i f al l t he condi t i ons of t he Gener al Pr ovi s i ons ar e f ul f i l l ed.

Payment f or i t ems del i ver ed t o l ocat i ons ot her t han t he wor k s i t e wi l l be l i mi t ed t o:

1. mat er i al s r equi r ed by t he t echni cal pr ovi s i ons; or

2. mat er i al s t hat have been f abr i cat ed t o t he poi nt wher e t hey ar e i dent i f i abl e t o an i t em of wor k r equi r ed under t hi s cont r act .

b. Such payment wi l l be made onl y af t er r ecei pt of pai d or r ecei pt ed i nvoi ces or i nvoi ces wi t h cancel ed check showi ng t i t l e t o t he i t ems i n t he pr i me cont r act or and i ncl udi ng t he val ue of mat er i al and l abor i ncor por at ed i nt o t he i t em. I n addi t i on t o pet r ol eum pr oduct s, payment f or mat er i al s del i ver ed of f - s i t e i s l i mi t ed t o t he f ol l owi ng i t ems: Any ot her const r uct i on mat er i al st or ed of f s i t e may be consi der ed i n det er mi ni ng t he amount of a pr ogr ess payment .

1. 8 PROJECT PHOTOGRAPHS

1. 8. 1 General

Fur ni sh di gi t al phot ogr aphs depi ct i ng const r uct i on as speci f i ed her ei n.

The phot ogr aphs shal l be i n di gi t al JPEG f or mat , wi t h a mi ni mum r esol ut i on of 1600 by 1200 pi xel s, 24 bi t t r ue col or . Submi t phot os i n a Wor d document , wi t h a capt i on under each phot o showi ng dat e t aken, pr oj ect l ocat i on, cont r act t i t l e and number , and a br i ef descr i pt i on of what t he phot o depi ct s. The phot os shal l be submi t t ed on CD- ROM conf or mi ng t o i ndust r y st andar ds used i n t he Uni t ed St at es.

1. 8. 2 Pr ogr ess Phot ogr aphs

Const r uct i on pr ogr ess phot ogr aphs shal l be t aken bet ween t he 1st and 15t h of each mont h and del i ver ed t o t he Cont r act i ng Of f i cer wi t h t he payment r equest f or t he mont h t aken. Phot os shal l be t aken f r om t en posi t i ons.

Locat i on of posi t i ons shal l be coor di nat ed wi t h or may be sel ect ed by t he Cont r act i ng Of f i cer . They shal l show, i nasmuch as pr act i cabl e, wor k accompl i shed dur i ng t he pr evi ous mont h. Phot ogr aphi c qual i t y and composi t i on of phot os shal l be such t hat t hey can be used f or br i ef i ngs and/ or t o i l l ust r at e ar t i c l es on t he const r uct i on pr ogr ess of t he pr oj ect .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Sect i on - -

SECTI ON 01 30 00 Page 6

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 35 26

GOVERNMENTAL SAFETY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 DEFI NI TI ONS

1. 4 REGULATORY REQUI REMENTS

1. 5 SI TE QUALI FI CATI ONS, DUTI ES, AND MEETI NGS

1. 5. 1 Per sonnel Qual i f i cat i ons

1. 5. 1. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)

1. 5. 1. 1. 1 Addi t i onal Si t e Saf et y and Heal t h Of f i cer ( SSHO)

Requi r ement s and Dut i es

1. 5. 1. 2 Compet ent Per son Qual i f i cat i ons

1. 5. 1. 2. 1 Compet ent Per son f or Conf i ned Space Ent r y

1. 5. 1. 2. 2 Compet ent Per son f or Scaf f ol di ng

1. 5. 1. 2. 3 Compet ent Per son f or Fal l Pr ot ect i on

1. 5. 1. 3 Qual i f i ed Tr ai ner Requi r ement s

1. 5. 1. 4 Cr ane Oper at or s/ Ri gger s

1. 5. 2 Per sonnel Dut i es

1. 5. 2. 1 Dut i es of t he Si t e Saf et y and Heal t h Of f i cer ( SSHO)

1. 5. 3 Meet i ngs

1. 5. 3. 1 Pr econst r uct i on Conf er ence

1. 5. 3. 2 Saf et y Meet i ngs

1. 6 AI RPORT AREA CRANE I NSTALLATI ON

1. 6. 1 FAA Obst r uct i on Eval uat i on Sur vey

1. 6. 2 Cr ane f l ags and saf et y l i ght s

1. 6. 3 Not i f i cat i on of Ai r Tr af f i c and Ai r space Of f i cer

1. 7 ACCI DENT PREVENTI ON PLAN ( APP)

1. 7. 1 EM 385- 1- 1 Cont ent s

1. 8 ACTI VI TY HAZARD ANALYSI S ( AHA)

1. 9 DI SPLAY OF SAFETY I NFORMATI ON

1. 10 UNEXPLODED ORDNANCE ( UXO)

1. 11 SI TE SAFETY REFERENCE MATERI ALS

1. 12 EMERGENCY MEDI CAL TREATMENT

1. 13 NOTI FI CATI ONS AND REPORTS

1. 13. 1 Acci dent Repor t s

1. 13. 2 Acci dent Not i f i cat i on

1. 13. 3 Mont hl y Exposur e Repor t s

1. 13. 4 Cr ane Repor t s

1. 13. 5 Cer t i f i cat e of Compl i ance

1. 14 HOT WORK PERMI T

1. 15 RADI ATI ON SAFETY REQUI REMENTS

1. 16 FACI LI TY OCCUPANCY CLOSURE

1. 17 SEVERE STORM PLAN

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON

3. 1 CONSTRUCTI ON AND/ OR OTHER WORK

SECTI ON 01 35 26 Page 1

3. 1. 1 Hazar dous Mat er i al Excl usi ons

3. 1. 1. 1 Ar my Radi at i on Per mi t ( ARP)

3. 1. 2 Unf or eseen Hazar dous Mat er i al

3. 2 PRE- OUTAGE COORDI NATI ON MEETI NG

3. 3 FALL HAZARD PROTECTI ON AND PREVENTI ON PROGRAM

3. 3. 1 Tr ai ni ng

3. 3. 2 Fal l Pr ot ect i on Equi pment and Syst ems

3. 3. 2. 1 Per sonal Fal l Ar r est Equi pment

3. 3. 3 Fal l Pr ot ect i on f or Roof i ng Wor k

3. 3. 4 Exi st i ng Anchor age

3. 3. 5 Hor i zont al Li f el i nes

3. 3. 6 Guar dr ai l s and Saf et y Net s

3. 3. 7 Rescue and Evacuat i on Pr ocedur es

3. 4 EQUI PMENT

3. 4. 1 Mat er i al Handl i ng Equi pment

3. 4. 2 Wei ght Handl i ng Equi pment

3. 5 EXCAVATI ONS

3. 5. 1 Ut i l i t y Locat i ons

3. 5. 2 Ut i l i t y Locat i on Ver i f i cat i on

3. 5. 3 Shor i ng Syst ems

3. 5. 4 Tr enchi ng Machi ner y

3. 6 UTI LI TI ES WI THI N CONCRETE SLABS

3. 7 ELECTRI CAL

3. 7. 1 Conduct of El ect r i cal Wor k

3. 7. 2 Por t abl e Ext ensi on Cor ds

3. 8 WORK I N CONFI NED SPACES

ATTACHMENTS:

01 35 26- A

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 35 26 Page 2

SECTI ON 01 35 26

GOVERNMENTAL SAFETY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF SAFETY ENGI NEERS ( ASSE/ SAFE)

ASSE A10. 34 ( 2001; R 2012) Pr ot ect i on of t he Publ i c on or Adj acent t o Const r uct i on Si t es

ASSE Z359. 1 ( 2012) Saf et y Requi r ement s f or Per sonal Fal l Ar r est Syst ems, Subsyst ems, and Components

ASME I NTERNATI ONAL ( ASME)

ASME B30. 22 ( 2010) Ar t i cul at i ng Boom Cr anes

ASME B30. 3 ( 2012) Const r uct i on Tower Cr anes

ASME B30. 5 ( 2011) Mobi l e and Locomot i ve Cr anes

ASME B30. 8 ( 2010) Fl oat i ng Cr anes and Fl oat i ng Derricks

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 10 ( 2018; TI A 18- 1) St andar d f or Por t abl e Fi r e Ext i ngui sher s

NFPA 306 ( 2014) St andar d f or Cont r ol of Gas Hazar ds on Vessel s

NFPA 51B ( 2008; AMD 1) Fi r e Pr event i on Dur i ng Wel di ng, Cut t i ng, and Ot her Hot Wor k

NFPA 70 ( 2017; ERTA 1- 2 2017; TI A 17- 1; TI A 17- 2)

Nat i onal El ect r i cal Code( 2017; ERTA 1- 2

2017; TI A 17- 1; TI A 17- 2; TI A 17- 3; TI A

17- 4; TI A 17- 5; TI A 17- 6; TI A 17- 7; TI A

17- 8; TI A 17- 9; TI A 17- 10; TI A 17- 11; TI A

17- 12; TI A 17- 13; TI A 17- 14) Nat i onal El ect r i cal Code

NFPA 70E ( 2018; TI A 18- 1; TI A 81- 2) St andar d f or El ect r i cal Saf et y i n t he Wor kpl ace

SECTI ON 01 35 26 Page 3

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

10 CFR 20 OSHA St andar ds f or Pr ot ect i on Agai nst Radiation

29 CFR 1910. 146 OSHA Per mi t - r equi r ed Conf i ned Spaces

29 CFR 1910. 147 The Cont r ol of Hazar dous Ener gy ( Lock Out / Tag Out )

29 CFR 1915 OSHA Conf i ned and Encl osed Spaces and Ot her Danger ous At mospher es i n Shi pyar d Employment

29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Construction

29 CFR 1926. 16 Rul es of Const r uct i on

29 CFR 1926. 1431 OSHA Hoi st i ng Per sonnel

29 CFR 1926. 500 OSHA Fal l Pr ot ect i on

32 CFR 655. 10 DOD Use of Radi at i on Sour ces by Non- Ar my Ent i t i es on Ar my Land ( AR 38511)

U. S. FEDERAL AVI ATI ON ADMI NI STRATI ON ( FAA)

AC70/7460-1K ( 2007) Obst r uct i on Mar ki ng and Li ght i ng

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Acci dent Pr event i on Pl an ( APP) ; G

Act i v i t y Hazar d Anal ysi s; G

Cr ane Cr i t i cal Li f t Pl an; G

Pr oof of qual i f i cat i ons f or Cr ane Oper at or ( s) ; G

Cer t i f i cat e of Compl i ance; G

Ar my Radi at i on Per mi t ( ARP) ; G

FAA Obst r uct i on Eval uat i on Sur vey; G

SECTI ON 01 35 26 Page 4

SD- 06 Test Repor t s

Acci dent Repor t s

Submi t acci dent r epor t s, as t hei r i nci dence occur s, i n accor dance wi t h t he r equi r ement s of t he Par agr aph ACCI DENT REPORTS.

Mont hl y Exposur e Repor t s

Submi t r epor t s usi ng t he Excel Spr eadsheet pr ovi ded by t he Government.

Cr ane I nspect i on Repor t s

SD- 07 Cer t i f i cat es

Conf i ned Space Ent r y Per mi t

Hot Wor k Per mi t

Radi at i on Li cense Cer t i f i cat es

Cr ane Oper at or s/ Ri gger s

1. 3 DEFINITIONS

a. Hi gh Vi s i bi l i t y Acci dent . Any mi shap whi ch may gener at e publ i c i t y and/ or hi gh vi s i bi l i t y .

b. Medi cal Tr eat ment . Tr eat ment admi ni st er ed by a physi c i an or by r egi st er ed pr of essi onal per sonnel under t he st andi ng or der s of a physi c i an. Medi cal t r eat ment does not i ncl ude f i r st ai d t r eat ment even t hr ough pr ovi ded by a physi c i an or r egi st er ed per sonnel .

c. Recor dabl e I nj ur i es or I l l nesses. Any wor k- r el at ed i nj ur y or i l l ness t hat r esul t s i n:

1. Deat h, r egar dl ess of t he t i me bet ween t he i nj ur y and deat h, or t he l engt h of t he i l l ness;

2. Days away f r om wor k ( any t i me l ost af t er day of i nj ur y/ i l l ness onset);

3. Rest r i ct ed wor k;

4. Tr ansf er t o anot her j ob;

5. Medi cal t r eat ment beyond f i r st ai d;

6. Loss of consci ousness; or

7. A s i gni f i cant i nj ur y or i l l ness di agnosed by a physi c i an or ot her l i censed heal t h car e pr of essi onal , even i f i t di d not r esul t i n Number s 1 t hr ough 6 above.

d. " USACE" pr oper t y and equi pment speci f i ed i n USACE EM 385- 1- 1 shoul d be i nt er pr et ed as Gover nment pr oper t y and equi pment .

SECTI ON 01 35 26 Page 5

1. 4 REGULATORY REQUI REMENTS

I n addi t i on t o t he det ai l ed r equi r ement s i ncl uded i n t he pr ovi s i ons of t hi s cont r act , compl y wi t h USACE EM 385- 1- 1, and f eder al , st at e, and l ocal , l aws, or di nances, cr i t er i a, r ul es and r egul at i ons. EM 385- 1- 1 i s avai l abl e onl i ne at :

http://publications.usace.army.mil/publications/eng-manuals/.

Submi t mat t er s of i nt er pr et at i on of st andar ds t o t he appr opr i at e admi ni st r at i ve agency f or r esol ut i on bef or e st ar t i ng wor k. Wher e t he r equi r ement s of t hi s speci f i cat i on, appl i cabl e l aws, cr i t er i a, or di nances, r egul at i ons, and r ef er enced document s var y, t he most st r i ngent r equi r ement s gover n.

1. 5 SI TE QUALI FI CATI ONS, DUTI ES, AND MEETI NGS

1. 5. 1 Per sonnel Qual i f i cat i ons

1. 5. 1. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)

Pr ovi de an SSHO t hat meet s t he r equi r ement s of EM 385- 1- 1 Sect i on 1, i n addi t i on t o t he f ol l owi ng:

A mi ni mum of 5 year s exper i ence as an SSHO on si mi l ar pr oj ect s.

30- hour OSHA const r uct i on saf et y c l ass or equi val ent wi t hi n t he l ast f i ve year s.

An aver age of at l east 24 hour s of f or mal saf et y t r ai ni ng each year f or t he past f i ve year s.

Compet ent per son t r ai ni ng as needed.

The SSHO must ensur e t hat t he r equi r ement s of 29 CFR 1926. 16 ar e met f or t he pr oj ect .

Pr ovi de a Saf et y over si ght t eam t hat i ncl udes a mi ni mum of one ( 1) per son at each pr oj ect s i t e t o f unct i on as t he Si t e Saf et y and Heal t h Of f i cer

( SSHO) .

The SSHO or an equal l y- qual i f i ed Al t er nat e SSHO must be at t he wor k s i t e at al l t i mes t o i mpl ement and admi ni st er t he Cont r act or ' s saf et y pr ogr am and gover nment - accept ed Acci dent Pr event i on Pl an. The SSHO and Al t er nat e SSHO must have t he r equi r ed t r ai ni ng, exper i ence, and qual i f i cat i ons i n accor dance wi t h EM 385- 1- 1 Sect i on 01. A. 17, and al l associ at ed sub- par agr aphs. I f t he SSHO i s of f - s i t e f or a per i od l onger t han 24 hour s, an equal l y- qual i f i ed al t er nat e SSHO must be pr ovi ded and must f ul f i l l t he same r ol es and r esponsi bi l i t i es as t he pr i mar y SSHO. When t he SSHO i s t empor ar i l y ( up t o 24 hour s) of f - s i t e, a Desi gnat ed Repr esent at i ve ( DR) , as i dent i f i ed i n t he AHA may be used i n l i eu of an Al t er nat e SSHO, and must be on t he pr oj ect s i t e at al l t i mes when wor k i s bei ng per f or med.

Not e t hat t he DR i s a col l at er al dut y saf et y posi t i on, wi t h saf et y dut i es i n addi t i on t o t hei r f ul l t i me occupat i on.

1. 5. 1. 1. 1 Addi t i onal Si t e Saf et y and Heal t h Of f i cer ( SSHO) Requi r ement s and Dut i es

The SSHO may al so ser ve as t he Qual i t y Cont r ol Manager . The SSHO may al so ser ve as t he Super i nt endent .

SECTI ON 01 35 26 Page 6 R0002

1. 5. 1. 2 Compet ent Per son Qual i f i cat i ons

Pr ovi de Compet ent Per sons i n accor dance wi t h EM 385- 1- 1, Appendi x Q and her ei n. Compet ent Per sons f or hi gh r i sk act i v i t i es i ncl ude conf i ned space, cr anes and r i ggi ng, excavat i on/ t r enchi ng, f al l pr ot ect i on, and el ect r i cal wor k. The CP f or t hese act i v i t i es must be desi gnat ed i n wr i t i ng, and meet t he r equi r ement s f or t he speci f i c act i v i t y ( i . e.

compet ent per son, f al l pr ot ect i on) .

The Compet ent Per son i dent i f i ed i n t he Cont r act or ' s Saf et y and Heal t h Pr ogr am and accept ed Acci dent Pr event i on Pl an, must be on- si t e at al l t i mes when t he wor k t hat pr esent s t he hazar ds associ at ed wi t h t hei r pr of essi onal exper t i se i s bei ng per f or med. Pr ovi de t he cr edent i al s of t he Compet ent Per sons( s) t o t he t he Cont r act i ng Of f i cer f or i nf or mat i on i n consul t at i on wi t h t he Saf et y Of f i ce.

1. 5. 1. 2. 1 Compet ent Per son f or Conf i ned Space Ent r y

Pr ovi de a Conf i ned Space ( CP) Compet ent Per son who meet s t he r equi r ement s of EM 385- 1- 1, Appendi x Q, and her ei n. The CP f or Conf i ned Space Ent r y must super vi se t he ent r y i nt o each conf i ned space i n accor dance wi t h EM 385- 1- 1, Sect i on 34.

Si nce t hi s wor k i nvol ves oper at i ons t hat handl e combust i bl e or hazar dous mat er i al s, t hi s per son must have t he abi l i t y t o under st and and f ol l ow t hr ough on t he ai r sampl i ng, Per sonal Pr ot ect i ve Equi pment ( PPE) , and i nst r uct i ons of a Mar i ne Chemi st , Coast Guar d aut hor i zed per sons, or Cer t i f i ed I ndust r i al Hygi eni st .

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.