The file's text, extracted by GovTribe without its formatting.
FIMP
Document 00 10 00 Page 1
PART 1 GENERAL
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
08/25
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD To be provided by Contracting Division.
1.2 BID SCHEDULE
| ITEM NO. |
| SUPPLIES/SERVICES |
| EST. QTY. |
| UNIT |
| UNIT PRICE |
| AMOUNT |
BASE BID:
| 0001 |
| Mobilization & Demobilization |
| 1 |
| JOB |
| JOB |
| 0002 |
| Final Record Drawings |
| 1 |
| JOB |
| JOB |
| 0003 |
| Structure 2789 - Design |
| 1 |
| JOB |
| JOB |
| 0004 |
| Structure 2790 - Design |
| 1 |
| JOB |
| JOB |
| 0005 |
| Structure 2814 - Design |
| 1 |
| JOB |
| JOB |
| 0006 |
| Structure 6005 - Design |
| 1 |
| JOB |
| JOB |
| 0007 |
| Structure 6037 - Design |
| 1 |
| JOB |
| JOB |
| 0008 |
| Structure 6076 - Design |
| 1 |
| JOB |
| JOB |
| 0009 |
| Structure 6091 - Design |
| 1 |
| JOB |
| JOB |
| 0010 |
| Structure 6095 - Design |
| 1 |
| JOB |
| JOB |
| 0011 |
| Structure 6117 - Design |
| 1 |
| JOB |
| JOB |
| 0012 |
| Structure 6123 - Design |
| 1 |
| JOB |
| JOB |
| 0013 |
| Structure 6138 - Design |
| 1 |
| JOB |
| JOB |
| 0014 |
| Structure 6169 - Design |
| 1 |
| JOB |
| JOB |
| 0015 |
| Structure 6208 - Design |
| 1 |
| JOB |
| JOB |
| 0016 |
| Structure 6324 - Design |
| 1 |
| JOB |
| JOB |
| 0017 |
| Structure 6327 - Design |
| 1 |
| JOB |
| JOB |
| 0018 |
| Structure 8577 - Design |
| 1 |
| JOB |
| JOB |
| 0019 |
| Structure 9027 - Design |
| 1 |
| JOB |
| JOB |
OPTIONS (JOB PRICE):
| 0021 |
| Structure 2789 - Construction |
| 1 |
| JOB |
| JOB |
| 0022 |
| Structure 2790 - Construction |
| 1 |
| JOB |
| JOB |
| 0023 |
| Structure 2814 - Construction |
| 1 |
| JOB |
| JOB |
| 0024 |
| Structure 6005 - Construction |
| 1 |
| JOB |
| JOB |
| 0025 |
| Structure 6037 - Construction |
| 1 |
| JOB |
| JOB |
| 0026 |
| Structure 6076 - Construction |
| 1 |
| JOB |
| JOB |
| 0027 |
| Structure 6091 - Construction |
| 1 |
| JOB |
| JOB |
| 0028 |
| Structure 6095 - Construction |
| 1 |
| JOB |
| JOB |
| 0029 |
| Structure 6117 - Construction |
| 1 |
| JOB |
| JOB |
| 0030 |
| Structure 6123 - Construction |
| 1 |
| JOB |
| JOB |
| 0031 |
| Structure 6138 - Construction |
| 1 |
| JOB |
| JOB |
| 0032 |
| Structure 6169 - Construction |
| 1 |
| JOB |
| JOB |
| 0033 |
| Structure 6208 - Construction |
| 1 |
| JOB |
| JOB |
| 0034 |
| Structure 6324 - Construction |
| 1 |
| JOB |
| JOB |
| 0035 |
| Structure 6327 - Construction |
| 1 |
| JOB |
| JOB |
| 0036 |
| Structure 8577 - Construction |
| 1 |
| JOB |
| JOB |
| 0037 |
| Structure 9027 - Construction |
| 1 |
| JOB |
| JOB |
| 0038 |
| Structure 2527 - Design |
| 1 |
| JOB |
| JOB |
| 0039 |
| Structure 2527 - Construction |
| 1 |
| JOB |
| JOB |
| 0040 |
| Structure 2534 - Design |
| 1 |
| JOB |
| JOB |
| 0041 |
| Structure 2534 - Construction |
| 1 |
| JOB |
| JOB |
| 0042 |
| Structure 2535 - Design |
| 1 |
| JOB |
| JOB |
| 0043 |
| Structure 2535 - Construction |
| 1 |
| JOB |
| JOB |
| 0044 |
| Structure 2540 - Design |
| 1 |
| JOB |
| JOB |
| 0045 |
| Structure 2540 - Construction |
| 1 |
| JOB |
| JOB |
| 0046 |
| Structure 2556 - Design |
| 1 |
| JOB |
| JOB |
| 0047 |
| Structure 2556 - Construction |
| 1 |
| JOB |
| JOB |
| 0048 |
| Structure 2706 - Design |
| 1 |
| JOB |
| JOB |
| 0049 |
| Structure 2706 - Construction |
| 1 |
| JOB |
| JOB |
| 0050 |
| Structure 2794 - Design |
| 1 |
| JOB |
| JOB |
| 0051 |
| Structure 2794 - Construction |
| 1 |
| JOB |
| JOB |
| 0052 |
| Structure 2802 - Design |
| 1 |
| JOB |
| JOB |
| 0053 |
| Structure 2802 - Construction |
| 1 |
| JOB |
| JOB |
| 0054 |
| Structure 2819 - Design |
| 1 |
| JOB |
| JOB |
| 0055 |
| Structure 2819 - Construction |
| 1 |
| JOB |
| JOB |
| 0056 |
| Structure 2832 - Design |
| 1 |
| JOB |
| JOB |
| 0057 |
| Structure 2832 - Construction |
| 1 |
| JOB |
| JOB |
| 0058 |
| Structure 2838 - Design |
| 1 |
| JOB |
| JOB |
| 0059 |
| Structure 2838 - Construction |
| 1 |
| JOB |
| JOB |
| 0060 |
| Structure 2844 - Design |
| 1 |
| JOB |
| JOB |
| 0061 |
| Structure 2844 - Construction |
| 1 |
| JOB |
| JOB |
| 0062 |
| Structure 5999 - Design |
| 1 |
| JOB |
| JOB |
| 0063 |
| Structure 5999 - Construction |
| 1 |
| JOB |
| JOB |
| 0064 |
| Structure 6015 - Design |
| 1 |
| JOB |
| JOB |
| 0065 |
| Structure 6015 - Construction |
| 1 |
| JOB |
| JOB |
| 0066 |
| Structure 6025 - Design |
| 1 |
| JOB |
| JOB |
| 0067 |
| Structure 6025 - Construction |
| 1 |
| JOB |
| JOB |
| 0068 |
| Structure 6029 - Design |
| 1 |
| JOB |
| JOB |
| 0069 |
| Structure 6029 - Construction |
| 1 |
| JOB |
| JOB |
| 0070 |
| Structure 6031 - Design |
| 1 |
| JOB |
| JOB |
| 0071 |
| Structure 6031 - Construction |
| 1 |
| JOB |
| JOB |
| 0072 |
| Structure 6034 - Design |
| 1 |
| JOB |
| JOB |
| 0073 |
| Structure 6034 - Construction |
| 1 |
| JOB |
| JOB |
| 0074 |
| Structure 6039 - Design |
| 1 |
| JOB |
| JOB |
| 0075 |
| Structure 6039 - Construction |
| 1 |
| JOB |
| JOB |
| 0076 |
| Structure 6040 - Design |
| 1 |
| JOB |
| JOB |
| 0077 |
| Structure 6040 - Construction |
| 1 |
| JOB |
| JOB |
| 0078 |
| Structure 6049 - Design |
| 1 |
| JOB |
| JOB |
| 0079 |
| Structure 6049 - Construction |
| 1 |
| JOB |
| JOB |
| 0080 |
| Structure 6054 - Design |
| 1 |
| JOB |
| JOB |
| 0081 |
| Structure 6054 - Construction |
| 1 |
| JOB |
| JOB |
| 0082 |
| Structure 6070 - Design |
| 1 |
| JOB |
| JOB |
| 0083 |
| Structure 6070 - Construction |
| 1 |
| JOB |
| JOB |
| 0084 |
| Structure 6077 - Design |
| 1 |
| JOB |
| JOB |
| 0085 |
| Structure 6077 - Construction |
| 1 |
| JOB |
| JOB |
| 0086 |
| Structure 6081 - Design |
| 1 |
| JOB |
| JOB |
| 0087 |
| Structure 6081 - Construction |
| 1 |
| JOB |
| JOB |
| 0088 |
| Structure 6094 - Design |
| 1 |
| JOB |
| JOB |
| 0089 |
| Structure 6094 - Construction |
| 1 |
| JOB |
| JOB |
| 0090 |
| Structure 6096 - Design |
| 1 |
| JOB |
| JOB |
| 0091 |
| Structure 6096 - Construction |
| 1 |
| JOB |
| JOB |
| 0092 |
| Structure 6110 - Design |
| 1 |
| JOB |
| JOB |
| 0093 |
| Structure 6110 - Construction |
| 1 |
| JOB |
| JOB |
| 0094 |
| Structure 6114 - Design |
| 1 |
| JOB |
| JOB |
| 0095 |
| Structure 6114 - Construction |
| 1 |
| JOB |
| JOB |
| 0096 |
| Structure 6116 - Design |
| 1 |
| JOB |
| JOB |
| 0097 |
| Structure 6116 - Construction |
| 1 |
| JOB |
| JOB |
| 0098 |
| Structure 6126 - Design |
| 1 |
| JOB |
| JOB |
| 0099 |
| Structure 6126 - Construction |
| 1 |
| JOB |
| JOB |
| 0100 |
| Structure 6136 - Design |
| 1 |
| JOB |
| JOB |
| 0101 |
| Structure 6136 - Construction |
| 1 |
| JOB |
| JOB |
| 0102 |
| Structure 6139 - Design |
| 1 |
| JOB |
| JOB |
| 0103 |
| Structure 6139 - Construction |
| 1 |
| JOB |
| JOB |
| 0104 |
| Structure 6141 - Design |
| 1 |
| JOB |
| JOB |
| 0105 |
| Structure 6141 - Construction |
| 1 |
| JOB |
| JOB |
| 0106 |
| Structure 6153 - Design |
| 1 |
| JOB |
| JOB |
| 0107 |
| Structure 6153 - Construction |
| 1 |
| JOB |
| JOB |
| 0108 |
| Structure 6156 - Design |
| 1 |
| JOB |
| JOB |
| 0109 |
| Structure 6156 - Construction |
| 1 |
| JOB |
| JOB |
| 0110 |
| Structure 6188 - Design |
| 1 |
| JOB |
| JOB |
| 0111 |
| Structure 6188 - Construction |
| 1 |
| JOB |
| JOB |
| 0112 |
| Structure 6204 - Design |
| 1 |
| JOB |
| JOB |
| 0113 |
| Structure 6204 - Construction |
| 1 |
| JOB |
| JOB |
| 0114 |
| Structure 6206 - Design |
| 1 |
| JOB |
| JOB |
| 0115 |
| Structure 6206 - Construction |
| 1 |
| JOB |
| JOB |
| 0116 |
| Structure 6214 - Design |
| 1 |
| JOB |
| JOB |
| 0117 |
| Structure 6214 - Construction |
| 1 |
| JOB |
| JOB |
| 0118 |
| Structure 6219 - Design |
| 1 |
| JOB |
| JOB |
| 0119 |
| Structure 6219 - Construction |
| 1 |
| JOB |
| JOB |
| 0120 |
| Structure 6220 - Design |
| 1 |
| JOB |
| JOB |
| 0121 |
| Structure 6220 - Construction |
| 1 |
| JOB |
| JOB |
| 0122 |
| Structure 6231 - Design |
| 1 |
| JOB |
| JOB |
| 0123 |
| Structure 6231 - Construction |
| 1 |
| JOB |
| JOB |
| 0124 |
| Structure 6232 - Design |
| 1 |
| JOB |
| JOB |
| 0125 |
| Structure 6232 - Construction |
| 1 |
| JOB |
| JOB |
| 0126 |
| Structure 6236 - Design |
| 1 |
| JOB |
| JOB |
| 0127 |
| Structure 6236 - Construction |
| 1 |
| JOB |
| JOB |
| 0128 |
| Structure 9017 - Design |
| 1 |
| JOB |
| JOB |
| 0129 |
| Structure 9017 - Construction |
| 1 |
| JOB |
| JOB |
| 0130 |
| Structure 9019 - Design |
| 1 |
| JOB |
| JOB |
| 0131 |
| Structure 9019 - Construction |
| 1 |
| JOB |
| JOB |
| 0132 |
| Structure 12004 - Design |
| 1 |
| JOB |
| JOB |
| 0133 |
| Structure 12004 - Construction |
| 1 |
| JOB |
| JOB |
| 0134 |
| Structure 32343 - Design |
| 1 |
| JOB |
| JOB |
| 0135 |
| Structure 32343 - Construction |
| 1 |
| JOB |
| JOB |
TOTALS:
TOTAL BASE (ITEMS 0003 thru 0019)
TOTAL UNIT PRICE (ITEMS 0020 thru 0135)
TOTAL BASE + UNIT PRICE (ITEMS 0001 thru 0135)
NOTES:
1. Refer to Section 01 22 00 for bid item descriptions.
2. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
3. The bidders are required to bid on all items, or their bid will be rejected.
4. Proposal shall include a cost loaded schedule in accordance with Specifications Section 01 32 01.00 10. The cost loaded schedule shall also reflect the following milestones within each CLIN (see also Note 5):
· Pre-Construction Inspections
· Design & Permitting
· Construction
· Post-Construction Inspections and Certifications
5. See Section 01 22 00 for restrictions on amount bid for each of the above sections.
6. Selection will be based upon the process laid out in the Source Selection Plan.
7. Line item 0007 is pre-priced at $500,000 and this price shown may not be changed. See Section 01 78 00 for Final Record Drawing definition and requirements.
8. The Bid Acceptance Period is as stated on Standard Form 1442.
9. The Government is under no obligation to exercise/award any option.
10. Optional items XXX to XXX, if awarded, will be awarded within 180 calendar days from issuance of the Notice to Proceed (NTP). If awarded, additional time shall be added as follows:
· Additional YYY days shall be added for options awarded in groups of 10 or less in each town (i.e. if 8 options for structures within the Town of Brookhaven and 5 options for structures within the Town of Babylon are awarded, YYY days shall be added).
· Additional YYY + (months) shall be awarded if options are awarded in groups of 10 or more in each town (i.e. if 15 options within the Town of Brookhaven and 15 options within the Town of Babylon are awarded, then YYY + 1 month shall be added. The larger of the two drives additional time.)
ADD NOTE FOR OPTION TO BE AWARDED WITHIN X DAYS OF [MILESTONE, typically after NTP]. Decide add to period of performance or not. Gravitate toward no. Maybe language that if home is awarded within x time of base, then no time added. Add time after x amount of days. At that point add time per option.
11. As homeowners may withdraw from the program at any time prior to execution of the Participation Agreement and execution of the Perpetual Easement, the Contractor is notified CLINs may not be fully awarded and may be executed only within the work completed up to the point of withdrawal.
12. Unit price bid must include all required design, materials, fasteners, labor etc. to furnish and install unit price items.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Document --