ABSTRACT_16B0004.pdf
PDF 96 KB Posted
- Attached to
- FY17 FY18 Grays Harbor Inner Harbor O&M and Deepening Dredging, Grays Harbor, Washington
- Solicitation number
- W912DW-16-B-0004
About this file
Abstract for W912DW-16-B-0004 WITH 3rd page fixed
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16B0004_ABSTRACT.pdf | ||
| R0004.pdf | ||
| R0003.PDF | ||
| R0003_Plans.pdf | ||
| R0002.pdf | ||
| R0001.pdf | ||
| PLANS.pdf | ||
| 16B0004.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. Solicitation No. W912DW-16-B-0004
2. Date Issued: 25 March 2016
3. Date Opened: 28 April 2016
4. Issuing Office:
Department of the Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle, WA 98124-2255
5. Project Title:
Unrestricted
6. Number of Amendments Issued: 4
1st Apparent low = American Construction Company Inc. $33,572,750.00
% Difference From GE: -19%
2nd Apparent low = Manson Construction Co. $36,505,000.00
% Difference From GE: -12%
3rd Apparent low = The Dutra Group $44,253,000.00
% Difference From GE: +7%
SIGNATURE: Bid Opening Officer: Caroline B. Mueller
FY17 - FY18 Grays Harbor Inner Harbor O&M and Deepening Dredging, Grays Harbor, Washington
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
8. GOVERNMENT ESTIMATE
(Check A, B or C and Complete D, E F) A. Hired Labor B. Reasonable Contract (w/out profit) XX C. Reasonable Contract (w/ profit)
7A. ITEM 7B. DESCRIPTION OF OFFERED ITEM 7C. EST 7D. U7E. UNIT 7F. AMOUNT
NUMBE QTY PRICE
ASE ITEMS
0001 Mobilization and Demobilization (Note 2)
0001AA First Work Window 1 JOB 669,000.00$ 0001AB Second Work Window 1 JOB 669,000.00$ 0001AC Third Work Window 1 JOB 669,000.00$
0002 Dredging and Disposal – O&M (Note 3) 800,000 CY 5.60$ 4,480,000.00$ 0003 Dredging and Disposal – Deepening (Note 4) 1,700,000 CY 9.60$ 16,320,000.00$ 0004 Water Quality Monitoring 20 DAY 330.00$ 6,600.00$
22,813,600.00$
0005 Dredging and Disposal – O&M (Note 3) 0005AA Additional O&M Volume 200,000 CY 5.60$ 1,120,000.00$ 0005AB Additional O&M Volume 300,000 CY 5.60$ 1,680,000.00$
0006 Dredging and Disposal – Deepening (Note 4) 0006AA Additional Deepening Volume 300,000 CY 9.60$ 2,880,000.00$ 0006AB Additional Deepening Volume 500,000 CY 9.60$ 4,800,000.00$
0007 Unsuitable Material Dredging (Note 5) 0007AA Dredging 10,000 CY 8.60$ 86,000.00$ 0007AB Additional Dredging 12,000 CY 8.60$ 103,200.00$
0008 Unsuitable Material Water Quality (WQ) Monitoring 0008AA WQ Monitoring – Unsuitable Material 5 DAY 580.00$ 2,900.00$ 0008AB WQ Monitoring – Unsuitable Material 10 DAY 580.00$ 5,800.00$
Maintenance Dredging and Disposal During Construction (MDDDC) (Note 7)
0009AA Additional MDDDC – O&M 400,000 CY 7.67$ 3,068,000.00$ 0009AB Additional MDDDC – O&M 400,000 CY 7.91$ 3,164,000.00$
0010 Additional WQ Monitoring 0010AA Additional WQ Monitoring 5 DAY 330.00$ 1,650.00$ 0010AB Additional WQ Monitoring 200 DAY 330.00$ 66,000.00$
0011 Additional Mobilization and Demobilization 1 JOB 669,000.00$
Unsuitable Material Transport, Transload and Placement (Note 6)
00012AA Transport, Transload and Placement 10,000 CY 45.50$ 455,000.00$ 0012AB Additional Transport, Transload and Placement 12,000 CY 45.50$ 546,000.00$
18,647,550.00$ 41,461,150.00$
TOTAL BASE ITEMS
OPTIONAL ITEMS
TOTAL OPTIONAL ITEMS
TOTAL BASE & OPTIONAL
9. OFFERS
NO. 1 NO. 2 NO. 3 NO. 4
A. Manson Construction Co. A. Great Lakes Dredge & Dock Company, LLC A. The Dutra Group A. American Construction Co., Inc.
5209 E. Marginal Way South 2122 York Rd, 2350 Kerner Blvd, Ste 200 1501 Taylor Way Seattle, WA 98134 Oak Brook, IL 60523 San Rafael, CA 94901-5595 Tacoma, WA 98421 proposals@mansonconstruction.com jfkaras@gldd.com hstewart@dutragroup.com kevinc@americanconstco.com B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt :20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond Business Size: LB Business Size: LB Business Size: LB Business Size: SB C. Amendments Acknowledged: 4 C. Amendments Acknowledged: 4 C. Amendments Acknowledged: 4 C. Amendments Acknowledged: 4
D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT D. ITEM 7C. EST E. UNIT F. AMOUNT
NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE NO. QTY PRICE
BASE
ITEMS
BASE
ITEMS
BASE
ITEMS
BASE
ITEMS
0001 0001 0001 0001
0001AA 1 2,000,000.00$ 0001AA 1 4,960,000.00$ 0001AA 1 3,400,000.00$ 0001AA 1 1,500,000.00$
0001AB 1 150,000.00$ 0001AB 1 1,800,000.00$ 0001AB 1 2,000,000.00$ 0001AB 1 1,500,000.00$
0001AC 1 150,000.00$ 0001AC 1 620,000.00$ 0001AC 1 500,000.00$ 0001AC 1 300,000.00$
0002 800,000 6.00$ 4,800,000.00$ 0002 800,000 6.35$ 5,080,000.00$ 0002 800,000 8.85$ 7,080,000.00$ 0002 800,000 5.40$ 4,320,000.00$
0003 1,700,000 10.50$ 17,850,000.00$ 0003 1,700,000 9.25$ 15,725,000.00$ 0003 1,700,000 8.85$ 15,045,000.00$ 0003 1,700,000 7.00$ 11,900,000.00$ 0004 20 2,500.00$ 50,000.00$ 0004 20 300.00$ 6,000.00$ 0004 20 3,000.00$ 60,000.00$ 0004 20 50.00$ 1,000.00$
TOTAL BASE ITEMS 25,000,000.00$ TOTAL BASE ITEMS 28,191,000.00$ TOTAL BASE ITEMS 28,085,000.00$ TOTAL BASE ITEMS 19,521,000.00$
OPTIONAL ITEMS OPTIONAL ITEMS OPTIONAL ITEMS OPTIONAL ITEMS
0005 0005 0005 0005
0005AA 200,000 4.75$ 950,000.00$ 0005AA 200,000 6.54$ 1,308,000.00$ 0005AA 200,000 5.50$ 1,100,000.00$ 0005AA 200,000 5.00$ 1,000,000.00$
0005AB 300,000 4.75$ 1,425,000.00$ 0005AB 300,000 6.54$ 1,962,000.00$ 0005AB 300,000 5.50$ 1,650,000.00$ 0005AB 300,000 5.00$ 1,500,000.00$ 0006 0006 0006 0006
0006AA 300,000 5.00$ 1,500,000.00$ 0006AA 300,000 9.06$ 2,718,000.00$ 0006AA 300,000 8.25$ 2,475,000.00$ 0006AA 300,000 7.00$ 2,100,000.00$
0006AB 500,000 5.00$ 2,500,000.00$ 0006AB 500,000 9.06$ 4,530,000.00$ 0006AB 500,000 8.25$ 4,125,000.00$ 0006AB 500,000 7.00$ 3,500,000.00$ 0007 0007 0007 0007
0007AA 10,000 8.00$ 80,000.00$ 0007AA 10,000 9.12$ 91,200.00$ 0007AA 10,000 9.00$ 90,000.00$ 0007AA 10,000 30.00$ 300,000.00$
0007AB 12,000 8.00$ 96,000.00$ 0007AB 12,000 9.12$ 109,440.00$ 0007AB 12,000 9.00$ 108,000.00$ 0007AB 12,000 20.00$ 240,000.00$ 0008 0008 0008 0008
0008AA 5 2,500.00$ 12,500.00$ 0008AA 5 340.00$ 1,700.00$ 0008AA 5 3,000.00$ 15,000.00$ 0008AA 5 100.00$ 500.00$
0008AB 10 2,500.00$ 25,000.00$ 0008AB 10 310.00$ 3,100.00$ 0008AB 10 3,000.00$ 30,000.00$ 0008AB 10 100.00$ 1,000.00$ 0009 0009 0009 0009
0009AA 400,000 4.75$ 1,900,000.00$ 0009AA 400,000 9.08$ 3,632,000.00$ 0009AA 400,000 5.50$ 2,200,000.00$ 0009AA 400,000 5.00$ 2,000,000.00$
0009AB 400,000 4.75$ 1,900,000.00$ 0009AB 400,000 9.08$ 3,632,000.00$ 0009AB 400,000 5.50$ 2,200,000.00$ 0009AB 400,000 5.00$ 2,000,000.00$ 0010 0010 0010 0010
0010AA 5 2,500.00$ 12,500.00$ 0010AA 5 240.00$ 1,200.00$ 0010AA 5 3,000.00$ 15,000.00$ 0010AA 5 50.00$ 250.00$
0010AB 200 2,500.00$ 500,000.00$ 0010AB 200 240.00$ 48,000.00$ 0010AB 200 3,000.00$ 600,000.00$ 0010AB 200 50.00$ 10,000.00$
0011 1 10,000.00$ 0011 1 360,000.00$ 0011 1 900,000.00$ 0011 1 100,000.00$ 0012 -$ 0012 -$ 0012 -$ 0012 -$
0012AA 10,000 27.00$ 270,000.00$ 0012AA 10,000 69.00$ 690,000.00$ 0012AA 10,000 30.00$ 300,000.00$ 0012AA 10,000 70.00$ 700,000.00$ 0012AB 12,000 27.00$ 324,000.00$ 0012AB 12,000 68.53$ 822,360.00$ 0012AB 12,000 30.00$ 360,000.00$ 0012AB 12,000 50.00$ 600,000.00$
TOTAL OPTIONAL ITEMS 11,505,000.00$ TOTAL OPTIONAL ITEMS 19,909,000.00$ TOTAL OPTIONAL ITEMS 16,168,000.00$ TOTAL OPTIONAL ITEMS 14,051,750.00$
TOTAL BASE & OPTIONAL 36,505,000.00$ TOTAL BASE & OPTIONAL 48,100,000.00$ TOTAL BASE & OPTIONAL 44,253,000.00$ TOTAL BASE & OPTIONAL 33,572,750.00$ COE SEATTLE DISTRICT (VERSION 3/01) Standard Form 1419 (2001)
| 2016-04-28T17:56:51-0700 | |
| MUELLER.CAROLINE.B.1398119548 |