This document provides an amendment to a solicitation for maintenance dredging of Bay Ridge and Red Hook Channels in New York. The amendment responds to questions from bidders by clarifying details of the project. It revises the label on a plan sheet and notes that side slopes are required to be cleared to the specified template. The responses do not change any other aspects of the solicitation.
The related federal contract opportunity outlines a solicitation for maintenance dredging of the channels to remove approximately 850,000 cubic yards of material. A mechanical clamshell dredge will be used to dredge the material, which will then be placed at a designated ocean site using bottom-dumping barges and tugs. The work must be completed by fall 2021 at a rate of at least 8,000 cubic yards per day. Liquidated damages of $2,231 per day will be assessed for delays. Bids are due around June 17, 2021. The opportunity is posted on SAM.gov and will be awarded using sealed bidding procedures by the US Army Corps of Engineers, New York District.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
-- ProvIde the Government's responses to Requests for Information (RFI). This is for INFORMATIONAL PURPOSES ONLY.
-- Revise the label in Sheet 2 of the Plans from “PAYABLE SIDE SLOPE MATERIAL" to “REQUIRED SIDE SLOPE MATERIAL”. This sheet is posted on SAM as a separate file.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0011
X 9B. DATED (SEE ITEM 11)
01-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jun-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS21B0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s).
Questions and answers are issued to the Offerors “FOR INFORMATION ONLY” and do not revise the solicitation, plans, or specifications.
Q1. The previous dredging project in Bay Ridge Channel in 2014 (Solicitation No. W912DS- 14-B-0016) had a dredging depth of -34’ MLLW with 2’ of allowable overdepth, while the current project has a required depth of -35’ MLLW with 2’ allowable overdepth.
Please advise if maintenance dredging of the current dredge area has been performed to a depth of -35’ MLLW before.
A1. The Bay Ridge and Red Hook Channels were historically constructed, and maintenance dredged to 40 feet since the 1930’s.
Q2. Please make available any as-built drawings showing that the Bay Ridge Channel has been deepened to -37’ MLLW or deeper before to confirm that material required to be dredged on this project is shoaled material and does not contain any new work deepening.
A2. There are no past as-built drawings available.
Q3. Has maintenance dredging been performed over the BEC cable located in the dredge area previously? If so, please make available any as-built surveys of the area.
A3. No, previous maintenance dredging has not been performed over the BEC cable located in the dredge area.
Q4. The As-Built drawing of the BEC1 Utility cable provided on PDF Page 103 of the Specifications shows a large concrete obstruction between stations 18+00 and 19+00 of the cable run. The red profile line (BEC 1 Profile and Burial Depth) shows that the BEC cable reaches a depth of only -38’ MLLW in this area, while the diver investigation (blue dots) showed the cable depth to be between -45’ and -50’ MLLW.
Please clarify the current cable depth of the BEC 1 Utility cable between stations 18+00 and 19+00 as shown on the as-built drawings provided in the specifications.
A4. Please refer to PDF Page 129 thru Page 142 in Section 00 90 01 of the specifications, letters dated August 24, 2011 and August 15, 2011.
W912DS21B0011
Please Note: Per Section 01 30 00 Paragraph 1.2 entitled SUBMITTALS in the specifications, the apparent low bidder is required to coordinate with the utility owner(s) to provide the BEC Utility Location Map and Coordinates as part of their preconstruction submittals.
Q5. If the BEC utility cable is indeed at a depth of only -38’ MLLW for a portion of the utility corridor, we suggest that the Government either reduce the required grade for this area or remove this dredge area from the project as it creates a significant hazard to safety.
A5. A determination will be made once the apparent low bidder’s preconstruction submittals have been accepted by the Government.
Q6. Please confirm that the +/- 65 foot wide “no spud/anchoring zone” is applied from the center cable only (BEC 2) and not from the north and south cables (BEC 1 and 3).
A6. Yes, the +/- 65 foot wide “no spud/anchoring zone” is from the center cable (BEC
2) only.
Please Note: The location of the center cable is APPROXIMATE ONLY. Once the apparent low bidder confirms the exact location, the +/- 65 foot wide no spud/anchoring offset must be applied to the confirmed exact location of the centerline.
Q7. Are side slopes required to be cleared to the side slope template? Sheet 2 of the Plan Drawings indicates that the side slope material is “payable” but is not labeled as “required” like the channel dredging template.
A7. The side slopes are required to be cleared to the side slope template. Attached is the Bay Ridge and Red Hook Channels Maintenance Dredging Plans Sheet 2, amended to reflect as such.
This amendment does not change any other parts of the solicit