AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912DW-16-R-0006 Mud Mountain Dam 9-Foot Tunnel Rearmoring, Enumclaw , WA
(see continuation page)
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-16-R-0006
X 9B. DATED (SEE ITEM 11)
15-Mar-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Apr-2016
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-16-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Apr-2016 02:00 PM to 21-Apr-2016 02:00 PM.
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
R0002
1. This amendment two (0002) provides the following for informational purposes:
a. Section 01 10 00 – APPENDICES
b. Section 01 33 39.00 27 – ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS
2. The proposal submittal time and date is extended to April 21, 2016 at 2:00:00 p.m. LOCAL TIME.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
Encl:
01 10 00 Appendices (draft) 01 33 39.00 27 (draft)
(End of Summary of Changes)
MMD 9-Foot Tunnel Re-armoring 16011
W912DW-16-R-0006 Appendix A Page 1
APPENDIX A MMD 9-FT Tunnel Rearmoring Conceptual Drawings
W912DW-16-R-0006 Appendix A Page 2
This page intentionally left blank.
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
A N
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:4
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-001.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
IG
SITE PLAN
1" = 60'-0
S-001
S
IT
E P
L A
N
S-004
S-002
S-005
S-003
S-006
60' 120'0
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:4
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-002.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
T R
U N
N
IO
N
.0
.0
G
A T E S
IL
L
(C
L
R
N 57 33' 48.6" E
18.2°
20' 40'0 S-001
1 START OF TUNNEL
PARTIAL SITE PLAN
1" = 20'-0"
S-002
P A
R T
IA
L S
IT
E P
L A
N
S T
A R
T O
F T
U N
N E
L
STRAIGHT SEGMENT OF TUNNEL 1318.82 ±
N39, 22'14.7"E
P C
.3
EL 887.78
E 1,726,797.852 N 53,722.147
EL 891.53
E 1,726,956.920 N 53,846.927
(CENTER OF MIXING CHAMBER)
E 1,726,970.853 N 53,863.549
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
GENERAL NOTES
UNLESS NOTED OTHERWISE.
ELEVATIONS ARE EXISTING, 1.
EXISTING EL 890.05
E 1,726,892.524
N 53,806.003
P T
.3
.3
T
R A
N S
IT
IO
N R
A M
P
S
T A
R T O
F T
U N
N E
L R
E A
R M
O R
IN
G
GNIROMRAER LENNUT
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:4
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-003.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
20' 40'0 S-001
2 END OF TUNNEL
PARTIAL SITE PLAN
1" = 20'-0"
28.5°
28°
56.5°
STRAIGHT SEGMENT OF TUNNEL 1318.82 ±
S-003
P
R T
IA
L S
IT
E P
L A
N
E N
D O
F T
U N
N E
L
'-6 (C
L
R
(C
L
R
P C
.1
N39, 22'14.7"E
.6
T
U N
N E
L D
A Y
L
IG
H T
+7
2.
E
ND
O F
TUNNEL
REARM
O
RI
NG
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
GENERAL NOTES
UNLESS NOTED OTHERWISE.
ELEVATIONS ARE EXISTING, 1.
EXISTING EL 860.00
GNIROMRAER LENNUT
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:4
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-004.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
21'-3"21'-3"21'-3" 21'-3" 20'-0" 20'-0"
20'-0"
20'-0"
20'-0"
3.0° 3.0°
3.0°
3.0°
3.0°
18.2°
3.2° ±
R 4
R
LENGTH (TYP)
STEEL BM
15' 30'0
S-004
S T
A R
T O
F T
U N
N E
L
P A
R T
IA
L P
L A
N S
T E
E L B
E A
M S
A
S-008
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
IN STRAIGHT LENGTH OF TUNNEL
MINIMUM LENGTH OF EACH STEEL BEAM
P C
P T
T R
A N
S
IT
IO
N R
A M
P
S
T A
R T O
F T
U N
N E
L R
E A
R M
O R
IN
G
(TYP)
BEAMS
STEEL
S-001
3 START OF TUNNEL
PARTIAL PLAN FOR STEEL BEAMS
1" = 15'-0"
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:4
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-005.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
18'-4" 18'-4"
18'-4"
18'-4"
22'-0"
17'-0"
17'-0"
'-0
'-0
5.5° 5.5°
5.5°
5.5°
7.0°
7.0°
.0
.0
28.5°
28.0°
6.5° ±
R 2
R 2
R
'-0
R
R
R
21'-3"21'-3"22'-6 7/8 "
S-005
E
D O
F T
U N
N E
L
(TYP)
STEEL BEAMS
P A
R T
IA
L P
L A
N S
T E
E L B
E A
M S
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
IN STRAIGHT LENGTH OF TUNNEL
MINIMUM LENGTH OF EACH STEEL BEAM
P C
END
O F
TUNNEL
REARM
O
RI
NG
S-001
4 END OF TUNNEL
PARTIAL PLAN FOR STEEL BEAMS
1" = 15'-0"
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:5
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-006.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
LOWER PLATE
TOP WEAR PLATE
PLATE JOINTW6 STEEL BEAM (TYP)
A
P A
R T
IA
L P
L A
N S
T E
E L B
E A
M S A
N D P
L A
T E
S
(N) 1" TOP WEAR PLATE
(N) 1" LOWER PLATE
(N) W6 STEEL BEAM
(E) TUNNEL FLOOR PLATE
A
S-007
A DETAIL
1 1/2" = 1'-0"
1' 2'0 6"
21"21"3"3"
/8
EXISTING WALL
EXISTING WALL PL 1" THICK (TYP)
6" 6"
(TYP)
PER DETAIL 1/S-007
PLATE TO STEEL BEAM
HOLE WELD LOWER
(TYP)
12"
(TYP)
12"
PENE
FULL
(TYP)
PER DETAIL 1/S-007
PLATE TO LOWER PLATE
HOLE WELD TOP WEAR
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
PENE
FULL
E
Q U
A L S
P A
C E
S
WEAR PLATE, TYP)
(1/8" ± 1/8" GAP FOR TOP
PLATE JOINT, TYP
S-001
5 PARTIAL PLAN FOR STEEL BEAMS AND PLATES
3/4" = 1'-0"
2'0 1' 4'
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:5
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-007.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
9'-0" (FIELD VERIFY)
(E) STEEL LINER
3'-0"3'-0"3'-0"
1/8 "
1/8 " SOLID GROUT
HEADED STUDS
(E) 7/8" x 6"
(E) S8x18.4
ORIGINAL ASCE RAILS
(E) ST4x11.5
/2
/8
/8
SPACING (TYP)
ANCHORS x 3' @ 2'-0"
(E) #8 DYWIDAG ROCK
S-007
C R
O S
S S
E C
T
IO
A TYPICAL CROSS SECTION
1" = 1'-0"
0 1' 2'6"
0 1" 2"1/2"
12" = 1'-0"-
(TYP)
1 1/2 "Ø HOLE
5/16
PENE
FULL
PENE
FULL
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
STEEL PL 1" THICK
PLATE CONNECTION DETAIL (TYPICAL)
TOP SURFACE
FINISHED FLUSH WITH PLATE
APPROVED EQUAL FILLER
BELZONA 1111 OR 1121 OR
DETAIL 1/S-007 (TYP)
TO W6 BEAMS PER
WELD LOWER PLATE
5/16 3 AT 12
TYP
DETAIL 1/S-007 (TYP)
TO LOWER PLATE PER
WELD TOP WEAR PLATE
LEGEND
(N) : NEW
(E) : EXISTING
1" THICK ASTM A36
(N) STEEL LOWER PLATE
(TYP)
1/8" JOINT GAP
PROVIDE 1/8" ±
AR500
1" THICK,
(REMOVABLE)
WEAR PLATE
(N) TOP
B
B SECTION
1" = 1'-0"
0 1' 2'6"
15'- 0"
HORIZONTAL
5 DEGREES ABOVE
3"Ø WEEP HOLE INCLINED
TUNNEL SIDEWALL
F L
O W
EXISTING ROCK
LOCATION
SEE PLANS FOR
BEAMS (4) REQUIRED
CL (N) W6x25 SPACER
(LOCATED HALF WAY BETWEEN EXISTING WALL JOINTS)
(N) 3"Ø WEEP HOLE AT 24'-0" OC, TYP (EACH SIDE)
OBSTRUCT WEEP HOLES
EACH SIDE OF TUNNEL (TYP). DO NOT
WALL SURFACE ABOVE STEEL WALL PLATE ON
APPROVED EQUAL) APPLIED TO EXISTING
INDICATED WITH BELZONA 1111 OR 1121 (OR
(N) CLEAN AND RESURFACE WALL AREAS AS
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:5
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-008.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
S-008
T R
A N
S
IT
IO
N R
A M
P
GROUT SOLID
BOTTOM PLATE
(E) HORSESHOE TUNNEL
(N) W6 SPACERS
(N) 1" LOWER PLATE
ASTM A36
1" LOWER PLATE
GATE CHAMBER
9-FT TUNNEL
P T
.3
S T
A
.3
GROUT BARRIER
3/4" ASTM A36
B
HOLE WELD
ASTM A36
1" LOWER PLATE
GROUT SOLID
B SECTION
1/2" = 1'-0"
0 2' 4'1'
1' 2'0 6"S-004
A TRANSITION RAMP
1 1/2" = 1'-0"
(TYP)
TAPERED STEEL BEAM
TAPERED STEEL BEAMS
S-007
DETAIL 1 ON
(TYP) PER
HOLE WELD
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
GATE CHAMBER FLOOR STEEL PLATE (EXISTING)
GATE CHAMBER FLOOR STEEL PLATE (EXISTING)
NOTE:
ADDITIONAL TYPICAL INFORMATION
SEE DWGS S-006 AND S-007 FOR
(N) 1" TOP WEAR PLATE
AR500
TOP WEAR PLATE
1" REMOVABLE
1" THICK FLOOR PLATE
NEW AR500
3" = 1'-0"
6"0 3" 1'
AR500
1" TOP WEAR PLATE
(GRIND FLUSH)
FULL PENE
PL JOINT
PL JOINT
FOR TUNNEL WIDTH
WELDS USE 9" WELD SPACING
FOR THIS FIRST ROW OF
12'-0" TRANSITION/RAMP
3"3" 8" 8" 8" 9" 9" 9" 3" 1'-6"3" 3"8"8"
AND GROUT UNDER
REMOVE EXIST FLOOR PL
NEW FLOOR PL
AR500 PLATE
1" THICK
AS REQUIRED
STEEL SHIM
DETAIL
HEADED STUD (TYP)
3" 9"8"8"8"8"
8" OC MAX (TYP)
AND SPACED @
DETAIL 1/S-007
HOLE WELD PER
LOWER PLATE
STUDS AT 15" EW
(E) 7/8"Ø x 6" HEADED
ASTM A514
EXISTING FLOOR PLATE
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
S I
D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E
W A
S H
IN
G T
O N
S E
A T
T L E D
IS
T R
IC
T
SEATTLE DISTRICT
:2
:5
P
M
OFSHEET
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
DESIGN FILE: L:\2015\100-SET-15-078 - MMD 9FT Tunnel\cadd\struct\Sheets\MMD9FT_S-009.dgn
E -3 -8 -3
J
A N
E N
U M
C L
A W
W A
S H
IN
G T
O O
T T
U N
N E
L R
E A
R M
O R
IN
G
M U
D M
O U
N T
A
IN
D
A M
C O
N C
E P
T L
E V
E L D
E S
S-009
J
K
IK
U T
A
V
R O
U S
E G
K A
T Z
E N
B E
R G
E R
L A
Y D
O W
N A
R E
W912DW-16-R-0006 Appendix B Page 1
APPENDIX B Existing Reference and As-Built Drawings
The existing MMD 9-Foot Tunnel Reference Drawings are attached for reference.
The existing drawings and as-built drawings are for information only as some of the drawings have been superseded by the modification of the existing structures and the addition of new structures. The existing conditions, including dimensions, elevations, and details shall be field-verified by the D-B Contractor prior to the start of construction. The upper portion of the alignment for the 9-FT Tunnel was changed after the new intake tower was constructed. This should be noted when reviewing the existing drawings.
W912DW-16-R-0006 Appendix B Page 2
This page intentionally left blank
G3ECDGK3
Polygon
INVERT AT START
W912DW-16-R-0006 Appendix C Page 1
APPENDIX C Technical Specifications List and Brief Descriptions
The following technical specifications are anticipated to be required for this Tunnel Rearmoring project.
The D-B Engineers shall start with the Unified Facilities Guide Specifications and shall modify them as required for the specific design and project requirements. A brief summary of what is required to be provided in each technical specification section for this project is also shown in this appendix.
W912DW-16-R-0006 Appendix C Page 2
W912DW-16-R-0006 Appendix C Page 1
Specification Draft Table of Contents
Division 03 – Concrete
03 31 01.00 10 – Cast-in-Place Structural Concrete for Civil Works
Division 05 – Metals
05 12 00 – Structural Steel
05 50 15 – Civil Works Fabrications
Others
Weep Hole Coring
Specification Descriptions
03 31 01.00 10 – Cast-in-Place Structural Concrete for Civil Works
This specification shall include the following information, but is not limited to the following:
All miscellaneous concrete in place shall be 7,000 psi minimum strength at 28 days. Concrete shall be tested in accordance with Section 5.6 of ACI 318.
All grout shall be non-shrink, 5,000 psi minimum strength at 28 days. Nonshrink grout must conform to ASTM C1107/C1107M, and be a commercial formulation suitable for the proposed application. Nonshrink grout must be a ready-mixed material requiring only the addition of water.
Water content must be the minimum to provide a flowable mixture and completely fill the space to be grouted without segregation, bleeding, or reduction of strength.
Belzona 1111 or 1121, an epoxy-based composite for metal repair, or equivalent, shall be used to fill and flush connection openings at the top wear plate and lower plate.
Grouting Plan Requirements: The D-B contractor shall provide a grouting plan for review demonstrating its capabilities of grouting the space between existing and new steel plates and performing the work.
The material shall be mixed in equipment of sufficient size and capacity to provide the amount of grout material for each stage in a single operation.
Gauges to monitor grout pressure shall be attached immediately adjacent to each injection port.
The gauge shall conform to an accuracy of no more than one-half percent error over the full range of the gauge. The range of the gauge shall not be more than 100 percent greater than the design grout pressure.
No grout holes, or vent holes, or sealing plugs shall be provided in the top wear plates. Grout holes and vent holes may be provided in the bulkheads/diaphragms and in the lower plates.
W912DW-16-R-0006 Appendix C Page 2
Grouting equipment shall be such that sudden surges in pressure at refusal do not occur.
All pipe shall conform to ASTM A53/A53M standard weight. The fittings shall be malleable iron Type I in accordance with ASME B16.3, ASME B16.5, and ASME B16.9, Class 150. Pipe shall be black steel of the diameter shown or as directed.
The D-B contractor shall submit a grouting plan that shall include but not limited to:
• The proposed grouting mix
• The proposed densities and viscosities
• Initial set time of the grout
• The proposed grouting method
• The maximum injection pressures
• The 24-hour and 28-day minimum compressive strength
• Proposed grout volumes
• Bulkhead/diaphragms designs
• Buoyant force calculations
• Flow Control
• Pressure gauge certification
• Vent location plans
05 12 00 – Structural Steel
This specification shall include the following information, but is not limited to the following:
All structural top wear plates shall be AR500 steel with a nominal Brinell Hardness of 500.
Structural and miscellaneous steel shapes shall conform to ASTM A572, GR. 50 ksi and supporting plates shall confirm to ASTM A36. The D-B Contractor shall provide grout and vent holes in plates. The D-B Contractor is not limited to welded connections and may develop connections not shown in the conceptual design provided they satisfy the design criteria and performance requirements. The welding of structural and miscellaneous steel shall conform to the 2010 edition of “Structural Welding Code – Steel” (AWS D1.1). High strength bolts shall conform to ASTM A325 Type 1, ASTM A490 Type 1 or 2.
The D-B Contractor shall be able to provide the necessary inspectors qualified as follows:
Certified Welding Inspectors (CWI) shall be qualified and certified in accordance with the provisions of AWS QC1. The laboratory and all personal performing nondestructive testing shall be qualified in accordance with ASNT CP-189. Only individuals qualified for NDT Level II or individuals qualified for Level I and working under the direct supervision of a Level II shall perform nondestructive testing. Level III NDT Inspectors shall possess a currently valid ASNT Level III certificate in each of the processes they are qualifying inspectors to. Copies of the certifications, including the Level III NDT Technician that certified the Level I and Level II Technicians shall be included in the submittals.
Prior to any welding, a CWI supplied by the D-B Contractor shall visually inspect the preparation of material for welding to assure compliance with the applicable AWS Code (D1.1 or D1.5) and approved WPS. The CWI shall also perform visual test (VT) inspection throughout the welding process to assure compliance with the applicable AWS Code (D1.1 or D1.5) and approved
W912DW-16-R-0006 Appendix C Page 3 welding procedure specification (WPS). All completed welds shall be cleaned free of oxide, flux, scale, or other foreign matter before inspection. All welds shall be visually inspected by a CWI to insure compliance with the requirements of the applicable AWS Welding Code.
Making, evaluating and reporting ultrasonic testing of welds shall conform to the requirements of AWS D1.1, Section 6, Part F or AWS D1.5 Subsection 12.16, as applicable. A record shall be made of each weld tested.
Making, evaluating and reporting radiographic testing of welds shall conform to the requirements of AWS D1.1, Section 6, Part E or AWS D1.5 Subsection 12.16, as applicable. Only film types designated as “fine grain” or “extra fine” shall be employed.
Magnetic particle inspection of welds shall conform to the applicable provisions of ASTM E 709 or AWS D1.5 Subsection 12.16, as applicable and in addition all magnetic particle inspections of welds shall be made using the Wet Contrasting Black on White Method.
Welds shall be unacceptable if shown to have defects prohibited by AWS D1.1, Section 6, Part C or AWS D1.5 Subsection 12.16, as applicable.
The D-B Contractor shall VT inspect all full penetration welds as indicated on the drawing.
Additionally, there will be twenty-five percent (25%) random testing of the remaining welds.
This testing shall be done by the ultrasonic testing (UT) and/or radiographic testing (RT) procedures described above. This additional twenty-five percent (25%) shall include a representative sample of welds from all welders. The random testing shall be spread throughout the project. A schedule for implementing the random testing shall be developed by the contractor and submitted for approval prior to fabrication. The RT will have to meet the acceptance criteria stated in AWS D1.1, Section 6.12.1. The UT will have to meet the acceptance criteria stated in AWS D1.1, Section 6.13.1.
The D-B Contractor shall VT inspect all fillet welds as indicated on the drawing. Additionally, there will be twenty-five percent (25%) random testing of the remaining welds. This testing shall be done by the magnetic particle testing procedures described above. This additional twenty-five percent (25%) shall include a representative sample of welds from all welders. The random testing shall be spread throughout the project. A schedule for implementing the random testing shall be developed by the contractor and submitted for approval prior to fabrication.
Defective weld metal shall be removed by air carbon-arc or oxygen gouging to sound metal. The surfaces shall be thoroughly cleaned before welding. The resulting cavities shall be rewelded in compliance with AWS D1.1, Subsection 5.26. When deemed necessary by the Contracting Officer, the D-B Contractor shall submit a welding repair plan for approval before repairs are made. Welds that have been repaired shall be retested by the same methods used in the original inspection. All costs of repairs and testing shall be borne by the D-B Contractor, except for repair of members cut to remove test coupons that were found to contain acceptable welds.
05 50 15 – Civil Works Fabrications
This specification shall include the following information, but is not limited to the following:
Provide a detailed Work Plan for fabrication, including descriptions of shop facilities, equipment, number of personnel, and related information prior to the Pre-fabrication Conference, and procedures for safe conduct of the work, careful removal and disposition of materials, protection of property that is to remain undisturbed, and coordination with other work in progress.
W912DW-16-R-0006 Appendix C Page 4
Weep Hole Coring
Provide a detailed Work Plan for preparation and coring weep holes in the sidewalls of the 9-Foot Tunnel. The D-B Contractor shall use the coring section on the Conceptual Drawings to provide necessary details.
W912DW-16-R-0006 Appendix D Page 1
APPENDIX D Existing Steel Floor, November 2013, 9-FT Tunnel Steel Floor Thicknesses
W912DW-16-R-0006 Appendix D Page 2
- 24 -
ATTACHMENT 2
November 2013 9’ Tunnel Steel Floor Thicknesses
9 ft Tunnel Steel Floor Readings
Seam Number
Station ‐
Measured from radial gate in feet
6" in from
Left Wall Center
6" in from
Right Wall Notes
0 20 0.335 0.603 0.846
0.5 30 0.326 0.673 0.839
1 42 0.260 0.670 0.860
2 52 0.239 0.621 0.845
3 62 Hole 0.621 0.800
4 72 Hole 0.660 0.800
5 82 Hole 0.642 0.820
6 91 0.143 0.657 0.828
7 101 Hole 0.682 0.845
8 111 0.141 0.724 0.822
9 121 Hole 0.816 0.843
10 131 Hole 0.699 0.836
11 141 Hole 0.776 0.868
12 151 Hole 0.651 0.857
13 161 Hole 0.767 0.880
14 170 Hole 0.768 0.910 0.657 0.689
15 180 Hole 0.780 0.878
16 190 Hole 0.772 0.900 0.719 0.835
17 200 Hole 0.739 0.884
18 210 Hole 0.751 0.907 0.707 0.823
19 220 Hole 0.796 0.905
20 230 Hole 0.800 0.903 0.675 0.796
21 240 Hole 0.720 0.899
22 250 Hole 0.758 0.911 0.668 0.774
23 260 Hole 0.714 0.928
24 270 Hole 0.744 0.911 0.603 0.769
25 280 Hole 0.724 0.898
26 290 Hole 0.704 0.885 0.638 0.769
27 300 Hole 0.720 0.889
28 310 Hole 0.641 0.862 0.540 0.769
29 320 Hole 0.627 0.878
30 330 0.115 0.642 0.855 0.546 0.702
31 340 0.212 0.630 0.859
32 350 Hole 0.655 0.848 0.529 0.781
33 360 0.206 0.767 0.855
34 370 0.158 0.612 0.860 0.534 0.748
35 380 0.395 0.657 0.872
36 390 0.204 0.611 0.842 0.545 0.751
W912DW-16-R-0006 Appendix D Page 3
- 25 -
37 400 0.347 0.633 0.847
38 410 0.334 0.623 0.850 0.524 0.753
39 420 0.397 0.618 0.846
40 430 0.407 0.517 0.863 0.429 0.743
41 440 0.500 0.521 0.857
42 450 0.570 0.520 0.831 0.423 0.708
43 460 0.620 0.505 0.841
44 470 0.625 0.448 0.828 0.459 0.729
45 480 0.626 0.615 0.844
46 490 0.685 0.539 0.815 0.394 0.491
47 500 0.663 0.375 0.835
48 510 0.684 0.488 0.831 0.334 0.581
49 520 0.715 0.490 0.812
50 531 0.712 0.382 0.803 0.400 0.691
51 541 0.724 0.437 0.822
52 551 0.728 0.451 0.818 0.393 0.641
53 561 0.756 0.466 0.867
54 571 0.775 0.390 0.821 0.410 0.612
55 581 0.757 0.365 0.832
56 591 0.738 0.224 0.804 0.376 0.640
57 601 0.781 0.423 0.836
58 611 0.698 0.298 0.821 0.370 0.519
59 621 0.777 0.422 0.848
60 631 0.737 0.377 0.831 0.400 0.602
61 641 0.758 0.215 0.831
62 651 0.772 0.284 0.811 0.378 0.543
63 661 0.784 0.355 0.795
64 671 0.745 0.291 0.794 0.387 0.478
65 681 0.764 0.344 0.817
66 691 0.795 0.293 0.838 0.402 0.550
67 701 0.779 0.348 0.835
68 711 0.757 0.211 0.816 0.373 0.501
69 721 0.779 0.222 0.807
70 731 0.777 0.125 0.804 0.468 0.480
71 741 0.776 0.236 0.796
72 751 0.797 0.116 0.822 0.375 0.484
73 761 0.805 0.328 0.832
74 771 0.797 0.242 0.848 0.430 0.467
75 781 0.823 0.387 0.837
76 791 0.803 0.211 0.790 0.457 0.404
77 801 0.868 0.283 0.783
78 811 0.745 0.387 0.810 0.378 0.440
79 821 0.820 0.449 0.845
80 832 0.796 0.296 0.800 0.482 0.483
81 842 0.780 0.258 0.819
W912DW-16-R-0006 Appendix D Page 4
- 26 -
82 852 0.801 0.233 0.777 0.411 0.480
83 861 0.799 0.269 0.803
84 871 0.786 0.209 0.802 0.457 0.473
85 881 0.803 0.318 0.777
86 891 0.799 0.219 0.785 0.587 0.451
87 902 0.864 0.191 0.785
88 912 0.802 0.177 0.782 0.568 0.339
89 922 0.782 0.260 0.803
90 932 0.766 0.173 0.790 0.483 0.452
91 942 0.803 0.382 0.802
92 952 0.807 Hole 0.796 0.549 0.549
93 962 0.822 0.315 0.805
94 972 0.822 0.123 0.793 0.577 0.500
95 982 0.815 0.275 0.787
96 992 0.770 0.200 0.807 0.511 0.542
97 1002 0.797 0.266 0.802
98 1012 0.740 0.213 0.787 0.488 0.460
99 1022 0.795 0.270 0.788
100 1032 0.795 0.201 0.797 0.478 0.531
101 1043 0.792 0.289 0.794
102 1053 0.805 0.163 0.846 0.503 0.386
103 1063 0.777 0.286 0.785
104 1073 0.782 Hole 0.764 0.485 0.513
105 1083 0.819 0.324 0.798
106 1093 0.824 0.128 0.773 0.305 0.424
107 1103 0.816 0.337 0.814
108 1113 0.800 Hole 0.809 0.453 0.453
109 1123 0.826 0.298 0.795
110 1133 0.800 0.134 0.805 0.377 0.561
111 1143 0.784 0.314 0.822
112 1153 0.819 Hole 0.802 0.460 0.413
113 1163 0.793 0.755 0.785
114 1173 0.792 0.136 0.822 0.518 0.415
115 1183 0.788 0.318 0.786
116 1193 0.803 Hole 0.773 0.590 0.457
117 1203 0.806 0.315 0.809
118 1213 0.795 0.177 0.802 0.512 0.444
119 1223 0.795 0.204 0.807
120 1233 0.813 0.190 0.783 0.564 0.470
121 1243 0.827 0.343 0.812
122 1253 0.803 0.151 0.806 0.485 0.502
123 1263 0.806 0.283 0.795
124 1273 0.828 0.277 0.837 0.541 0.599
W912DW-16-R-0006 Appendix D Page 5
- 27 -
125 1283 0.793 0.340 0.713
126 1293 0.805 0.115 0.833 0.513 0.417
127 1303 0.805 0.364 0.818
128 1313 0.821 0.251 0.837 0.601 0.504
129 1323 0.809 0.352 0.831
130 1333 0.852 0.118 0.824 0.472 0.444
131 1344 0.814 0.383 0.820
132 1354 0.842 0.255 0.831 0.496 0.537
133 1364 0.836 0.334 0.823
134 1374 0.847 0.202 0.882 0.498 0.458
135 1384 0.849 0.350 0.823
136 1394 0.840 0.278 0.838 0.588 0.602
137 1404 0.846 0.400 0.816
138 1414 0.842 0.224 0.840 0.605 0.455
139 1424 0.843 0.363 0.819
140 1434 0.825 Hole 0.817 0.576 0.458
141 1444 0.848 0.366 0.806
142 1454 0.861 Hole 0.831 Truck Truck
143 1463 0.818 Hole 0.842
144 1474 0.827 Hole 0.851 0.492 0.550
145 1484 0.822 0.432 0.844
146 1493 0.833 Hole 0.840
147 1500 0.888 0.344 0.827
148 1507 0.848 0.099 0.822
149 1515 0.827 0.268 0.847
150 1522 0.828 Hole 0.827
151 1529 0.877 0.400 0.797
152 1536 0.893 0.371 0.623
153 1543 0.868 0.666 0.565
154 1550 0.875 0.551 0.200
155 1557 0.901 0.741 0.258
156 1565 0.888 0.765 Hole
157 1572 0.900 0.780 Hole
158 1579 0.885 0.796 Hole
159 1586 Equipment 0.833 Hole
160 1593 0.960 0.824 Hole
161 1599 0.906 0.959 0.871
162 1607 0.899 Readings on Test Panels Below
163 1613 0.900 Readings on Test Panels Below
164 1619 0.900 Readings on Test Panels Below
165 1625 0.907 Readings on Test Panels Below
166 1631 0.899 Readings on Test Panels Below
167 1637 0.890 Readings on Test Panels Below
168 1643 0.890 Readings on Test Panels Below
169 1649 0.882 Readings on Test Panels Below
170 1655 0.874 Readings on Test Panels Below
171 1662 0.846 Readings on Test Panels BDownstream End of Tunnel
172 1670 0.889
W912DW-16-R-0006 Appendix D Page 6
W912DW-16-R-0006 Appendix E Page 1
APPENDIX E USACE MEMO on Hydraulic Conditions in MMD 9-FT Tunnel (7 July 2015)
W912DW-16-R-0006 Appendix E Page 2
CENWS-EN-HH-HE 7 July 2015
FROM: Chief, Hydraulic Engineering Section (Katz)
SUBJECT: Hydraulic Conditions in MMD 9-foot tunnel – (Excerpted from MFR AUG 2015)
Purposes.
This memorandum is intended as supplemental information for the RFP, and has the following purposes.
1. Describe the range of tunnel hydraulic conditions that can occur in the tunnel as currently configured.
2. Describe the range of hydraulic conditions that may occur when the tunnel is modified by the addition of a new tunnel liner.
References.
EM-1110-2-1601 - Hydraulic Design of Flood Control Channels
EM 1110-2-1602 – Hydraulic Design of Reservoir Outlet Works
HEC-RAS - Hydrologic Engineering Center River Analysis Software
Design Assumptions
Horizontal extent of replacement liner.
1. The nine-foot tunnel hydraulic conditions described in this memorandum were analyzed assuming that a steel liner will be installed through the horseshoe tunnel and to the downstream end of the discharge conduit.
2. It was assumed that the present tunnel floor slope would be maintained, from its entrance to the mixing chamber, downstream through the rectangular tunnel, and the radial gate chamber. A 12-ft transition from the existing floor to the new floor is assumed in the transition to the horseshoe tunnel. The slope of the proposed floor in the horseshoe tunnel is the same as its existing floor.
Vertical position of replacement liner.
1. This analysis assumes that the replacement floor panels will be installed eight (8) inches above the existing liner. This allows abandoning in place the current damaged steel liner and building a new steel plate armored floor above the original damaged floor.
2. Hydraulic analysis found that any floor raise of eight inches or less will provide a tunnel discharge at the current pool limit (elevation 930 feet) that is sufficiently close to its current discharge to avoid a significant change in Water Management reservoir regulation. The reduction in discharge at the pool limit (930 feet elevation) due to the new liner is estimated at 360 cfs.
3. The current design requires a floor raise of 8 inches for structural reasons. While this is acceptable hydraulically, any further design change that moves the new liner
W912DW-16-R-0006 Appendix E Page 3 closer to the existing liner profile is likely to improve future hydraulic conditions and reduce the risk of occurrence of a new, undesirable hydraulic condition (e.g., hydraulic jump or slug flow).
Monitoring and Post-Construction Modification
1. It is assumed that the tunnel hydraulic conditions will be closely monitored and the tunnel floor inspected regularly after installation of the new tunnel liner.
2. Operations. If the restriction caused by the new liner results in conditions described above (e.g., slug flow observed at the tunnel exit), it is recommended that operational adjustments be considered. Modified operations, if needed, could include reducing the normal gate setting to about 75% or less, and allowing the reservoir pool to rise, to approximately the 940-foot to 950 foot elevation range.
3. Maintenance. Worn areas will be replaced before holes develop in the protective steel floor. Since the tunnel liner was already damaged before the pool elevation was restricted, the effectiveness of the new liner in minimizing damage is not absolutely clear at this time. Damages may continue to occur in areas where it has been previously observed, or in other areas due to changed hydraulic conditions.
a. To provide additional protection, and a maintainable surface, the entire horseshoe tunnel will be lined with a two-layer floor; the lower layer a permanent 1-inch thick steel; the top layer will be composed of 1-inch thick steel plates securely connected to the lower layer (2-inch total thickness of steel).
b. The top plates plates will be about 8 feet by 3 feet in size, and are designed to be replaced as needed by project personnel. The connection between the two layers of plates will be filled and smoothed to minimize asperities/roughness
c. If feasible, this system will be tested in advance of the full tunnel relining project.
Outflow discharge probability of occurrence1
The probability of occurrence of outflow discharges described in this MFR can be estimated from the percent of time an equivalent inflow discharge is equaled or exceeded, by assuming that Mud Mountain Dam is simply passing inflows.
Low Flow (1,000 cfs): exceeded 60% of the time Intermediate Flow (2,000 cfs): exceeded 20% of the time.
Pool Limit (present) (2,400cfs): exceeded 13% of the time.
For reference, the MMD median inflow/outflow is 1,170 cfs.
Hydraulic Conditions.
1 Source: Senior Water Manager Ken Brettmann - statistics on mean daily MMD inflows (a good representation of outflow statistics assuming an operation of passing inflows).
W912DW-16-R-0006 Appendix E Page 4
Methods
1. Discharge Rating Curves. Discharge rating curves for present and proposed conditions were prepared using methods described in EM-2-1110-1602, Appendix D, Computation of Discharge Rating Curves for Outlet Works.
2. Water Surface Profiles. Water surface profiles were computed by one-dimensional hydraulic modeling using Corps of Engineers HEC-RAS software.
Model files are available for review.
3. Calibration. Discharge Rating Curves and Water Surface Profiles closely match (Figure A-3; Table 1).
4. Super elevation at channel bends was calculated using the approach in EM 1110-2-1601, Section 2-5, Flow in Curved Channels.
5. If conditions other than those described in this MFR are needed for design purposes, (e.g., if the final design liner is placed at a different elevation), changes can be calculated relatively quickly with the HEC-RAS model and spreadsheet described above.
Results
1. Hydraulic Roughness.
a. Discharge rating curves and HEC-RAS model simulations were performed with low and high roughness. The Darcy Weisbach f was varied from 0.009 to 0.014, and the Mannings n from 0.010 to 0.012. At this time, the lower roughness values best match the USGS gage data. However, data includes only one point above elevation 910; we will investigate opportunities to add more data points in this range.
b. The proposed new liner decreases discharge by about 350 cfs when comparing the same roughness assumption with fully open gate at the pool limit. The range of roughness assumptions makes approximately the same difference (350 cfs) when comparing the current and proposed floors at the pool limit and fully open gate (Figures A-4 to A-7).
c. Tunnel hydraulics is sensitive to hydraulic roughness when open channel flow occurs and when full flow occurs. For a given discharge, pool elevation increases with increasing roughness (Figure A-10).
2. Present Configuration
a. Low flow; low roughness. When the tunnel is operating at relatively low flow
(e.g., 1000 cfs; pool elevation about 902; Figure A-4) with the radial gate fully open, it is a fully open channel from the entrance in the mixing chamber to the tunnel exit at the tailrace. At this discharge, the pool in the mixing chamber is approximately at the top of the bell-mouth tunnel entrance, the water depth at the tunnel entrance is about 7.3 feet, and near the tunnel exit, the water depth is approximately 3.5 feet. Water velocity varies from about 15 feet per second at the tunnel entrance (critical depth) to about 32 feet per second at the downstream end (normal depth) (Figure A-8; Table 2). The super elevated water surface at the upstream bend will be approximately 0.3 feet
W912DW-16-R-0006 Appendix E Page 5 above the centerline depth at the outside of the bend, and about 0.3 feet below the average depth at the inside of the bend (calculated from guidance in EM 1110-2-1601, Hydraulic Design of Flood Control Channels, Section 2-5, assuming the bend radius of 500 feet, average depth of 4.9 feet, and the average velocity about 22 feet per second). At the bend near the tunnel exit, the super elevated water surface will be approximately 0.8 feet above the centerline depth at the outside of the bend, and about 0.8 feet below the centerline depth at the inside of the bend (assuming bend radius is 350 feet, the centerline depth is 3.5 feet, and the average velocity is about 32 feet per second).
b. Intermediate flow (Figure A-8 and Table 2). When the tunnel radial gate is 100% open, the upper limit of open channel flow probably occurs when the upstream pool elevation is near 915 feet, and discharge is about 2000 cfs (Figure A-8; low roughness). This discharge is exceeded about 20-percent of the time. This scenario produces slightly pressurized flow and water depths in the range of 9 feet at the tunnel entrance, and open channel flow with a water depth of 6.5 feet near the tunnel exit, with corresponding velocities of 25 fps to 36 fps.
i) When much of the tunnel, especially at the upstream end, operates at close to full flow depth, the effectiveness of the air intake may be reduced, and slug flow can occur. Such conditions have been observed at the outlet of the tunnel, including a cycling between full flow and open channel flow at the tunnel exit portal. No distinct negative consequences have been observed, such as noise, vibration, or widely fluctuating discharge2.
We will look for opportunities to make further observations over the next season.
ii) Super elevation in the tunnel would be the same or less than in the low-flow condition, because the free water surface is narrower in cross-section, and the water velocity is only slightly higher; it is difficult to predict because the tunnel is nearly full, and normal methods do not apply. At both tunnel bends, the tunnel could be pressurized due to cross-waves.
c. Pool Limit (Figure A-8 and Table 2). Currently, the 9-foot tunnel is left open until the water level in the mixing chamber at the upstream end of the tunnel is predicted to rise above 930 foot elevation. This occurs about 13% of the time. At the pool limit, assuming the radial gate is 100% open and closure operations have not begun, the tunnel probably is flowing full, and is slightly pressurized in most of its length. Air bubbles and larger air pockets may move downstream as the tunnel may be in a transition phase from partly full to pressurized discharge. Since the tunnel is pressurized, there is no free water surface, and no super elevation occurs.
d. Very High Pool (Figure A-9 and Table 3). The nine-foot tunnel is not currently used when the pool is above 930 elevation. If the tunnel was opened in the
2 Personal conversation between Dan Katz and Doug Knapp, NWP, June, 2015
W912DW-16-R-0006 Appendix E Page 6 most extreme possible event, the upstream pool would be 1220 feet in elevation, the tunnel would be fully pressurized, the estimated hydraulic and energy grade lines would be as shown in Figure A-9, and associated depths and velocities at corresponding points in the tunnel would be as listed in Table 3.
2. Modified Configuration.
a. General.
1. It is assumed the new liner will be 8 inches above the existing liner.
Detailed differences between the existing and 8-inch raised floors can be found in Appendix figures and tables.
2. The area reduction resulting from the proposed new tunnel liner produces a reduction in tunnel capacity of up to 350 cfs for pool elevations below the 930-foot limit (Figures A-4 to A-7).
3. Although the 9-foot tunnel will have less capacity than the current tunnel, and a pool elevation of up to 950 might be required to match the discharge of the current tunnel at the 930 pool, it is unlikely to be operated up to the 950 pool elevation. This is because the 23 foot tunnel is available for use at pool elevations above 930.
b. Low flow. When the tunnel is operating at low flow (e.g., 1000 cfs) with the radial gate fully open, its hydraulic conditions are nearly the same as the tunnel in its current configuration; it is a fully open channel from the entrance in the mixing chamber to the tunnel exit at the tailrace. The estimated velocities, depths, and super elevation are as given above, in Results – Present Configuration - Low Flow.
c. Intermediate flow When the tunnel radial gate is fully open, the upper limit of fully open channel flow probably occurs when the upstream pool elevation is about 910, and discharge is about 1650 cfs (Figure A-10). Above that elevation, the tunnel begins to transition to fully pressurized flow. Thus, for a discharge of 2,000 cfs, the tunnel probably flows full, as shown in Figure A-8 and Table 2. While current operational rules require the tunnel gate to be operated either fully open or fully closed, in the future it may need to be operated less than fully open to avoid slug flow and to assure proper airflow with the new liner. Such a change would require coordination with stakeholders / agencies.
d. Pool Limit. Unless operational changes are needed as described immediately above, the 9-foot tunnel will be left open as it is currently - until the water level in the mixing chamber at the upstream end of the tunnel is predicted to rise above 930 foot elevation. At this limit, assuming the radial gate is 100% open and closure operations have not begun, the tunnel will flow full, and will be pressurized. As with current operations, air bubbles and larger air pockets may move downstream as the tunnel is in a transition phase from partly full to pressurized discharge. Since the tunnel is pressurized, there is no free water surface (Figure A-6), and no super elevation occurs.
e. Very High Pool. The nine-foot tunnel is not to be used when the pool is above 930 elevation. However, if the tunnel was opened in the most extreme
W912DW-16-R-0006 Appendix E Page 7 possible event, the upstream pool would be 1220 feet in elevation, the tunnel would be fully pressurized. The estimated hydraulic and energy grade lines would be no higher than as shown in Figure A-10, and associated depths and velocities at corresponding points in the tunnel would be no greater than as listed in Appendix Table, “Mud Mountain Tunnel – RAS Model Results for High Water Conditions.”
Daniel M. Katz Chief, Hydraulic Engineering Section
Seattle District
W912DW-16-R-0006 Appendix E Page 8
APPENDIX
Figures
A-1
A-2
A-3. Roughness calibration of HEC-RAS model with Discharge Rating Curve
A-4. Discharge Rating Curve of Current Nine-Foot (R3) Tunnel at Mud Mountain Dam.
A-5. Discharge Rating Curve – Current Nine-Foot (R3) Tunnel at Mud Mountain Dam with High Friction Factor.
A-6. Discharge Rating Curve – Proposed Nine-Foot (R3) Tunnel at Mud Mountain Dam with Low Friction Factor.
A-7. Discharge Rating Curve – Proposed Nine-Foot (R3) Tunnel at Mud Mountain Dam with High Friction Factor.
A-8. Water surfaces and hydraulic grade lines for normal pool elevation (low friction factor).
A-9. High Pool Hydraulic Grade Lines (low friction factor).
A-10. Comparison of High and Low Mannings n.
Tables
1. Data displayed in Figure A-3 (roughness calibration).
2. HEC-RAS output for Figure 8 (Water surfaces and grade lines for normal pool elevation and low n).
3. HEC-RAS output for Figure 9 (Water surfaces and grade lines for high pool elevation and low n).
W912DW-16-R-0006 Appendix E Page 9
Figure A-3. Demonstration of close calibration of HEC-RAS model with Discharge Rating Curve (both with Manning n = 0.01 or equivalent Darcy-Weisbach f). x-axis: pool elevation (feet); y-axis: discharge, cfs).
Table 1. Data displayed in Figure A-3.
W912DW-16-R-0006 Appendix E Page 10
Figure A-4. Discharge Rating Curve – Current Nine-Foot (R3) Tunnel at Mud Mountain Dam with Low Friction Factor (Darcy Weisbach f = 0.009). Physically possible operations are on and left of: “inlet” curve between elevation 892 and 905; “100% gate” between elevation 905 and 915; and “100 pipe” above elevation 915. Transition from open channel to pressure flow: rough operation may occur with gate openings 80% to 100% above approximately pool elevation 905. Points in red are associated with the downstream USGS gage used for curve calibration; “14% mix cham” and “50% mix cham “ show, respectively, show USGS measured data points with gate 14% and 50% open, respectively.
W912DW-16-R-0006 Appendix E Page 11
Figure A-5. Discharge Rating Curve – Current Nine-Foot (R3) Tunnel at Mud Mountain Dam with High Friction Factor (Darcy Weisbach f = 0.014). Physically possible operations are on and left of: “inlet” curve between elevation 892 and 905; “100% gate” between elevation 905 and 915; and “100 pipe” above elevation 915. Transition from open channel to pressure flow: rough operation may occur with gate openings 80% to 100% above approximately pool elevation 905. Points in red are associated with the downstream USGS gage used for curve calibration; “14% mix cham” and “50% mix cham “ show, respectively, show USGS measured data points with gate 14% and 50% open, respectively.
W912DW-16-R-0006 Appendix E Page 12
Figure A-6. Discharge Rating Curve – Proposed Nine-Foot (R3) Tunnel at Mud Mountain Dam with Low Friction Factor (Darcy Weisbach f = 0.009). Physically possible operations are on and left of: “inlet” curve between elevation 892 and 905; “100% gate” between elevation 905 and 915; and “100 pipe” above elevation 915. Transition from open channel to pressure flow: rough operation may occur with gate openings 80% to 100% above approximately pool elevation 905. Points in red are associated with the downstream USGS gage used for curve calibration; “14% mix cham” and “50% mix cham “ show, respectively, show USGS measured data points with gate 14% and 50% open, respectively.
W912DW-16-R-0006 Appendix E Page 13
Figure A-7. Discharge Rating Curve – Proposed Nine-Foot (R3) Tunnel at Mud Mountain Dam with High Friction Factor (Darcy Weisbach f = 0.014). Physically possible operations are on and left of: “inlet” curve between elevation 892 and 905; “100% gate” between elevation 905 and 915; and “100 pipe” above elevation 915. Transition from open channel to pressure flow: rough operation may occur with gate openings 80% to 100% above approximately pool elevation 905. Points in red are associated with the downstream USGS gage used for curve calibration; “14% mix cham” and “50% mix cham “ show, respectively, show USGS measured data points with gate 14% and 50% open, respectively.
W912DW-16-R-0006 Appendix E Page 14
Figure A-8. Water surfaces and hydraulic grade lines for normal pool elevation. Comparison of discharges from 1000 cfs to 2400 cfs for the existing and proposed tunnel configuration with low roughness (n = 0.01). Note: Pool elevation in mixing chamber best represented by elevation at about station 1760 (Limit of gray shading). Elevations shown beyond gray shading near station 1800 are not realistic and can be ignored.
W912DW-16-R-0006 Appendix E Page 15
Table 2. HEC-RAS output for Figure 8 (Water surfaces and grade lines for normal pool elevation and low n).
W912DW-16-R-0006 Appendix E Page 16
Table 2 Continued.
W912DW-16-R-0006 Appendix E Page 17
Table 2 Continued.
W912DW-16-R-0006 Appendix E Page 18
Figure A-9. High Pool Hydraulic Grade Lines. Comparison of Discharges from 4000 cfs to 4750 cfs for the existing and proposed tunnel configuration with low roughness (n = 0.01). Note: Pool elevation in mixing chamber best represented by elevation at about station 1762 (near limit of gray shading). Elevations shown at and beyond limit of gray shading (station 1800) are not realistic and can be ignored.
W912DW-16-R-0006 Appendix E Page 19
Table 3. HEC-RAS output for Figure 9 (Water surfaces and grade lines for high pool elevation and low n).
W912DW-16-R-0006 Appendix E Page 20
Table 3 Continued.
W912DW-16-R-0006 Appendix E Page 21
Table 3 Continued.
W912DW-16-R-0006 Appendix E Page 22
Figure A-10. High and Low Mannings n. Comparison showing the effect of low and high Mannings n Roughness Coefficient (n = 0.01; n = 0.012) at two different flow rates: 1650 cfs and 2400 cfs for the existing condition. Notes: 1) Pool elevation in mixing chamber best represented by elevation at station 1762.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .