FT VANCOUVER HEADSTONE REALIGNMENT AND RESTORATION
Solicitation number
W912DW18R0018
Issued by

About this file

Performance Work Statement

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NWS BQP 7.4.1.03a

PERFORMANCE WORK STATEMENT

Headstones Realignment and Cleaning for Fort Vancouver Post Cemetery, WA for

88th Regional Support Command, Washington

Part 1

General Information

1. GENERAL: This is a non-personnel services contract to perform fieldwork to remove historic headstones, re-excavate and realign pockets, and reinstall, and clean stones. Fieldwork will be performed by field crews under the supervision of a qualified masonry conservator.

2. Data will be informed by site plans, historic photographs, National Register of Historic Places Determination of Eligibility, and the Cemetery Maintenance Plan.

3. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, technical equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to remove the headstones, prepare the new alignment, and reinstall the headstones, as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Vancouver Post Cemetery was established in 1882. It is the fourth of four cemeteries associated with the Hudson’s Bay Company and the US military, and includes some relocated military burials, as well as Native American burials, many of which are marked “unknown.” There are also four Medal of Honor recipients buried at the Post cemetery. Most of the markers are the standard government-issue type established during the Civil War era, and consist of plane white marble with curved tops. There are also 159 private markers of varying types and sizes, some of which are sandstone. Approximately 20 of these are less than 50 years of age.

Because the cemetery is eligible for listing in the National Register, the 88th’s management of its historic features and objects must comply with Section 110 of the National Historic Preservation Act.

Part of this obligation requires historic resources to be treated according to the Secretary of the Interior’s Standards for Restoration and Rehabilitation (36 CFR 67). Throughout the years, burial markers have moved out of alignment due to ground disturbance and natural settlement of the slope, resulting in an uneven and non-historic appearance.

1.3 Objectives:

• Evaluate and assess headstone stability prior to removal.

• Ensure precautions are taken for headstones that are vulnerable to damage during removal.

• Removal of 900 burials headstones at Fort Vancouver Barracks Cemetery.

• Excavation and modification of pocket to alignment with cemetery grid.

• Reinstallation of headstones into new realigned pocket.

• Clean all 1,450 markers (standard as well as private) with a prescribed cleaning agent to remove stains and biological growth.

• Option 1: Headstone Realignment of an additional 550 headstones at Vancouver Post Cemetery, as needed, in rows to be identified by the COR as requiring additional alignment.

1.4 Scope: Field excavation and removal of existing burial stones, excavation of a new pocket, and reinstallation of stones in alignment with overall historic grid layout; cleaning.

1.5 Period of Performance: The period of performance shall be for 12 months from contract award.

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: The Contractor is not required to perform services on holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of 8:00 am to 5:00 pm, Monday thru Friday, unless the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closures. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Scheduling and Coordination:

Contractor shall notify the COR at least five (5) working days prior to start of construction. The Contractor shall be specifically responsible for the coordination of all phases of work under this contract. This work will be done in an area of active Army Reserve Units. Contractor will not interfere with normal operations of the Military units or hamper or delay any and all Military Operations. Any work deemed necessary by the Contractor to be performed on Saturdays, Sundays, or legal holidays to maintain or correct Contractor schedules for the purpose of meeting the specified completion period for this project, shall be performed only with the approval of the Government and without additional cost to the Government. The Contractor shall notify the Contracting Officer or his/her authorized representative of work planned or scheduled for other than normal working hours. This notification shall be submitted in writing a minimum of 72 hours in advance of the proposed work.

Approval for work during other than normal duty hours (other than that specified by the Government) will be contingent upon availability of Government personnel to open the affected facilities for access. The Contractor is responsible for all permits, licenses, taxes, payments of fines and penalties for noncompliance, and associated fees. Items covered by this requirement include, but are not limited to:

building permits, digging permits, fees associated with hot work permits, State/City requirements for specially licensed or registered contractors to perform work, etc. Failure to conduct coordination IAW this paragraph resulting in the Contractor’s inability to gain access to the job site or to conduct work shall not constitute grounds for change orders for either time extensions or additional consideration due to lost.

1.6.6 Place of Performance: The work to be performed under this contract will be performed at the Vancouver Post Cemetery, Vancouver, Washington.

1.6.7 Type of Contract: The government will award a Firm Fixed Price Contract.

1.6.8 Antiterrorism (AT) and Operations Security (OPSEC)

1.6.8.1 AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date, new employee hire, or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 60 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil

1.6.8.2. Access and general protection/policy and procedures. For standard installations, the contractor and all associated sub-contractor employees shall provide all information required for background checks necessary to meet installation access requirements. These checks will be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. For non-standard installations, the contractor and all associated sub-contractors shall obtain background checks per 1.6.8.2.1 when unescorted access is required for employees without a CAC and associated background investigation.

Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.8.2.1 For Contractors that do not require CAC, but require access to a DoD facility or installation. The contractor shall obtain a background check for all contractor employees, including subcontractor employees, requiring unescorted access to government facilities. The background checks must include a check of the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB). In cases where obtaining an NCIC-III/TSDB background check is not possible, the contractor may submit background checks conducted by a third party entity. If third party checks are used, they must include a national criminal records check (including felonies and misdemeanors), Department of Motor Vehicles records check, and a check of the national sex offender registry. These checks must be completed on applicable employees within 6 months from the Notice to Proceed date. Background check reports will be provided to the COR by the third party or through the contractor. Under no circumstance will reports obtained by the employee be provided to the COR. These background checks will cover the previous ten years and include all states of previous residence during that time period.

1. Documentation of background checks, including the reports, will be sent to the COR by either the contractor or third party for each employee prior to the employee entering Army-controlled installations or facilities.

2. If adverse information is contained in the background check, unescorted access may be denied in accordance with Army Directive 2014-05 (Policy Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors).

http://jko.jten.mil/

3. Contractor employees who will be entering Army-controlled installations or facilities and who do not possess a valid CAC, including subcontractor employees, must present a Federal personal identity verification card or authorized identification issued by state, or local governments.

1.6.8.3. The Contractor will submit the list of employee's requesting unescorted access, along with their background checks, 20 business days prior to needing access. Upon receipt of this list, the COR will review the list of employees and create an Access Control Roster (ACR) that identifies those personnel authorized unescorted access. The COR will return the ACR to the contractor when review is complete.

1.6.8.4. Individuals may be denied unescorted access if derogatory information includes, but is not limited to, the following:

1. The background check contains criminal arrest information about the individual that causes the Senior Commander to determine that the individual presents a potential threat to the good order, discipline, or health and safety of the organization.

2. The installation is unable to verify the individual's claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access.

3. The individual has a current arrest warrant in NCIC, regardless of the offense or violation.

4. The individual is currently barred from entry or access to a Federal installation or facility.

5. The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

6. The individual has a U.S. conviction for espionage, sabotage, treason, terrorism, or murder.

7. The individual is a registered sex offender.

8. The individual has a felony conviction within the past 10 years, regardless of the offense or violation.

9. The individual has been convicted of a felony firearms or explosives violation.

10. The individual has engaged in acts or activities designed to overthrow the U.S. Government by force.

11. The individual is identified in the TSDB as known to be suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

1.6.8.5. In cases where an uncleared Contractor employee, including any subcontractor employee, is denied access based on derogatory information, the individual may request a waiver.

1.6.8.6. iWATCH Training. All Contractor employees, including subcontractor employees, to be briefed on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Contracting Officer. This training to be completed within 30 calendar days of Notice to Proceed and within 30 calendar days of new employees commencing performance with the results reported to the Contracting Officer no later than 60 calendar days after Notice to Proceed.

1.6.8.7 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES

1. Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the Contracting Officer, who will notify the Security Office.

2. The Contractor shall adhere to requirements as directed in Federal Acquisition Regulation – 52.222-54;

Employment Eligibility Verification. Contractors shall be enrolled in the Department of Homeland Security E-Verify Program. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.

3. The Contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

4. The Contractor shall return within two business days all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a Contractor employee no longer requires access to the installation or facility.

5. The Contractor shall comply with all personnel identity verification procedures. Employees must be accompanied by an authorized Government employee at all times while providing services in secure areas.

6. During Force Protection Conditions (FPCON) Charlie and Delta, services are discontinued and services shall resume when the FPCON level is reduced to level Bravo or lower.

1.6.8 Contractor Travel: (Not Applicable)

1.6.9 Other Direct Costs: (Not Applicable)

1.6.10 Data Rights: (Not Applicable)

1.6.11 Organizational Conflict of Interest: (Not Applicable)

1.6.12 PHASE IN /PHASE OUT PERIOD: (Not Applicable)

http://www.dhs.gov/E-Verify

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide necessary access to the cemetery and to all subjects of this investigation.

3.2. Water for construction purposes is available from an existing water connection and will be furnished by the Government. The Contractor shall provide and remove all materials, equipment, and labor to make any connections for temporary water. Temporary connections shall be coordinated through the COR. The Contractor shall furnish anti-siphon and backflow prevention devices on all temporary water connections.

3.3 Facilities: If needed, the Government will provide open space to be used for staging. The existing sanitary facilities in the Government buildings may be used by the Contractor’s personnel.

3.4 Utilities: The Government will allow use of electrical outlets required by the contractor to operate technical equipment.

3.5 Equipment (Not Applicable)

3.6 Materials (Not Applicable)

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: (Not Applicable)

4.3. Materials: The Contractor shall furnish materials, supplies, and equipment necessary to for burial stone excavation/removal, reinstallation, and cleaning. Existing material shall only be reused as specifically directed on the contract drawings and specifications. Materials and equipment shall be essentially the standard products of a manufacturer regularly engaged in the manufacture of the product, shall meet the requirements of the specification, and essentially duplicate material and equipment that have been in satisfactory use for at least two (2) years prior to the award of this contract. All materials shall be of the latest type or model currently being produced by the manufacturer. Seconds or otherwise substandard materials will not be allowed.

4.4. Equipment: The Contractor shall provide all equipment and tools necessary for burial stone excavation/removal, reinstallation, and cleaning.

4.5. Delivery and Storage: Contractor shall insure that any items stored at the site prior to installation are stored in an environment that will not cause rusting, warping, staining or any physical breakage or damage.

All labor and equipment required for loading, unloading, transporting and moving materials shall be provided by the Contractor. No building or covered area is available at this site for storage of building materials.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. FIELD EXCAVATION, STONE REMOVAL, REINSTALLATION, AND CLEANING

Contractor shall prepare and stabilize stones for protection during removal; contractor shall excavate around burial stones and lift out of place to a protected location and position; contractor shall adjust existing pockets and reinstall stones in alignment with historic grid layout. Following reinstallation, burial stones shall be cleaned with D/2 Biological Solution.

5.1.1 Field Work – Realignment

Headstones shall be carefully removed from their existing setting. The void shall be re-dug and shaped so that the headstone can be reset on the gravesite centerline at the head of the grave with inscription facing the grave. They shall be reset plumb and aligned laterally, transversely, and diagonally with the headstones at other graves. The use of a top and back line string will ensure uniformity, leveling, and alignment.

Headstones shall be set 24-26 inches from the finished grade to the top of the arc. Some of the headstones have inscriptions on both sides of the marker. The inscription with the service member shall be centered at the head of the grave and facing the grave. On stones with inscription on both sides of the marker the spouse will be facing away from the grave.

Headstones that have been removed after setting shall be placed behind the gravesite and placed to reset on its long edge in a vertical free standing position. Headstones shall not be placed against any other standing headstone.

All headstones removed during a single workday shall be reset on the same workday.

After the first day of fieldwork, the Contracting Officer’s Representative will review and check alignment to ensure work is performed properly.

5.1.2 Field Work – Cleaning

All headstones shall be cleaned after resetting using clean water and a fiber brush to remove any mud or grass stains. If water under pressure is used, the pressure shall not exceed 500 psi to minimize possible damage. The private historic headstones shall not be cleaned with a pressure washer. The Contractor shall supplement cleaning by spraying all headstones with the chemical whitening product D/2 Biological Solution per the manufacturer's instructions. If water used in cleaning should soften the soil around the base of the headstone, the Contractor shall take care not to tip the stone out of plumb or alignment. The Contractor shall take care to protect the turf area from any damage during cleaning. Any turf damaged by the Contractor shall be restored without additional expense to the Government.

5.1.3 Archaeological Discovery

Contractor shall stop work immediately and contact the project manager if excavation encounters cultural resources such as historic or prehistoric materials or artifacts.

5.1.4 Field Records

Contractor shall maintain an accurate and precise record of any anomalies encountered during excavation, to include subsurface obstacles such as bedrock or other natural features. Contractor’s on-site coordinator shall compile records that summarize the daily work activities complete with personnel, hours worked, work performed, problems encountered, resolution of problems, and anticipated requirements, at a minimum.

INVESTIGATION DERIVED WASTES

All field work wastes or staging and materials will be removed from Government property at the end of each shift and disposed of off-site.

SITE RESTORATION

All work sites shall be left in a clean and safe condition at the end of each shift. Soil, debris, or other waste generated by the work shall be removed from the cemetery by sweeping and washing with fresh water.

After completion of the work, tools, appliances, surplus materials, temporary drainage, rubbish, and debris incidental to work shall be removed and disposed of by the Contractor. Site clean-up shall be to the requirements and to the satisfaction of the COR. Utilities, structures, pavement, fences, or any other pre-existing item that is damaged due to the Contractor’s negligence will be repaired or replaced prior to completion of this contract.

All resultant debris, i.e. excess soil and stones, rocks, boulders, shall be removed from area to disposal area designated by the COR. The soil around each headstone shall be tamped to full compaction and filled to three inches below ground level. The last three inches is to be filled in to ground level with contractor provided topsoil, and left in a clean state, free of stones. The Contractor shall rake in seed and starter fertilizer around the headstone. Seed and fertilizer will be provided by the contractor. Caution must be taken to avoid chipping the headstone. All materials used to box the headstones, i.e. cardboard and bands, etc., shall be disposed of off-site by the contractor.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS) U.S. ARMY CORPS OF ENGINEERS

(USACE)

6.1. The Secretary of the Interior’s Standards for the Treatment of Historic Properties, U.S. Department of the Interior.

6.2 Preservation Brief 48 – “Preserving Grave Markers in Historic Cemeteries,” National Park Service, U.S. Department of the Interior, Technical Preservation Services.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

7.2. Attachment 2/Technical Exhibit 2 – Estimated Workload Data

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS #1.

Contractor shall assess headstones for vulnerability to damage during removal, and prepare any necessary protections.

Method shall be visual assessment. No damaged burial stones or component features.

Review of fieldwork by TCX program manager.

PRS #2.

Contractor shall remove headstones and re-excavate the pockets to realign with historic cemetery grid pattern;

headstones shall be reinstalled in newly prepared pockets.

900 headstones properly realigned. No damaged headstones or component features.

Review of fieldwork and results by TCX program manager.

PRS #3.

Contractor shall clean all headstones with D2 commercial formula.

All headstones (1,450) cleaned of staining, biological growth, or other surface accumulation other than the original stone.

No damaged headstones or component features.

Review of fieldwork and results by TCX program manager.

PRS #4.

All materials and workmanship shall be warranted by the Contractor.

Period of not less than one (1) year from the date of final acceptance by the Government. For products and materials that are normally warranted by the manufacturer or supplier for more than one year, the Contractor shall provide the Government with a written warrant, or certification, indicating the manufacturer’s or supplier’s terms and conditions of the warranty.

No further deterioration, leaning, or staining/damage of headstones or component features during the warranty period.

Confirmation of status by COR and/or TCX program manager.

Option 1 550 headstones properly realigned at Fort Vancouver Cemetery.

7.2 Technical Exhibit 2 Estimated Workload Data

Contract Manpower Report: The Contractor shall report all Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Department of the Army via a secure data collection site. The Contractor is required to complete all required data fields using the following web address: http://www.ecmra.mil/, then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at help desk at http://www.ecmra.mil.

TECHNICAL EXHIBIT 1
7.2 Technical Exhibit 2 Estimated Workload Data
Contract Manpower Report:

Standard