Design_Narrative_VA_Albany_Parking_Garage.pdf

PDF 43 MB Posted

Attached to
Samuel S. Stratton Department of Veterans Affairs Medical Center Parking Garage, Albany, NY
Solicitation number
W912DS18R0020
Issued by

About this file

Design narrative

View the file

Other files

File Type Posted
W912DS18R0022.pdf PDF
Drawings_VA_Albany_Parking_Garage.pdf PDF
Specifications_VA_Albany_Parking_Garage.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Build Solicitation for the

Stratton Veterans Affairs Medical

Center Garage Albany, New York

VA Project Number 528-810 July 1, 2018

United States Army Corps of Engineers New York District 26 Federal Plaza

New York, NY 10278

Table of Contents

1. General Information

2. Civil

3. Utilities

4. Earthwork

5. Architectural

6. Structural

7. HVAC

8. Electrical and Communications

9. Fire Protection

10. Plumbing

11. Whole Building Commissioning

12. Specifications

13 Appendix

13.1 Concept Drawings (under separate cover)

13.2 Topographic Survey

13.3 Geotechnical Survey

13.4 Soil Testing

1.0 General Information

1.0.1 The Design Build Contractor (DB) shall prepare complete construction documents for all work to be constructed. The construction documents to be prepared include, but are not limited to construction drawings, specifications, submittals, design analysis and calculations in conformance with this Request for Proposal and as required in Section 01 33 16 DESIGN AFTER AWARD. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment as identified in the standard unedited Unified Facilities Guide Specifications (UFGS). If specific materials are not identified in the UFGS then the DB will use materials accepted within the construction industry and in compliance with Design Criteria.

1.0.2 Although the Appendix contains concept drawings, this is a design build project requiring a complete, independent design by the Design-Build Contractor and these drawings are not to be used to absolve the successful Design-Build Contractor of conducting a thorough site investigation or of their design responsibility and the completeness of the design and constructed project. The Contractor shall develop a complete design, including professionally stamped sealed drawings, specifications and engineering calculations by a professional architect and/or engineer licensed in New York State.

1.0.3 The project shall be designed in accordance with the RFP. The design of the building and the materials selected shall be appropriate, high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the designs and construction are based.

1.0.4 The Design/Build Contractor will prepare the DD1354 IAW UFC 1-300-08 Criteria for Transfer and Acceptance of Military Real Property (submittal register). Instructions for using the Resident Management System (RMS) will be provided by USACE NYD. The form entitled “Transfer and Acceptance of Military Real Property (DD Form 1354)” complete with Checklist Instructions and instructions for the DB/C to complete these forms is available through www.wbdg.org.

1.1 Standards, Documents and Criteria

These design instructions shall be deemed the controlling authority where any differences exist with referenced documents and criteria. Designers should notify the Contracting Officer’s Representative of design issues when differences exist that may result in non-compliance with standards, applicable codes and regulations.

1.2 Codes:

The designs, materials, equipment and installation shall be in accordance with the requirements of the listed codes and design manuals, with the listed specifications and the instructions of this document.

Life safety, building classification and construction shall be in accordance with the more stringent of the most current versions of NFPA 101 and the International Building Code (IBC), as modified by United Facility Criteria (UFC) 1-200-01 “General Building Requirements”.

1.3 General Project Description:

The complete design and construction of a new parking garage with four floors accommodating approximately 185 parking spaces, 18 of which shall be handicap accessible (1 in 6 must be van accessible). The existing parking lot has 52 handicapped accessible parking spaces which must be replaced in total through additional accessible spaces in the garage or on the ground of the remaining parking lot. The intent is the Design Builder may include more than 18 HC spaces in the garage at their discretion, but 52 total HC spaces must be provided to replace those displaced by the project.

The garage will consist of two sloped ramps (“bays”) not exceeding 5.5% slope and nominally flat “bay” end areas all to accommodate two way traffic (24 feet wide) and perpendicular standard parking stalls of 9 foot by 18 foot 6 inch dimension. Minimum clearance heights for handicapped van parking must be maintained for routes to and from and for areas containing “HCP VAN” parking spaces.

The garage shall have the foundation, structure and utilities designed to accommodate three (3) future stories. The design shall have an elevated, enclosed walkway (i.e., bridge) between the garage and the main hospital building’s third floor with adequate clearance beneath the bridge to accommodate emergency vehicle and truck traffic. Slope of the bridge walking surface may not exceed 2% grade.

The project shall include the requirement to lease temporary parking space and provide shuttle transportation from temporary parking area(s) to the Medical Center, to replace 168 parking spaces displaced during construction.

The project will create this government facility with industry-accepted construction affording normal maintenance (i.e., annual wash down of garage floors, weekly cleaning of bridge floors, seasonal glass cleaning, periodic elevator inspection and maintenance, annual testing of special systems…) and repair cycles of an appropriate commercial level of quality (i.e., seven years for traffic paint and sealants, annual HVAC filter changes…), to ensure continued beneficial use over an anticipated 50 year life span.

1.4 Off-site parking and shuttle service:

The Design Builder shall provide off-site parking for 168 vehicle spaces displaced during the construction of the new garage during the entirety of that displacement. The Design Builder shall also provide a shuttle service to and from the off-site parking and Stratton VAMC during that same period of parking displacement for VA staff using the off-site parking.

It is required that the shuttle service provide transportation to and from the Stratton VMAC in a timely fashion so that a maximum of 30 minutes is necessary for a user, once parked and arriving at the off-site parking pickup area, to be conveyed to the Stratton VAMC or for a user to arrive at the designated pick up location at the Stratton VAMC and be conveyed to the off-site parking area.

The shuttle should operate from 0700 -1800 hrs., Monday through Friday. Peaks are 0700 - 0830 hrs.

and 1600 - 1700 hrs. with almost all the personnel arriving or departing during the peak times.

The shuttle service shall accommodate peak personnel loads at shift changes within the designated 30 minutes maximum as well as provide a regularly scheduled conveyance of staff between the hospital and off-site parking during shifts. This regular schedule for the shuttle shall accommodate staff access to their vehicles in the event they require access from the hospital or access from parking to the hospital at other than shift changes.

The shuttle service shall provide a notification system, a means to provide current arrival and departure times reflecting actual “live” conditions available to the off-site parking users. The notification system may include electronic boards posted at the off-site parking and hospital loading areas or mobile device applications or mobile device postings made freely available to the users and VAMC. Shuttle tracking may include GPS positioning, automated or manual tracking and information posting.

The off-site parking accommodates VA staff working a Stratton VAMC. In the event the 30-minute maximum travel time is exceed a delay in staff coverage may occur. Delays in staff coverage may, in turn create a need for staff overtime to accommodate delays in staff arrivals. Additionally, delay in conveying staff to their vehicles at the end of shifts can unnecessarily inconvenience them and potentially financially impact them. In the event the maximum travel time is exceeded a liquidated damage amount will be assessed the Design Builder as follows:

Liquidated Damages for Exceeding the Max 30 minute Travel Time will be determined based on:

2/3 of the personnel on the shuttle will be nurses. Nurses on duty can't leave until their replacement arrives. If a staff replacement is late, the VA must pay them overtime at an average rate of $41 per hour. It is assumed that no one will be more than 1 hour late.

To determine the cost to the VA and the damage to be assessed:

(2/3)(168)($41) = $4,587. Say $4,600 for the maximum daily penalty to be applied as determined by VAMC.

1.5 Bid Options

Refer to the bid forms for cost line item numbers. The base bid includes all options. Bidding options shall be deductions from the basic scope of work and include:

1.5.1 Overhead bridge from parking structure level 4 to the Stratton VAMC third floor. Scope of this option includes bridge foundations, vertical supports, bridge assembly, mechanical, electrical and fire suppression/detection, plumbing, access and egress doors, demolition at existing building connection and finishes. Exterior door opening at elevator level 4.0 shall be infilled with glazing assembly to match adjacent wall area.

1.5.2 Parking tier 3.0 and parking ramp to level 2.5. Scope of this option includes structure, deck, under deck lighting, exterior spandrels, fencing and ingress doors to elevator lobby at level 3.0. Doors to be replaced with store front glazing to match adjacent enclosure. Light standards and pole mounted lighting shall be installed at level 2.5 to 2.0 ramp.

2.0 Civil

2.1 Site Location:

The parking facility will be sited on an existing parking lot of the Stratton Veterans Affairs Medical Center, Albany, New York property.

2.2 Facility Layout:

2.2.1 Concept drawings are provided in the Appendix. Final facility design will be developed by the Design Builder during a design charrette with representatives of the USACE and Stratton VAMC. Any proposed changes from the concept site layout shall be submitted for review and approval in accordance with the requirements set forth in Section 01 33 16 DESIGN AFTER AWARD.

2.2.2 Design Builder Staging Areas and Haul Routes shall be established with the Contracting Officer’s Representative (COR). Construction sites shall be kept neat and free of trash. Construction sites shall be surrounded by a screened 6-foot high FE-6 chain link fence or a COR approved equal. It shall separate construction traffic from daily personnel traffic. The construction fence shall be required to shield the view of construction.

2.2.3 Design Builder’s Use of Site - The DB is free to utilize all areas within the proposed staging and parking limits indicated on the drawings as required for laydown, offices, parking and storage facilities.

The DB must construct new facilities, or return areas to original condition or better. Any damage to existing improvements adjacent to or on the project site due to construction activity under this contract shall be replaced or repaired at the Design Builder's expense.

2.3 Site Preparation:

Site preparation shall include, but not be limited to the demolition of pavement, removal of an existing bus stop shelter, removal and /or relocation of existing utilities, earth work to establish the building pad and site improvements’, desired elevations and other items as indicated.

2.3.1 Excavated materials:

Excavated materials shall be separated to satisfactory and unsatisfactory soil materials in accordance with the Unified Soil Classification System and compaction efforts shall be specified by ASTM standards.

Surplus satisfactory materials and unsatisfactory materials as defined by the geotechnical engineer of record including, but not limited to rock, concrete, asphalt, metal, refuse and organics, shall be the property of the Design Builder, removed from the site and legally disposed of. All costs in connection with borrow material and disposal of materials shall be at the Contractor's expense. All liability of any nature resulting from borrow operations including transportation of, and those resulting from disposal of material shall be the responsibility of the Contractor.

2.3.2 Design Builder’s Storage Yard:

The storage yard shall be located at the site as shown.

2.3.3 Survey Controls:

Recoverable concrete monuments shall be installed and used by the Design Builder for facility construction layout. When the controls are established the Design Builder shall indicate their locations on the working construction documents and maintain them.

2.4 Storm Water Management Systems:

2.4.1 Drainage:

Slope grade away from the building exterior to maintain positive drainage.

2.4.2 Storm Runoff:

Storm runoff shall be calculated by the Rational Method defined in HDS-4. Any collection and closed piping system deemed necessary shall be designed for the 10-year storm frequency. Infiltration methods shall be used to the greatest extent possible.

2.4.3 Existing/new Storm Drainage, Storm water Mitigation, Erosion and Sediment Control:

The site is developed and drains by a combination of storm water structures and surface sheet drainage.

Comply with Article 17 of the New York State Environmental Conservation Law; Title 6 Part 750 of New York Codes, Rules and Regulations; and the current New York State Pollution Discharge Elimination System Permit. The design of new drainage features shall be completed and stamped by a New York State Registered Professional Engineer.

2.5 Site Engineering:

2.5.1 Existing Topographic Conditions:

Verify existing conditions, including but not limited to existing conditions features, one foot topographic lines and all existing utility information including type, size, horizontal location, vertical depth and slopes.

2.5.2 Existing Geotechnical Conditions:

See Appendix “Report of Subsurface Exploration and Geotechnical Engineering Evaluation for the Proposed Parking Garage, VA Medical Center, Albany, New York”.

2.5.3 Foundation Analysis Design:

Design Builder shall prepare a Foundation Design Analysis (FDA) including narrative, data presentation and calculations. The FDA shall be prepared as an individual document to be included as an attachment to the design submissions. All findings from geotechnical explorations, testing, design, and analysis shall be reported in the FDA.

2.6 Pavement Engineering:

2.6.1 Pavement Design:

All roads, drives and parking areas shall be designed using H-20 load rating as the minimum design standard. Pavement shall be additionally designed to accommodate the load of the City of Albany aerial fire apparatus including outrigger loads. Pavement design life should be 20 years. Roads, drives and grade level parking areas shall consist of hot mix asphalt (HMA) concrete pavement. HMA pavement sections shall consist of the following layers at a minimum but not less than that required for H-20 loading:

• 1 ½ inch bituminous top course (NYSDOT Item #403.170, Type 7F);

• 2 ½ inches bituminous binder course (NYSDOT Item #403.170, Type 3);

• 12 inches of 95% compacted, grades aggregate base course (NYSDOT Item #304.12, Type 2);

• Geotechnical membrane over compacted subgrade.

• 24 inches minimum 90% compacted prepared subgrade.

2.6.2 Pavement Connection of New Pavement to Existing Pavement:

A straight line saw cut of the wearing top course of existing pavement a minimum of 6 inches beyond the vertical cut of the binder asphalt course and granular base course to create a lap of the new wear course over the existing binder course.

2.6.3 Parking Areas:

All parking areas (surface and elevated floors) must comply with the Architectural Barriers Act (ABA) latest edition. The standard for off-street parking requires a minimum dimension of 9 feet by 18’-6” for vehicles. A 90 degree “perpendicular” layout is preferred.

2.6.4 Traffic Signage, Pavement Marking and Informational Signage:

2.6.4.1 Provide traffic signage per the Manual of Uniform Traffic Control Devices (MUTCD), latest edition and 17 NYCRR Chapter V (New York State Supplement).

2.6.4.2 Mark pavement as indicated utilizing Pavement Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with FS TT-P-1952, with drying time of less than 3 minutes.

Color: White. Glass Beads: AASTO M 247, Type 1.

2.6.4.3 Provide informational signage indicating vehicle paths, egress paths, exiting, floor designations, overhead clearance, handicapped parking signs, elevator use and user orientation.

2.6.4.4 Provide illuminated sign marking vehicle entrance as “PARKING” utilizing a minimum of 8 inch high aluminum letters Provide internal illumination using concealed, internally wired, fluorescent-strip fixture system to illuminate message panels uniformly with minimum halation and without light leaks. Make provisions for servicing from the back and for concealed connection to electric service. Coordinate electrical characteristics with those of power supply provided.

• LED: Provide number of fixtures required by sign-panels size.

• Controls: Provide sign mounted photoelectric sensor for turning lights on and off.

3.0 Utilities:

3.1 Existing Field Information:

See Appendix for site topographic and utility survey.

3.2 New Utilities:

All new utilities will tie into existing utility systems. Marker tape and tracer wire will be used for all underground utilities with the exception of no tracer wire over electrical conduit. Underground utilities and other structures shall be designed to HS-20 DOT loading conditions.

3.3 Water:

Any connection to the potable water supply for temporary construction purposes and/or permanent service must be protected by an approved backflow device (RPZ) supplied by the Design Builder. The device is to have a current inspection which must be maintained as current certifications. A flow meter at temporary construction connections is also required to monitor water use for billing purposes.

4.0 Earthwork

Cut and fill: Site grading shall blend into the existing topography to the greatest extent permitted while retaining the functionality of the new facility, impacted adjacent parking lot, roads, drive lanes, walks and landscaping. Any fill brought on site shall come from a source with a valid New York State mining permit.

5.0 Architectural

5.1 Code and Fire Safety Analysis:

The jurisdiction having authority is Veterans Affairs VISN-2. Refer to UFC 3-600-01 for applicable International Building Code use and special requirements. The Design Builder shall submit a complete Life Safety Plan and Code Analysis indicating, at a minimum, the locations of all necessary fire doors, fire walls, fire partitions, egress routes, egress travel distances, occupancy use, construction type and ratings of building elements. The design shall meet ABA requirements.

The parking structure will be reviewed and assigned a Risk Category as described in ASCA 7-10. The Risk Category and resultant design load calculations shall be shown in the Code Review and Fire Safety Analysis submission.

The pedestrian bridge will be designed in accordance with AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges.

5.2 Materials and Systems

5.2.1 Materials and Colors

Exterior Feature Color Brick Match primary field brick of the Medical Center Concrete Light grey for cast in place; white for precast wall elements Aluminum curtain wall 2-Coat Fluoropolymer to match Glidden 40YY 48/048 “Grey

Expectations” Aluminum Entrance Doors 2-Coat Fluoropolymer to match Glidden 40YY 48/048 “Grey

Expectations” Glass Clear Spandrel Glass Opaque grey Hollow Metal Door and Frames Glidden 40YY 48/048 “Grey Expectations” Standing Seam Metal Roof Glidden 20YY 22/059 “Grey Tweed” Metal wall panels (bridge) Color to be selected from manufacturer’s standard colors.

Louvers Color to match Glidden 40YY 48/048 “Grey Expectations” Fencing 2-Coat Fluoropolymer to match Glidden 40YY 48/048 “Grey

Expectations” or dark grey vinyl clad Sealants adjacent to concrete Light grey adjacent to curtain wall and metal door frames Dark grey adjacent to brick Match brick (mid-beige)

5.2.2 Masonry

5.2.2.1 Concrete Masonry Units: ASTM C 90. Provide units made with integral water repellent.

1. Unit Compressive Strength: Provide units with minimum average net-area compressive strength of 1900 psi (13.1 MPa).

2. Weight Classification: Normal weight, unless otherwise indicated.

3. Size (Width): Manufactured to dimensions 3/8 inch less than nominal dimensions.

5.2.2.2 Thin Brick Masonry Built into Precast Panels: Provide thin brick masonry units cast into the panels by the Precast Manufacturer. These units shall conform to Type TBX of ASTM C1088. The back side of thin brick must have a keyback, dovetail or grooved back to provide bond to concrete. Use 4” by 12” nominal brick ½” thick having color and texture matching the brick of the adjacent hospital building.

5.2.2.3 Brick Masonry for stair and elevator towers shall be Facing Brick SW, Type FBX, nominally 4” by 12” by 4” thick meeting ASTM C216 having color and texture matching the brick of the adjacent hospital building.

5.2.3 Concrete shall be a minimum of 5000 psi and air entrained for exterior exposure. All finish floors shall be within 1/8 inch tolerance over 10 feet for level surfaces and within 1/8 inch tolerance for sloped surfaces. After all bleed water has evaporated from the surface of horizontal cast in place concrete surfaces float to finish floor level and steel trowel. After the concrete has set sufficiently to carry the workmen’s weight, saw cut control joints and broom finish perpendicular to the traffic surface. After the curing period recommended by the manufacturer, mix and apply concrete floor hardener in two or three coat applications. Place sealer complying with ASTM C309 on concrete floors.

All sidewalks shall be 4 inches thick unless intended for use by service vehicles which shall be 6 inches thick and reinforced. All sidewalks shall be 6 feet wide for snow removal operations.

5.2.4 Vapor Barriers:

A vapor barrier shall be provided on the warm side of all surfaces separating heated from non-heated spaces. Provide a ten mil, reinforced polyethylene sheet vapor barrier under all concrete slabs on grade.

5.2.5 Air Barriers:

Provide an air barrier on the exterior of the bridge wall system, such that the air barrier is continuous across all openings (sealed to window and door frames) and extending from underside of floor, up wall, across roof assembly, down wall and across underside of floor assembly. Acceptable air barriers may be applied as sheet goods or sprayed in place. Air barriers shall be vapor non-permeable, and are not required when spray foam insulation is used. Under alternate construction types, air barriers shall be vapor permeable. The building shall meet the air barrier requirements as defined in the current edition of the New York State Energy Code.

5.2.6 Aluminum Curtain Wall

Commercial grade, frame depth of 6 inches sized and reinforced, as necessary, to resist lateral load requirements with angle clip joint construction. All fasteners shall be aluminum and/or stainless steel and concealed by the framing system. System shall meet ASTM E 330 testing requirements.

5.2.7 Aluminum Entrance Doors, Frames and Hardware:

5.2.7.1 Extra heavy duty, commercial grade, aluminum glazed doors, frames and hardware are required.

Extra heavy duty frame series, wall thickness of .188 inches, frame depth of 6 inches with angle clip joint construction. All fasteners shall be aluminum and/or stainless steel and concealed by the framing system. Door heights shall be 7’-0”.

5.2.7.2 Locks shall be supplied with Best Mortise Cylinders or equal (Arrow and Falcon) to integrate with the Medical Center’s existing lock system. Locks shall be provided with interior paddle releases to permit exiting when the garage egress doors are locked. Doors shall be keyed alike and three (3) sets of keys for each door shall be provided to the VAMC. Coordinate keying requirements with the VAMC and Contracting Officer.

5.2.7.3 Hinges shall be tamper proof continuous geared type and comply with ANSI A5111.

5.2.7.4 Door closers shall be heavy duty, overhead type with hold open capability ANSI/BHMA A156.4 Grade 1.

5.2.7.5 Pushes and pulls shall comply with ANSI A156.6 J304/J305.

5.2.7.6 Flush bolts and Dust Proof Strikes shall comply with ANSI 156.16.

5.2.7.7 Thresholds, Weather Stripping and Sweeps shall comply with ANSI A156.21.

5.2.7.8 Standard finish for hardware is satin chrome USD 26.

5.2.7.9 Provide powered handicapped accessible door operators for primary entrance doors and bridge doors.

5.2.8 Glass

Glass shall be solar-control low-e-coated, clear laminated, sized to accommodate unit size and lateral loads and comply with ASTM E 1300. Stair and elevator tower glazing may be single pane units. Bridge glazing shall be nominally 1 inch insulated units complying with ASTM E 774 with a maximum Summer Daytime U-Factor of 0.38.

5.2.9 Insulated Metal Wall Panels

Exterior bridge walls shall be foam-core insulated, composite metal panels (R-38) with nominally flat surfaces. Steel wall panel assembly shall be fabricated from two, minimum 26 gauge, galvanized sheets with closed-cell polyisocyanurate or polyurethane foam insulation core with joints between panels designed to form weather tight seals.

All panels shall be coil coated and receive a factory applied polyvinylidene fluoride Kynar 500/Hylar 5000 finish consisting of a baked on top-coat over a manufacturer’s recommended prime coat. Panels shall have a manufacturer’s 20 year warranty for delamination and finish performance.

5.2.10 Roofing

5.2.10.1 Sloped Standing Seam Metal Roofing (SSSMR) – Stair towers.

5.2.10.1.1 1 ½ inch standing seam, coil coated, galvanized metal roofing compliant with ASTM E 1514.

Finish shall be 2-Coat Fluoropolymer: AAMA 621 with a 20 year finish warranty. Minimum metal thickness of 22 gauge. Slide clip attach metal roofing panels to structural deck over a self-adhering, high-temperature sheet: 30 to 40 mils (0.76 to 1.0 mm) thick minimum, consisting of slip-resisting, polyethylene-film top surface laminated to layer of butyl or SBS modified asphalt adhesive, with release-paper backing; cold applied.

5.2.10.1.2 Provide components approved by roof panel manufacturer and as required for a complete metal roof panel assembly including trim, copings, fasciae, corner units, ridge closures, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal roof panels.

5.2.10.1.3 Provide two-pipe snow retention system (“fences”) utilizing two mini clamps for attachment to the standing seams of sufficient design to hold snow from sliding off of roof.

5.2.10.2 Single Ply Roofing - bridge

5.2.10.2.1 Minimum ½ inch per foot sloped, fully adhered, single ply white 60 mil EPDM membrane over mechanically fastened polyisocyanurate insulation and ½ inch “recovery” board. Provide crickets and edge washes create by tapered insulation to assure positive drainage to roof drains. The R-60 roof system shall have a 20 year material and non pro-rated, no leak warranty.

5.2.11 Vinyl Composition Tile (VCT):

Bridge floor finish shall be 12”-inches x 12-inches x 1/8-inch thick type VCT. Federal Specification: ASTM F 1066. Seal and wax all vinyl composition tile prior to substantial completion. Use 2 coats of sealer and 2 coats of wax in accordance with the manufacturer’s instructions.

5.2.12 Gypsum Board Ceiling Finish:

Provide wet area rated, painted gypsum board ceilings in bridge. Gypsum ceilings shall have a smooth texture. Finish all gypsum board surfaces to a Level 4 finish, as defined by “GA-214-90, Levels of Gypsum Board Finish”.

5.2.13 Painting:

Painting practices shall comply with applicable Federal, State, and Local laws enacted to insure compliance with the Federal Clean Air Standard. At the time of application, paint shall show no signs of deterioration. Uniform suspension of pigments shall be maintained during all applications. Unless otherwise specified or recommended by the paint manufacturer, paint may be applied by brush, roller, or spray. Rollers for applying paints and enamels shall be of a type designed for the coating to be applied and the type of surface to be coated. Paints, except water-thinned types, shall be applied as recommended by the paint manufacturer for the particular surface.

5.2.14 Louvers

Weather resistant drainable type, of extruded aluminum, with bird screens. Louvers shall be made to withstand wind loads of 100mph and exposure D. They shall bear the AMCA certified ratings program seal for air performance and water penetration in accordance with AMCA 500 and AMCA 511. The ratings shall show a water penetration of less than .11 pounds per square yard. Proposed color of louvers shall be included in color boards.

5.2.15 Stairs and Railings

Stairs and landings shall be designed to support 100 psf minimum live load and 300 pound point load at any location. Treads shall have slip resistant nosings. Railing systems shall be epoxy coated galvanized steel, aluminum or stainless steel.

5.2.16 Parking Equipment

5.2.16.1 Attendant’s Booth shall be a handicapped accessible, preassembled, nominally 5’-11” wide by 8’-7” long insulated, lighted, heated and air conditioned enclosure. Exterior envelope shall be a minimum 14 gauge epoxy painted, galvanized metal exterior panels, 4 inch rigid polyurethane insulation and minimum 18 gauge galvanized metal interior panels. Glazing shall be tempered or laminated safety glass set in removable interior glazing stops. A horizontal sliding, weather stripped window shall be included. Door shall be 36” wide sliding, epoxy painted, galvanized and insulated steel similar to the exterior wall assembly with weather stripping, ball bearing hangers, safety glazing, hook bolt lock and hardware. Booth shall have an interior counter and storage drawer. Counter shall accommodate drop cords through a counter opening. Booth shall be prewired and have a duplex outlet, lighting and switching devices. A factory installed 100 amp breaker panel with branch breakers shall be provided.

5.2.16.2 Lift Gates shall be barrier arm operators designed for single lane vehicular traffic control for high traffic commercial and industrial applications. The operator to be equipped with a DC convenience open package that will automatically raise the arm in the event of a power outage and include:

• Automatic sequencing inputs.

• Up input memory buffer.

• Down memory option.

• Multiple up commands.

• Gate tracker reporting output.

• Programming switches.

• Built-in power On/Off switch.

• DC powered convenience open.

• Arm folding bracket for low headroom.

• Foam padding for arm.

• Plug-in loop detectors.

• Surge suppressors

5.2.17 Anti-climb Fencing and Gates

5.2.17.1 Material: Steel material for fence framework (i.e. tubular pickets, rails and posts), shall be galvanized prior to forming in accordance with the requirements of ASTM A653/A653M, with minimum yield strength of 45,000 psi (310 MPa). The steel shall be hot-dip galvanized to meet the requirements of ASTM A653/A653M with a minimum zinc coating weight of 0.90 oz/ft2 (276 g/m2), Coating Designation G-90.

Material for pickets shall be 1” square x 14 Ga. tubing. The cross-sectional shape of the rails shall conform to the manufacturer’s design with outside cross-section dimensions of 1.75” square and a minimum thickness of 14 Ga. Picket shall be spaced 4.7” o.c. +/- to maintain a maximum clear spacing between pickets of 4”. Picket retaining rods shall be 0.125” diameter galvanized steel. High quality PVC grommets shall be supplied to seal all picket-to-rail intersections. Fence posts and gateposts shall meet the minimum size requirements established by the fence manufacturer for the code required applied loads.

5.2.17.2 Fabrication

Pickets, rails and posts shall be precut to specified lengths. Pickets shall be predrilled to accept retaining rods. Tops of pickets shall be pointed to discourage climbing.

Grommets shall be inserted into the holes in the rails and pickets shall be inserted through the grommets so that predrilled picket holes align with the upper rails. Retaining rods shall be inserted into each rail so that they pass through the predrilled holes in each picket.

The manufactured galvanized framework shall be subjected to a coating process (high-temperature, in-line, multi-stage, multi-layer) including, as a minimum, a multi-stage pretreatment/wash, an electrostatic spray application of an epoxy base, and a separate electrostatic spray application of a polyester finish. The base coat shall be a thermosetting epoxy powder coating (gray in color) with a minimum thickness of 2 mils (0.0508mm). The topcoat shall be a “no-mar” TGIC polyester powder coat finish with a minimum thickness of 2 mils (0.0508mm).

Completed sections (i.e., panels) shall be capable of supporting a 600 lb. load applied at mid-span without permanent deformation. Panels shall be biasable to a 25% change in grade.

Sliding gates shall be fabricated using channel rails sized for the spans, 2” sq. x 12ga. gate ends, and 1” sq. x 14 ga. pickets. Gates that exceed 6’ in width will have a 1.75” sq. x 14ga. intermediate uprights. All rail and upright intersections shall be joined by welding. All picket and rail intersections shall also be joined by welding. Gusset plates will be welded at each upright to rail intersection. Cable kits will be provided for additional trussing for all gates leaves over 6’. Sliding gate hardware and key operated locking mechanisms shall be provided.

5.2.17.3 Grounding

Fence system shall be grounded to meet UL 96A Standard.

5.2.17.4 Accessories

Accessories as necessary caps, rail and brace ends, wire ties or clips, braces and tension bands, tension bars, truss rods, rollers, fasteners, trolleys and guide rails. Arrange latches for locking so that lock will be accessible from both sides of the gate regardless of the latching arrangement.

5.2.18 Hydraulic Passenger Elevators

5.2.18.1 Provide manufacturer's standard elevator systems with standard components, published by manufacturer as included in standard pre-engineered elevator systems and as required for a complete system. Provide:

5.2.18.2 Hydraulic Silencers: Provide hydraulic silencer containing pulsation-absorbing material in a blowout-proof housing at pump unit.

5.2.18.3 Piping: Provide size, type, and weight piping recommended by manufacturer, and provide flexible connectors to minimize sound and vibration transmissions from power unit.

5.2.18.4 Provide dielectric couplings at plunger/cylinder units.

5.2.18.5 Casing for Underground Piping: PVC pipe complying with ASTM D 1785 joined with PVC fittings complying with ASTM D 2466 and solvent cement complying with ASTM D 2564.

5.2.18.6 Protective Cylinder Casings: PVC pipe casings complying with ASME A17.1.

5.2.18.7 Protective Cylinder Coating: Two or more layers of PVC tape or other coating complying with

ASME A17.1.

5.2.18.8 Corrosion Protective Filler: A solventless, petroleum-based gel formulated for filling the space between hydraulic cylinders and protective casings. Car Frame and Platform: Welded steel units.

5.2.18.9 Finish Materials: Provide the following materials and finishes for exposed parts of elevator car enclosures, car doors, hoistway entrance doors and frames, and signal equipment:

• Satin Stainless Steel: ASTM A 666, Type 304, with No. 6, non-directional satin finish.

• Rolled Steel Floor Plate: ASTM A 786/A 786M.

5.2.18.10 Passenger Elevator Operation System: Standard microprocessor operation system for the group of elevators as required to provide "group automatic operation" as defined in ASME A17.1.

5.2.18.11 Auxiliary Operations: In addition to primary operation system features, provide the following operational features for elevators including all necessary controllers and hardware.

• Standby Powered Lowering: On activation of standby power, cars are lowered to the lowest floor, open their doors, and shut down.

• Firefighter’s Emergency Operation: Provide signals, key-operated switches and related operation instruction signage as required by NFPA 72-Section 3-0.3.7 and ASME A17.1 rules 2.27.3, 2.27.6, 2.27.7 and 2.27.8.

5.2.18.12 Security Features: Security features shall not affect emergency firefighters' service.

• Keyswitch Feature: Car and hall push buttons are activated and deactivated by security keyswitches.

• Secured Landing Feature: Allows each landing to be secured or cleared. Access codes are programmed at each car operating panel using a security keyswitch. Secured landing feature is activated and deactivated by a security keyswitch at the main landing.

5.2.18.13 Provide signal equipment for group of elevators with hall-call and car-call buttons that light when activated and remain lit until call has been fulfilled.

5.2.18.14 Car Control Stations: Provide fully recessed car control stations with applied metal faceplates.

Mount in return panel adjacent to car door.

5.2.18.15 Emergency Communication System: Provide system that complies with ASME A17.1 and the U.S. Architectural & Transportation Barriers Compliance Board's "Americans with Disabilities Act (ADA), Accessibility Guidelines (ADAAG)." System provides two-way voice communication without using a handset and provides visible signals that indicate when system has been activated and when monitoring station has responded. System is contained in flush-mounted cabinet, with identification, instructions for use, and battery backup power supply.

5.2.18.15 Car Position Indicator: For passenger elevator cars, provide illuminated-signal type, digital-display type, or segmented type, located above car door or above car control station. Also provide audible signal to indicate to passengers that car is either stopping at or passing each of the floors served.

5.2.18.16 Hall Push-Button Stations: Provide one hall push-button station at each landing for each group of elevators. Locate between two elevators at center of group or at location most convenient for approaching passengers.

5.2.18.17 Hall Lanterns: Provide units with illuminated arrows

6.0 Structural

The structural design objectives are to utilize materials that work with the functionality of the building, the interior and exterior design objectives and provide durable, long lived service with minimum maintenance. All structural design shall be in accordance with;

UFC 1-200-01 “General Building Requirements”

UFC 3-301-01 “Structural Design Criteria for Buildings” UFC 3-310-04 “Seismic Design of Buildings” International Building Code 2015 2017 New York State Building Code Supplement

ASCE 7-10

ACI 362.1-12: Guide for the Design and Construction of Durable Concrete Parking Structures ACI 318-14: Building Code Requirements for Structural Concrete

Analyze, design and detail the building as a complete structural system. Design structural elements to preclude damage to finishes, partitions and other frangible, non-structural elements to prevent impaired operability of moveable components and to prevent leakage and floor or roof ponding.

Provide all calculation input data, including loads, diagrams, node diagrams and adequate documentation to illustrate and validate the design.

Design of foundation and framing to include capacity for future vertical expansion of three full floors for additional parking.

Structural calculations and structural construction documents shall be signed and sealed by a New York State licensed engineer.

6.1 Structural Foundation System

Exterior wall footing and/or grade beam depths shall meet or exceed frost depth as indicated by IBC for the geographic location.

A Site-Specific Geotechnical Report has been prepared for this project and is included in the Appendices.

This report shall be used as the basis for the D/B Contractor’s RFP response and applicable pre-award design. If the D/B Contractor chooses to utilize the provided geotechnical report as a design basis in post-award design, the D/B Contractor shall provide a project Geotechnical Engineer, as a primary Team Member. This Geotechnical Engineer, shall be the Engineer of Record in regards to interpretation and application of the RFP Geotechnical Report. It shall be the D/B contractor’s responsibility for determination of actual soil conditions present and design to suit those conditions. The contractor shall be responsible for obtaining all required drilling permits.

6.2 Structural framing system

Three optional systems are acceptable and generically described as:

1) Structural steel frame including columns and beams. Filigree panel system with waterproofing and drainage layer and concrete topping slab. Coating system for structural steel members including but not limited to:

(a) Hot dipped galvanized.

(b) High performance paint system.

2) Cast in place reinforced concrete frame with post tensioned floor slabs.

(a) Maximum tensile stress in top surface of concrete slab under working loads f’t=0 psi.

(b) Silane sealer.

(c) Concrete admixtures to include silica fume and corrosion inhibitor.

3) Precast columns and beams with precast concrete tee floor slabs.

(a) Silane sealer.

(b) Corrosion protection of connection plates to follow ACI 362.1 and the latest PCI

Design Handbook.

6.3 Structural Design Criteria

Risk Category II applies as defined by ASCE 7-10, Table 1.5-1.

Gravity Loads:

Minimum Live Loads:

Parking 40 psf Stairway 100 psf

Minimum Design Snow Load:

Ground Snow load 40 psf.

Snow drift and unbalanced conditions computed and applied per ASCE 7-10.

Roof Loads shall be combined per load combinations in the UFC and IBC.

Lateral Loads:

Minimum Design Wind Load Requirements per ASCE 7-10:

All wind loads shall be computed and applied using a design wind speed of 115 mph.

Exposure category B.

Minimum Design Seismic Load Requirements:

Seismic design loads shall be computed and applied following ASCE 7-10, UFC 3-310-04, site specific information provided in the geotechnical report and the International Building Code current edition.

Concrete:

Minimum 28 day compressive strength = 5000 psi Maximum water/cement ratio = 0.4 Concrete durability design shall assume exposure class F3 and C2 per ACI 318-14, Chapter 19.

Exterior concrete shall be air entrained.

All exterior steel components shall be hot-dip galvanized and touch up painted with galvanizing compound.

7.0 HEATING VENTILATING AND AIR-CONDITIONING (HVAC) REQUIREMENTS

7.1 GENERAL DESIGN CRITERIA:

7.1.1 The HVAC system for the garage bridge shall be designed with outdoor ambient design conditions of 88˚F DB and 72˚F WB in summer, and -6˚F DB in winter. The bridge indoor space design temperature shall be 78˚F DB at 50% RH in occupied cooling mode (summer) with a nighttime setback temperature of 88˚F. Winter heating indoor design conditions shall be and 62˚F DB with a nighttime setback temperature of 52˚F.

7.1.2 Bridge: Bridge shall be ventilated per ASHRAE 62.1 corridor requirements from a rooftop unit.

Ventilation supply air shall utilize a zone air distribution effectiveness of 0.8 due to ceiling supply of warm air and ceiling return.

7.1.3 Design shall fully comply with the following regulations:

UFC 1-300-07A, Design Build Technical Requirements UFC 1-200-01, General Building Requirements UFC 1-300-09N, Design Procedures UFC 3-310-03A, Mechanical Engineering

UFC 3-430-01FA, Heating and Cooling Distribution Systems UFC 3-470-01, Lonworks (R) Utility Monitoring and Control System (UMCS) COE Engineering Regulations, Manuals, Engineering Technical Letters (ETL) and Pamphlets (current editions) ASHRAE Standards

SMACNA

Standards IBC International Building Code IMC International Mechanical Code

IECC International Energy Conservation Code National Institute of Occupational Safety and Health (NIOSH) Standards (latest editions) Occupational Safety and Health Administration (OSHA) Standards (latest editions)

7.2 HVAC EQUIPMENT:

7.2.1 Rooftop Unit: Provide a 5-Ton vertical discharge heating and cooling rooftop unit (RTU) equal to a Daiken MPS - 005 on the roof of the bridge between the parking garage and hospital. Unit shall have a factory applied powder coated single wall steel cabinet with two stage indirect fired gas heater with aluminum heat exchanger, R-410A refrigerant DX cooling coil and filter. RTU shall be provided with manufacturers controls tied to the existing hospitals energy management system. Unit shall be mounted on 18” high curb.

7.2.2 Design Build Contractor's Designer of Record shall verify rooftop unit size in accordance with Bridge heating and cooling loads.

7.2.3 Supply duct shall be provided with duct smoke detector tied to fire alarm system for shut-down if smoke is detected. Provide supply ductwork running the length of the bridge with associated diffusers

(4) and one common return register. Sound conditions and levels for interior spaces shall comply with ASHRAE Handbook criteria for corridors.

7.2.4 Air Distribution: The HVAC system shall be ducted supply and return air, complying with VHA specifications and the latest SMACNA Standards. Supply, a n d return ductwork shall be galvanized steel. Supply and return air ductwork within 15 feet of air handling unit connections, shall be internally lined with 1-1/2” thick acoustical fiberglass liner, 1.5 lb/ft3 density, with vinyl or neoprene coating resistant to fungal growth, complying with “NAIMA Duct Liner Installation Guidelines” and ASHRAE

189.1. All register, grille and diffuser branch ducts shall be provided with a manual balancing damper, operated by locking-type quadrant operators. Access doors shall be provided for all concealed damper operators. Fire dampers shall be provided at all 2- hour fire rated construction penetrations. Fire dampers shall be 100% free area with a 165˚F fusible link. Supply and return mains shall be routed within the corridor ceiling space for easy access to branch volume dampers. All concealed supply ductwork shall be provided with 2” thick flexible fiberglass ductwork. All exhaust ductwork located within unconditioned spaces shall be provided with 3” thick flexible fiberglass insulation.

7.2.5 Provide 1” gas line from hospital to RTU.

7.3 DIRECT DIGITAL CONTROL SYSTEM

7.3.1 System Requirements: Factory-installed hardware and software to enable the VA Hospital

Energy Management system to monitor, control, and display status and alarms of rooftop unit.

7.3.2 Hardwired Points:

Room temperature.

Discharge-air temperature.

Burner operating.

7.3.3 Control System: New rooftop unit shall be added to the existing Hospital control system. RTU control system shall be microprocessor based Direct Digital Control (DDC). The DDC system shall completely, seamlessly and directly interface with the existing building Energy Management

Control System utilizing BACnet protocol. The RTU software must have seamless communications with the hospital energy management system and be capable of sending to, receiving from, and interpreting global commands with the base-wide system and resident software.

7.3.4 System Operation: The control system shall monitor Bridge space temperature via wall-mounted space temperature sensor, and maintain set point. Rooftop unit shall cycle on/off to maintain temperature set point during occupied and unoccupied hours. Temperature shall be set back during unoccupied hours.

7.4 ENERGY CONSERVATION REQUIREMENTS:

7.4.1 ENERGY PERFORMANCE: The building, including the building envelope, HVAC systems, power, and lighting systems shall be designed to achieve a non-plug load energy consumption that is at least 40% below the consumption of a baseline building meeting the minimum requirements of latest edition of ASHRAE Standard 189.1

7.4.2 REQUIRED ENERGY CONSERVATION FEATURES & TABLES: All design features not described below will be in accordance with the minimum requirements of ANSI/ASHRAE/IESNA Standard 90.1- 2010 including requirement to purchase Energy Star and FEMP designated products. Additional energy conservation features may be required to meet the above energy performance. The contractor is responsible for determining and providing additional energy conservation features to meet the energy performance requirement.

7.4.3 COMPLIANCE DOCUMENTATION: The required energy conservation features contribute to the achievement of the above energy performance and are life cycle cost effective for the facility. Use of the required energy conservation features does not eliminate the requirement for energy analysis calculations documenting compliance. The D-B contractor must document compliance with the above energy performance utilizing the methodology described in ASHRAE 90.1, Appendix G as discussed in section 01 33 16 Design After Award.

7.4.4 COMMISSIONING: Energy-related building systems shall be commissioned in accordance with the requirements of VA hospital requirements. Commissioning activities shall be completed for the following energy-related systems, at a minimum:

▪ Roof top unit

▪ Energy management control system

8.1 General Electrical Requirements:

8.1.1 Select electrical characteristics of the power system to provide a safe, efficient, and economical distribution of power based upon the size and types of loads to be served. Use distribution and utilization voltages of the highest level that is practical for the load to be served.

8.1.2 All design and construction work shall comply with the latest edition of the National Electric Code (NEC), National Electrical Safety Code (NESC), UFC 3-501-01 for electrical design criteria, and all applicable UFC (United Facilities Criteria) requirements.

8.1.3 Provide pull ropes in all spare conduits. Cap spare conduits that do not terminate in equipment. In addition, provide spare conduits as required by the I3A and UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design.

8.1.4 Fire-stop all penetrations in fire-rated elements (walls,…