W912DS22Q0005 0001.pdf

PDF 453 KB Posted

Attached to
Gelberman Drydock Federal contract opportunity
Solicitation number
W912DS22Q0005
Issued by
Department of the Army Corps of Engineers Engineering District New York

View the file

Other files for this federal contract opportunity

Other files attached to Gelberman Drydock, newest first.
File Type Posted
91-102-53 - Gelberman - Frames 56 Through Transom - Hull 351.pdf PDF
DOC052121.pdf PDF
91-100-G6 - Gelberman - Docking Plan - Hull 351.pdf PDF
91-302-513 - Gelberman - Shafting Detail - Hull 351.pdf PDF
351-H400-0001 sht 1-3 Rudder and Rudder Stock Details.pdf PDF
W912DS22Q0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: (1) Include Draw ings: No. 91-100-G6 - Docking Plan; No. 91-102-53 – Transverse Framing Details; No.

91-302-513 – Shafting Detail; No. 3-5021-A – Kallenberg 4 Blade 64”x52” Propeller; No. 351-H400-0001 – Rudder & Rudder Stock Details and DOCO52121. Remove reference to Draw ing No. 1738-01-2 – Lines Plan. (2) Extend the due date from 07 January 2022 to 12 January

2022 @2PM EST.

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1449, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22Q0005

X 9B. DATED (SEE ITEM 11)

23-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jan-2022

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS22Q0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Jan-2022 02:00 PM to 12-Jan-2022 02:00 PM.

The following have been modified:

SOW

Specification for Gelberman Propeller Replacement

STATEMENT OF WORK

SW-1 Description of Work

a. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work on U.S. Drift Collection Vessel "GELBERMAN" specified herein. The principal dimensions and physical data for the vessel are shown below:

GENERAL DESCRIPTION

Length Overall ...................................................... 85'-0" Breadth, Molded ................................................... 26'-0" Depth, Molded ...................................................... 10’-0” Material ................................................................ All Welded Steel Displacement, light ............................................... 213 short tons Propellers (2) ........................................................ 64"Dx52"P, 4 blade Draft, loaded, aft ................................................... 8'-6” Hull Form .............................................................. Monohull/Keel Coolers ABS I.D. No

b. The major workscope includes drydocking the vessel, assisting with ABS and USCG required inspections, and replacing the Vessels Propellers

c. The Contractor is not responsible for the costs associated with providing the inspection services of

ABS.

d. Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies.

e. General vessel arrangements and details are included in the attached file named “Reference

Drawings”. The accuracy of these drawings has not been verified. Therefore, the Contractor shall template all work from the vessel. Specific details and designs for new work that will be accomplished during this repair contract are included in the attached file named “Contract Drawings”.

Potential bidders are encouraged to inspect the vessel prior to submitting a bid. See Contract Clause SW-55 for more details.

f. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in his or her possession.

g. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at his/her expense. Any damage from removal or relocation of parts, equipment, etc.

shall be repaired or replaced at the Contractor’s expense.

h. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel Vessels" and

USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR).

SW-2 Mastership Agreement

Prior to the award of this Contract, the Contractor shall enter into a "Mastership Agreement for Repair and Alteration of Vessels". If the Contractor has entered such an agreement prior to this Contract, that agreement may be utilized. For more information, see DFARS Subpart 252.217-71, Master Agreement for Repair and Alteration of Vessels.

SW-3 Contract Duration

The Contract duration is ten (10) calendar days after delivery of the vessel to Contractor’s yard. The Contractor is responsible for completing all definite and indefinite work items within the ten (10) calendar day Contract duration. See Paragraph SC-1 for additional details.

SW-4 Distance Restriction From Caven Point Terminal

All Contract work shall be performed at a location within a 125 nautical mile radius from Caven Point Marine Terminal, Jersey City, New Jersey.

SW-5 Pre-bid Vessel Inspections

Pre-bid inspections may be held to allow all prospective Bidders to inspect the vessel. The pre-bid inspections can be held by appointment in Jersey City, NJ. Representatives of prospective Bidders wishing to attend should contact William Lyness at (201) 309-2360 for the specifics of the exact location and time.

During the pre-bid inspections, Bidders will be allowed unencumbered access throughout the entire vessel. Representatives of the Government will be available, but only to the extent necessary to escort Bidders and assist with access. Government Representatives on the vessel will not discuss the scope of the work or make any technical clarifications or interpretations.

After each inspection, a meeting will be held with all participants to allow for the presentation of any questions. This meeting is not for the purpose of educating Bidders that have not carefully reviewed the plans and specifications and have come unprepared. Questions will not be answered at that time but will be acknowledged and recorded. The Government will prepare answers to all questions and forward a copy of both the questions and answers to all prospective Bidders through form Solicitation Amendment.

SPECIAL CONDITIONS

SC-1 Pre-Award Survey, Delivery, Commencement, Completion of Work and Return of Plant

a. A Pre-Award Survey may be requested prior to award in accordance with FAR 9.106 to verify that the

Contractor is able to comply with the required performance schedule, taking into consideration all existing commercial and government business commitments and has the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

b. To minimize the vessel’s time out of service and to allow for flexibility in scheduling, the Government will deliver the plant to the nearest slip at the Contractor's facility on a date mutually agreed on by the Government and Contractor, on or before 25 January 2022.

c. The Government will accept return of the plant in open water, clear of the Contractor's yard or any other berthing facility used in connection with Contract work upon completion of the Contract.

d. The Contractor shall commence the work under the Contract immediately after delivery of the vessel to the Contractor’s facility and shall execute the work within the time stated in the Contract. The Contract duration shall be computed from and including the first calendar day after delivery of the vessel to the Contractor.

e. The time for completion shall be computed to the hour at which the plant is accepted by the COR in open water clear of the Contractor's yard. The date of completion shall be considered as half a day if the plant is accepted by the COR before 12:00 o'clock Noon and as a whole if accepted after 12:00 o'clock Noon. The work cannot be considered complete until the COR has agreed all activated and contracted work is satisfactory.

SC-2 Berthing, Drydocking and Services

The Contractor shall have a suitable drydock facility available on or before 25 January 2022. Following completion of underwater work, the Contractor shall be prepared to drydock the vessel in case of unforeseen circumstances. Contract delays resulting from unavailability of a dry dock shall be the Contractors responsibility.

The drydock that the Contractor plans to use shall be certified for docking the vessel, based on the dimensions and weight identified in paragraph SW-1, by one of the following:

(a) US Navy, Naval Sea Systems Command

(b) American Bureau of Shipping (ABS)

(c) An independent registered Professional Engineer specialized in drydocks, who shall cover the inspection requirements of item (a) or (b) above.

A copy of the drydock certification shall be submitted with the Offeror’s bid.

The Inspection Certificate shall be within three (3) years if the age of the dock is less than ten (10) years old and within two (2) years if the age of the dock is over ten (10) years old.

Floating drydocks shall be one integral unit. The Government will allow the coupling of two rated docks to meet the load requirements of the vessel, provided that the lifting plan used shall include provisions for ensuring integrity of the coupling in the event of foul weather. Linked drydocks shall be certified as an entity.

SC-3 Liquidated Damages

a. In the case of failure on the part of the Contractor to complete the work within the time frame in the

Contract or any extensions thereof, the Contractor shall pay the Government as liquidated damages, the sum of $3,000 for each calendar day of delay until the work is completed or accepted.

b. The Contractor shall not be charged with liquidated damages when the delay in delivery or performance arises out of causes beyond the control and without the fault or negligence of the Contractor as defined in the Default Clause of the Mastership Agreement for Repairs and Alterations of Vessels (DFARS Clause 252.217-7009 - Default).

SC-4 Contractor's Custody of Plant

a. On entering and leaving dry dock, or marine railway, the Contractor shall have charge of, and be responsible for a vessel not operating under its own power. If tug or pilot service is required during delivery or return of the plant or at any time during Contractor's custody for maneuvering the plant between open water and dry dock, slip or berth at the Contractor's yard or other facility, or for moving the plant for any reason during the course of Contract work, such service shall be promptly furnished by the Contractor at his/her expense. This shall not exclude the right of the Government to move its plant around the Contractor's premises using the Government's personnel and facilities if the Government representative considers such movement of the plant to be in the interests of safety of the plant, or otherwise in the Government's interests.

b. The Government shall have the right to access the vessel while in the Contractor's custody with

Government owned or hired floating plant or personnel for the purpose of delivering equipment, materials or personnel to the plant in the Contractor's custody.

c. The Contractor shall not permit the plant to go aground or bear upon the bottom of any waterway or any submerged object while in his/her possession. The Contractor shall not perform any Contract work on the plant if it should accidentally go aground or bear upon any submerged object but shall notify the Government representative and immediately take the necessary steps to refloat the plant.

The sole exception to this shall be that the plant shall be allowed to rest or bear upon a drydock which is properly prepared, in accordance with the plant's drydocking plan.

d. If the Contractor anchors the plant offshore for the purpose of performing Contract work on the plant, the Contractor shall convey Government inspectors, crew and hired personnel to and from the plant at the convenience of the Government at the Contractor's expense. While at such anchorage, the plant shall be considered in the custody of the Contractor and subject to any pertaining provision of these conditions.

SC-5 Accident Prevention

The Contractor shall provide a fire protection plan, flood prevention plan, and safety plan to the COR. All plans shall be in compliance with all federal, state, and local regulations as well as USCG, ABS, and USACE regulations. This information shall be submitted no later than seven (7) days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.

The bulleted items listed below refer to specific areas of accident prevention, however this in no way limits the Contractor’s responsibility to perform all work under this Contract in strict accordance with their fire protection, flood prevention, and safety plans as well as all federal (ex. 29 CFR), state, local, USCG, ABS, and USACE regulations (EM 385-1-1).

a. The Contractor shall take all necessary precautions for the protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this Contract. The Contractor shall comply with all pertinent provisions of the Mastership Agreement for Repair and Alteration of Vessels and the Corps of Engineers Safety Manual EM 385-1-1, dated 30 November 2014 entitled "Safety and Health Requirements Manual" as amended and shall also take or cause to be taken such additional measures as the COR may determine to be reasonably necessary for the purpose. The Contractor shall also comply with OSHA Safety and Health Standards 29 CFR. The Contractor shall designate the entire area of work as a hardhat area.

b. A qualified employee shall be designated by the Contractor to be directly responsible for full and immediate compliance with all applicable safety and fire protection requirements. The COR will make a safety inspection of shipyard facilities within 12 hours of the vessel's arrival at the Contractor's yard.

At such time the Contractor's safety program will be reviewed with the Contractor's safety representative.

c. When the specifications require work in areas fitted with the fixed CO2 systems (i.e. machinery spaces), the COR shall be notified prior to commencing work. All work in these areas shall be in strict accordance with 29 CFR 1915.506 and substitute fire protection equipment shall be furnished by the Contractor during the test or repair period.

d. Fire watches shall be posted wherever hot work is performed. Fire watches shall also be posted on the opposite side of all adjacent bulkheads, decks, and overheads where the hot work is performed.

All fire watches shall remain on site until 30 minutes after the hot work is completed. For additional requirements, see 29 CFR 1915. It should be noted that 29 CFR 1915.52 (b)(3) only requires additional fire watches for specific conditions, however the Contractor shall provide fire watches for all hot work as mentioned above.

e. The Contractor is responsible for compliance with USCG regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed, a certified marine chemist's gas-free certificate shall be furnished to the Government representative at the Contractor's expense prior to commencing work. Additionally, a copy of the most recent gas-free certificate shall be posted near the vicinity of the work and at each gangway for the vessel. The Contractor shall have the marine chemist recertify the vessel for all ongoing hot work permits in the event of any vessel movement or change in ballasted condition or in the case of any combustible liquid spillage. Following any of these events, inspection for recertification by a Competent Person is unacceptable.

f. All work in confined areas or enclosed spaces shall be performed in accordance with Sections 06.I and 19.A.08 of EM 385-1-1, "Safety and Health Requirements Manual", dated 30 November 2014 as amended. In such areas or spaces the Contractor shall test for the concentration of oxygen and have immediately available a sufficient number of respirators for everyone working in such areas or spaces. An attendant shall be stationed outside every confined space while work is being performed therein and a rescuer equipped with respirators and retrieval lines shall be immediately available in case of an emergency.

g. The Contractor shall furnish a gangway, conforming to EM 385-1-1, most recent revision, of suitable strength and construction for safe and convenient boarding of the vessel at all times. The gangway shall be installed at an angle of less than 40 degrees and shall have 39-inch high guardrails at both sides. Hatches and openings that present a falling hazard shall be provided with suitable and substantial guards.

h. All exits and passageways shall be kept free of obstructions and shall be kept well lighted at all times.

i. The Contractor shall maintain an accurate record of, and shall report to the COR, in the manner and on the forms prescribed by the COR, exposure data and all accidents, resulting in death, traumatic injury, occupational disease, and/or damage to property, materials, supplies and equipment incident to work performed under this Contract.

j. The COR will notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.

k. Compliance with the requirements of this provision (SC-5) by any subcontractors shall be the responsibility of the Contractor.

SC-6 Performance of Work by the Government

The Government reserves the right to quarter and subsist the crew on the vessel and to perform certain work while the plant is in the Contractor’s possession. Government personnel, as well as materials, equipment, and tools, shall be permitted to access the vessel while in the Contractor’s possession and to perform the work mentioned above.

SC-7 Labor Reports

The Contractor shall keep and maintain complete payroll records for the duration of time covering the work under this Contract for a period of three (3) years from the end of such periods, and such records shall be made available for Government inspection upon request.

SC-8 Workmanship

a. General

1. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.

2. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause of Contractor's replacement at no additional cost to the Government.

SC-9 Electric Power, Steam, Water, Compressed Air, and Heating Oil

The Contractor shall furnish all necessary steam, compressed air, and electric power for lighting and heating, and for the operations of necessary deck and auxiliary machinery of the plant while it is in his/her possession. The Contractor shall provide water for use on the vessel. The water is intended to be used for sinks and toilets and therefore does not need to be potable.

The Contractor is responsible for providing all labor, hoses, electrical cable, and any other equipment or material needed to make up the connections for the services identified above. The Contractor is also responsible for disconnecting the services at the completion of the Contract.

SC-10 Wharfage, Dockage, Garbage Disposal, Etc.

While the plant is in his/her possession, the Contractor shall be responsible for any, and pay all expenses of wharfage, dunnage, dockage, mooring lines, garbage disposal, security, etc. The Contractor, after making repairs, shall move the boat to a convenient berth for the purpose of testing machinery and taking on supplies. Fresh water for the use of the plant shall be provided by the Contractor at his/her expense while the plant is in his/her possession, and all fresh water tanks shall be properly filled on completion of the work and return of the plant to the Government.

SC-11 Tests and Trials

All machinery or other equipment installed, repaired or worked on by the Contractor shall be tested upon completion of all work to demonstrate proper installation and operation to the COR. This shall include all removals for access and/or interference (See Contract Clause SW-1-g. for details).

Rework on any such equipment to demonstrate proper installation and operation shall be performed at the expense of the Contractor.

SC-12 Contractor Cooperation with the U.S. Coast Guard, the American Bureau of Shipping and the Contracting Officer’s Representative

The Contractor shall cooperate with the COR in the recertification and/or inspection of the vessel by the U.S. Coast Guard (USCG), ABS and the COR. All costs associated with the Contractor's cooperation shall be the responsibility of the Contractor. The Contractor's cooperation during or in connection with such investigations may include, but not be limited to, the following:

a. Flooding of areas of decks, small voids, small tanks and small spaces for testing of watertight integrity whether worked on under this Contract or not;

b. Manual movement of any unattached objects or any objects which can be easily dismounted or opened and moved anywhere on the vessel;

c. Minor interruptions of work for purposes of inspection not to exceed eight (8) man-hours of such interruptions.

For the purpose of monitoring the quantity of man-hours used for items b and c above, the Contractor shall maintain a log sheet to document the number of man-hours worked throughout the Contract completion. The Contractor shall request approval and signature of the Government Representative on site for each entry on the log sheet to verify the information.

SC-13 Watch Service Requirements

The Contractor shall provide a 24 hour watch service to respond to any emergencies/alarms on the vessel while in the Contractor’s possession. The watchman will be given a key to the GELBERMAN for use at night, on weekends and on holidays. The Contractor shall provide the name and qualifications of the watchman in writing to the COR. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.

SC-14 Vessel Security

The Contractor is responsible for security while the vessel is in the Contractor’s possession. Physical means of preventing unauthorized access (i.e. gated access) to the vessel shall be provided in accordance with Federal Acquisition Regulation (FAR) Clause 252.217-7016 - Plant Protection.

Technical Provisions

TP 1.01 Drydocking

Drydocking, as used below, is defined as the Contractor’s responsibility to furnish all labor, material, equipment, and services to remove the vessel from the water in order to perform the work required by these specifications. The Contractor shall use either a drydock, marine railway, or travel lift to remove the vessel from the water. All requirements below shall apply regardless of which method of removal is used.

Notice to Proceed for the Contract will not be provided by the Contracting Officer until the Government has reviewed and approved the Contractor’s structural calculations for using a travel lift, if used.

a. Irrespective of whether the vessel is in drydock, the Contractor is responsible for ensuring that there is a suitable drydock available for the plant for the entire contract duration in the event that an emergency drydocking of the plant should be necessary for any reason.

b. The COR may allow exceptions at his/her discretion to the necessity for drydocking for various items of work on a case-by-case basis only when informed by the Contractor and allowed to render a decision prior to any work being performed on the requested exception.

c. The drawings listed below are included with the contract package for the Contractor’s use with drydocking the vessel. The Contractor is responsible for determining the actual drydock blocking arrangement. The Contractor shall use the reference drawings listed below to determine the drydock block size and arrangement.

Drawing No. 91-100-G6 - Docking Plan Drawing No. 91-102-53 – Transverse Framing Details Drawing No. 91-302-513 – Shafting Detail Drawing No. 3-5021-A – Kallenberg 4 Blade 64”x52” Propeller Drawing DOCO52121

d. Drydocking blocks and other drydocking supports shall not obstruct access to remove, work upon, or replace: docking plugs, discharge openings, seachests, anodes, shafts, struts, stern tubes, propellers, rudders, keel coolers or any other hull fittings. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and re-drydock the plant, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the COR of their plan to relocate the blocks to adequately support the vessel.

e. The Contractor shall install temporary grounding straps from the vessel's hull to the dry dock's steel structure. The Contractor shall ensure that the straps will adequately protect the vessel from any stray currents that may be present from shore side power source.

f. Any direction by the COR for work required under these specifications including the direction of indefinite work items which extends drydocking time within the overall Contract duration shall not result in any additional cost to the Government.

g. Prior to undocking the vessel, the Contractor shall notify the COR and the master of the vessel.

Notification shall be provided a minimum of twenty-four (24) hours prior to undocking.

h. When undocking the vessel, all interior spaces and systems affected by work performed under this Contract shall be inspected for leakage, watertight integrity and/or seaworthiness by the Contractor and witnessed by COR or designated Government Representatives onsite.

TP 1.02 Rudders

The Contractor shall furnish all labor and material to perform the following work on the rudders:

a. Remove the access plates and drain plugs on the two (2) rudders and allow the rudders to drain.

b. Remove the lock bars, nuts and washers at the end of the rudder stocks, and then remove rudders from rudder stocks.

c. The Contractor shall pressure test the rudders in the presence of the COR to ensure that there are no leaks. The Contractor shall coordinate with the COR prior to the test to determine what pressure and medium should be used for the test.

d. Fill rudders with rust preventative compound conforming to MIL-C-16173, latest revision, such as

Corrosion Proof Compound AMD2, Grade 3, by the Ashland Oil Company, Russell, KY, or approved equal, drain the rudders and reinstall drain plugs when all drainage stops.

e. Re-install rudders by means of re-securing keys, washers, nuts, lock bars, new Contractor furnished neoprene gaskets and access plates.

The rudders are shown in the Contract drawing 351-H400-0001 – Rudder & Rudder Stock Details.

TP 1.03 Propellers

The Contractor shall remove and replace the port and starboard propellers with Government furnished spares. The propellers are 4 blade 64"D x 52"P. Any removed propellers are the property of the Government. The Contractor shall remove the rudders prior to removing the propellers. The Contractor shall hone and blue-fit test the propellers to the shafts to produce a minimum of 80% contact between the propeller inner bore and the propeller shaft. The Contractor shall demonstrate the propeller fit to the representatives of ABS, USCG, and the COR. The Contractor shall clean and reuse the old fairwater nuts replacing any damaged or missing screws at his/her expense. Bidders shall quote a unit price per propeller replaced, both propellers will be replaced.

TP 2.01 Propeller Nuts

The Contractor shall fabricate and install two (2) new propeller nuts and fairwater caps for the vessel. The new propeller nuts shall be fabricated from Stainless steel. Each nut shall be Four (4) inches deep, and shall be cut for a 4 inch diameter thread with 4 threads per inch.

(End of Summary of Changes)