B.01.02_-_ABSTRACT_W912DW-16-B-0012.pdf
PDF 82 KB Posted
- Attached to
- Albeni Falls Dam 115 kV Transformer Motor Operated Disconnect (MOD) Replacement, Oldtown, Idaho
- Solicitation number
- W912DW-16-B-0012
About this file
Abstract of Offers W912DW-16-B-0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R0001.pdf | ||
| AFDTransformer_MOD_Replacement_Reference_Drawings.pdf | ||
| AFD_Transformer_MOD_Replacement_Drawings.pdf | ||
| 16B0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. Solicitation No. W912DW-16-B-0012
2. Date Issued: 21 July 2016
3. Date Opened: 22 August 2016
4. Issuing Office:
Department of the Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle, WA 98124-2255
5. Project Title:
Unrestricted
6. Number of Amendments Issued: 1
1st Apparent low = KVA Electric $342,471.00
% Difference From GE: 8%
2nd Apparent low = Pick Electric Inc $396,266.00
% Difference From GE: 25%
3rd Apparent low = Cherokee Construction Services LLC $404,385.11
% Difference From GE: 27%
SIGNATURE: Bid Opening Officer: Monique Paano
High Voltage Transformer Motor Operated Disconnect (MOD) Replacement
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
8. GOVERNMENT ESTIMATE
(Check A, B or C and Complete D, E F) A. Hired Labor B. Reasonable Contract (w/out profit) XX C. Reasonable Contract (w/ profit)
7A. ITEM
7B. DESCRIPTION OF OFFERED
ITEM 7C. EST 7D. UNIT 7E. UNIT 7F. AMOUNT
NUMBER QTY PRICE
BASE ITEMS
MOBILIZATION AND
DEMOBILIZATION 1 JOB 30,973.00$ 30,973.00$
INSTALL 170kV DISCONNECT
SWITCHES WITH ELECTRIC
OPERATORS AND GROUNDING
SWITCHES 1 JOB 221,339.00$ 221,339.00$
INSTALL DISCONNECT SWITCH
CONTROL CABLES 1 JOB 10,498.00$ 10,498.00$
FURNISH DISCONNECT SWITCH
ERECTING ENGINEER SERVICES 1 JOB 10,312.00$ 10,312.00$
SYSTEMS TESTING AND
COMMISSIONING 1 JOB 8,858.00$ 8,858.00$
FURNISH TRAINING OF
GOVERNMENT PERSONNEL 1 JOB 5,108.00$ 5,108.00$
All work for O&M manuals as specified in Section 01 78 23 from preparation to final approval. 1 JOB 10,000.00$ 10,000.00$
All work for As-Built drawings as specified in Section 01 78 00 from preparation to final approval. 1 JOB 20,000.00$ 20,000.00$
317,088.00$
0009 INSTALL POWER CABLES 1 JOB 437.00$ 437.00$
437.00$
317,525.00$
TOTAL BASE ITEMS
OPTIONAL ITEMS
TOTAL OPTIONAL ITEMS
TOTAL BASE & OPTIONAL
9. OFFERS
NO. 1 NO. 2 NO. 3
A. Company: Cherokee Construction Services LLC A. Company: Pick Electrick Inc A. Company: KVA Electric Address: 901 W Evergreen Blvd. Suite 150 Address: P.O. Box 6770 Address: 13933 Jim Creek Rd City, State: Vancouver, WA City, State: Spokane, WA City, State: Arlington, WA email Paul@cherokeeconstruction.biz email brian@pickelectric.com email: anthony@kvaelectric.com B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond Business Size: Size here Business Size: Size here Business Size: Size here
C. Amendments Acknowledged: 0 C. Amendments Acknowledged: 1 C. Amendments Acknowledged: 1
D. ITEM 7C. ESTE. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT
NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE
BASE
ITEMS BASE ITEMS BASE ITEMS
0001 1 36,146.78$ 36,146.78$ 0001 1 20,922.00$ 20,922.00$ 0001 1 21,500.00$ 21,500.00$ 0002 1 187,605.85$ 187,605.85$ 0002 1 275,034.00$ 275,034.00$ 0002 1 131,000.00$ 131,000.00$ 0003 1 45,183.48$ 45,183.48$ 0003 1 41,541.00$ 41,541.00$ 0003 1 23,500.00$ 23,500.00$ 0004 1 27,110.08$ 27,110.08$ 0004 1 20,000.00$ 20,000.00$ 0004 1 96,000.00$ 96,000.00$ 0005 1 22,591.74$ 22,591.74$ 0005 1 3,000.00$ 3,000.00$ 0005 1 28,071.00$ 28,071.00$ 0006 1 18,073.38$ 18,073.38$ 0006 1 4,132.00$ 4,132.00$ 0006 1 3,200.00$ 3,200.00$ 0007 1 10,000.00$ 10,000.00$ 0007 1 10,000.00$ 10,000.00$ 0007 1 10,000.00$ 10,000.00$ 0008 1 20,000.00$ 20,000.00$ 0008 1 20,000.00$ 20,000.00$ 0008 1 20,000.00$ 20,000.00$
TOTAL BASE ITEMS 366,711.31$ TOTAL BASE ITEMS 394,629.00$ TOTAL BASE ITEMS 333,271.00$
OPTIONAL ITEMS OPTIONAL ITEMS OPTIONAL ITEMS
0009 1 37,673.80$ 0009 1 1,637.00$ 1,637.00$ 0009 1 9,200.00$ 9,200.00$ TOTAL OPTIONAL ITEMS 37,673.80$ TOTAL OPTIONAL ITEMS 1,637.00$ TOTAL OPTIONAL ITEMS 9,200.00$ TOTAL BASE & OPTIONAL 404,385.11$ TOTAL BASE & OPTIONAL 396,266.00$ TOTAL BASE & OPTIONAL 342,471.00$
Standard Form 1419 (2001)
COE SEATTLE DISTRICT (VERSION 3/01)
| 2016-08-22T11:48:21-0700 | |
| PAANO.MONIQUE.A.1168213405 |
File details come from the government source that posted it. Updated .