ABSTRACT OF OFFERS - CONSTRUCTION

1. Solicitation No. W912DW-12-B-0001

2. Date Issued: 10 May 12

3. Date Opened: 15 Jun 12

4. Issuing Office:

Department of the Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle, WA 98124-2255

5. Project Title:

Small business Set Aside

6. Number of Amendments Issued: 2

1st Apparent low = Portable Hydraulic Dredging, Inc. $1,794,750.00

% Difference From GE: -1%

2nd Apparent low = Vortez Marine Construction, Inc. $2,205,000.00

% Difference From GE: 21%

SIGNATURE: Bid Opening Officer: Monique Paano ORIGINAL SIGNED THIS DATE: 15 Jun 12

FY12 Snohomish River Channel, Downstream & Upstream Settling Basins, Maintenance Dredging, Everett, WA

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

8. GOVERNMENT ESTIMATE

(Check A, B or C and Complete D, E F) A. Hired Labor B. Reasonable Contract (w/out profit) XX C. Reasonable Contract (w/ profit)

7A. ITEM 7B. DESCRIPTION OF OFFERED ITEM 7C. EST 7D. UNIT 7E. UNIT 7F. AMOUNT

NUMBER QTY PRICE

BASE ITEMS

0001 Mobilization and Demobilization 1 JOB 487,475.00$ 487,475.00$

0002 Hydraulic Pipeline Dredge Sediment from the lower settling basin (Sta. 333+50 to 345+50) with Disposal at the Jetty Island Disposal Areas:

0002AA Dredging and disposal of dredge material at Jetty Island Beach Nourishment site 14,000 C.Y. 5.32$ 74,480.00$ 0002AB Dredging and disposal of dredge material at Jetty Island Placement Area. 25,000 C.Y. 5.86$ 146,500.00$

708,455.00$

0003 Hydraulic Pipeline Dredge Sediment from the lower settling basin (Sta. 333+50 to 345+50) with Disposal at the Jetty Island Disposal Areas:

0003AA Dredging and disposal of dredge material at Jetty Island Placement Area. 25,000 C.Y. 5.43$ 135,750.00$ 0003AB Dredging and disposal of dredge material at Jetty Island Placement Area. 15,000 C.Y. 5.24$ 78,600.00$

Hydraulic Pipeline Dredge Sediment from the Upstream Settling Basin (Sta. 68+00 to 82+00) and Navigation Channel (Sta. 46+00 to 68+00). All dredged material shall be disposed at the Site “O” or “Riverside” upland disposal sites managed by the Port of Everett

0004AA Dredging and disposal first 50,000 Cubic Yards at Site “O” 50,000 C.Y. 5.22$ 261,000.00$ 0004AB Dredging and disposal over 50,000 at Site “O” 50,000 C.Y. 5.21$ 260,500.00$ 0004AC Dredging and disposal first 25,000 Cubic Yards at Site “Riverside” 25,000 C.Y. 7.67$ 191,750.00$ 0004AD Dredging and disposal over 25,000 at Site “Riverside” 25,000 C.Y. 7.36$ 184,000.00$

1,111,600.00$ 1,820,055.00$

TOTAL BASE ITEMS

OPTIONAL ITEMS

TOTAL OPTIONAL ITEMS

TOTAL BASE & OPTIONAL

9. OFFERS

NO. 1 NO. 2

A. Company: Portable Hydraulic Dredging A. Company: Vortex Marine Construction, Inc.

Address: 33100 S.E3. Sofich Ln. Address: Livingston Street Pier City, State: Eagle Creek, OR 97022 City, State: Oakland, CA 94606 Phone & Fax: (503) 637-6590 Phone & Fax: (510) 261-2444 B. Bid Security Type/Amt : 20% Bid Bond B. Bid Security Type/Amt : 20% Bid Bond Business Size: Size here Business Size: Size here

C. Amendments Acknowledged: 2 C. Amendments Acknowledged: 2

D. ITEM 7C. ESTE. UNIT F. AMOUNT D. ITEM 7C. ESTE. UNIT F. AMOUNT

NO. QTY PRICE NO. QTY PRICE

BASE ITEMS BASE ITEMS

0001 1 396,250.00$ 396,250.00$ 0001 1 849,500.00$ 849,500.00$ 0002 0002

0002AA 14,000 6.50$ 91,000.00$ 0002AA 14,000 7.00$ 98,000.00$

0002AB 25,000 7.00$ 175,000.00$ 0002AB 25,000 7.00$ 175,000.00$

TOTAL BASE ITEMS 662,250.00$ TOTAL BASE ITEMS 1,122,500.00$

OPTIONAL ITEMS OPTIONAL ITEMS

0003 0003

0003AA 25,000 6.00$ 150,000.00$ 0003AA 25,000 5.50$ 137,500.00$

0003AB 15,000 5.50$ 82,500.00$ 0003AB 15,000 5.50$ 82,500.00$

0004 0004

0004AA 50,000 6.00$ 300,000.00$ 0004AA 50,000 6.00$ 300,000.00$

0004AB 50,000 6.00$ 300,000.00$ 0004AB 50,000 5.50$ 275,000.00$

0004AC 25,000 6.00$ 150,000.00$ 0004AC 25,000 6.00$ 150,000.00$

0004AD 25,000 6.00$ 150,000.00$ 0004AD 25,000 5.50$ 137,500.00$

TOTAL OPTIONAL ITEMS 1,132,500.00$ TOTAL OPTIONAL ITEMS 1,082,500.00$

TOTAL BASE & OPTIONAL 1,794,750.00$ TOTAL BASE & OPTIONAL 2,205,000.00$