W912DS18T0013_Amendment-0004.pdf
PDF 519 KB Posted
- Attached to
- Hocking Shipyard Services Federal contract opportunity
- Solicitation number
- W912DS-18-T-0013
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DS18T0013_Amendment-0003.pdf | ||
| Response_to_Industry_Questions_for_RFQ_W912DS.pdf | ||
| Photos.pdf | ||
| W912DS18T0013_Amendment-0002.pdf | ||
| Amendment_0001.docx | DOCX document | |
| Solicitation.pdf | ||
| APPENDIX_B_-_Hocking_Anode_Locations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide amended price proposal scheldule
2. Extend the due date for quotations to 29 August 2018 at 2:00pm et.
3. Provide questions and answ ers, for informational purposes only.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS18T0013
X 9B. DATED (SEE ITEM 11)
02-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2018
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS18T0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004_ PRICE PROPOSAL
Hocking Shipyard Repair Services Proposal Schedule
PRICE PROPOSAL SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 4 Definite Items - Structural
FFP
FOB: Destination Work items consist of 1.01 through 1.04
NET AMT
0002 11 Definite Items- Machinery
FFP
Works items consist of 2.01 through 2.11
0003 5 Indefinite Items - Structural
FFP
Work items consist of 1.05 through 1.09
0004 7 Indefinite Items - Machinery
FFP
Works items consist of 2.12 through 2.18
CLIN 1: Definite Items - Structural
1.01 Drydocking
1.02 Exterior Cleaning and Painting
1.03 Interior Cleaning and Paining
1.04 Hull Anodes
CLIN 2: Definite Items - Machinery
2.01 Propeller Shaft Bearing Clearances
2.02 Propeller Shaft Runout Readings
2.03 Shaft Extraction
2.04 Rudder Stock Bearings
2.05 Sea Valves
2.06 Deck Vents
2.07 Propellers
2.08 Replace Port Main Engine Silencer
2.09 Replace Worn Exhaust Blankets
2.10 Replacement of Propeller Shaft Seals
2.11 Boiler Stack Removal and Replacement
CLIN 3: Indefinite Items - Structural
1.05 Bilge Water Disposal
1.06 Rudder Removal, Cleaning, and Re-installation
1.07 Paint Exterior Main Deck
1.08 Metalwork
1.09 Welding Seams
CLIN 4: Indefinite Items - Machinery
2.12 Renewal of Deck Vent Stems
2.13 Removal of Deck Vents
2.14 Propeller Shafts
2.15 Propeller Shaft Bearings
2.16 Rudder Stocks
2.17 Rudder Bearings
2.18 Replacement of Sea Valves
GRAND TOTAL $
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Aug-2018 04:00 PM to 29-Aug-2018 02:00 PM.
(End of Summary of Changes)
AMENDMENT 4 - Q&A
Q&A
The following are responses to questions from interested vendors, and are provided for informational purposes only.
Q1. Clarification requested on TP1. Item # TP1.02 states that the main deck will be roughed up and item # TP1.07 is asking to sandblast the main deck.
A1. TP 1.02 should include roughing up and painting from the gunnel to the keel only.
The main deck will be sandblasted and painted under indefinite item TP 1.07, should we choose to activate it.
File details come from the government source that posted it.