About this file

Amendment 0001

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amendment_0002_SBOBA_Placement_Survey.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001_Water_Quality_Certificate.pdf PDF
W912DS-17-B-0006.pdf PDF
W912DS-17-B-0006_Table_of_Contents.pdf PDF
W912DS-17-B-0006_Plans.pdf PDF
W912DS-17-B-0006_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE70891765

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Bid opening date remains 19 July 2017 at 2:00 P.M. EST

2) Incorporate Water Quality Certif icate (WQC) for this project, to be added Section 00 90 02, Part 3.2 Attachment L. Please see attached.

3) Answ er bidder questions. Please see continuation sheet.

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods:

In the space provided on the SF 1442, by separate letter, or by signing block 15 below .

FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS17B0006

X 9B. DATED (SEE ITEM 11)

19-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Jul-2017

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS17B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0001

Maintenance Dredging of Sandy Hook Channel, New York Harbor, New York Federal Navigation Project

W912DS-17-B-0006

Amendment 0001

To Bidders

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

3. The following DRAWINGS have been ADDED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- Incorporate Water Quality Certificate (WQC) for this project, to be added Section 00 90 02, Part 3.2 Attachment L. Please see attached.

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATION SECTIONS have REVISED and REISSUED:

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED

Questions and Answers:

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)

Question 1. (Marine Ventures ) Section 01 57 20.00 10 "Environmental Protection" Paragraph

1.12 Protection of Environmental Resources states "Provide inspection coverage on a rotating , six (6) hours on and six (6) off basis. Does that mean that during a 24-hour monitoring period four different observers will be on watch e.g. one in the morning, one in the afternoon, one in the evening, and one during graveyard shift?

Answer 1. Environmental Observers shall not work no more than 6 hours at a time. Any other manning decisions are based on the labor and safety laws governing the vessel.

Question 2. Section 01 57 20.00 10 "Environmental Protection" Paragraph 1.12 Protection of Environmental Resources states "Rotate six (6) hour monitoring periods from week to week."

Must the observers switch monitoring periods on a weekly basis i.e. if an observer worked the morning shift one week then the following week that same observer must work a different shift but not the morning shift?

Answer 2. That is correct, the Environmental Observers they shall switch watch periods.

Please be aware that the quoted Section 01 57 20.00 10 "Environmental Protection", Section A "SOW for ESOs" Lines C and D are only applicable to work performed by Hopper Dredges from 15 June to 15 November. The Army Corps doubts that a hopper could complete the work, due to past inability of type.

Question 3. Do you know if there will be a UXO component to the project?

Answer 3. As solicited there is no provision for Unexploded Ordinance. No UXO has been found in recent prior maintenance dredging cycles.

Question 4. Is a chart / map available of the locations of the planned dredging operations?

Answer 4. The vicinity map and detail chart of the proposed dredging operation is included in the solicitation plans.

File details come from the government source that posted it. Updated .