This abstract of bids document summarizes bids received in response to a solicitation for maintenance dredging of the Red Hook Flats Anchorage in New York Harbor. The solicitation was issued by the U.S. Army Corps of Engineers, New York District on July 6, 2023, with bids opened on August 8, 2023. Four bids were received for the base work of dredging, transporting, and disposing of dredged materials from Weeks Marine, Cashman Dredging and Marine Contracting, Dutra Group, and Don Jon. Pricing was provided on a unit price basis for various contract line items including mobilization, dredging and transport of different material quantities, monitoring, and an optional dredging area. Total evaluated prices for the base work plus optional areas ranged from approximately $9.15 million to $30 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGES

7A. ITEM

NO.

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

D. UNIT

PRICE

1 1 Job $1,034,962.48

2 20,545 CY $10.12 $207,915.40

17.00$

$ 22.00

3 26,085 CY $10.16 $265,023.60 $ 17.00 $ 22.00

4 546,040 CY $10.16 $5,547,766.40 $ 13.00 $ 22.00

5 1 Job $40,000.00

6 202,020 CY $10.17 $2,054,543.40 $ 12.50 $ 22.00

Total Base $7,095,667.88 Total Option

$2,054,543.40

Total Base Plus Option

$9,150,211.28

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

W912DS23B0010

2. DATE ISSUED

6 July 2023

3. DATE OPENED

8 August 2023

B. BID SECURITY (Type and amount)

4. ISSUING OFFICE

U.S. Army Corps of Engineers, New York District Contracting Division

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL: Monica Coniglio, Contract Specialist

SIGNATURE DATE SIGNED

8 August 2023

5. PROJECT TITLE

Maintenance Dredging of NY Harbor - Red Hook Flats Anchorage, FNP

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

Weeks Marine

A. OFFEROR

CashmanA. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

Basic Work 2 - Dredging, Transportation and Placement of Dredged Material

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

7B. DESCRIPTION OF OFFERED ITEM E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

$443,445.00

Mobilization and Debmobilization $1,750,000.00 $2,000,000.00 Basic Work - Dredging, Transportation and Placement of Dredged Material

$349,265.00 $451,990.00

$7,098,520.00

$573,870.00

$12,012,880.00

$15,053,740.00

$4,444,440.00

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

Basic Work 3 - Dredging, Transportation and Placement of Dredged Material

$12,241,480.00 $19,498,180.00

$9,716,230.00

$4,444,440.00

Black Box Monitoring

$2,525,250.00Option - Dredging Area 4

$75,000.00 $15,000.00

$2,525,250.00

PAGES

D. UNIT PRICE D. UNIT

PRICE

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

1 1 Job

2 20,545 CY $ 13.00 $ 12.00

3 26,085 CY $ 13.00 $ 12.00

4 546,040 CY $ 10.50 $ 12.00

5 1 Job

6 202,020 CY $ 9.00 $ 11.00

Total Base $0.00

Total Option

$0.00

Total Base Plus Option

$0.00

2. PROJECT TITLE

Maintenance Dredging of NY Harbor - Red Hook Flats Anchorage, FNP

4. OFFERS (Continued)

NO.: 3 NO.: 4 NO.: 5 NO.: 6

A. OFFEROR

Dutra Group

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER

W912DS21B0013

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

A. OFFEROR

Don Jon

A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. ITEM

NO.

B. ESTIMATED

QUANTITY

C. UNIT

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT PRICE E. ESTIMATED

AMOUNT

$1,451,210.00 $3,000,000.00 $267,085.00 $246,540.00 $339,105.00 $313,020.00

$1,818,180.00

$10,262,040.00

$0.00

$5,733,420.00 $6,552,480.00

$9,639,000.00 $12,484,260.00 $0.00

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

$2,222,220.00

$30,000.00 $1,818,180.00

$150,000.00 $2,222,220.00

$7,820,820.00 $0.00