SEE ADDENDUM
(No Collect Calls)
W912DW-16-Q-0087 01-Sep-2016
b. TELEPHONE NUMBER
206-764-6573
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 08 Sep 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DW9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
VINCENT E DANIELS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W68MD961732876
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 960302 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
LIBBY DAM PROJECT OFFICE
17877 HIGHWAY 37
LIBBY MT 59923-9703
TEL: 406-293-7751 FAX: 206-764-3681
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7.5 million
NAICS:
541350
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF60
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DW-16-Q-0087
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Historic Assets Concrete Investigation
Provide all labor, material, and equipment necessary for necessary to investigate and evaluate historic building conditions and prepare the management program as defined in this Performance Work Statement except for those items specified as government furnished property and services.
FOB: Destination
PURCHASE REQUEST NUMBER: W68MD961732876
FFP
NET AMT
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
1. REPRESENTATIONS AND CERTIFICATIONS CONTAINED HEREIN MUST BE COMPLETED BY
QUOTERS AND RETURNED WITH OFFERS:
IF YOUR REPRESENTATIONS AND CERTIFICATIONS ARE REGISTERED IN THE SYSTEM
FOR AWARD MANAGEMENT (SAM) CHECK HERE . IF NOT, YOU CAN
REGISTER ONLINE AT www.sam.gov
2. Marking of Quote Envelopes:
Envelopes shall be plainly marked as follows:
Quote for: Historic Assets Concrete Investigation for the Libby Dam Historic District
Request for Quote No.: W912DW-16-Q-0087
Closing Date and Time: 8 September 2015, 2:00 P.M. Pacific Time
AMENDMENTS NUMBERED________HAVE BEEN RECEIVED
Hand carried quote submittal procedures have changed. When dropping off all hand carried proposals, the official delivery location is now the guard station in the main foyer of Federal Center South, located at Building 1202, 4735 E. Marginal Way South where the official time clock is also located. Notify the guard on duty that you have a quote for Contracting Division. The point of contract will be notified and a representative from Contracting Division will sign in your package(s) and transport them to Contracting
Division. Please allow sufficient time for these procedures when submitting hand carried quotes. All other quote submittal procedures remain the same.
3. For questions call (206)-764-6573. Mailed quotes shall be accepted before closing at US Army Corps of
Engineers, Seattle District, P.O. Box 3755 Seattle, WA. 98124. Physical street address is US Army Corps of Engineers, Seattle District, 4735 E. Marginal Way S., Building 1202, Seattle, WA 98134. All emailed offers shall contain the RFQ No. W912DW-15-Q-0087 in the subject line and emailed to the following email address: vincent.e.daniels@usace.army.mil.
4. PROSPECTIVE OFFERORS: Contractors are required to be registered in the System for Awards
Management (SAM) for awards resulting from solicitations.
This rule more efficiently implements the Debt Collection Improvement Act of 1996, as it requires contractors to be registered in SAM for consideration of future solicitations, awards, and payment.
Registration is required prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement from a solicitation. LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE AN OFFER INELIGIBLE FOR AWARD. The web site may be accessed at www.sam.gov.
5. ELECTRONIC FUNDS TRANSFER (EFT): Effective 99 Jun 01, the Government will make all payments by EFT (unless the Government VISA credit card is accepted). The only exceptions are: 1) Foreign Vendors, 2) Government Agencies, and 3) One time payments. The EFT forms and instructions are on the USACE Finance Center (UFC) Web Page; www.fc.usace.army.mil. The UFC point of contact for this action is Mr. Michael Rye, (901) 874-8543.
6. Required Submittals:
a) Instruction Page (2 pages)
Indicate if you are registered SAM.
Must acknowledge any/all amendments to the solicitation.
Must fill in all company information requested All submittals as required by evaluation criteria
b) Fill in all pricing information.
c) 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)
d) 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)
e) 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS--REPRESENTATION (NOV 2015)
f) 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX
LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
g) 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL
ITEMS (JUL 2016) ALTERNATE I (OCT 2014)
h) 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014)
i) 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JULY 2013)
All of these must be filled in and returned in order to be eligible for evaluation.
DO NOT return the rest of the solicitation form.
7. The contractor is required to provide the following information with your quote:
Federal Taxpayer’s ID Number:
DUNS Number:
Cage Code Number This requires registration in SAM, web site for registration is www.sam.gov.
Remit to Address:
Company Name:
Address:
City/State/Zip:
Phone & Fax Numbers:
Point of Contact:
E-Mail Address:
The offeror must provide pricing for all items in the solicitation for its quote to be acceptable to the Government.
All quoted items must meet the requirements of the Request for Quote (RFQ) including specifications stated in all attachments.
Multiple quotes are not accepted for this RFQ. If multiple quotes are received only one quote (as determined by the Contracting Officer) will be evaluated by the Government. The quote shall be determined acceptable based on the date and time received.
The contractor should list any special features or warranty information applicable to the quoted product(s).
ANNOUNCEMENT TO OFFERORS
Due to recent national events Seattle District US Army Corps of Engineers shall be conducting business under heightened security for the foreseeable future.
Access to Federal Center South, 4735 E Marginal Way S, Building 1202, Seattle, WA 98124 will be through the front lobby only. The building is under Federal Protective Service, which means that persons entering the facility are subject to inspection; including purses, packages, etc. All deliveries shall be thoroughly inspected. In addition, visitors may be required to be escorted by Corps personnel while in the building.
For any questions please contact the Contract Specialist assigned to your project or check our website at www.nws.usace.army.mil for up-to-date information.
ITEM(S) 0001 - PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Historic Assets Concrete Investigation for the Libby Dam Historic District Libby Dam
Libby, Montana
PART 1
General Information
1. GENERAL: This is a non-personnel services contract to perform a surface assessment, and selective forensic investigation, and reporting on the condition of concrete historic buildings that contribute to the Libby Dam Historic District. Data on building features, materials, and component conditions will be obtained using both conventional evaluation methods and minimally invasive, forensic investigative methods, where necessary.
Other data fields will include historic photographs, drawings, site plans, treatment history and methods applied, as well as identify applicable historic preservation regulatory requirements and guidelines.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, technical equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to investigate and evaluate historic building conditions and prepare the management program as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: Libby Dam was begun in 1966, and completed in 1972, with formal dedication ceremonies taking place in 1975. The dam face, powerhouse, visitor’s center, and other recreational features and amenities were designed by the Pacific Northwest’s foremost practitioner of Mid-Modernism, and chief designer of the Seattle World’s Fair of 1962, Paul Thiry. Altogether, these buildings, structures, and features have been determined eligible for listing in the National Register of Historic Places as the Libby Dam Historic District (District). Because of the widespread use of concrete in the District, the color, texture, and execution of the concrete materials are important character defining qualities that warrant careful preservation planning and treatment.
In order for the Corps to maintain compliance with Section 110 of the National Historic Preservation Act, the District’s built environment resources and landscapes must be treated according to the Secretary of the Interior’s Standards for Rehabilitation (36 CFR 67). Mechanical damage, water migration, and biological growth, as well as inappropriate maintenance and repair episodes have compromised the architectural values of these resources, and in some cases may be contributing to further surficial or structural decline.
This project work is being requested to arrest ongoing deterioration or decline of concrete materials, stem further inappropriate treatment of concrete surfaces, and guide future repair and treatment.
1.3 Objectives:
Examination of building interiors and exteriors to identify ongoing surficial degradation or discoloration of concrete surfaces, as well as failing or inappropriate repairs.
Examination of select subsurface areas using appropriate minimally invasive forensic methods such as acousto-ultrasonic tools or resistance technology (SINT) to investigate potential underlying structural failure
Identification of critical, ongoing points of water access and damage to structural components Prioritization of critical and less critical repair needs Laboratory identification of concrete component type, color, and proportions for use as a repair and aintenance standard Identification of biological growth or other surface accretions or staining; recommendation for cleaning and removal Development of a report summarizing conditions and recommending treatments, as well as projected costs
1.4 Scope: Ultrasonic and Forensic Evaluation. Investigative methods may include minimally invasive testing of concrete substrate using SINT (resistograph), echo stress wave, and acousto-ultrasonic technologies for the purposes of identifying cracks, voids, de-bonding, or other material failure, and to identify access or entry points for damaging agents such as water. Resistograph technology must utilize drill bits of a size not to exceed 3mm to ensure concrete materials are not damaged and testing areas are not visually detectable. The resistance to the drill penetration shall be graphed on a 1:1 basis for immediate analysis, and results tabulated and interpreted in the report.
1.5 Period of Performance: The period of performance shall be for four months from date of award.
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: The Contractor is not required to perform services on holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of
8:00 am to 5:00 pm, Monday thru Friday, unless the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closures.
For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed on the following buildings and structures at Libby Dam: Libby Dam, Libby Dam Powerhouse, Libby Dam Visitor Center, Restroom facilities at Abutments and in Souse Gulch, Picnic Shelters in Souse Gulch, Trash receptacles, water fountains, light structures, picnic tables, grills, other recreational structures, signage railing and any other buildings, structures or features meeting eligibility standards within the Libby Dam Historic District.
1.6.6 Type of Contract: The government will award a Firm Fixed Price Contract
1.6.7 Security Requirements: Contract work site is in public access areas and restricted areas of Libby Dam.
(1) All personnel shall submit the following information: a. Employee name, b. SSN, c. Date of Birth, d. Place of Birth, e. Drivers license number & issuing state, (or other Security Officer approved form of ID), f. SF 85 page 6 (Authorization For Release Of Information).
In addition to the requirements in accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers' contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE: exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services). The contractor shall submit to the Division/District Contract Office, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with 1-551 stamp or attached INS Form 1-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form 1-151 or 1-551), Temporary Resident Card (INS Form 1-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form 1-327), Refugee Travel Document (INS Form 1-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).
REQUIRED: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by District Security Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.7.2 Key Control: Not Applicable
1.6.7.3 Lock Combinations: Not Applicable
1.6.8 Special Qualifications: The qualified consultant shall possess all equipment, training, and licensing necessary to perform the forensic examination of buildings.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, quality assurance representative (QAR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10 Quality Assurance Representative (QAR): The QAR monitors all technical aspects of the contract and assists in contract administration. The COR ensures the Contractor performs the technical requirements of the contract using technical oversight and the Quality Assurance Surveillance Plan (QASP) The QAR shall not change any contract terms and conditions.
1.6.11 Key Personnel: The following personnel are considered key personnel by the government:
Contract Manager and Lead Forensic Investigator. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:30p.m., Monday thru Friday, except Federal holidays or when the government facility is closed for administrative reasons.
1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.13 Contractor Travel: (Not Applicable)
1.6.14 Other Direct Costs: (Not Applicable)
1.6.15 Data Rights: (Not Applicable)
1.6.16 Organizational Conflict of Interest: (Not Applicable)
1.6.17 PHASE IN /PHASE OUT PERIOD: (Not Applicable)
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1 DEFINITIONS:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.4 DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.5 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.6 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.7 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.8 QUALITY ASSURANCE REPRESENTATIVE (QAR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QAR Quality Assurance Representative QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Services: The Government will provide necessary interior and exterior access to buildings that are the subject of this investigation.
3.2 Facilities: If needed, the Government will provide open space behind the Visitor’s Center to be used for staging.
3.3 Utilities: The Government will allow use of electrical outlets required by the contractor to operate technical equipment.
3.4 Equipment (Not Applicable)
3.5 Materials (Not Applicable)
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance: (Not Applicable)
4.3 Materials: The Contractor shall furnish materials, supplies, and equipment necessary to facilitate masonry investigations.
4.4 Equipment: The Contractor shall provide all equipment and tools necessary for minimally invasive examination of masonry.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1 Basic Services: The Contractor shall provide services for testing/probing of historic masonry surfaces.
5.2 Forensic Probing and Assessment.
The forensic examination will be conducted using resistograph (SINT), ultrasonic and echo stress wave technologies.
Forensic Records The Contractor's shall maintain an accurate and precise record of surface locations where each forensic reading is performed. Graphs of the resistance drill penetration readings will be provided in the report.
The Contractor’s on-site coordinator shall compile records that summarize the daily work activities complete with personnel, hours worked, work performed, problems encountered, resolution of problems, and anticipated requirements, at a minimum.
Investigation Derived Wastes All field work wastes or staging and materials will be removed from Government property at the end of each shift and disposed of off-site.
Site Restoration All work sites shall be left in a clean and safe condition at the end of each shift. Soil, debris, or other waste generated by the work shall be removed from the walkways and ramps by sweeping and washing with fresh water.
After completion of the work, tools, appliances, surplus materials, temporary drainage, rubbish, and debris incidental to work shall be removed and disposed of by the Contractor. Site clean-up shall be to the requirements and to the satisfaction of the USACE QAR. Utilities, structures, pavement, fences, or any other pre-existing item that is damaged due to the Contractor’s negligence will be repaired or replaced prior to completion of this contract.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS) U.S. ARMY CORPS OF ENGINEERS
(USACE)
6.1 The Secretary of the Interior’s Standards for the Treatment of Historic Properties, U.S. Department of the
Interior.
6.2 UFGS 04 01.0091 Restoration and Cleaning of Masonry in Historic Buildings
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule
7.3 Attachment 3/Technical Exhibit 3 – Estimated Workload Data
TECHNICAL EXHIBIT 1
Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement) Standard
Performance Threshold (This is the maximum error rate.
It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS #1.
The contractor shall perform surface (exterior/interior walls, ceilings, roofs) inspections and evaluations of the following significant buildings, structures, and features: Visitor’s Center, Powerhouse, Treaty Tower, one restroom, one picnic shelter, Vista Observation Deck, Flag Presentation, one of each of the following - railing section, light fixture, signage.
Identification and reporting of general surface conditions for each building, structure, or feature;
identification of typical/representative types of old or failing repairs that require treatment. Descriptions and tabulation of building, location of evaluation, and conditions identified.
No more than one customer complaint.
Review of report by TCX program manager.
PRS #2.
The contractor shall conduct subsurface (forensic) evaluations of surface areas that suggest underlying structure concern or water access.
Up to ten forensic probes: Method shall be resistograph, ultrasonic, and stress wave forensic testing;
drill bits for subsurface penetration not to exceed 3mm; locations of probe sites shall be recorded and tabulated in the report.
No more than one customer complaint.
Review of report by TCX program manager.
PRS #3.
Laboratory testing to identify concrete components and component ratios for replicating appropriate mixtures for repairs.
Up to ten laboratory tests taken on representative areas of the buildings, structures, and features identified in PRS #1.
Recommendation for specific concrete material replication for each of the identified structures,* or representative structure (*A single test may be made for concrete found to be consistent on one or more structures).
No more than one customer complaint.
Review of report by TCX program manager.
PRS #4.
Prioritization of urgent repairs or treatments, and identification of method for surface cleaning.
Narrative description and tabulation.
No more than one customer complaint.
Review of report by TCX program manager.
ITEM(S) 0001 - QASP
QUALITY ASSURANCE SURVEILLANCE PLAN
Historic Concrete Assessment and Treatment Recommendations for Libby Dam Historic District Libby, Montana
1 March 2016
1. Overview The U.S. Army Corps of Engineers, Seattle District (Corps) is obligated under Section 110 of the National Historic Preservation Act (NHPA) to identify and nominate properties eligible for listing in the National Register of Historic Places, and to preserve and maintain significant properties according to the Secretary of the Interior’s Standards for the Rehabilitation of Historic Buildings and Structures. Libby Dam, to include the dam embankment, spillway, powerhouse, visitor’s center, landscape, administrative, and recreational structures and amenities has been determined eligible for the National Register as the Libby Dam Historic District (District).
This QASP addresses a task that will help the Corps satisfy its Section 110 responsibilities, and improve management decisions for the treatment of historic properties within the District.
The Technical Center of Expertise for the Preservation of Historic Structures and Buildings (TCX) serves as the Corps’ technical lead in matters relating to the treatment and management of the historic built environment, and provides technical guidance to managers and personnel with oversight of historic buildings and structures. In order to ensure the Corps is fully in compliance with the NHPA, the TCX has developed a PWS to engage expertise in historic masonry and concrete investigations, conservation, repair, and restoration to assess the material condition of the District’s concrete structures. The end product will be a report that identifies surface and select subsurface conditions, recommends methods for treatment, and prioritizes needed repairs.
This performance-based Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidance the Quality Assurance Representative (QAR) will use in evaluating the technical performance of the Contractor in accordance with the terms and conditions of the performance work statement (PWS). The QASP objective is to define Government procedures to be used to verify that appropriate performance and quality assurance methods are used in the management of this performance-based contract. The purpose of the QASP is to assure that performance of specific activities and completion of milestones are accomplished in accordance with all requirements set forth in the Statement of Work (PWS).
This QASP describes the mechanism for documenting noteworthy accomplishments or discrepancies for work performed by the Contractor. Information generated from Government’s surveillance activities will directly feed into the evaluation of performance discussions with the Contractor. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents and Government receives the quality of services called for in the contract. The QASP details how and when Government will monitor, evaluate, and document Contractor performance on the PWS. The QASP is intended to accomplish the following:
Define the role and responsibilities of participating Government representatives.
Define the key milestones/deliverables that will be assessed.
Define performance standards for key milestones/deliverables.
Describe the surveillance methodology that will be employed by Government in assessing the Contractor’s performance.
Describe the surveillance documentation process and provide copies of the form that Government will use in evaluating the Contractor’s performance.
Outline corrective action procedures.
2. Roles and Responsibilities
The USACE Contracting Officer (KO) has overall responsibility for overseeing the Contractor’s performance.
The KO is responsible for monitoring of the Contractor’s performance in the areas of contract compliance, and contract administration; reviewing the QAR’s assessment of the Contractor’s performance; and resolving all differences between the QAR’s assessment and the Contractor’s assessment of performance. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
The Quality Assurance Representative (QAR) is officially responsible for technical administration of the project and assures proper Government surveillance of the Contractor’s performance. The QAR is the key primary party responsible for monitoring, assessing, recording, and reporting on the technical performance of the Contractor as indicated in the performance schedule.
It is not the responsibility of QAR to perform quality control for the Contractor or to execute work that the Contractor was contracted to perform. The QAR will coordinate all Government comments on written deliverables, and the QAR will evaluate and rate the Contractor at the end of the contract. The QAR will work with the Contractor to identify and correct any deficiencies prior to those deficiencies adversely affecting the work. USACE, through the QAR with any necessary technical representative, will also perform quality assurance review of the Contractor’s methodology during any field investigations. It is the responsibility of USACE to ensure that the Contractor receives Government comments on all deliverables within the allotted time on each of the submittals.
QA Team Members:
Scott W. Britt, Contracting Officer (KO); (206) 764-3517, e-mail scott.w.britt@usace.army.mil).
Lauren L. McCroskey, Quality Assurance Representative (QAR); (206) 764-3538, e-mail lauren.l.mccroskey@usace.army.mil)
3. Performance Standards for Key Milestones/Deliverables The Contractor’s performance will be evaluated by assessing the key milestones/deliverables described in the statement of work according to two standards: quality and timeliness. For each of the performance standards, USACE will assign one of two ratings of the Contractor’s performance: acceptable, or unacceptable (as shown in Table 1). Further detail on each of these standards is outlined in Tables 2-5.
Table 1. Performance Standards, All Tasks
Performance Standard Acceptable Performance Unacceptable Performance
Quality Contractor meets or exceeds the requirements in the PWS for the milestone/deliverable.
Contractor does not meet the requirements in the PWS for the milestone/ deliverable.
Timeliness
Contractor provides milestone/deliverable according to or ahead of the schedule outlined in the
PWS.
Contractor provides milestone/deliverable behind the schedule outlined in the PWS.
If a milestone/deliverable is rated as being of unacceptable quality at the time that the PWS deadline for the milestone/deliverable expires, the milestone/deliverable will automatically receive an unacceptable rating for timeliness. At no point will a milestone/deliverable receive an acceptable rating for timeliness if it is rated as being of unacceptable quality. If timeliness is unacceptable it may be changed to acceptable if due date is renegotiated and met according to the PWS. If quality is unacceptable it may be changed to acceptable when it is determined by USACE to meet the standards in the PWS. Overall acceptable performance on a milestone/deliverable requires ratings of acceptable for both the quality and timeliness standards.
Table 2. Performance Expectations for Monitoring (refer to PWS Paragraph 3 and 6)
Performance Objectives Performance Standard Monitoring Method
Quality Assurance Representative (QAR).
An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Quality Assurance Representative (QAR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Quality Assurance Representative (QAR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Quality Assurance Representative (QAR).
An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Quality Assurance Representative (QAR). An employee of the U.S. Government appointed by the contracting officer to administer the contract.
Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Quality Assurance Representative (QAR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Performance Objectives Performance Standard Monitoring Method
Quality Assurance Representative (QAR).
An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Quality Assurance Representative (QAR). An employee of the U.S. Government appointed by the contracting officer to administer the contract.
Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Quality Assurance Representative (QAR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
4. Surveillance Methodology
The surveillance methods listed below will be used in the administration of this QASP.
100% Inspection: At the completion of all key milestones and deliverables, performance will be evaluated by inspecting 100% of all milestones and deliverables (e.g., document review). The Government will document performance for each completed milestone/deliverable prior to payment, as described in Section 6.0.
Periodic Progress Inspection: At the Government’s discretion, periodic teleconferences and/or site visits may be conducted to evaluate progress toward key milestones and deliverables. The KO or QAR may call a teleconference if he/she believes that deficiencies exist that must be addressed prior to milestone/deliverable completion. The KO or QAR will assure that any such request does not create a claim by the Contractor. While corrective action or re-performance will be required if necessary, the Contractor will not be financially penalized for unacceptable performance recorded in periodic progress reports, provided that final performance evaluation of the milestone/deliverable is deemed acceptable.
5. Surveillance Documentation Government expects Contractor to perform at the acceptable level. The QAR will use a performance evaluation form to record evaluation of the Contractor’s performance for each milestone and deliverable in accordance with the methodology described in the PWS and QASP. The QAR will provide the performance evaluation for the Government's contract record. The QAR must substantiate, through narratives in the form, all unacceptable ratings and file the report in the Government's contract record. At a minimum, the evaluation form will indicate actual and scheduled delivery times and number of reviews required to achieve the final product.
When a milestone/deliverable receives an overall unacceptable rating, the Contractor shall explain, within 14 days, in writing to the QAR why performance was unacceptable, how performance will be returned to acceptable levels, and how recurrence of the problem will be prevented in the future. The QAR or KO will immediately discuss any unacceptable rating with the Contractor to assure that corrective action is promptly initiated.
6. Payment and Corrective Action
Full payment for a milestone/deliverable will be provided upon verification of overall acceptable performance, as rated on quality and timeliness. This verification will be recorded in a performance evaluation specifying overall Contractor performance as either acceptable or unacceptable for the milestone/deliverable. If a milestone/deliverable is unacceptable re-performance is required until the milestone/deliverable is acceptable.
7. Quality Assurance Surveillance Forms
Attached are the quality assurance surveillance forms that will be used by USACE to detail any required corrective actions. Additional quality assurance feedback will come in the form of comments on documents, USACE performance evaluations, field checklists, and letters to the Contractor.
QUALITY ASSURANCE MONITORING FORM
Date: ___/____/______
Work Task (Milestone/Activity): _______________________________________
Survey Period: ___/____/______ through ___/____/______ Method of Surveillance: QAR Review
Evaluation of Contractor’s Performance: _______
Evaluation
Corrective Action Required: Yes No
Narrative Discussion of Contractor’s Performance during Survey Period:
Discussion
CORRECTIVE ACTION FORM FOR QASP
1) Work Task (Milestone/Activity): _________________________
2) Survey Period: ___/____/______ through ___/____/______
3) Description of the Failure/Deficiency that Precipitated the Corrective Action:
Description
4) Description of the Criterion that the Failure/Deficiency was Evaluated Against:
5) Personnel Involved in the Identification of the Failure/Deficiency, Determination of the Appropriate
Corrective Action, Approval of the Corrective Action, and Implementation of the Corrective Action:
6) Description of the Corrective Action that was Required:
7) Date/Time of Implementation of the Corrective Action: ___/____/______
8) Follow-Up Information to Prevent Recurrence of Failure/ Deficiency (i.e., Need For Revision of
Procedures or…