A.07.24_-_W912DW18Q0090_0001.pdf

PDF 138 KB Posted

Attached to
Mud Mountain Dam Debris Removal and Chipping Operations - Equipment w/ Operator
Solicitation number
W912DW18Q0090
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
A.07.23_-_W912DW18Q0090.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment One (0001) dated 21 August 2018 is to correct the hours and add an internal mobilization at the MMD site on CE-5 Track Mounted Excavator w ith Hydraulic Thumb. All other terms and conditions remain unchanged. Accordingly, this solicitation is amended as follow s:

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18Q0090

X 9B. DATED (SEE ITEM 11)

16-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Aug-2018

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW18Q0090

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

ITEM(S) 0001 - BID SCHEDULE

DESCRIPTION QTY UNIT U. PRICE AMOUNT

CE-1: Dozer LGP 1 Job NA $________ (Similar to D6 / min 140 hp / min 32,000 lbs / 6 way blade with Brush Rake)

Regular Hourly Rate x Est. Quantity = Amount $__________ x 80 Hours $_________

Overtime Hourly Rate x Est. Quantity = Amount $__________ x 40 Hours $_________

Mobilization / Demobilization 1 Job $_________

Mobilization (Internal at MMD site)

Davis Bacon Wage Determination No. WA180095 _4 dated 08/10/2018 is applicable to this procurement as incorporated herein.

DESCRIPTION QTY UNIT U. PRICE AMOUNT

CE-2: Grapple Skidder 1 Job NA $________ (Min 160hp)

Regular Hourly Rate x Est. Quantity = Amount $__________ x 80 Hours $_________

Overtime Hourly Rate x Est. Quantity = Amount $__________ x 40 Hours $_________

Mobilization / Demobilization 1 Job $_________

CE-3: Track Mounted 1 Job NA $________ Hydraulic Excavator w/ Hydraulic Thumb (min 135hp / min 40,000lbs / min 27ft reach)

Regular Hourly Rate x Est. Quantity = Amount $__________ x 80 Hours $_________

Overtime Hourly Rate x Est. Quantity = Amount $__________ x 40 Hours $_________

Mobilization / Demobilization 1 Job $_________

CE-4: Track Mounted 1 Job NA $________ Hydraulic Excavator w/ Hydraulic Thumb (min 135hp / min 40,000lbs / min 27ft reach)

Regular Hourly Rate x Est. Quantity = Amount $__________ x 80 Hours $_________

Overtime Hourly Rate x Est. Quantity = Amount $__________ x 40 Hours $_________

Mobilization / Demobilization 1 Job $_________

CE-5: Track Mounted 1 Job NA $________ Hydraulic Excavator w/ Hydraulic Thumb (min 200hp / min 74,000lbs / min 35ft reach with grinder and chipper / min 850hp with a 10’ x 10’ opening capable of reducing, large logs, stumps, and old growth timber / avg DBH of logs is 4-6 ft, stumps maybe 6-10 ft in diameter into 6" minus chips)

Regular Hourly Rate x Est. Quantity = Amount $__________ x 680 Hours $_________

Overtime Hourly Rate x Est. Quantity = Amount $__________ x 240 Hours $_________

Mobilization / Demobilization 1 Job $_________

Mobilization (Internal at MMD site)

(End of Summary of Changes)

File details come from the government source that posted it.